LS3P SOUTH POINT HIGH SCHOOL SECURE VESTIBULE 9201-201460
GASTON COUNTY SCHOOLS April 28, 2020
Addendum No. 4
ADDENDUM 4 Page - 1
ADDENDUM NO. 4
Date of Addendum: April 28, 2020
Project Name: South Point High School Secure Vestibule
PROJECT INFORMATION
A. Owner: Gaston County Schools
B. Architect: LS3P
C. Architect Project Number: 9201-201460.
NOTICE TO BIDDERS
A. This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders
and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede
information in the Project Manual, Drawings, and previously issued Addenda. Portions of the
Addendum affecting the Contract Documents will be incorporated into the Contract by
enumeration of the Addendum in the Owner/Contractor Agreement.
B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid
Form.
ATTACHMENTS
A. This Addendum includes the following attached Sheets:
1. Architectural Sheet AD-100 – DEMOLITION PLAN, dated 4/28/2020, (reissued).
REVISIONS TO DRAWING SHEETS
A. Replace Sheet AD-100 – DEMOLITION PLAN with revised Sheet AD-100, included in the
Attachments.
CLARIFICATIONS
A. RFI #4 – Alternate #1 Question
Pinnix General Contractors: Will the new curtain wall systems have new sun shades,
reuse existing or none at all? On A201 it appears there is a sun shade, however on the
enlarged elevation on A202 there is not one shown.
LS3P SOUTH POINT HIGH SCHOOL SECURE VESTIBULE 9201-201460
GASTON COUNTY SCHOOLS April 28, 2020
Addendum No. 4
ADDENDUM 4 Page - 2
LS3P: Provide new sunshades compatible with selected curtain wall system, to replace
existing shade devices. Refastening of existing components would result in damage to the
proposed new curtain wall.
B. RFI #5 – Alternate #1 Question
Pinnix General Contractors: There are horizontal blinds on the existing curtain wall
windows. Are we to remove and reinstall on the new curtain walls or provide and install
new?
LS3P: Install new blinds on all replaced units.
C. RFI #6 – Alternate #1 Question
Pinnix General Contractors: The condensate lines for the mini splits are running through
the windows to be replaced on the east elevation. I could not access the inside to see how
these are routed on the interior due to asbestos abatement at this time. Are these to be
removed and reinstalled in the new storefronts or relocated to a new penetration through
the wall?
LS3P: These lines should be rerouted through the new curtainwall/storefront units where
insulated metal infill panels (Mapes or similar) are provided to match existing.
D. RFI #7 – Alternate #1 Question
Pinnix General Contractors: There are what appear to be 1.5” copper condensate drain
lines that are penetrating the existing curtain wall frames. Are these to be removed and
reinstalled in the new curtain wall frames or in a new wall penetration?
LS3P: Lines would be reinstalled similar to response for item C, routed through insulated
panel and not through the structure of the curtain wall framing.
END OF DOCUMENT 009113
UP
DN
2
CONFERENCE
3
CONFERENCE
4
ASST
PRINCIPAL
5
PRINCIPAL
6
EQUIP
7
HEALTH
8
HEALTH
9
TLT
11
SRO OFFICE
12
COUNSELOR
13
VAULT
14
TLT
15
TLT
16
PUBLIC
LOBBY
WALL TO
REMAIN
22
CONF.
23
CLASSROOM
02
13
0703
01
7'-
4 1
/2"
10'-11 3/4"
04
14
05
EQEQ
08
09
09
A-202 A4
10
SC
OP
E O
F W
OR
K
PHOTO A1
A. NUMBERED KEY NOTES DO NOT IMPLY SEQUENCE. CONTRACTOR TO PERFORM DEMOLITION WORK AS REQUIRED PER WORK SEQUENCE.
B. DEMOLITION DRAWINGS ARE INTENDED TO SHOW GENERAL AREAS OF DEMOLITION AS WELL AS GENERAL EXISTING CONDITIONS. THEY DO NOT SHOW ALL WORK WHICH MAY BE NECESSARY. COMPARE WITH DRAWINGS INDICATING NEW CONSTRUCTION.
C. REFER TO OTHER DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON DEMOLITION. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION ON MECHANICAL AND ELECTRICAL DEMOLITION.
D. EXISTING WORK TO REMAIN SHALL BE TEMPORARILY SECURED, BRACED AND STABILIZED UNTIL PERMANENT CONSTRUCTION IS IN PLACE.
E. VERIFY FIELD CONDITIONS PRIOR TO START OF DEMOTION/CONSTRUCTION AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES.
F. VERIFY THAT CONSTRUCTION INDICATED FOR REMOVAL IS NOT LOAD BEARING OR IS ADEQUATELY SHORED AS INDICATED ON STRUCTURAL DRAWINGS PRIOR TO STARTING ANY WORK.
G. ERECT BARRICADES, FENCES OR OTHER SECURABLE MEANS TO PREVENT UNAUTHORIZED ACCESS INTO CONSTRUCTION ZONES.
H. DO NOT ALLOW MATERIAL AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOB SITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. NO ON-SITE SALE OR BURNING OF REMOVED ITEMS IS PERMITTED.
I. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT OF INSULATION, WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE TO REMAIN.
J. TERMINATE AND CAP ANY UTILITY IN WALLS CEILINGS AND FLOORS TO BE REMOVED AND NOT INTENDED FOR REUSE.
K. PREPARE AND PATCH SURFACES THAT RECEIVE NEW FINISHES AS REQUIRED BY REMOVING OR RELOCATING DEVICES, WIRING OR OTHER APPURTENANCES NO LONGER APPROPRIATE FOR THE NEW USE OF THE ROOM.
L. MAINTAIN EXISTING FINISHES, OPERATIONAL CHARACTERISTICS, AND APPEARANCE OF ITEMS SCHEDULED TO REMAIN OR BE REUSED.
M. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.
DEMOLITION PLAN SHEET NOTES
LEGEND
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
EXISTING EQUIPMENT TO REMAIN
SALVAGE EXTERIOR SIGNAGE. CAREFULLY DETACH FROM EXISTING CONSTRUCTION, CLEAN, AND PREVENT DAMAGE. STORE IN A SECURE AREA UNTIL DELIVERY TO OWNER.
SALVAGE EXTERIOR SECURITY EQUIPMENT FOR REUSE
REMOVE BENCH AND RELOCATE AT OWNER'S DISCRETION
DATE:
PROJECT:
REVISIONS:
TEL. 704.333.6686 FAX 704.333.2926
CHARLOTTE, NORTH CAROLINA 28202
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2020 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS AND
DOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSION
FROM LS3P ASSOCIATES LTD.
227 WEST TRADE STREET SUITE 700
WWW.LS3P.COM
4/2
7/2
020 4
:25:2
8 P
M
BIM
360:/
/So
uth
Po
int
Hig
h S
ch
oo
l/A
rch
_S
ou
thP
oin
tHS
_2018.r
vt
9201-201460
04/13/2020
DEMOLITIONPLAN
AD-100
SOUTH POINT HIGHSCHOOL - SECUREVESTIBULE &FACADEIMPROVEMENTS
BID DOCUMENTS
GASTON COUNTYSCHOOLS
1/4" = 1'-0"B1
DEMOLITION PLANKEY PLAN
EXISTING
BUILDING
EXISTING
BUILDING
A
N
PROJECT
NORTH
TRUE
NORTH
N
EXISTING
BUILDING
EXISTING
BUILDING
A
N
PROJECT
NORTH
TRUE
NORTH
N
N
PROJECT
NORTH
TRUE
NORTH
N
N
PROJECT
NORTH
TRUE
NORTH
N
NTSA1
PHOTO
DEMOLITION NUMBERED NOTES
01 CUT FLOOR SLAB AS REQUIRED BY STRUCTURAL FOR NEW COLUMN FOOTING. ATTOILET, CAREFULLY REMOVE TILES FOR REINSTALLATION AFTER COMPLETION OF WORK.
02 REMOVE EXISTING DOOR, FRAME, AND STOREFRONT SYSTEM. PREP OPENING TORECIEVE NEW STOREFRONT ENTRANCE SYSTEM.
03 EXISTING FLOOR AND BASE FINISH TO REMAIN. PATCH AS REQUIRED BY WORK.REPLACEMENT FINISHES TO BE COMPLETED AS SEPARATE PROJECT, NIC.
04 REMOVE EXISTING HOSE BIBB AND CAP PLUMBING AS REQUIRED BY MECHANICALDRAWINGS
05 DEMOLISH EXISTING PAVING AND GRATE. INFILL GRADE TO PROVIDE FLUSH CONDITIONFOR NEW WORK.
07 REMOVE EXISTING WINDOW AND FRAME.PREP OPENING FOR INFILL AND NEW WINDOWUNIT. CUT EXISTING SPANDREL CMU BLOCK AS REQ'D FOR HEIGHT OF NEW SILL.
08 DEMOLISH EXISTING SIDEWALK
09 CLEAN AND PREP EXISTING BRICK SURFACES FOR PAINTING AND FINISHES ASSCHEDULED
10 SALVAGE EXISTING MEMORIAL PLAQUE
13 REMOVE EXISTING DOOR AND FRAME. INFILL OPENING WITH NEW CMU BLOCK TO MATCHEXISTING. PAINT WALL CORNER TO CORNER ON BOTH SIDES OF OPENING.
14 DISCONNECT AND SALVAGE EXISTING DOOR SECURITY DEVICES FOR LATER REUSE.