Page 1: Project La  Farge  – Delivering of  cement plant equipment to Kaluga region

Project La Farge – Delivering of cement plant equipment to Kaluga region.

Page 2: Project La  Farge  – Delivering of  cement plant equipment to Kaluga region

Description of the cargo

No. Description of goods Package No.Package Dims. (cm)

Ttl Volume(m3)

Weight (kg)

Qty Type L W H Net Gross

1 Tyre / бандаж 01-316KI02-C-1/4 1 Ba 660 660 163 71,003 77 562 79 200

2 Tyre / бандаж 01-316KI02-C-2/4 1 Ba 660 660 163 71,003 77 562 79 200

3 Tyre / бандаж 01-316KI02-C-3/4 1 Ba 645 645 143 59,492 49 443 51 000

4 Expansion joint / Температурный компенсатор CBMI-FER-M-C-012-8/8 1 Ca 670 660 250 110,550 12 506 14 526

5 Shell of Cement Mill/корпус шаровой мельницы 01-416MB07-1/1 1 T 1 763 443 449 350,673 125 165 126 315

6 Main drive / главный редуктор 1/4 1 Ca 650 375 385 93,844 69 500 74 000

7 Grinding bowl / размольная чаша GP-033 1 Ba 521 521 241 65,417 70 000 70 000

8 Helical gear unit / геликоидальное зубчатое колесо GP-036-FL 1 Ca 583 399 387 90,023 105 000 111 000

ИТОГО 8 912,004 586 738 605 241

Page 3: Project La  Farge  – Delivering of  cement plant equipment to Kaluga region

Discharging of equipment in the port of Novorossiysk

Page 4: Project La  Farge  – Delivering of  cement plant equipment to Kaluga region

Reloading of the equipment from sea-river going vessel on board the barge in Dzerzhink.

Page 5: Project La  Farge  – Delivering of  cement plant equipment to Kaluga region

Reloading of the equipment from sea-river going vessel on board the barge in Dzerzhink.

Page 6: Project La  Farge  – Delivering of  cement plant equipment to Kaluga region

Discharging of the equipment from the barge on the trucks in Kaluga.

Page 7: Project La  Farge  – Delivering of  cement plant equipment to Kaluga region

Delivering of the equipment from Kaluga to La Farge job site, Ferzikovo.

Page 8: Project La  Farge  – Delivering of  cement plant equipment to Kaluga region

Discharging of the equipment from the trucks by hydraulic lifting system of the trailer at La Farge job site, Ferzikovo.