project marketing summary
TRANSCRIPT
OFFSHORE SUPPORT & PRODUCTION FACILITYBUSINESS UNITRADIANT UTAMA GROUP
PRESENTATION2015
List of Projects
Newly Awarded and Current Projects• CNOOC SES LTD. – FSO Widuri
Terminal• SANTOS (SAMPANG) PTY. LTD. –
FPSO Sea Good 101• TOTAL E&P INDONESIE – Dredging
Package No.2• TOTAL E&P INDONESIE – Dredging
Package No.9• TOTAL E&P INDONESIE – River
Crossing and River Banks
Potential Projects
• TOTAL E&P INDONESIE – Dredging Package No.1
• SANTOS INDONESIA – Ande-Ande Lumut Development Project
• HUSKY-CNOOC MADURA LTD. – Floating Production Unit for the MDA-MBH Field Development
• TOTAL E&P INDONESIE – Charter of AHT, Tugboat, Crewboat, Seabus
• TOTAL E&P INDONESIE –Production Facility Maintenance
MOPU
Current Project
Project Name MOPU Conversion and Operating Services
Duration of the Project 10 years + 5 years
Project Duration April 2006 – April 2017
Contract Value USD xxx Daily Rate : xxx X-Brace per day: USD xxx Peluang per day: USD xxx Booster Compressor per day : USD xxx
Brief Description of the Project This project is intended for the installation of MOPU in Maleo Area for
Santos Indonesia. The facility supplies over 40% of gas to the industry located in East Java. Due to that reason, MOPU has become one of the most important asset of Local Government in East Java.
PT. Supraco Lines together with its Parent Company, PT. Radiant Utama Interinsco, Tbk. has provided full services for this project, starting from Engineers and Crews, installation of MOPU on site, Gas Production and MOPU maintenance.
Charter FSO for Widuri Terminal
Project Name Charter for One (1) Unit
Floating Storage Offloading (FSO)for Widuri Terminal
Duration of the Project 5 years fixed + 5 add. Years
Project Type Consortium (fee-based)
Commencement Date December 2014 – May 2019
Contract Value USD XXX Daily Rate XXX FSO Federal II
Brief Description of the Project This project is to replace existing FPSO, Lentera Bangsa, owned and operated by Trada Maritim
Tbk. Due to explosion, the project is suspended & terminated. The converted FSO will be dedicated to accommodate oil production from Charterer oilfield
concessions offshore North West Java. The FSO is now on mooring process in Widuri Terminal.
Current Project
Provision of Oyong Production Barge Services
Project Name Provision of Oyong Production Barge Services
Duration of the Project 1 year fixed + 1 additional year
Project Type Consortium with RUI and Apexindo (fee-based)
Commencement Date September 2013 – September 2014
Contract Value USD xxx Daily Rate USD xxx
Brief Description of the Project This project is dedicated to support Santos by providing FPSO in Oyong Area.
FPSO Seagood 101
Current Project
Dredging & Lifting Services – Package No. 2
• Project Name Provision of 1 Unit 150 T Crane Barge
and its Package for Dredging andLifting/Add. Works (Package-2)
• Duration of the Project 3 years
• Project Type Asset Based
• Estimated Commencement Date June 2014 – June 2017
• Estimated Contract Value USD 8 millions
• Brief Description of the Project This project main intention is to perform
dredging activities in shallow waters and coastal sea of the Mahakam Contract area in East Kalimantan.
This project is just recently commenced on October 2014.
•
Current Project
Dredging & Lifting Services – Package No. 9
• Project Name Provision of 1 Unit Crane Barge
and its Package for Dredging andLifting/Add. Works (Package-9)
• Duration of the Project 3 years
• Project Type Asset Based
• Estimated Commencement Date January 2014 – January 2017
• Contract Value USD 9 millions
• Brief Description of the Project This project main intention is to perform
dredging activities in shallow waters and coastal sea of the Mahakam Contract area in East Kalimantan.
This project starts on May 2014•
Current Project
PRODUCED WATER TREATMENT RENTAL
Future Project
Hi-Flow Test Skid Project Name Produced Water Treatment Rental
Services
Duration of the Project 6 months
Project Type Rental
Duration of Projecy November 2014 – May 2015
Contract Value USD xxx Sales xxx
Project Information
The Produced Water Treatment (PWT) to maintain quality of produced and effluent water prior to disposal overboard. The quality of produced formation water disposed overboard will be in accordance with Indonesian environmental regulation as a minimum.
For offshore installations, the maximum oil content in waste water is 50 mg/L. The facilities will be designed by the Contractor to meet an environmental target of 25 mg/L. Continuous on-line oil-in-water monitoring equipment shall be installed for continuous monitoring and recording of effluent oil levels.