1Chapter 11: Project Management
Project Management
![Page 2: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/2.jpg)
2Chapter 11: Project Management
Introduction
![Page 3: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/3.jpg)
3Chapter 11: Project Management
Previous Examples of Projects Transporting Olympic Flame (Chapter 1) Mercedes-Benz facility location (Chapter 5)
![Page 4: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/4.jpg)
4Chapter 11: Project Management
Viper Development Project
Project team given 3 years to go from concept to roadster. Needed to develop new 8.0-litter V-10 aluminum
engine and new high performance six-speed transmission.
Comparable projects usually require five years at Chrysler.
![Page 5: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/5.jpg)
5Chapter 11: Project Management
Viper Development Project con’t
Project team members hand-picked. Artemis Prestige selected to help manage
project ability to track several projects concurrently interactive use provide broad picture of entire project help identify the impact of each activity on the
ultimate completion of the project
![Page 6: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/6.jpg)
6Chapter 11: Project Management
Viper Development Project: An Overwhelming Success
First test engine required less than a year to develop.
Transmission developed in 1.5 years compared to the usual 5 to 6 years.
Many important innovations in the frame, body, and brakes were incorporated .
![Page 7: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/7.jpg)
7Chapter 11: Project Management
Zeneca Pharmaceuticals
Mission is the development of new drugs for the medical community.
The development of a new drug is a complex project with typical durations of 10 years.
![Page 8: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/8.jpg)
8Chapter 11: Project Management
Zeneca Pharmaceuticals: Major Steps in Drug Development
Preclinical Testing Investigational New Drug Human Clinical Testing
three separate phases
New Drug Application Approval
![Page 9: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/9.jpg)
9Chapter 11: Project Management
Differences Between Pharmaceutical R&D Projects and Other Industries
Final product is information rather than a physical product.
Long duration, extreme costs, and high chances for failure.
![Page 10: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/10.jpg)
10Chapter 11: Project Management
Background
Project management concerned with managing organizational activities.
Often used to integrate and coordinate diverse activities.
Projects are special types of processes.
![Page 11: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/11.jpg)
11Chapter 11: Project Management
Defining a Project
Projects are processes that are performed infrequently and ad hoc, with a clear specification of the desired objective.
![Page 12: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/12.jpg)
12Chapter 11: Project Management
Examples of Projects Constructing highways, bridges,
tunnels and dams Erecting skyscrapers, steel mills,
and homes Organizing conferences and
conventions Managing R&D projects Running political campaigns,
war operations, and advertising campaigns
![Page 13: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/13.jpg)
13Chapter 11: Project Management
Reasons for Growth in Project Operations
More Sophisticated Technology
Better-Educated Citizens More Leisure Time Increased Accountability Higher Productivity Faster Response to
Customers Greater customization for
customers
![Page 14: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/14.jpg)
14Chapter 11: Project Management
Planning the Project
![Page 15: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/15.jpg)
15Chapter 11: Project Management
Life Cycle of a Project (Stretched-S) & (Exponential)
![Page 16: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/16.jpg)
16Chapter 11: Project Management
Organizing the Project Team
Ad Hoc Project Form Weak Functional Matrix Strong Project Matrix
![Page 17: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/17.jpg)
17Chapter 11: Project Management
Types of Project Team Members
Those having a long-term relationship with the project.
Those that the PM will need to communicate with closely.
Those with rare skills necessary to project success.
![Page 18: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/18.jpg)
18Chapter 11: Project Management
Project Plans
![Page 19: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/19.jpg)
19Chapter 11: Project Management
Work Breakdown Structure
![Page 20: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/20.jpg)
20Chapter 11: Project Management
Project Master Schedule
![Page 21: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/21.jpg)
21Chapter 11: Project Management
Complexity of Scheduling Project Activities
Large number of activities Precedence relationships Limited time of the project
![Page 22: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/22.jpg)
22Chapter 11: Project Management
Planning and Scheduling Projects
Planning. Determining what must be done and which tasks must precede others.
Scheduling. Determining when the tasks must be completed; when they can and when they must be started; which tasks are critical to the timely completion of the project; and which tasks have slack and how much.
![Page 23: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/23.jpg)
23Chapter 11: Project Management
Scheduling the Project: PERT and CPM
![Page 24: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/24.jpg)
24Chapter 11: Project Management
Terminology
Activity Event Network Path Critical Path Critical Activities
![Page 25: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/25.jpg)
25Chapter 11: Project Management
Project Planning When Activity Times are Known
Inputs list of the activities that must be completed activity completion times activity precedence relationships
![Page 26: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/26.jpg)
26Chapter 11: Project Management
Project Planning When Activity Times are Known continued
Outputs graphical representation of project time to complete project identification of critical path(s) and activities activity and path slack earliest and latest time each activity can be started earliest and latest time each activity can be completed
![Page 27: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/27.jpg)
27Chapter 11: Project Management
Example
Activity Time Preceded ByA 10 --B 7 --C 5 AD 13 AE 4 B,CF 12 DG 14 E
![Page 28: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/28.jpg)
28Chapter 11: Project Management
Network Diagram
![Page 29: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/29.jpg)
29Chapter 11: Project Management
Early Start and Finish Times
![Page 30: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/30.jpg)
30Chapter 11: Project Management
Latest Start and Finish Times
![Page 31: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/31.jpg)
31Chapter 11: Project Management
Activity Slack Time
TES = earliest start time for activity
TLS = latest start time for activity
TEF = earliest finish time for activity
TLF = latest finish time for activity
Activity Slack = TLS - TES = TLF - TEF
![Page 32: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/32.jpg)
32Chapter 11: Project Management
Path Slack
Duration of Critical Path
- Path Duration
Path Slack
![Page 33: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/33.jpg)
33Chapter 11: Project Management
Activity Slack Times
Activity ES EF LS LF Slack
A 0 10 0 10 0
B 0 7 10 17 10
C 10 15 12 17 2
D 10 23 10 23 0
E 15 19 17 21 2
F 23 35 23 35 0
G 19 33 21 35 2
![Page 34: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/34.jpg)
34Chapter 11: Project Management
Project Planning When Activity Times are Uncertain
Inputs Optimistic (to), most likely (tm), and pessimistic (tp) time
estimate for each activity activity precedence relationships
Outputs graphical representation of project expected activity and path completion times variance of activity and path completion times probability that project completed by specified time
![Page 35: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/35.jpg)
35Chapter 11: Project Management
Expected Activity Time and Variance of Activity Time
tt t t
t t
eo m p
p o
4
6
62
2
![Page 36: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/36.jpg)
36Chapter 11: Project Management
Example
Activity Preceded By to tm tp te 2
A -- 2 6 7 5.50 .694
B -- 5 7 9 7.00 .444
C A 3 5 6 4.83 .250
D A 10 10 10 10.0 0.000
E B,C 3 4 5 4.0 .111
F D 8 12 13 11.5 .694
G E 2 4 8 4.33 1.000
![Page 37: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/37.jpg)
37Chapter 11: Project Management
Network Diagram with Expected Activity Times and Variances
1
2
3
4
5
6
[5.5, 0.694]
[7.0, 0.444]
[4.83, 0.250]
[10, 0.0]
[4.0, 0.111]
[4.33, 1.0]
[11.5, 0.913]A
B
C
D
E
F
G
![Page 38: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/38.jpg)
38Chapter 11: Project Management
Expected Completion Time and Variance of Path A-D-F
Expected completion time = 5.5 + 10 + 11.5=27
Path Variance = 0.694 + 0 + 0.913 = 1.607
![Page 39: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/39.jpg)
39Chapter 11: Project Management
Path Expected Times and Variances
PathExpected
Time VarianceStandardDeviation
A-D-F 27 1.607 1.27
A-C-E-G 14.66 2.055 1.43
B-E-G 15.33 1.555 1.25
![Page 40: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/40.jpg)
40Chapter 11: Project Management
Probabilities of Completion
V
timecompletion expected - timecompletion desiredz
![Page 41: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/41.jpg)
41Chapter 11: Project Management
Probability of Project Being Completed on or Before Time 25
z
25 27
127157
..
Only path A-D-F has reasonable chance of taking 25 or more:
From standard normal table in Appendix A, there is a 5.82% chance of completing project on or before time 25.
![Page 42: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/42.jpg)
42Chapter 11: Project Management
Probability of Path A-D-F being Completed on or Before Time 25
5.82%
![Page 43: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/43.jpg)
43Chapter 11: Project Management
Plan E Project Operations Network
![Page 44: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/44.jpg)
44Chapter 11: Project Management
Proper Use of Dummy Activities
![Page 45: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/45.jpg)
45Chapter 11: Project Management
Activity Expected Times and Variances
![Page 46: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/46.jpg)
46Chapter 11: Project Management
Simulating Project Completion Times with Spreadsheets
A
B
C
D
E
F
![Page 47: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/47.jpg)
47Chapter 11: Project Management
Simulating Project Completion Times
Activity Mean (days)StandardDeviation
A 32.1 1.2
B 24.6 3.1
C 22.2 2.2
D 26.1 5.2
E 34.4 6.2
F 34.5 4.1
![Page 48: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/48.jpg)
48Chapter 11: Project Management
Activity Activity Activity Activity Activity Activity Path1 Path 2 Path 3 ProjectA B C D E F (A-C-F) (B-D-F) (B-E) Finish Time
0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00
Minimum 0.00 0.00 0.00 0.00Maximum 0.00 0.00 0.00 0.00
![Page 49: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/49.jpg)
49Chapter 11: Project Management
![Page 50: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/50.jpg)
50Chapter 11: Project Management
Project Management Software Capabilities
![Page 51: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/51.jpg)
51Chapter 11: Project Management
Microsoft Project’s Gantt Chart
![Page 52: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/52.jpg)
52Chapter 11: Project Management
Pert Chart Generated by Microsoft Project
![Page 53: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/53.jpg)
53Chapter 11: Project Management
Calendar of Activities Created by Microsoft Project
![Page 54: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/54.jpg)
54Chapter 11: Project Management
Controlling the Project: Cost and Performance
![Page 55: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/55.jpg)
55Chapter 11: Project Management
Variance Report Cost standard determined using engineering
estimates or analysis of past performance Actual cost monitored and compared with cost
standard Project manager can exert control if difference
between standard and actual (called a variance) is considered significant.
![Page 56: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/56.jpg)
56Chapter 11: Project Management
Cost-Schedule Reconciliation Charts
![Page 57: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/57.jpg)
57Chapter 11: Project Management
Earned Value Chart
![Page 58: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/58.jpg)
58Chapter 11: Project Management
Goldratt’s Critical Chain
![Page 59: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/59.jpg)
59Chapter 11: Project Management
Introduction Similar issues that trouble people about working on
projects regardless of type of project unrealistic due dates too many changes resources and data not available unrealistic budget
These issues/problems related to need to make trade-offs
To what extent are these problems caused by human decisions and practices?
![Page 60: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/60.jpg)
60Chapter 11: Project Management
Three Project Scenarios
![Page 61: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/61.jpg)
61Chapter 11: Project Management
Project Completion Time Statistics
![Page 62: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/62.jpg)
62Chapter 11: Project Management
Observations Average Completion Times Implications of Assuming Known Activity
Times Shape of the Distribution Worker Time Estimates Impact of Inflated Time Estimates Student Syndrome
![Page 63: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/63.jpg)
63Chapter 11: Project Management
Multitasking
![Page 64: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/64.jpg)
64Chapter 11: Project Management
Alternative Gantt Charts for Projects A and B
![Page 65: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/65.jpg)
65Chapter 11: Project Management
Common Chain of Events Underestimate time needed to complete
project assumption of known activity times and
independent paths Project team members inflate time estimates Work fills available time
student syndrome early completions not reported
![Page 66: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/66.jpg)
66Chapter 11: Project Management
Common Chain of Events continued
Safety time misused Misused safety time results in missed
deadlines Hidden safety time complicates task of
prioritizing project activities Lack of clear priorities results in poor
multitasking
![Page 67: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/67.jpg)
67Chapter 11: Project Management
Common Chain of Events concluded
Poor multitasking increases task durations Uneven demand on resources also results due
to poor multitasking More projects undertaken to ensure all
resources fully utilized More projects further increases poor
multitasking
![Page 68: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/68.jpg)
68Chapter 11: Project Management
Reversing the Cycle
Reduce number of projects assigned to each individual
Schedule start of new projects based on availability of bottleneck resources
Reduce amount of safety time added to individual tasks and then add some fraction back as project buffer activity durations set so that there is a high probability the
task will not be finished on time
![Page 69: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/69.jpg)
69Chapter 11: Project Management
The Critical Chain
Longest chain of consecutively dependent events considers both precedence relationships and
resource dependencies
Project Buffer Feeding Buffer
![Page 70: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/70.jpg)
70Chapter 11: Project Management
Sample Network Diagram
![Page 71: Project management ppt @ bec doms](https://reader038.vdocuments.site/reader038/viewer/2022102504/54b5ab344a795993378b4580/html5/thumbnails/71.jpg)
71Chapter 11: Project Management
Project and Feeder Buffers