Project Management
Unit 8
![Page 2: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/2.jpg)
Executing and Controlling
Executing and controlling serve as input to each other
In this unit Execution related to contract work Administration of contract work Quality Assurance Integrated Change Control
![Page 3: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/3.jpg)
Contracting Life Cycle
In Unit 5, we covered Procurement Planning Solicitation Planning
Solicitation Requesting vendors to compete for the
project Bidders Conferences Advertising
![Page 4: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/4.jpg)
Bidder Conference Prearranged meeting Prospective vendors attend to get clarification All vendors attend the meeting at the same
time.
Advertising Newspapers Professional Journals etc Internet
![Page 5: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/5.jpg)
Source Selection Receive the bids and proposals Apply Source Selection Criteria Contract negotiation Screening Systems Weighting Systems
Apply weight to each of the evaluation criteria, and decide the total score for each of the vendors
Independent Estimates
![Page 6: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/6.jpg)
Contract Administration Monitoring vendor’s performance
throughout the project Work Results (deliverables, quality, and cost) Change Requests
– Change in deliverables– Change in contract terms– Arbitration when two parties cannot come to a
conclusion. Third party involvement to avoid going to court.
– Seller Invoices
![Page 7: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/7.jpg)
Quality Assurance
Quality planning process lays out the quality standards for the project.
Quality Control Work results are monitored to see if they
meet relevant quality standards. If the results do not meet the quality standards, then the root cause analysis is done, and the cause is eliminated.
Inspection oriented.
![Page 8: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/8.jpg)
Quality Assurance Performing quality audits to determine how
the project is doing Typically a managerial process. The overall performance is evaluated to
ensure the project meets relevant quality standards.
Output : Quality Improvements Quality improvements may need Change
Requests (or corrective actions) Can be scheduled at key intervals within a
project.
![Page 9: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/9.jpg)
Quality Control
Inspections are needed to prove the performance, and compare with the requirements.
Inspections could be in the form of (some examples) Reviews Work Product Reviews Code Walkthroughs
![Page 10: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/10.jpg)
Control Chart Typically used in areas where there are
repetitive activities : manufacturing
Mean
Assignable Cause
Upper and Lower Control Limits
![Page 11: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/11.jpg)
Upper and Lower Control limits are at +/- 3 standard deviations. (σ)
Know these values
Limit Percentage
+/- 1 sigma 68.26 percent
+/- 2 sigma 95.46 percent
+/- 3 sigma 99.73 percent
+/- 6 sigma 99.99 percent
![Page 12: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/12.jpg)
If all control points fall within plus or minus three standard deviations, then the process is in control.
Or else, the process is out of control, and corrective action is needed.
Pareto Chart The 80/20 rule A small number of causes create the
majority of the problems.
![Page 13: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/13.jpg)
Statistical Sampling Taking a sample from the population and
studying the variances Quality plan will tell you when to pass or
fail the lot based on the results of the sample.
Results of Quality Control Rework Process adjustments
![Page 14: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/14.jpg)
Integrated Change Control
Changes come about for many reasons Team members may recommend a better, more
efficient way of doing a job Requirements change …….. Consider impact to the triple constraints Not all changes are implemented. Some changes may produce positive results.
![Page 15: Project Management Unit 8. Executing and Controlling Executing and controlling serve as input to each other In this unit Execution related to contract](https://reader036.vdocuments.site/reader036/viewer/2022082816/56649f3f5503460f94c5feff/html5/thumbnails/15.jpg)
Change Control Board (CCBs)decide the ‘fate’ of a change.
Configuration Management Is a subset of change control process.