project involvement and construction
TRANSCRIPT
![Page 1: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/1.jpg)
Projects in which I was involved.
![Page 2: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/2.jpg)
HV transformer installation.
![Page 3: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/3.jpg)
Installation of S/S protection panels and equipment.
![Page 4: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/4.jpg)
Earthmat testing. Earthmat inspections.
![Page 5: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/5.jpg)
Substation fall off potential test, step and touch voltage measurements and earthing testing.
![Page 6: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/6.jpg)
Substation fall off potential test.
![Page 7: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/7.jpg)
132kV 5 Pole structure replacement with 132kV monopolesThe existing pole structures were damaged by woodpeckers and deteriorated over years. The challenge was to replace the structures with steel mono poles with the minimum outage time. The line could only be switched off over weekends which was a huge challenge for this project.
The picture is before construction began during the surveying stage to compile a report on the condition of the structures.
![Page 8: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/8.jpg)
132kV 5 Pole structure replacement with 132kV monopoles.
The new 132kV strain mono pole in place.
![Page 9: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/9.jpg)
Mini subs and RMU installations.
![Page 10: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/10.jpg)
Metering audits, Installation and verification.
![Page 11: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/11.jpg)
Metering audits, Installation and verification.
![Page 12: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/12.jpg)
Condition assessments of the reticulation network in Angola.
![Page 13: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/13.jpg)
Commercial property development in Cabinda, West Africa. Maintenance Building under construction.
![Page 14: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/14.jpg)
Maintenance Building in construction phase.
Completed Maintenance Building.
![Page 15: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/15.jpg)
Residential renewable energy installation, PV Cells, controller and
battery's.
![Page 16: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/16.jpg)
PV controller and DB boards.
![Page 17: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/17.jpg)
Generator standby plant installation.
![Page 18: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/18.jpg)
Generator ATS panel.
![Page 19: Project involvement and construction](https://reader036.vdocuments.site/reader036/viewer/2022062523/587b40a81a28ab9c0e8b592d/html5/thumbnails/19.jpg)
DC power for telecommunication sites.