project involvement and construction

19
Projects in which I was involved.

Upload: arno-kanter

Post on 15-Apr-2017

51 views

Category:

Engineering


5 download

TRANSCRIPT

Page 1: Project involvement and construction

Projects in which I was involved.

Page 2: Project involvement and construction

HV transformer installation.

Page 3: Project involvement and construction

Installation of S/S protection panels and equipment.

Page 4: Project involvement and construction

Earthmat testing. Earthmat inspections.

Page 5: Project involvement and construction

Substation fall off potential test, step and touch voltage measurements and earthing testing.

Page 6: Project involvement and construction

Substation fall off potential test.

Page 7: Project involvement and construction

132kV 5 Pole structure replacement with 132kV monopolesThe existing pole structures were damaged by woodpeckers and deteriorated over years. The challenge was to replace the structures with steel mono poles with the minimum outage time. The line could only be switched off over weekends which was a huge challenge for this project.

The picture is before construction began during the surveying stage to compile a report on the condition of the structures.

Page 8: Project involvement and construction

132kV 5 Pole structure replacement with 132kV monopoles.

The new 132kV strain mono pole in place.

Page 9: Project involvement and construction

Mini subs and RMU installations.

Page 10: Project involvement and construction

Metering audits, Installation and verification.

Page 11: Project involvement and construction

Metering audits, Installation and verification.

Page 12: Project involvement and construction

Condition assessments of the reticulation network in Angola.

Page 13: Project involvement and construction

Commercial property development in Cabinda, West Africa. Maintenance Building under construction.

Page 14: Project involvement and construction

Maintenance Building in construction phase.

Completed Maintenance Building.

Page 15: Project involvement and construction

Residential renewable energy installation, PV Cells, controller and

battery's.

Page 16: Project involvement and construction

PV controller and DB boards.

Page 17: Project involvement and construction

Generator standby plant installation.

Page 18: Project involvement and construction

Generator ATS panel.

Page 19: Project involvement and construction

DC power for telecommunication sites.