Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No Item Description Type Initial Estimat. Cost/Allocated amount LOAN (EUR) Actual Cost/Allocated amount LOAN (EUR) Actual Cost/Allocated amount With Government Contribution (EUR) Contracted Amount (EUR) Proc. Method Prior / Post review No of packages TSU/PMN Finalize Shortlist, TS, TOR, RF, Bidding Doc/Invitation to Quote TSU Submit to IBRD for NO: Shortlist, TS, TOR, RF, Bidding Doc/Invitation to Quote Approved Shortlist, TS, TOR, RF, Bidding Doc/Invitation to Quote SPN/ REoI Invitation of Bids/Tender Invitation Bid opening-Technical/Financial Request and NO for Technical Evaluation/Qualification Request and NO for final evaluation Contract award/Signing Contract completion Commited Disbursed Activity Status Funds from contracts that ended without exhausting the entire contracted amount 1 A.1.0 Secondary and Tertiary Care Reform Strategy Implementation 2 A-101 TA health institutions network & norms and standards and STC Basic Benefits Package 3 A-101.1 Int TA health institutions Hospital Optimization Plan ( Jaanus Pikani) (Contract + Contract Am No. 1) CS IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 - 25-Jan-12 - 07-Feb-12 29-Feb-12 30-Nov-12 Contract signed&in progress 0.0 4 A-101.2 Int TA for STC Basic Benefits Package (Euro Health Group) CS CQS Prior 1 Dec-10 Apr 06, 2011 May 9, 2011 May 12, 2011 - 07-Jul-11 July 22, 2011 August 3, 2011 23-Feb-12 30-Nov-12 Contract signed&in progress 0.0 5 A-101.3/1 Loc TA Hospital Optimization Plan (Sadeta Lopičić) CS IC Post 1 June/July 2012 Aug-12 Aug-12 - - 07-Sep-12 - - 10-Sep-12 31-Dec-12 Contract signing n progress 0.0 A-101.3/2 Loc TA Hospital Optimization Plan (Milan Mirković) CS IC Post 1 June/July 2012 Aug-12 Aug-12 - - 07-Sep-12 - - 10-Sep-12 31-Dec-12 Contract signing n progress 0.0 6 A-101.4 Loc TA for STC Basic Benefits Package (Institute for Public Health of MNE) CS SSS Prior 1 Apr-11 June 29, 2011 July 13, 2011 - - - - - 01-Nov-11 31-Dec-12 Contract signed&in progress 0.0 A-102 Analytical study on HR in Health System in MN A-102.1 Analytical study on HR in Health System in MN 0.00 0.0 0.0 7 A-103 STC payment model design and implementation 8 A-103.1 Int TA STC payment model design and implementation (T.i.n.s. llc and Karol Consulting llc) CS CQS Prior 1 Oct/Nov 2010 February 2, 2011 February 2, 2011 Nov 23, 2010 - Dec 17, 2010 February 04, 2011 February 11, 2011 June 3, 2011 November 30, 2012 Contract signed&in progress 0.0 9 A-103.2-1 Loc TA for Adoption of the AR-DRG Patient Classification System, Hospital Payment System and Contracting (Vladimir Dobričanin) CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12 Contract signed&in progress 0.0 10 A-103.2-2 Loc TA for Adoption of the AR-DRG Patient Classification System, Hospital Payment System and Contracting (Mirjana Đukić) CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12 Contract signed&in progress 0.0 11 A-103.2-3 Loc TA for Adoption of the AR-DRG Patient Classification System, Hospital Payment System and Contracting (Andrija Vujović) CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12 Contract signed&in progress 0.0 12 A-103.2-4 Loc TA for Adoption of the AR-DRG Patient Classification System, Hospital Payment System and Contracting (Sadeta Lopičič) CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12 Contract signed&in progress 0.0 13 A-103.2-5 Loc TA for Adoption of the AR-DRG Patient Classification System, Hospital Payment System and Contracting (Dragana Milonjić) CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12 Contract signed&in progress 0.0 14 A-103.2-6 Loc TA for Adoption of the AR-DRG Patient Classification System, Hospital Payment System and Contracting (Milijana Đukanović) CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12 Contract signed&in progress 0.0 15 A-103.3 Purchasing DRG Licence G DC Prior 1 - - - - - - - - - Dec-12 Trial Version Contract 0.0 16 A-103.4 Purchasing DRG Casemix Material G CoE Disbursed and goods 0.0 17 A-104 Private public integration 18 A-104.1 Int TA Private public integration (Hernan Fuenzalida- Puelma)(Contract+Contract Am. 1) CS IC Prior 1 May/June 2011 Jun-11 Jun-11 May 6, 2011 - June 2, 2011 June 16, 2011 June 17, 2011 Aug-11 Oct-12 Contract signed&in 0.0 19 A-104.2/1 Loc TA - Integration of private HC institutions into the network of health institutions (Dragoljub Perović) CS SSS Prior 1 May-11 June 20, 2011 June 22, 2011 - - - June 22, 2011 June 23, 2011 June 25, 2012 Contract signed&in progress 0.0 20 A-104.2/2 Loc TA - Integration of private HC institutions into the network of health institutions (Milan Mirković) CS SSS Prior 1 May-11 June 20, 2011 June 22, 2011 - - - June 22, 2011 June 23, 2011 June 25, 2012 Contract signed&in progress 0.0 21 A-104.2/3 Loc TA - Integration of private HC institutions into the network of health institutions (Mladen Filipović) CS SSS Prior 1 May-11 June 20, 2011 June 22, 2011 - - - June 22, 2011 June 23, 2011 June 25, 2012 Contract signed&in progress 0.0 22 A-104.2/4 Loc TA - Integration of private HC institutions into the network of health institutions (Srđan Popović) CS SSS Prior 1 May-11 June 20, 2011 June 22, 2011 - - - June 22, 2011 June 23, 2011 June 25, 2012 Contract signed&in progress 0.0 23 A-105 TA for Quality Assurance Strategic Framework (QA Model Design&Impl.) and Clinical Guidelines and Protocols Development and Revision 24 A-105.1 Int TA for QA Strategic Framework (QA Model Design&Impl.) and Cl. Guidelines and protocols dev. and revision (Ana Stavljenic-Rukavina) CS IC Prior 1 Dec-10 February 28, 2011 Apr-11 February 14, 2011 - March 01, 2011 April 22, 2011 - May 20, 2011 December 1, 2012 Contract signed&in progress 0.0 25 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines (Goran Nikolić) CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 Contract signed&in 0.0 26 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines (Abedin Adžović) CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 Contract signed&in progress 0.0 ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of September 24, 2012) Component A: Health Policy Reform Subcomponent A.1: Health Policy Development and Capacity Development 72968 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 03-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

WITH INITIAL COST ESTIMATES

No

Item Description

Type

Init

ial

Est

imat

. C

ost

/All

oca

ted a

mount

LO

AN

(E

UR

)

Act

ual

Cost

/All

oca

ted a

mount

LO

AN

(EU

R)

Act

ual

Cost

/All

oca

ted a

mount

Wit

h G

over

nm

ent

Contr

ibuti

on (

EU

R)

Contr

acte

d A

mount

(EU

R)

Pro

c. M

ethod

Pri

or

/ P

ost

rev

iew

No o

f pac

kag

es

TS

U/P

MN

Fin

aliz

e S

hort

list

, T

S, T

OR

,

RF

, B

iddin

g D

oc/

Invit

atio

n t

o Q

uote

TS

U S

ubm

it t

o I

BR

D f

or

NO

: S

hort

list

,

TS

, T

OR

, R

F, B

iddin

g D

oc/

Invit

atio

n t

o

Quote

Appro

ved

Short

list

, T

S, T

OR

, R

F,

Bid

din

g D

oc/

Invit

atio

n t

o Q

uote

SP

N/

RE

oI

Invit

atio

n o

f B

ids/

Ten

der

Invit

atio

n

Bid

open

ing-T

echnic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tec

hnic

al

Eval

uat

ion/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

final

eval

uat

ion

Contr

act

awar

d/S

ignin

g

Contr

act

com

ple

tion

Com

mit

ed

Dis

burs

ed

Act

ivit

y S

tatu

s

Funds

from

contr

acts

that

ended

wit

hout

exhau

stin

g t

he

enti

re c

ontr

acte

d a

mount

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and

STC Basic Benefits Package

3 A-101.1 Int TA health institutions Hospital Optimization Plan (Jaanus

Pikani) (Contract + Contract Am No. 1)CS IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 - 25-Jan-12 - 07-Feb-12 29-Feb-12 30-Nov-12

Contract

signed&in

progress

0.0

4 A-101.2 Int TA for STC Basic Benefits Package (Euro Health

Group)CS CQS Prior 1 Dec-10 Apr 06, 2011 May 9, 2011

May 12,

2011- 07-Jul-11 July 22, 2011

August 3,

201123-Feb-12 30-Nov-12

Contract

signed&in

progress

0.0

5 A-101.3/1 Loc TA Hospital Optimization Plan (Sadeta Lopičić) CS IC Post 1June/July

2012Aug-12 Aug-12 - - 07-Sep-12 - - 10-Sep-12 31-Dec-12

Contract

signing n

progress

0.0

A-101.3/2 Loc TA Hospital Optimization Plan (Milan Mirković) CS IC Post 1June/July

2012Aug-12 Aug-12 - - 07-Sep-12 - - 10-Sep-12 31-Dec-12

Contract

signing n

progress

0.0

6 A-101.4 Loc TA for STC Basic Benefits Package (Institute for

Public Health of MNE)CS SSS Prior 1 Apr-11

June 29,

2011July 13, 2011 - - - - - 01-Nov-11 31-Dec-12

Contract

signed&in

progress

0.0

A-102 Analytical study on HR in Health System in MNA-102.1 Analytical study on HR in Health System in MN 0.00 0.0 0.0

7 A-103 STC payment model design and implementation

8 A-103.1 Int TA STC payment model design and implementation

(T.i.n.s. llc and Karol Consulting llc)CS CQS Prior 1

Oct/Nov

2010

February 2,

2011

February 2,

2011

Nov 23,

2010- Dec 17, 2010

February 04,

2011

February 11,

2011June 3, 2011

November

30, 2012

Contract

signed&in

progress

0.0

9 A-103.2-1

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Vladimir

Dobričanin)

CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12

Contract

signed&in

progress

0.0

10 A-103.2-2

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Mirjana

Đukić)

CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12

Contract

signed&in

progress

0.0

11 A-103.2-3

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Andrija

Vujović)

CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12

Contract

signed&in

progress

0.0

12 A-103.2-4

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Sadeta

Lopičič)

CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12

Contract

signed&in

progress

0.0

13 A-103.2-5

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Dragana

Milonjić)

CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12

Contract

signed&in

progress

0.0

14 A-103.2-6

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Milijana

Đukanović)

CS IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12 Nov-12

Contract

signed&in

progress

0.0

15 A-103.3 Purchasing DRG Licence G DC Prior 1 - - - - - - - - - Dec-12Trial Version

Contract 0.0

16 A-103.4 Purchasing DRG Casemix Material G CoEDisbursed

and goods 0.0

17 A-104 Private public integration

18 A-104.1 Int TA Private public integration (Hernan Fuenzalida-

Puelma)(Contract+Contract Am. 1)CS IC Prior 1

May/June

2011Jun-11 Jun-11 May 6, 2011 - June 2, 2011 June 16, 2011 June 17, 2011 Aug-11 Oct-12

Contract

signed&in 0.0

19 A-104.2/1 Loc TA - Integration of private HC institutions into the

network of health institutions (Dragoljub Perović)CS SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

Contract

signed&in

progress

0.0

20 A-104.2/2 Loc TA - Integration of private HC institutions into the

network of health institutions (Milan Mirković)

CS SSS Prior 1 May-11June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

Contract

signed&in

progress

0.0

21 A-104.2/3 Loc TA - Integration of private HC institutions into the

network of health institutions (Mladen Filipović)CS SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

Contract

signed&in

progress

0.0

22 A-104.2/4 Loc TA - Integration of private HC institutions into the

network of health institutions (Srđan Popović)CS SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

Contract

signed&in

progress

0.0

23 A-105 TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision

24 A-105.1

Int TA for QA Strategic Framework (QA Model

Design&Impl.) and Cl. Guidelines and protocols dev. and

revision (Ana Stavljenic-Rukavina)

CS IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

March 01,

2011

April 22,

2011- May 20, 2011

December 1,

2012

Contract

signed&in

progress

0.0

25 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines

(Goran Nikolić)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in 0.0

26 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines

(Abedin Adžović)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in

progress

0.0

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of September 24, 2012)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

72968

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

27 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines

(Vesna Miranović)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in 0.0

28 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines

(Filip Vukmirović)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in

progress

0.0

29 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines

(Sreten Kavarić) (Contract+Contract Am. 1)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in

progress

0.0

30 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines

(Nada Rondović)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in 0.0

A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 Contract 0.0

31 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in

progress

0.0

A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 Contract 0.0

32 A-105.2/9/2 Loc TA for developing Clinical Protocols and Guidelines

(Vladimir Todorovic)CS SSS Prior 2 May-11 June 2, 2012 June 7, 2012 - - - - - July 1, 2012 31-Dec-12

Contract

signed&in

progress

0.0

33 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines

(Ljubica Pejakov)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in

progress

0.0

34 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines

(Dragan Laušević)CS SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012

Contract

signed&in

progress

0.0

35 A-106 TA PR campaign design and implementation

36 A-106.1 Loc TA - Capacity Building & Implementation of Public

Information Campaign (Lazar Pejović)CS IC Post 1

Aug/Sep

20119-Sep-11 28-Sep-11 4-Oct-11 - 10-Nov-11 - - Dec-11 Dec-12

Contract

signed&in

progress

0.0

37 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC)

(Gorica Soković) (Contract+Contract Am. 1)CS SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 31-Dec-12

Contract

signed&in 0.0

38 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC)

(Vesna Nikaljević) (Contract+Contract Am. 1)CS SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 31-Dec-12

Contract

signed&in 0.0

39 A-106.3Loc TA - PR Strategy materials design & production (Video

Material) (Produkcija Vjeverica llc)G S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 23-Jul-12

Contract

signed&in 0.0

40 A-106.3/1Loc TA - PR Strategy materials design & production (Web

Site to support MHSIP) (Baroom Baroom llc)G S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 21-Aug-12

Contract

signed&in 0.0

41 A-106.3/2Loc TA - PR Strategy materials design & production

(Photographs) (Baroom Baroom llc)G S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 01-Aug-12

Contract

signed&in 0.0

42 A-107 MoH capacity development

43 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical

cancer)) (Milutin Bulajić) (Contract+Contract Am. 1)

CS IC Post 1 Mar-11April 5,

2011

April 22,

2011

February 21,

2011-

March 15,

2011- - May 25, 2011 31-Dec-12

Contract

signed&in

progress

0.0

44 A-107.2Loc TA for Development of National Colorectal Cancer

Prevention Program (Brigita Smolović)CS IC Post 1 Jun-11

June 30,

2011July 11, 2011 - - 20-Jul-11 - - 27-Jul-11 5-Jun-12

Contract

completed0.0

45 A-107.3 Loc TA for Development of National Cervical Cancer

Prevention Program (Milovan Jovanovic)CS IC Post 1 Jun-11

July 26,

2011

August 4,

2011- - 12-Aug-11 - - 25-Aug-11 5-Jun-12

Contract

completed0.0

A-107.3 National Health Account (NHA) TR

46 A-1.1 Institutional Development of the Drugs Agency

47 A-111 TA Policy and capacity development

48 A-111.2Int TA for capacity development (In-country Training)

(ALIMS Serbia)(Contract+Con. Am.1)CS CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

February

24,2011- - May 15, 2011 31-Jul-11

Contract

completed0.0

49 A-111.3Drugs Agency capacity development, out-of-country Training,

conducted in ALIMS, Belgrade, SerbiaTR SoE Post Multi Oct-10

Nov 24,

2010

February 8,

2011

Activity

completed0.0

50 A-111.3/1Study Tour (Belgrade, HC Quality&Accreditation in SEE

countries, March 16-18, 2011) (Jadranka Lakicevic and

Lorena Vlahovic)

TR SoE Post 1 Mar-11 18-Mar-11 18-Mar-11Activity

completed0.0

51 A-111.3/2Drugs Agency capacity development, out-of-country Training,

conducted in HALMED, Zagreb, CroatiaTR SoE Post Multi May-12 8-May-12 9-May-12

Activity

completed0.0

52 A-112 Information system for the Drugs' Agency

53 A-112.1 Drugs' Agency Software development - Web Portal, DMS and

eCTD validation and review software (MG Soft)G ICB Prior 1

Jan-Sep

201119-Sep-11 02-Nov-11 - 5-Nov-11 16-Dec-11 - 02-Mar-12 03-Apr-12 29-Nov-12

Contract

signed&in

progress

0.0

54 A-1.2 Trainings / study tours

55 A-120 Trainings / study tours (WG Capacity Dev.) TR Remaining amount/Throughout the life of the projectThroughout

the life of the

56 A-120/1

PR WG&PMN representatives/study visit to Macedonian HIF,

Skopje, June 27-29, 2011 (Amer Ramusovic, Lidija

Scepanovic&Boba Vukoslavovic)

TR SoE Post 1 Jun-11 21-Jun-11 22-Jun-11 29-Jun-11Activity

completed0.0

57 A-120/2Workshop "Guidelines for Good Clinical Practice", Sep

30, 2011, at Med. Fac in Podgorica, METR SoE Post 1 Sep-11 27-Sep-11 28-Sep-11 30-Sep-11

Activity

completed0.0

58 A-120/34 Workshops "Guidelines for Good Clinical Practice", Feb-

May, 2012TR SoE Post 4 Dec-11 28-Dec-11 4-Jan-12 26 Apr, 2012

Activity

completed0.0

59 A-120/4

ST for memebrs of the PPP WG to attend the 7th Annual

PPP in CEE/SEE Conference (April 18-20, 2012, Vienna,

Austria) (Cirgic, Todorovic, Filipovic)

TR SoE Post 1 Mar-12 Marr 9, 2012 13-Mar-12 20-Apr-12Activity

completed0.0

60 A-120/5

Study Tour (visit to the Agency for Quality and

Accreditaion of Serbia, Belgrade, May 23-25, 2012)

(Jadranka Lakicevic and Lorena Vlahovic)

TR SoE Post 1 May-12 10-May-12 10-May-12 25-May-12Activity

completed0.0

A-120/6 Project Closing Workshop

Subtotal A.1:

Page 3: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

61 A.2.0 Hospital Information System/Hardware G 1ST ICB Prior 1May-Oct

201124-Oct-11 17-Nov-11

62 A.2.0/Lot 1 Storadge system and Servers G 1ST ICB Prior 1May/-Oct

201125-May-12 5-Jun-12 - 7-Jun-12 19-Jul-12 - Aug-12 Sep-12 Dec-12

NO to BER

in progress0.0

63 A.2.0/Lot 2 Work stations and Printers (Informatika Montenegro llc) G IST ICB Prior 1May/-

Oct201124-Oct-11 17-Nov-12 - 22-Nov-11 31-Jan-12 - 25-Apr-12 12-Jun-12 4-Sep-12

Contract

completed, 0.0

64 A.2.1 Information System / Software G

65 A-210Health Information System / Software for MOH (Consortium

Saga/Saga CG)G ICB Prior 1

Jan-July

201126-Jul-11 21-Oct-11 - 25-Oct-11 20-Dec-11 - 12-Mar-12 3-Apr-12 21-Aug-12

Contract

signed&in

progress

0.0

66 A-211 Health Information System / Software for IPH (MG Soft) G ICB Prior 1June/July

20113-Oct-11 15-Nov-11 - 18-Nov-11 24-Jan-12 - 27-Feb-12 14-Mar-12 20-Dec-12

Contract

signed&in

progress

0.0

67 A-211.1 Loc TA - System Analyst for the IPH (Branimir Bukilic) CS IC Post 1 Aug-11 9-Sep-11 15-Sep-11 17-Sep-11 - 19-Oct-11 - - 29-Dec-12 1-Jul-12Contract

completed0.0

68 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović) (12 months)

CS SSS Prior 1 May-11May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012

Contract

completed0.0

69 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić) (12 months)CS SSS Prior 1 May-11

May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012

Contract

completed0.0

70 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS SSS Prior 1 May-11

May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012

Contract

completed0.0

71 A-212/4

Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) (12 months)

Contract+ Am. No. 1

CS SSS Prior 1 May-11July 27,

2011

August 4,

2011- - - - - June 12, 2011 June 15, 2012

Contract

completed0.0

72 A-213

TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement (Ljiljana Krejović)

Contract+Am.1

CS IC Post 1 May-11May 31,

2011

May 31,

2011- - - - - June 8, 2011 June 15, 2012

Contract

completed0.0

0.0

74 B.1.0 Operational Review of the PHC

75 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010 7/9/10 - Oct 22, 2010October 23,

2011

Contract

completed0.0

0.0 0.0 0.0 0.0

76 B.2.0 PHC Specialization Program Development & Implementation

77 B-201 Int TA PHC Specialization Program Development &

Implementation (University of Ljubljana)CS QCBS Prior 1

Oct/Nov

2010

Nov 22,

2010Nov 22, 2010

January 10,

2011-

February 3,

2011May 19, 2011 - Jun-11 Dec-12

Contract

signed&in

progress

0.0

78 B-202Loc TA Family Medicine Specialization Program

Implementation Coordinator (Ljiljana Kezunovic)CS IC Post 1 Jan-12 13-Feb-12 14-Feb-12 - - - - - 25-Apr-12 31-Dec-12

Contract

signed&in

progress

0.0

79 B.3.0TA for PHC Specialist Medicine Training Program (Medicine

and Nursing, 4 rounds, 8-11)CS IC/CQ Prior Multi Ongoing throughout the life of the Project Dec-12

80 B-301Training Program (Education) Coordinator (rounds8-11)

(Mara Drecun) (Contract+Am.1)CS SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/11

Amendment

signed&in

progress

0.0

81 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/11

Amendment

signed&in 0.0

82 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS SSS Prior Multi

83 B-303.1-D- Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

84 B-303.1-D- Educator Doctor (V.Oborina) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

85 B-303.1-D- Educator Doctor (V.S.Lalović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

86 B-303.1-D- Educator Doctor (S.Mićanović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

87 B-303.1-D- Educator Doctor (D.Radunović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

88 B-303.1-D- Educator Doctor (M.Grbović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

89 B-303.1-D- Educator Doctor (P.Divanović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

90 B-303.1-D- Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

91 B-303.1-D- Educator Doctor (J.Pepić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

92 B-303.1-D- Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

93 B-303.1-D- Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

94 B-303.1-D- Educator Doctor (N.Janković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

95 B-303.1-D- Educator Doctor (Božika Subašić) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 Contract 0.0

96 B-303.1-D- Educator Doctor (R.Pajović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

97 B-303.1-D- Educator Doctor (E.Bašović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

98 B-303.1-D- Educator Doctor (M.Hodžić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

99 B-303.1-D- Educator Doctor (L.Delević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

100 B-303.1-D- Educator Doctor (V.Peranović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

101 B-303.1-D- Educator Doctor (Z.Miljković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

102 B-303.1-D- Educator Doctor (V.Zelović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

103 B-303.1-D- Educator Doctor (Julijana Zečević) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 Contract 0.0

104 B-303.1-D- Educator Doctor (B.Radović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

105 B-303.1-D- Educator Doctor (M.Bogavac) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

106 B-303.1-D- Educator Doctor (O.Poček) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

107 B-303.1-D- Educator Doctor (S.Šabović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

108 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS

Subtotal A.2:

Subcomponent A.2: Health Information System

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Page 4: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

109 B-303.1-N- Educator Nurse (M.Pavićević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

110 B-303.1-N- Educator Nurse (J.Radinović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

111 B-303.1-N- Educator Nurse (Lj.Milićević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

112 B-303.1-N- Educator Nurse (B.Mudreša) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

113 B-303.1-N- Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 Contract 0.0

114 B-303.1-N- Educator Med.Technician (M.Kažić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

115 B-303.1-N- Educator Nurse (D.Rakčević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

116 B-303.1-N- Educator Nurse (M.Đeković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

117 B-303.1-N- Educator Nurse (N.Božović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

118 B-303.1-N- Educator Nurse (L.Vujović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

119 B-303.1-N- Educator Nurse (V.Garović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

120 B-303.1-N- Educator Nurse (M.Marković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

121 B-303.1-N- Educator Nurse (R.Ostojić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

122 B-303.1-N- Educator Nurse (T.Đurić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

123 B-303.1-N- Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

124 B-303.1-N- Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

125 B-303.1-N- Educator Nurse (T.Šebek) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

126 B-303.1-N- Educator Nurse (L.Mitrović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

127 B-303.1-N- Educator Nurse (R.Džoganović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

128 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag,

Jovanović Danijela, Dašić Radmila) (Contract+Am.1)

CS IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10Contract

completed0.0

129 B-304.1-D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS

130 B-304.1-D- T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

131 B-304.1-D- T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

132 B-304.1-D- T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

133 B-304.1-D- T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

134 B-304.1-D- T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

135 B-304.1-D- T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

136 B-304.1-D- T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

137 B-304.1-D- T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

138 B-304.1-D- T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

139 B-304.1-D- T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

140 B-304.1-D- T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

141 B-304.1-D- T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

142 B-304.1-D- T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

143 B-304.1-D- T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

144 B-304.1-D- T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

145 B-304.1-D- T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

146 B-304.1-D- T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

147 B-304.1-D- T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

148 B-304.1-D- T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

149 B-304.1-D- T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

150 B-304.1-D- T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 Contract 0.0

151 B-304.1-D- T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

152 B-304.1-D- T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

153 B-304.1-D- T. Lecturer Doctor (Jadranka Lakićević) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 Contract 0.0

154 B-304.1-D- T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

155 B-304.1-D- T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 Contract 0.0

156 B-304.1-D- T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

157 B-304.1-D- T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 Contract 0.0

158 B-304.1-N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS

159 B-304.1-N- T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

160 B-304.1-N- T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

161 B-304.1-N- T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

162 B-304.1-N- T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

163 B-304.1-N- T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

164 B-304.1-N- T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

165 B-304.1-N- T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

166 B-304.1-N- T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

167 B-304.1-N- T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

168 B-304.1-N- T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

169 B-304.1-N- T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

170 B-304.1-N- T. Lecturer Med. Technician (Dragan Guberinić) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 Contract 0.0

171 B-304.1-N- T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

172 B-304.1-N- T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

173 B-304.1-N- T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

174 B-304.1-N- T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 Contract 0.0

175B-304.1-N-

17

T. Lecturer Med. Technician (G.Jokanović)

(Contract+Am.1)CS SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Contract

completed0.0

176 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir

Dobričanin, Ognjen Jovićević, Nada Janković, Edita

Bašović) (round 9) (Miroslav Stanišljević)

(Contract+Am.1)

CS IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10Contract

completed0.0

177 B-305

8th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc.

SoE Post Mar-10 Sep 22, 2010 Sep 24, 2010 Jun-10 Completed 0.0

178 B-306

9th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc.

SoE Post Sep-10Dec 20,

2010Dec 20, 2010 Jan-11 COmpleted 0.0

179 B-307

10th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc.

SoE Post Feb-11 June 1, 2011 June 1, 2011 June 25, 2011 COmpleted 0.0

180 B-308

11th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc.

SoE Post Sep-11 23-Nov-11 01-Dec-11 Jan-12 Completed 0.0

Page 5: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

181 B-3.1 Equipment - Diagnostic equipment

182 B-312Medical equipment for Primary Health Care Development

G ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12

183 B-312 Lot 1 Diagnostic equipment (URION llc) G ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12

Contract

signing in 0.0

184 B-312 Lot 2 Diagnostic and therapy equipment (PDG llc) G ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 19-Sep-12 31-Oct-12

Contract

signing in 0.0

185 B-312 Lot 3Small medical equipment and furniture (Inel Medica llc)

G ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 31-Aug-12 12-Oct-12

Contract

signing in 0.0

186 B-3.2 Civil Works

187 B-321PHC facility DZ Bijelo Polje renovation (Contract + Am.1

(Extention of Date of Completion))W ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 5/31/12

Contract

signed and in

progress

0.00

B-321PHC facility DZ Bijelo Polje renovation (Amendment 2

(VO#1+VO#2))W ICB Prior 1 27-Aug-12 31-Oct-12

Am. No.2

clearance in

progress

188 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje (IGH Institut, Zagreb CRO)CS CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

Contract

signed&in

progress

0.0

189 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10

Contract

completed0.0

190 B-324 PHC Bijelo Polje Waste Water Biological Treatment Facility G S Prior 1 Aug-12 Aug-12 Aug-12 - Aug-12 Sep-12 - Sep-12 Sep-12 Oct-12

Evaluation

rescheduled

for Sep 26

191 C.1 PMN Personnel CS

192 C1.1 Coordinator, short-term (4months)( Pavle Aligrudić) CS SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10Contract

completed0.0

193 C1.2Administrative Assistant, short-term (4 months) (Boba

Vukoslavović)CS SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10

Contract

completed0.0

194 C1.3Coordinator (24 months) (Majda Škrijelj)

(Contract+Am.1+Am.2)CS IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 31-Dec-12

Amendment

signed&in 0.0

195 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1+Am.2)CS IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 31-Dec-12

Amendment

signed&in 0.0

196 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 7/1/11Contract

completed0.0

197 C1.6Administrative Assistant (12 months) (Natasa Jolic)

(Contract + Am.1)CS IC Post 1

April 20,

2011

April 20,

2011

April 20,

2011

April 21,

2011- - - - June 6, 2011 31-Dec-12

Amendment

signed&in 0.0

198 C.2 PMN Trainings / Study tours TR SoE/CQ Post Multi Ongoing throughout the life of the Project

199PMN Training (Sarajevo, Procurement Seminar, May 31-

Jun 4, 2010) (Boba Vukoslavovic)TR SoE Post 1 May-10 May 27,2012 May 27,2012 May-10

Activity

completed0.0

200PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj)TR SoE Post 1 Oct-10 4-Oct-10 4-Oct-10 Oct-10

Activity

completed0.0

201

PMN Study Tour (Belgrade, meetings regarding Serbian

Health Project DRG negotiations, October 7, 2011)

(Majda Skrijelj&Lidija Scepanovic)

TR SoE Post 1 Sep-11 22-Sep-11 22-Sep-11 Oct-11Activity

completed0.0

202PMN Training (Skopje, IT Procurement, Oct 27, 2011)

(Boba Vukoslavovic)TR SoE Post 1 Oct-11 26-Oct-11 26-Oct-11 Oct-11

Activity

completed0.0

203 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.)SoE Post Ongoing throughout the life of the Project

Ongoing

thorugh the 0.0

204 C.4 Independent Financial Audit CS LCS Prior 1 Apr-11April 29,

2011May 6, 2011

May 10,

2011- 22-Jun-11 - 7-Jul-11 25-Jul-11 11-Sep-12

Contract

signed&in

progress

0.0

205 C.5 Annual survey CS CQ Prior 1 Jan-11February 1,

2011

February 2,

2011

February 2,

201110-Nov-11 - - 05-Mar-12 05-Dec-12

Contract

signed&in 0.0

206 C.6Local TA for Monitoring and Evaluation

CS IC / CQ Prior 1 Activity to be initiated towards the end of the ProjectActivity to

initiate in mid 0.0

207 C.7 Office Furniture/Equipment G

208 C 7.1 PMN Office Furniture G S Prior 1 Jul-10 26-Jun-10 28-Jun-10 - Aug-10 Oct 12, 2010 - Nov 1, 2010 Nov 12, 2010 -Contract

completed0.0

209 C 7.2 PMN Office Equipment (Hardware) G S Prior 1 Jul-11 1-Aug-11 3-Aug-11 - 14-Oct-11 25-Oct-11 - - 3-Nov-11 -Contract

completed0.0

210C.8 5-month TSU Operating Expenses

MHSIP

funding

completed

0.0

C.9 2-month TSU Operating Expenses

0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total negotiated Loan amount

Savings (1) 1

Uncommitted (2) 2

Committed/contracted (3) 1+2 0.00

Total 1+2+3

Funds from contracts that ended without exhausting the entire

contracted amount (approx.)

Subtotal C.1:

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subcomponent C.1: Project Management Network

(Commited minus CW) * 0.83

Loan share for CW

Subtotal C.8:

TOTAL Component C:

Sub-total A+B+C

GRAND TOTAL Additional financing:

B-321 CW

Commited minus CW

Page 6: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

WITH INITIAL COST ESTIMATES

No

Item Description

Type

Init

ial

Est

imat

. C

ost

/All

oca

ted a

mount

LO

AN

(E

UR

)

Act

ual

Cost

/All

oca

ted a

mount

LO

AN

(EU

R)

Act

ual

Cost

/All

oca

ted a

mount

Wit

h G

over

nm

ent

Contr

ibuti

on (

EU

R)

Contr

acte

d A

mount

(EU

R)

Pro

c. M

ethod

Pri

or

/ P

ost

rev

iew

No o

f pac

kag

es

TS

U/P

MN

Fin

aliz

e S

hort

list

, T

S, T

OR

,

RF

, B

iddin

g D

oc/

Invit

atio

n t

o Q

uote

TS

U S

ubm

it t

o I

BR

D f

or

NO

: S

hort

list

,

TS

, T

OR

, R

F, B

iddin

g D

oc/

Invit

atio

n t

o

Quote

Appro

ved

Short

list

, T

S, T

OR

, R

F,

Bid

din

g D

oc/

Invit

atio

n t

o Q

uote

SP

N/

RE

oI

Invit

atio

n o

f B

ids/

Ten

der

Invit

atio

n

Bid

open

ing-T

echnic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tec

hnic

al

Eval

uat

ion/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

final

eval

uat

ion

Contr

act

awar

d/S

ignin

g

Contr

act

com

ple

tion

Com

mit

ed

Dis

burs

ed

Act

ivit

y S

tatu

s

Funds

from

contr

acts

that

ended

wit

hout

exhau

stin

g t

he

enti

re c

ontr

acte

d a

mount

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and

STC Basic Benefits Package 622,960.00 299,987.22 361,430.39

3 A-101.1 Int TA health institutions Hospital Optimization Plan (Jaanus

Pikani) (Contract + Contract Am No. 1)CS 60,200.0 91,930.3 110,759.4 110,759.4 IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 - 25-Jan-12 - 07-Feb-12 29-Feb-12 30-Nov-12 110,759.4 49,579.9

Contract

signed&in

progress

0.0

4 A-101.2 Int TA for STC Basic Benefits Package (Euro Health

Group)CS 60,200.0 74,768.1 90,082.0 90,082.0 CQS Prior 1 Dec-10 Apr 06, 2011 May 9, 2011

May 12,

2011- 07-Jul-11

July 22,

2011

August 3,

201123-Feb-12 30-Nov-12 90,082.0 22,520.5

Contract

signed&in

progress

0.0

5 A-101.3 Loc TA Hospital Optimization Plan (IC) CS 201,280.0 17,436.6 21,008.0 0.0 IC Prior 2 Jul-12 01-Aug-12 09-Aug-12 Aug-12 - Sep-12 - Sep-12 Oct-12 Dec-12 0.0 0.0ToR

approved, 0.0

6 A-101.4 Loc TA for STC Basic Benefits Package (Institute for

Public Health of MNE)CS 201,280.0 115,852.2 139,581.0 139,581.0 SSS Prior 1 Apr-11

June 29,

2011July 13, 2011 - - - - - 01-Nov-11 31-Dec-12 139,581.0 34,895.3

Contract

signed&in

progress

0.0

A-102 Analytical study on HR in Health System in MNA-102.1 Analytical study on HR in Health System in MN 100,000.00

7 A-103 STC payment model design and implementation 266,000.0 436,285.1 525,644.7

8 A-103.1 Int TA STC payment model design and implementation

(T.i.n.s. llc and Karol Consulting llc)CS 176,000.0 180,478.9 217,444.5 217,444.5 CQS Prior 1

Oct/Nov

2010

February 2,

2011

February 2,

2011

Nov 23,

2010-

Dec 17,

2010

February

04, 2011

February 11,

2011June 3, 2011

November

30, 2012217,444.5 83,632.5

Contract

signed&in

progress

0.0

9 A-103.2-1

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Vladimir

Dobričanin)

CS 15,000.0 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

0.0

10 A-103.2-2

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Mirjana

Đukić)

CS 15,000.0 12,718.8 15,323.8 15,323.8 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 201315,323.8 6,895.7

Contract

signed&in

progress

0.0

11 A-103.2-3

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Andrija

Vujović)

CS 15,000.0 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

0.0

12 A-103.2-4

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Sadeta

Lopičič)

CS 15,000.0 11,072.1 13,339.9 13,339.9 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 201313,339.9 6,003.0

Contract

signed&in

progress

0.0

13 A-103.2-5

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Dragana

Milonjić)

CS 15,000.0 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

0.0

14 A-103.2-6

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Milijana

Đukanović)

CS 15,000.0 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

0.0

15 A-103.3 Purchasing DRG Licence G 0.0 200,000.0 240,963.9 0.0 DC Prior 1 - - - - - - - - - Dec-12 0.0 0.0Trial Version

Contract 0.0

16 A-103.4 Purchasing DRG Casemix Material G 0.0 2,489.5 2,999.4 2,999.4 CoE 2,999.4 2,999.4Disbursed

and goods 0.0

17 A-104 Private public integration 100,000.0 65,869.5 79,360.9

18 A-104.1 Int TA Private public integration (Hernan Fuenzalida-

Puelma)CS

60,000.0 47,628.3 57,383.5 57,383.5IC Prior 1

May/June

2011Jun-11 Jun-11 May 6, 2011 - June 2, 2011

June 16,

2011June 17, 2011 Aug-11 Oct-12

57,383.553,361.7

Contract

signed&in 0.0

19 A-104.2/1 Loc TA - Integration of private HC institutions into the

network of health institutions (Dragoljub Perović)CS

10,000.0 4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

5,171.12,154.7

Contract

signed&in

progress

0.0

20 A-104.2/2 Loc TA - Integration of private HC institutions into the

network of health institutions (Milan Mirković)CS

10,000.0 4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

5,171.12,154.7

Contract

signed&in 0.0

21 A-104.2/3 Loc TA - Integration of private HC institutions into the

network of health institutions (Mladen Filipović)CS

10,000.0 4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

5,171.12,154.7

Contract

signed&in

progress

0.0

22 A-104.2/4 Loc TA - Integration of private HC institutions into the

network of health institutions (Srđan Popović)CS

10,000.0 5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

6,463.93,232.0

Contract

signed&in

progress

0.0

23 A-105 TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision 220,000.0 118,814.0 143,149.4

24 A-105.1

Int TA for QA Strategic Framework (QA Model

Design&Impl.) and Cl. Guidelines and protocols dev. and

revision (Ana Stavljenic-Rukavina)

CS 70,000.0 86,019.8 103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

March 01,

2011

April 22,

2011- May 20, 2011

December 1,

2012103,638.3 69,960.6

Contract

signed&in

progress

0.0

25 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines

(Goran Nikolić)CS 15,000.0 6,706.3 8,079.9 8,079.9 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 8,079.9 7,541.2

Contract

signed&in 0.0

26 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines

(Abedin Adžović)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 2,693.0

Contract

signed&in

progress

0.0

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 13, 2012)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 7: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

27 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines

(Vesna Miranović)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 2,693.3

Contract

signed&in 0.0

28 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines

(Filip Vukmirović)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 3,232.0

Contract

signed&in

progress

0.0

29 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines

(Sreten Kavarić) (Contract+Contract Am. 1)CS 15,000.0 5,314.8 6,403.4 6,403.4 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 6,403.4 3,770.7

Contract

signed&in

progress

0.0

30 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines

(Nada Rondović)CS 15,000.0 2,146.0 2,585.5 2,585.5 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 2,585.5 2,370.1

Contract

signed&in 0.0

A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines CS 0.0 0.0 0.0 0.0 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 0.0 0.0 Contract 0.0

31 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 2,693.3

Contract

signed&in

progress

0.0

A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines CS 0.0 0.0 0.0 0.0 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 0.0 0.0 Contract 0.0

32 A-105.2/9/2 Loc TA for developing Clinical Protocols and Guidelines

(Vladimir Todorovic)CS 15,000.0 2,682.6 3,232.0 3,232.0 SSS Prior 2 May-11 June 2, 2012 June 7, 2012 - - - - - July 1, 2012 31-Dec-12 3,232.0 0.0

Contract

signed&in

progress

0.0

33 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines

(Ljubica Pejakov)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

0.0

34 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines

(Dragan Laušević)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

0.0

35 A-106 TA PR campaign design and implementation 70,000.0 51,267.5 61,768.1

36 A-106.1 Loc TA - Capacity Building & Implementation of Public

Information Campaign (Lazar Pejović)CS 11,666.7 16,095.4 19,392.0 19,392.0 IC Post 1

Aug/Sep

20119-Sep-11 28-Sep-11 4-Oct-11 - 10-Nov-11 - - Dec-11 Dec-12 19,392.0 5,817.5

Contract

signed&in

progress

0.0

37 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC)

(Gorica Soković) (Contract+Contract Am. 1)CS 11,666.7 14,469.2 17,432.8 17,432.8 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 31-Dec-12 17,432.8 12,795.1

Contract

signed&in 0.0

38 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC)

(Vesna Nikaljević) (Contract+Contract Am. 1)CS 11,666.7 14,469.2 17,432.8 17,432.8 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 31-Dec-12 17,432.8 11,130.4

Contract

signed&in 0.0

39 A-106.3Loc TA - PR Strategy materials design & production (Video

Material) (Produkcija Vjeverica llc)G 11,666.7 3,884.4 4,680.0 4,680.0 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 23-Jul-12 4,680.0 0.0

Contract

signed&in 0.0

40 A-106.3/1Loc TA - PR Strategy materials design & production (Web

Site to support MHSIP) (Baroom Baroom llc)G 11,666.7 1,145.9 1,380.6 1,380.6 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 21-Aug-12 1,380.6 0.0

Contract

signed&in 0.0

41 A-106.3/2Loc TA - PR Strategy materials design & production

(Photographs) (Baroom Baroom llc)G 11,666.7 1,203.5 1,450.0 1,450.0 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 01-Aug-12 1,450.0 0.0

Contract

signed&in 0.0

42 A-107 MoH capacity development 100,000.0 44,551.1 53,676.0

43 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical

cancer)) (Milutin Bulajić) (Contract+Contract Am. 1)

CS 60,000.0 28,455.9 34,284.2 34,284.2 IC Post 1 Mar-11April 5,

2011

April 22,

2011

February 21,

2011-

March 15,

2011- - May 25, 2011 31-Dec-12 34,284.2 22,466.0

Contract

signed&in

progress

0.0

44 A-107.2Loc TA for Development of National Colorectal Cancer

Prevention Program (Brigita Smolović)CS 10,000.0 5,365.1 6,463.9 6,463.9 IC Post 1 Jun-11

June 30,

2011July 11, 2011 - - 20-Jul-11 - - 27-Jul-11 5-Jun-12 6,463.9 6,463.9

Contract

completed0.0

45 A-107.3 Loc TA for Development of National Cervical Cancer

Prevention Program (Milovan Jovanovic)CS 10,000.0 10,730.1 12,927.9 12,927.9 IC Post 1 Jun-11

July 26,

2011

August 4,

2011- - 12-Aug-11 - - 25-Aug-11 5-Jun-12 12,927.9 12,927.8

Contract

completed0.0

A-107.3 National Health Account (NHA) TR 20,000.0

46 A-1.1 Institutional Development of the Drugs Agency

47 A-111 TA Policy and capacity development 250,000.0 269,432.4 324,617.4

48 A-111.2Int TA for capacity development (In-country Training)

(ALIMS Serbia)CS

40,000.0 46,088.4 55,528.2 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

February

24,2011- - May 15, 2011 May 15, 2012 55,528.2 30,749.2

Contract

signed0.0

49 A-111.3Drugs Agency capacity development, out-of-country Training,

conducted in ALIMS, Belgrade, SerbiaTR

20,000.0 9,938.6 11,974.2 11,974.2SoE Post Multi Oct-10

Nov 24,

2010

February 8,

201111,974.2 11,974.2

Activity

completed0.0

50 A-111.3/1

Study Tour (Belgrade, HC Quality&Accreditation in SEE

countries, March 16-18, 2011) (Jadranka Lakicevic and

Lorena Vlahovic)

TR

0.0 239.9 289.0 289.0

SoE Post 1 Mar-11 18-Mar-11 18-Mar-11 289.0 289.0Activity

completed0.0

51 A-111.3/2Drugs Agency capacity development, out-of-country Training,

conducted in HALMED, Zagreb, CroatiaTR

40,000.0 18,945.6 22,826.0 22,826.0SoE Post Multi May-12 8-May-12 9-May-12 22,826.0 0.0

Activity

completed0.0

52 A-112 Information system for the Drugs' Agency

53 A-112.1 Drugs' Agency Software development - Web Portal, DMS and

eCTD validation and review software (MG Soft)G

150,000.0 194,220.0 234,000.0 234,000.0ICB Prior 1

Jan-Sep

201119-Sep-11 02-Nov-11 - 5-Nov-11 16-Dec-11 - 02-Mar-12 03-Apr-12 29-Nov-12 234,000.0 23,400.0

Contract

signed&in

progress

0.0

54 A-1.2 Trainings / study tours

55 A-120 Trainings / study tours (WG Capacity Dev.) TR 125,410.0 35,263.0 42,485.5 Remaining amount/Throughout the life of the projectThroughout

the life of the

56 A-120/1

PR WG&PMN representatives/study visit to Macedonian HIF,

Skopje, June 27-29, 2011 (Amer Ramusovic, Lidija

Scepanovic&Boba Vukoslavovic)

TR

0.0 1,737.8 2,093.8 2,093.8

SoE Post 1 Jun-11 21-Jun-11 22-Jun-11 29-Jun-11 2,093.8 2,093.8Activity

completed0.0

57 A-120/2Workshop "Guidelines for Good Clinical Practice", Sep

30, 2011, at Med. Fac in Podgorica, METR

0.0 1,020.4 1,229.4 1,229.4SoE Post 1 Sep-11 27-Sep-11 28-Sep-11 30-Sep-11 1,229.4 1,229.4

Activity

completed0.0

58 A-120/34 Workshops "Guidelines for Good Clinical Practice", Feb-

May, 2012TR

0.0 21,123.5 25,450.0 25,450.0SoE Post 4 Dec-11 28-Dec-11 4-Jan-12 26 Apr, 2012 25,450.0 20,266.6

Activity

completed5,183.5

59 A-120/4

ST for memebrs of the PPP WG to attend the 7th Annual

PPP in CEE/SEE Conference (April 18-20, 2012, Vienna,

Austria) (Cirgic, Todorovic, Filipovic)

TR

0.0 2,069.8 2,493.8 2,493.8

SoE Post 1 Mar-12 Marr 9, 2012 13-Mar-12 20-Apr-12 2,493.8 2,493.8Activity

completed0.0

60 A-120/5

Study Tour (visit to the Agency for Quality and

Accreditaion of Serbia, Belgrade, May 23-25, 2012)

(Jadranka Lakicevic and Lorena Vlahovic)

TR

0.0 811.4 977.6 977.6

SoE Post 1 May-12 10-May-12 10-May-12 25-May-12 977.6 977.6Activity

completed0.0

A-120/6 Project Closing Workshop0.0 8,500.0 10,241.0

1,754,370.0 1,321,469.8 1,592,132.3 1,319,919.5Subtotal A.1:

Page 8: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

61 A.2.0 Hospital Information System/Hardware G 720,000.0 525,774.0 633,462.6 1ST ICB Prior 1May-Oct

201124-Oct-11 17-Nov-11

62 A.2.0/Lot 1 Storadge system and Servers G 360,000.0 115,000.0 138,554.2 0.0 1ST ICB Prior 1May/-Oct

201125-May-12 5-Jun-12 - 7-Jun-12 19-Jul-12 - Aug-12 Sep-12 Dec-12 0.0 0.0

Evaluation in

process, BER 0.0

63 A.2.0/Lot 2 Work stations and Printers (Informatika Montenegro llc) G 360,000.0 173,375.2 208,885.8 208,885.8 IST ICB Prior 1May/-

Oct201124-Oct-11 17-Nov-12 - 22-Nov-11 31-Jan-12 - 25-Apr-12 12-Jun-12 4-Sep-12 208,885.8 0.0

Contract

completed, 0.0

64 A.2.1 Information System / Software G

65 A-210Health Information System / Software for MOH (Consortium

Saga/Saga CG)G

0.0 114,589.8 138,060.0 138,060.0ICB Prior 1

Jan-July

201126-Jul-11 21-Oct-11 - 25-Oct-11 20-Dec-11 - 12-Mar-12 3-Apr-12 21-Aug-12 138,060.0 13,806.0

Contract

signed&in

progress

0.0

66 A-211 Health Information System / Software for IPH (MG Soft) G0.0 86,427.9 104,130.0 104,130.0

ICB Prior 1June/July

20113-Oct-11 15-Nov-11 - 18-Nov-11 24-Jan-12 - 27-Feb-12 14-Mar-12 20-Dec-12 104,130.0 10,413.0

Contract

signed&in

progress

0.0

67 A-211.1 Loc TA - System Analyst for the IPH (Branimir Bukilic) CS0.0 7,511.1 9,049.5 9,049.5

IC Post 1 Aug-11 9-Sep-11 15-Sep-11 17-Sep-11 - 19-Oct-11 - - 29-Dec-12 1-Jul-12 9,049.5 9,049.5Contract

completed0.0

68 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović) (12 months)

CS

0.0 5,365.1 6,463.9 6,463.9

SSS Prior 1 May-11May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012 6,463.9 6,463.9

Contract

completed0.0

69 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić) (12 months)CS

0.0 5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012 6,463.9 6,463.9

Contract

completed0.0

70 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS

0.0 5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012 6,463.9 3,232.0

Contract

completed0.0

71 A-212/4

Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) (12 months)

Contract+ Am. No. 1

CS

0.0 6,303.9 7,595.1 7,595.1

SSS Prior 1 May-11July 27,

2011

August 4,

2011- - - - - June 12, 2011 June 15, 2012 7,595.1 7,595.1

Contract

completed0.0

72 A-213

TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement (Ljiljana Krejović)

Contract+Am.1

CS

0.0 4,470.9 5,386.6 5,386.6

IC Post 1 May-11May 31,

2011

May 31,

2011- - - - - June 8, 2011 June 15, 2012 5,386.6 5,386.6

Contract

completed0.0

73 A-214 Loc TA for LAN Project Design for Hardware (selected

locations/hospitals outside PG)CS

0.0 2,000.0 2,409.6 0.0IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 - - Dec-11 Dec-11 Dec-11 0.0 0.0

To be

reconsidered0.0

720,000.0 525,774.0 633,462.6 492,498.8

2,474,370.0 1,847,243.8 2,225,594.9 1,812,418.2

74 B.1.0 Operational Review of the PHC

75 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 50,000.0 13,546.8 16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010 7/9/10 - Oct 22, 2010October 23,

201116,321.5 16,321.5

Contract

completed0.0

50,000.0 13,546.8 16,321.5 16,321.5

76 B.2.0 PHC Specialization Program Development & Implementation

77 B-201 Int TA PHC Specialization Program Development &

Implementation (University of Ljubljana)CS 60,000.0 213,689.7 257,457.5 257,457.5 QCBS Prior 1

Oct/Nov

2010

Nov 22,

2010Nov 22, 2010

January 10,

2011-

February 3,

2011

May 19,

2011- Jun-11 Dec-12 257,457.5 143,032.5

Contract

signed&in

progress

0.0

78 B-202Loc TA Family Medicine Specialization Program

Implementation Coordinator (Ljiljana Kezunovic)CS 0.0 6,974.6 8,403.1 8,403.1 IC Post 1 Jan-12 13-Feb-12 14-Feb-12 - - - - - 25-Apr-12 31-Dec-12 8,403.1 4,946.7

Contract

signed&in

progress

0.0

60,000.0 220,664.3 265,860.6 265,860.6

79 B.3.0TA for PHC Specialist Medicine Training Program (Medicine

and Nursing, 4 rounds, 8-11)CS

700,000.0 423,399.1 510,119.3 510,119.3IC/CQ Prior Multi Ongoing throughout the life of the Project Dec-12 510,119.3

80 B-301Training Program (Education) Coordinator (rounds8-11)

(Mara Drecun) (Contract+Am.1)CS

0.0 16,213.0 19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/11 19,533.7 19,533.7

Amendment

signed&in

progress

0.0

81 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS

0.0 9,308.4 11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/11 11,214.9 11,214.9

Amendment

signed&in 0.0

82 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 0.0 29,448.7 35,480.4 35,480.4 SSS Prior Multi 35,480.4

83 B-303.1-D- Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 0.0 887.0 1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,068.7 413.7 Contract 655.0

84 B-303.1-D- Educator Doctor (V.Oborina) (Contract+Am.1) CS 0.0 1,293.0 1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,557.8 989.0 Contract 568.8

85 B-303.1-D- Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 0.0 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,348.8 465.4 Contract 883.4

86 B-303.1-D- Educator Doctor (S.Mićanović) (Contract+Am.1) CS 0.0 2,541.2 3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 3,061.7 1,913.3 Contract 1,148.4

87 B-303.1-D- Educator Doctor (D.Radunović) (Contract+Am.1) CS 0.0 1,239.3 1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,493.2 1,236.8 Contract 256.4

88 B-303.1-D- Educator Doctor (M.Grbović) (Contract+Am.1) CS 0.0 2,146.0 2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,585.6 1,762.5 Contract 823.1

89 B-303.1-D- Educator Doctor (P.Divanović) (Contract+Am.1) CS 0.0 1,985.1 2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,391.7 1,368.2 Contract 1,023.5

90 B-303.1-D- Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 0.0 872.7 1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,051.5 396.5 Contract 655.0

91 B-303.1-D- Educator Doctor (J.Pepić) (Contract+Am.1) CS 0.0 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 344.7 Contract 172.4

92 B-303.1-D- Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 0.0 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,551.3 861.9 Contract 689.5

93 B-303.1-D- Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 0.0 1,234.0 1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,486.7 1,085.9 Contract 400.8

94 B-303.1-D- Educator Doctor (N.Janković) (Contract+Am.1) CS 0.0 1,008.6 1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,215.2 672.2 Contract 543.0

95 B-303.1-D- Educator Doctor (Božika Subašić) CS 0.0 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 689.5 517.1 Contract 172.4

96 B-303.1-D- Educator Doctor (R.Pajović) (Contract+Am.1) CS 0.0 1,180.3 1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,422.1 810.1 Contract 611.9

97 B-303.1-D- Educator Doctor (E.Bašović) (Contract+Am.1) CS 0.0 1,273.3 1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,534.1 965.3 Contract 568.8

98 B-303.1-D- Educator Doctor (M.Hodžić) (Contract+Am.1) CS 0.0 3,083.1 3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 3,714.6 2,344.2 Contract 1,370.4

99 B-303.1-D- Educator Doctor (L.Delević) (Contract+Am.1) CS 0.0 1,430.7 1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,723.7 1,034.2 Contract 689.5

100 B-303.1-D- Educator Doctor (V.Peranović) (Contract+Am.1) CS 0.0 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7 Contract 517.1

101 B-303.1-D- Educator Doctor (Z.Miljković) (Contract+Am.1) CS 0.0 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 172.4 Contract 689.5

102 B-303.1-D- Educator Doctor (V.Zelović) (Contract+Am.1) CS 0.0 1,144.5 1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,379.0 689.5 Contract 689.5

103 B-303.1-D- Educator Doctor (Julijana Zečević) CS 0.0 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 517.1 172.4 Contract 344.7

104 B-303.1-D- Educator Doctor (B.Radović) (Contract+Am.1) CS 0.0 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,034.2 689.5 Contract 344.7

105 B-303.1-D- Educator Doctor (M.Bogavac) (Contract+Am.1) CS 0.0 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 689.5 Contract 172.4

106 B-303.1-D- Educator Doctor (O.Poček) (Contract+Am.1) CS 0.0 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7 Contract 517.1

107 B-303.1-D- Educator Doctor (S.Šabović) (Contract+Am.1) CS 0.0 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 689.5 172.4 Contract 517.1

108 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 0.0 21,971.7 26,471.9 26,471.9 26,471.9

Subtotal A.2:

Subcomponent A.2: Health Information System

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Page 9: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

109 B-303.1-N- Educator Nurse (M.Pavićević) (Contract+Am.1) CS 0.0 4,692.6 5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 5,653.8 4,000.1 Contract 1,653.7

110 B-303.1-N- Educator Nurse (J.Radinović) (Contract+Am.1) CS 0.0 944.3 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,137.7 749.8 Contract 387.9

111 B-303.1-N- Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 0.0 1,309.1 1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,577.2 784.3 Contract 792.9

112 B-303.1-N- Educator Nurse (B.Mudreša) (Contract+Am.1) CS 0.0 472.1 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 568.8 237.0 Contract 331.8

113 B-303.1-N- Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 0.0 414.9 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 499.9 155.1 Contract 344.8

114 B-303.1-N- Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 0.0 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,172.1 573.1 Contract 599.0

115 B-303.1-N- Educator Nurse (D.Rakčević) (Contract+Am.1) CS 0.0 643.8 775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 775.7 465.4 Contract 310.3

116 B-303.1-N- Educator Nurse (M.Đeković) (Contract+Am.1) CS 0.0 4,338.5 5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 5,227.1 3,560.5 Contract 1,666.6

117 B-303.1-N- Educator Nurse (N.Božović) (Contract+Am.1) CS 0.0 658.1 792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 792.9 387.8 Contract 405.1

118 B-303.1-N- Educator Nurse (L.Vujović) (Contract+Am.1) CS 0.0 629.5 758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 758.4 724.0 Contract 34.5

119 B-303.1-N- Educator Nurse (V.Garović) (Contract+Am.1) CS 0.0 372.0 448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 448.2 103.4 Contract 344.7

120 B-303.1-N- Educator Nurse (M.Marković) (Contract+Am.1) CS 0.0 214.6 258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 258.6 103.4 Contract 155.2

121 B-303.1-N- Educator Nurse (R.Ostojić) (Contract+Am.1) CS 0.0 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 930.8 620.5 Contract 310.3

122 B-303.1-N- Educator Nurse (T.Đurić) (Contract+Am.1) CS 0.0 901.3 1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,085.9 637.8 Contract 448.2

123 B-303.1-N- Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 0.0 1,001.5 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,206.6 724.0 Contract 482.6

124 B-303.1-N- Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 0.0 314.7 379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 379.2 137.9 Contract 241.3

125 B-303.1-N- Educator Nurse (T.Šebek) (Contract+Am.1) CS 0.0 1,688.2 2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,034.0 1,241.1 Contract 792.9

126 B-303.1-N- Educator Nurse (L.Mitrović) (Contract+Am.1) CS 0.0 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 930.8 413.7 Contract 517.1

127 B-303.1-N- Educator Nurse (R.Džoganović) (Contract+Am.1) CS 0.0 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,034.2 1,034.2 Contract 0.0

128 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag,

Jovanović Danijela, Dašić Radmila) (Contract+Am.1)

CS

0.0 2,049.4 2,469.2 2,469.2

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10 2,469.2 1,034.2Contract

completed1,435.0

129 B-304.1-D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS 0.0 22,273.8 26,835.9 26,835.9 26,835.9

130 B-304.1-D- T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 0.0 1,641.7 1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,978.0 1,370.4 Contract 607.6

131 B-304.1-D- T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 0.0 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Contract 189.6

132 B-304.1-D- T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 0.0 865.6 1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,042.9 711.0 Contract 331.8

133 B-304.1-D- T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 0.0 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Contract 189.6

134 B-304.1-D- T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 0.0 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,172.1 775.7 Contract 396.5

135 B-304.1-D- T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 0.0 845.9 1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,019.1 687.3 Contract 331.8

136 B-304.1-D- T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 0.0 236.1 284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 284.4 189.6 Contract 94.8

137 B-304.1-D- T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 0.0 1,377.0 1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,659.1 1,090.3 Contract 568.8

138 B-304.1-D- T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 0.0 1,881.3 2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,266.7 1,525.5 Contract 741.2

139 B-304.1-D- T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 0.0 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 853.2 474.0 Contract 379.2

140 B-304.1-D- T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 0.0 536.5 646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 646.4 275.8 Contract 370.6

141 B-304.1-D- T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 0.0 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,551.3 706.7 Contract 844.6

142 B-304.1-D- T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 0.0 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 284.4 Contract 232.7

143 B-304.1-D- T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 0.0 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Contract 189.6

144 B-304.1-D- T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 0.0 432.8 521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 521.4 284.4 Contract 237.0

145 B-304.1-D- T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 0.0 944.2 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,137.7 711.0 Contract 426.7

146 B-304.1-D- T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 0.0 704.6 848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 848.9 331.8 Contract 517.1

147 B-304.1-D- T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 0.0 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 189.6 Contract 327.5

148 B-304.1-D- T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 0.0 425.6 512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 512.8 297.3 Contract 215.5

149 B-304.1-D- T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 0.0 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,348.8 801.5 Contract 547.3

150 B-304.1-D- T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 0.0 314.8 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 379.2 189.6 Contract 189.6

151 B-304.1-D- T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 0.0 482.9 581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 581.8 349.1 Contract 232.7

152 B-304.1-D- T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 0.0 1,960.0 2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,361.5 1,482.4 Contract 879.1

153 B-304.1-D- T. Lecturer Doctor (Jadranka Lakićević) CS 0.0 422.0 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 508.5 148.7 Contract 359.8

154 B-304.1-D- T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 0.0 1,244.7 1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,499.6 848.9 Contract 650.7

155 B-304.1-D- T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 0.0 293.3 353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 353.4 0.0 Contract 353.4

156 B-304.1-D- T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 0.0 1,169.6 1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,409.1 883.4 Contract 525.7

157 B-304.1-D- T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 0.0 368.4 443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 443.9 189.6 Contract 254.3

158 B-304.1-N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS 0.0 16,399.2 19,758.0 19,758.0 19,758.0

159 B-304.1-N- T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 0.0 597.3 719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 719.7 452.5 Contract 267.2

160 B-304.1-N- T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 0.0 1,083.7 1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,305.7 913.6 Contract 392.1

161 B-304.1-N- T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 0.0 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,318.6 879.1 Contract 439.6

162 B-304.1-N- T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 0.0 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,172.1 659.3 Contract 512.8

163 B-304.1-N- T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 0.0 543.7 655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 655.0 409.4 Contract 245.6

164 B-304.1-N- T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 0.0 1,409.2 1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,697.8 1,163.5 Contract 534.4

165 B-304.1-N- T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 0.0 1,631.0 1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,965.0 1,305.7 Contract 659.3

166 B-304.1-N- T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 0.0 1,616.7 1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,947.8 1,383.3 Contract 564.5

167 B-304.1-N- T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 0.0 2,539.5 3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 3,059.6 2,255.9 Contract 803.7

168 B-304.1-N- T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 0.0 851.2 1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,025.6 659.3 Contract 366.3

169 B-304.1-N- T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 0.0 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 853.2 547.3 Contract 306.0

170 B-304.1-N- T. Lecturer Med. Technician (Dragan Guberinić) CS 0.0 143.1 172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 172.4 120.7 Contract 51.7

171 B-304.1-N- T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 0.0 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,318.6 879.1 Contract 439.6

172 B-304.1-N- T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 0.0 608.0 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 732.6 439.6 Contract 293.0

173 B-304.1-N- T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 0.0 744.0 896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 896.3 581.8 Contract 314.6

174 B-304.1-N- T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 0.0 397.0 478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 478.3 284.4 Contract 193.9

175B-304.1-N-

17

T. Lecturer Med. Technician (G.Jokanović)

(Contract+Am.1)CS

0.0 364.8 439.6 439.6SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 439.6 219.8

Contract

completed219.8

176 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir

Dobričanin, Ognjen Jovićević, Nada Janković, Edita

Bašović) (round 9) (Miroslav Stanišljević)

(Contract+Am.1)

CS

0.0 4,077.4 4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10 4,912.6 2,363.6Contract

completed2,549.0

177 B-305

8th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 0.0 60,361.7 72,725.0 72,725.0

SoE Post Mar-10 Sep 22, 2010 Sep 24, 2010 Jun-10 72,725.0 72,725.0 Completed 0.0

178 B-306

9th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 0.0 68,265.8 82,248.0 82,248.0

SoE Post Sep-10Dec 20,

2010Dec 20, 2010 Jan-11 82,248.0 82,248.0 COmpleted 0.0

179 B-307

10th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 0.0 71,722.4 86,412.6 86,412.6

SoE Post Feb-11 June 1, 2011 June 1, 2011 June 25, 2011 86,412.6 86,412.6 COmpleted 0.0

180 B-308

11th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 0.0 101,307.5 122,057.2 122,057.2

SoE Post Sep-11 23-Nov-11 01-Dec-11 Jan-12 122,057.2 122,057.2 Completed 0.0

Page 10: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

181 B-3.1 Equipment - Diagnostic equipment

182 B-312Medical equipment for Primary Health Care Development

G525,000.0 555,007.8 668,684.0 0.0

ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12

183 B-312 Lot 1 Diagnostic equipment G 400,000.0 447,800.0 539,518.1 0.0 ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12 0.0 0.0

BER NO in

progress0.0

184 B-312 Lot 2 Diagnostic and therapy equipment (PDG llc) G 50,000.0 35,901.6 43,254.9 43,254.9 ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12 43,254.9 0.0

Contract

signing in 0.0

185 B-312 Lot 3Small medical equipment and furniture (Inel Medica llc)

G75,000.0 71,306.2 85,911.1 85,911.1

ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12

85,911.10.0

Contract

signing in 0.0

186 B-3.2 Civil Works 1,050,000.0 1,587,456.2 2,802,917.9

187 B-321PHC facility DZ Bijelo Polje renovation (Contract + Am.1

(Extention of Date of Completion))W

1,000,000.0 1,000,000.0 2,679,328.4 2,679,328.4ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 5/31/12 2,679,328.4 2,029,243.88

Contract

signed and in

progress

0.00

B-321/2PHC facility DZ Bijelo Polje renovation (Amendment 2

(VO#1+VO#2))W

0.0 484,876.9 0.0

Am. No.2

clearance in

progress

188 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje (IGH Institut, Zagreb CRO)CS

50,000.0 53,942.7 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12 64,991.2 34,205.8

Contract

signed&in

progress

0.0

189 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

0.0 3,636.7 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10 4,381.5 4,381.5

Contract

completed0.0

190 B-324 PHC Bijelo Polje Waste Water Biological Treatment Facility G0.0 45,000.0 54,216.9 0.0

S Prior 1 Aug-12 Aug-12 Aug-12 - Aug-12 Sep-12 - Sep-12 Sep-12 Oct-12

TS&ITQ to

be sent for

NO2,275,000.0 2,565,863.0 3,981,721.3 3,387,986.4

2,385,000.0 2,800,074.2 4,263,903.4 3,670,168.5

191 C.1 PMN Personnel CS 56,900.0 136,797.9 164,816.8

192 C1.1 Coordinator, short-term (4months)( Pavle Aligrudić) CS 0.0 7,106.4 8,561.9 8,561.9 SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10 8,561.9 8,561.9Contract

completed0.0

193 C1.2Administrative Assistant, short-term (4 months) (Boba

Vukoslavović)CS

0.0 3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10 3,995.6 3,995.6

Contract

completed0.0

194 C1.3Coordinator (24 months) (Majda Škrijelj)

(Contract+Am.1+Am.2)CS

0.0 53,298.0 64,214.4 64,214.3IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 31-Dec-12 64,214.3 51,371.5

Amendment

signed&in 0.0

195 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1+Am.2)CS

0.0 47,375.8 57,079.3 57,079.3IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 31-Dec-12 57,079.3 42,809.6

Amendment

signed&in 0.0

196 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS0.0 9,948.9 11,986.7 11,986.7

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 7/1/11 11,986.7 11,986.7Contract

completed0.0

197 C1.6Administrative Assistant (12 months) (Natasa Jolic)

(Contract + Am.1)CS

0.0 15,752.5 18,978.9 18,978.9IC Post 1

April 20,

2011

April 20,

2011

April 20,

2011

April 21,

2011- - - - June 6, 2011 31-Dec-12 18,978.9 11,986.7

Amendment

signed&in 0.0

198 C.2 PMN Trainings / Study tours TR 10,000.0 2,630.3 3,169.1 3,169.1 SoE/CQ Post Multi Ongoing throughout the life of the Project

199PMN Training (Sarajevo, Procurement Seminar, May 31-

Jun 4, 2010) (Boba Vukoslavovic)TR

0.0 633.5 763.2 763.2SoE Post 1 May-10 May 27,2012 May 27,2012 May-10 763.2 763.2

Activity

completed0.0

200PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj)TR

0.0 1,180.3 1,422.0 1,422.0SoE Post 1 Oct-10 4-Oct-10 4-Oct-10 Oct-10 1,422.0 1,422.0

Activity

completed0.0

201

PMN Study Tour (Belgrade, meetings regarding Serbian

Health Project DRG negotiations, October 7, 2011)

(Majda Skrijelj&Lidija Scepanovic)

TR

0.0 394.3 475.0 475.0

SoE Post 1 Sep-11 22-Sep-11 22-Sep-11 Oct-11 475.0 475.0Activity

completed0.0

202PMN Training (Skopje, IT Procurement, Oct 27, 2011)

(Boba Vukoslavovic)TR

0.0 422.4 508.9 508.9SoE Post 1 Oct-11 26-Oct-11 26-Oct-11 Oct-11 508.9 508.9

Activity

completed0.0

203 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 55,000.0 140,000.0 168,674.7 168,674.7SoE Post Ongoing throughout the life of the Project 168,674.7 120,000.0

Ongoing

thorugh the 0.0

204 C.4 Independent Financial Audit CS20,000.0 3,107.5 3,744.0 3,744.0

LCS Prior 1 Apr-11April 29,

2011May 6, 2011

May 10,

2011- 22-Jun-11 - 7-Jul-11 25-Jul-11 11-Sep-12 3,744.0 3,744.0

Contract

signed&in

progress

0.0

205 C.5 Annual survey CS40,000.0 111,191.0 133,965.0 133,965.0

CQ Prior 1 Jan-11February 1,

2011

February 2,

2011

February 2,

201110-Nov-11 - - 05-Mar-12 05-Dec-12 133,965.0 13,396.5

Contract

signed&in 0.0

206 C.6Local TA for Monitoring and Evaluation

CS40,000.0 20,000.0 24,096.4 0.0

IC / CQ Prior 1 Activity to be initiated towards the end of the Project 0.0 0.0Activity to

initiate in mid 0.0

207 C.7 Office Furniture/Equipment G

208 C 7.1 PMN Office Furniture G 0.0 1,079.0 1,300.0 1,300.0 S Prior 1 Jul-10 26-Jun-10 28-Jun-10 - Aug-10 Oct 12, 2010 - Nov 1, 2010 Nov 12, 2010 - 1,300.0 1,300.0Contract

completed0.0

209 C 7.2 PMN Office Equipment (Hardware) G 0.0 1,288.2 1,552.0 1,552.0 S Prior 1 Jul-11 1-Aug-11 3-Aug-11 - 14-Oct-11 25-Oct-11 - - 3-Nov-11 - 1,552.0 1,552.0Contract

completed0.0

221,900.0 416,093.9 501,317.9 477,221.5

210C.8 5-month TSU Operating Expenses 62,500.0 36,369.6 43,818.8 43,818.8

43,818.8 43,818.8

MHSIP

funding

completed

0.0

62,500.0 36,369.6 43,818.8 43,818.8

284,400.00 452,463.46 545,136.70 521,040.24

5,143,770.02 5,099,781.43 7,034,635.05 6,003,626.93

5,143,770.02 5,099,781.43 7,034,635.05 6,003,626.93 6,003,627.0 3,624,589.9 51,799.2

2,679,328.4 2,029,243.9 50,000.00

Total negotiated Loan amount 5,100,000.00 3,324,298.6 1,595,346.0

Savings (1) 218.57 1 2,759,167.8 1,324,137.2

Uncommitted (2) 1,340,613.54 2 1,000,000.0 1,000,000.0

Committed/contracted (3) 3,759,167.89 6,003,627.05 6,003,626.93 1+2 3,759,167.8 2,324,137.2 41,500.00

Total 1+2+3 5,100,000.00

Funds from contracts that ended without exhausting the entire

contracted amount (approx.)40,000.0 48,192.8 48,192.8

Subtotal C.1:

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subcomponent C.1: Project Management Network

(Commited minus CW) * 0.83

Loan share for CW

Subtotal C.8:

TOTAL Component C:

Sub-total A+B+C

GRAND TOTAL Additional financing:

B-321 CW

Commited minus CW

Page 11: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

WITH INITIAL COST ESTIMATES

No

Item Description

Type

Init

ial

Est

imat

. C

ost

/All

oca

ted a

mount

LO

AN

(E

UR

)

Act

ual

Cost

/All

oca

ted a

mount

LO

AN

(EU

R)

Act

ual

Cost

/All

oca

ted a

mount

Wit

h G

over

nm

ent

Contr

ibuti

on (

EU

R)

Contr

acte

d A

mount

(EU

R)

Pro

c. M

ethod

Pri

or

/ P

ost

rev

iew

No o

f pac

kag

es

TS

U/P

MN

Fin

aliz

e S

hort

list

, T

S, T

OR

,

RF

, B

iddin

g D

oc/

Invit

atio

n t

o Q

uote

TS

U S

ubm

it t

o I

BR

D f

or

NO

: S

hort

list

,

TS

, T

OR

, R

F, B

iddin

g D

oc/

Invit

atio

n t

o

Quote

Appro

ved

Short

list

, T

S, T

OR

, R

F,

Bid

din

g D

oc/

Invit

atio

n t

o Q

uote

SP

N/

RE

oI

Invit

atio

n o

f B

ids/

Ten

der

Invit

atio

n

Bid

open

ing-T

echnic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tec

hnic

al

Eval

uat

ion/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

final

eval

uat

ion

Contr

act

awar

d/S

ignin

g

Contr

act

com

ple

tion

Com

mit

ed

Dis

burs

ed

Act

ivit

y S

tatu

s

Funds

from

contr

acts

that

ended

wit

hout

exhau

stin

g t

he

enti

re c

ontr

acte

d a

mount

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and

STC Basic Benefits Package 622,960.00 299,987.22 361,430.39

3 A-101.1 Int TA health institutions Hospital Optimization Plan (Jaanus

Pikani) (Contract + Contract Am No. 1)CS 60,200.0 91,930.3 110,759.4 110,759.4 IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 - 25-Jan-12 - 07-Feb-12 29-Feb-12 30-Nov-12 110,759.4 49,579.9

Contract

signed&in

progress

0.0

4 A-101.2 Int TA for STC Basic Benefits Package (Euro Health

Group)CS 60,200.0 74,768.1 90,082.0 90,082.0 CQS Prior 1 Dec-10 Apr 06, 2011 May 9, 2011

May 12,

2011- 07-Jul-11

July 22,

2011

August 3,

201123-Feb-12 30-Nov-12 90,082.0 22,520.5

Contract

signed&in

progress

0.0

5 A-101.3 Loc TA Hospital Optimization Plan (IC) CS 201,280.0 17,436.6 21,008.0 0.0 IC Prior 2 Jul-12 Jul-12 Aug-12 Sep-12 - Sep-12 - Sep-12 Oct-12 Dec-12 0.0 0.0ToR NO in

progress0.0

6 A-101.4 Loc TA for STC Basic Benefits Package (Institute for

Public Health of MNE)CS 201,280.0 115,852.2 139,581.0 139,581.0 SSS Prior 1 Apr-11

June 29,

2011July 13, 2011 - - - - - 01-Nov-11 31-Dec-12 139,581.0 34,895.3

Contract

signed&in

progress

0.0

A-102 Analytical study on HR in Health System in MNA-102.1 Analytical study on HR in Health System in MN 100,000.00

7 A-103 STC payment model design and implementation 266,000.0 436,285.1 525,644.7

8 A-103.1 Int TA STC payment model design and implementation

(T.i.n.s. llc and Karol Consulting llc)CS 176,000.0 180,478.9 217,444.5 217,444.5 CQS Prior 1

Oct/Nov

2010

February 2,

2011

February 2,

2011

Nov 23,

2010-

Dec 17,

2010

February

04, 2011

February 11,

2011June 3, 2011

November

30, 2012217,444.5 83,632.5

Contract

signed&in

progress

0.0

9 A-103.2-1

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Vladimir

Dobričanin)

CS 15,000.0 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

0.0

10 A-103.2-2

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Mirjana

Đukić)

CS 15,000.0 12,718.8 15,323.8 15,323.8 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 201315,323.8 6,895.7

Contract

signed&in

progress

0.0

11 A-103.2-3

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Andrija

Vujović)

CS 15,000.0 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

0.0

12 A-103.2-4

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Sadeta

Lopičič)

CS 15,000.0 11,072.1 13,339.9 13,339.9 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 201313,339.9 6,003.0

Contract

signed&in

progress

0.0

13 A-103.2-5

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Dragana

Milonjić)

CS 15,000.0 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

0.0

14 A-103.2-6

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Milijana

Đukanović)

CS 15,000.0 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

0.0

15 A-103.3 Purchasing DRG Licence G 0.0 200,000.0 240,963.9 0.0 DC Prior 1 - - - - - - - - - Dec-12 0.0 0.0Trial Version

Contract 0.0

16 A-103.4 Purchasing DRG Casemix Material G 0.0 2,489.5 2,999.4 2,999.4 CoE 2,999.4 2,999.4Disbursed

and goods 0.0

17 A-104 Private public integration 100,000.0 65,869.5 79,360.9

18 A-104.1 Int TA Private public integration (Hernan Fuenzalida-

Puelma)CS

60,000.0 47,628.3 57,383.5 57,383.5IC Prior 1

May/June

2011Jun-11 Jun-11 May 6, 2011 - June 2, 2011

June 16,

2011June 17, 2011 Aug-11 Oct-12

57,383.553,361.7

Contract

signed&in 0.0

19 A-104.2/1 Loc TA - Integration of private HC institutions into the

network of health institutions (Dragoljub Perović)CS

10,000.0 4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

5,171.12,154.7

Contract

signed&in

progress

0.0

20 A-104.2/2 Loc TA - Integration of private HC institutions into the

network of health institutions (Milan Mirković)CS

10,000.0 4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

5,171.12,154.7

Contract

signed&in 0.0

21 A-104.2/3 Loc TA - Integration of private HC institutions into the

network of health institutions (Mladen Filipović)CS

10,000.0 4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

5,171.12,154.7

Contract

signed&in

progress

0.0

22 A-104.2/4 Loc TA - Integration of private HC institutions into the

network of health institutions (Srđan Popović)CS

10,000.0 5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - - June 22, 2011 June 23, 2011 June 25, 2012

6,463.93,232.0

Contract

signed&in

progress

0.0

23 A-105 TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision 220,000.0 118,814.0 143,149.4

24 A-105.1

Int TA for QA Strategic Framework (QA Model

Design&Impl.) and Cl. Guidelines and protocols dev. and

revision (Ana Stavljenic-Rukavina)

CS 70,000.0 86,019.8 103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

March 01,

2011

April 22,

2011- May 20, 2011

December 1,

2012103,638.3 69,960.6

Contract

signed&in

progress

0.0

25 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines

(Goran Nikolić)CS 15,000.0 6,706.3 8,079.9 8,079.9 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 8,079.9 7,541.2

Contract

signed&in 0.0

26 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines

(Abedin Adžović)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 2,693.0

Contract

signed&in

progress

0.0

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 3, 2012)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 12: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

27 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines

(Vesna Miranović)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 2,693.3

Contract

signed&in 0.0

28 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines

(Filip Vukmirović)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 3,232.0

Contract

signed&in

progress

0.0

29 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines

(Sreten Kavarić) (Contract+Contract Am. 1)CS 15,000.0 5,314.8 6,403.4 6,403.4 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 6,403.4 3,770.7

Contract

signed&in

progress

0.0

30 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines

(Nada Rondović)CS 15,000.0 2,146.0 2,585.5 2,585.5 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 2,585.5 2,370.1

Contract

signed&in 0.0

A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines CS 0.0 0.0 0.0 0.0 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 0.0 0.0 Contract 0.0

31 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 2,693.3

Contract

signed&in

progress

0.0

A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines CS 0.0 0.0 0.0 0.0 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 0.0 0.0 Contract 0.0

32 A-105.2/9/2 Loc TA for developing Clinical Protocols and Guidelines

(Vladimir Todorovic)CS 15,000.0 2,682.6 3,232.0 3,232.0 SSS Prior 2 May-11 June 2, 2012 June 7, 2012 - - - - - July 1, 2012 31-Dec-12 3,232.0 0.0

Contract

signed&in

progress

0.0

33 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines

(Ljubica Pejakov)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

0.0

34 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines

(Dragan Laušević)CS 15,000.0 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

0.0

35 A-106 TA PR campaign design and implementation 70,000.0 51,267.5 61,768.1

36 A-106.1 Loc TA - Capacity Building & Implementation of Public

Information Campaign (Lazar Pejović)CS 11,666.7 16,095.4 19,392.0 19,392.0 IC Post 1

Aug/Sep

20119-Sep-11 28-Sep-11 4-Oct-11 - 10-Nov-11 - - Dec-11 Dec-12 19,392.0 5,817.5

Contract

signed&in

progress

0.0

37 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC)

(Gorica Soković) (Contract+Contract Am. 1)CS 11,666.7 14,469.2 17,432.8 17,432.8 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 31-Dec-12 17,432.8 12,795.1

Contract

signed&in 0.0

38 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC)

(Vesna Nikaljević) (Contract+Contract Am. 1)CS 11,666.7 14,469.2 17,432.8 17,432.8 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 31-Dec-12 17,432.8 11,130.4

Contract

signed&in 0.0

39 A-106.3Loc TA - PR Strategy materials design & production (Video

Material) (Produkcija Vjeverica llc)G 11,666.7 3,884.4 4,680.0 4,680.0 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 23-Jul-12 4,680.0 0.0

Contract

signed&in 0.0

40 A-106.3/1Loc TA - PR Strategy materials design & production (Web

Site to support MHSIP) (Baroom Baroom llc)G 11,666.7 1,145.9 1,380.6 1,380.6 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 21-Aug-12 1,380.6 0.0

Contract

signed&in 0.0

41 A-106.3/2Loc TA - PR Strategy materials design & production

(Photographs) (Baroom Baroom llc)G 11,666.7 1,203.5 1,450.0 1,450.0 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 01-Aug-12 1,450.0 0.0

Contract

signed&in 0.0

42 A-107 MoH capacity development 100,000.0 44,551.1 53,676.0

43 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical

cancer)) (Milutin Bulajić) (Contract+Contract Am. 1)

CS 60,000.0 28,455.9 34,284.2 34,284.2 IC Post 1 Mar-11April 5,

2011

April 22,

2011

February 21,

2011-

March 15,

2011- - May 25, 2011 31-Dec-12 34,284.2 22,466.0

Contract

signed&in

progress

0.0

44 A-107.2Loc TA for Development of National Colorectal Cancer

Prevention Program (Brigita Smolović)CS 10,000.0 5,365.1 6,463.9 6,463.9 IC Post 1 Jun-11

June 30,

2011July 11, 2011 - - 20-Jul-11 - - 27-Jul-11 5-Jun-12 6,463.9 6,463.9

Contract

completed0.0

45 A-107.3 Loc TA for Development of National Cervical Cancer

Prevention Program (Milovan Jovanovic)CS 10,000.0 10,730.1 12,927.9 12,927.9 IC Post 1 Jun-11

July 26,

2011

August 4,

2011- - 12-Aug-11 - - 25-Aug-11 5-Jun-12 12,927.9 12,927.8

Contract

completed0.0

A-107.3 National Health Account (NHA) TR 20,000.0

46 A-1.1 Institutional Development of the Drugs Agency

47 A-111 TA Policy and capacity development 250,000.0 269,432.4 324,617.4

48 A-111.2Int TA for capacity development (In-country Training)

(ALIMS Serbia)CS

40,000.0 46,088.4 55,528.2 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

February

24,2011- - May 15, 2011 May 15, 2012 55,528.2 30,749.2

Contract

signed0.0

49 A-111.3Drugs Agency capacity development, out-of-country Training,

conducted in ALIMS, Belgrade, SerbiaTR

20,000.0 9,938.6 11,974.2 11,974.2SoE Post Multi Oct-10

Nov 24,

2010

February 8,

201111,974.2 11,974.2

Activity

completed0.0

50 A-111.3/1

Study Tour (Belgrade, HC Quality&Accreditation in SEE

countries, March 16-18, 2011) (Jadranka Lakicevic and

Lorena Vlahovic)

TR

0.0 239.9 289.0 289.0

SoE Post 1 Mar-11 18-Mar-11 18-Mar-11 289.0 289.0Activity

completed0.0

51 A-111.3/2Drugs Agency capacity development, out-of-country Training,

conducted in HALMED, Zagreb, CroatiaTR

40,000.0 18,945.6 22,826.0 22,826.0SoE Post Multi May-12 8-May-12 9-May-12 22,826.0 0.0

Activity

completed0.0

52 A-112 Information system for the Drugs' Agency

53 A-112.1 Drugs' Agency Software development - Web Portal, DMS and

eCTD validation and review software (MG Soft)G

150,000.0 194,220.0 234,000.0 234,000.0ICB Prior 1

Jan-Sep

201119-Sep-11 02-Nov-11 - 5-Nov-11 16-Dec-11 - 02-Mar-12 03-Apr-12 29-Nov-12 234,000.0 23,400.0

Contract

signed&in

progress

0.0

54 A-1.2 Trainings / study tours

55 A-120 Trainings / study tours (WG Capacity Dev.) TR 125,410.0 26,763.0 32,244.5 Remaining amount/Throughout the life of the projectThroughout

the life of the

56 A-120/1

PR WG&PMN representatives/study visit to Macedonian HIF,

Skopje, June 27-29, 2011 (Amer Ramusovic, Lidija

Scepanovic&Boba Vukoslavovic)

TR

0.0 1,737.8 2,093.8 2,093.8

SoE Post 1 Jun-11 21-Jun-11 22-Jun-11 29-Jun-11 2,093.8 2,093.8Activity

completed0.0

57 A-120/2Workshop "Guidelines for Good Clinical Practice", Sep

30, 2011, at Med. Fac in Podgorica, METR

0.0 1,020.4 1,229.4 1,229.4SoE Post 1 Sep-11 27-Sep-11 28-Sep-11 30-Sep-11 1,229.4 1,229.4

Activity

completed0.0

58 A-120/34 Workshops "Guidelines for Good Clinical Practice", Feb-

May, 2012TR

0.0 21,123.5 25,450.0 25,450.0SoE Post 4 Dec-11 28-Dec-11 4-Jan-12 26 Apr, 2012 25,450.0 20,266.6

Activity

completed5,183.5

59 A-120/4

ST for memebrs of the PPP WG to attend the 7th Annual

PPP in CEE/SEE Conference (April 18-20, 2012, Vienna,

Austria) (Cirgic, Todorovic, Filipovic)

TR

0.0 2,069.8 2,493.8 2,493.8

SoE Post 1 Mar-12 Marr 9, 2012 13-Mar-12 20-Apr-12 2,493.8 2,493.8Activity

completed0.0

60 A-120/5

Study Tour (visit to the Agency for Quality and

Accreditaion of Serbia, Belgrade, May 23-25, 2012)

(Jadranka Lakicevic and Lorena Vlahovic)

TR

0.0 811.4 977.6 977.6

SoE Post 1 May-12 10-May-12 10-May-12 25-May-12 977.6 977.6Activity

completed0.0

1,754,370.0 1,312,969.8 1,581,891.3 1,319,919.5Subtotal A.1:

Page 13: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

61 A.2.0 Hospital Information System/Hardware G 720,000.0 525,774.0 633,462.6 1ST ICB Prior 1May-Oct

201124-Oct-11 17-Nov-11

62 A.2.0/Lot 1 Storadge system and Servers G 360,000.0 115,000.0 138,554.2 0.0 1ST ICB Prior 1May/-Oct

201125-May-12 5-Jun-12 - 7-Jun-12 19-Jul-12 - Aug-12 Sep-12 Dec-12 0.0 0.0

Evaluation in

process, BER 0.0

63 A.2.0/Lot 2 Work stations and Printers (Informatika Montenegro llc) G 360,000.0 173,375.2 208,885.8 208,885.8 IST ICB Prior 1May/-

Oct201124-Oct-11 17-Nov-12 - 22-Nov-11 31-Jan-12 - 25-Apr-12 12-Jun-12 4-Sep-12 208,885.8 0.0

Contract

completed, 0.0

64 A.2.1 Information System / Software G

65 A-210Health Information System / Software for MOH (Consortium

Saga/Saga CG)G

0.0 114,589.8 138,060.0 138,060.0ICB Prior 1

Jan-July

201126-Jul-11 21-Oct-11 - 25-Oct-11 20-Dec-11 - 12-Mar-12 3-Apr-12 21-Aug-12 138,060.0 13,806.0

Contract

signed&in

progress

0.0

66 A-211 Health Information System / Software for IPH (MG Soft) G0.0 86,427.9 104,130.0 104,130.0

ICB Prior 1June/July

20113-Oct-11 15-Nov-11 - 18-Nov-11 24-Jan-12 - 27-Feb-12 14-Mar-12 20-Dec-12 104,130.0 10,413.0

Contract

signed&in

progress

0.0

67 A-211.1 Loc TA - System Analyst for the IPH (Branimir Bukilic) CS0.0 7,511.1 9,049.5 9,049.5

IC Post 1 Aug-11 9-Sep-11 15-Sep-11 17-Sep-11 - 19-Oct-11 - - 29-Dec-12 1-Jul-12 9,049.5 9,049.5Contract

completed0.0

68 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović) (12 months)

CS

0.0 5,365.1 6,463.9 6,463.9

SSS Prior 1 May-11May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012 6,463.9 6,463.9

Contract

completed0.0

69 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić) (12 months)CS

0.0 5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012 6,463.9 6,463.9

Contract

completed0.0

70 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS

0.0 5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- - - - - June 12, 2011 June 15, 2012 6,463.9 3,232.0

Contract

completed0.0

71 A-212/4

Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) (12 months)

Contract+ Am. No. 1

CS

0.0 6,303.9 7,595.1 7,595.1

SSS Prior 1 May-11July 27,

2011

August 4,

2011- - - - - June 12, 2011 June 15, 2012 7,595.1 7,595.1

Contract

completed0.0

72 A-213

TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement (Ljiljana Krejović)

Contract+Am.1

CS

0.0 4,470.9 5,386.6 5,386.6

IC Post 1 May-11May 31,

2011

May 31,

2011- - - - - June 8, 2011 June 15, 2012 5,386.6 5,386.6

Contract

completed0.0

73 A-214 Loc TA for LAN Project Design for Hardware (selected

locations/hospitals outside PG)CS

0.0 2,000.0 2,409.6 0.0IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 - - Dec-11 Dec-11 Dec-11 0.0 0.0

To be

reconsidered0.0

720,000.0 525,774.0 633,462.6 492,498.8

2,474,370.0 1,838,743.8 2,215,354.0 1,812,418.2

74 B.1.0 Operational Review of the PHC

75 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 50,000.0 13,546.8 16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010 7/9/10 - Oct 22, 2010October 23,

201116,321.5 16,321.5

Contract

completed0.0

50,000.0 13,546.8 16,321.5 16,321.5

76 B.2.0 PHC Specialization Program Development & Implementation

77 B-201 Int TA PHC Specialization Program Development &

Implementation (University of Ljubljana)CS 60,000.0 213,689.7 257,457.5 257,457.5 QCBS Prior 1

Oct/Nov

2010

Nov 22,

2010Nov 22, 2010

January 10,

2011-

February 3,

2011

May 19,

2011- Jun-11 Dec-12 257,457.5 143,032.5

Contract

signed&in

progress

0.0

78 B-202Loc TA Family Medicine Specialization Program

Implementation Coordinator (Ljiljana Kezunovic)CS 0.0 6,974.6 8,403.1 8,403.1 IC Post 1 Jan-12 13-Feb-12 14-Feb-12 - - - - - 25-Apr-12 31-Dec-12 8,403.1 4,946.7

Contract

signed&in

progress

0.0

60,000.0 220,664.3 265,860.6 265,860.6

79 B.3.0TA for PHC Specialist Medicine Training Program (Medicine

and Nursing, 4 rounds, 8-11)CS

700,000.0 423,399.1 510,119.3 510,119.3IC/CQ Prior Multi Ongoing throughout the life of the Project Dec-12 510,119.3

80 B-301Training Program (Education) Coordinator (rounds8-11)

(Mara Drecun) (Contract+Am.1)CS

0.0 16,213.0 19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/11 19,533.7 19,533.7

Amendment

signed&in

progress

0.0

81 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS

0.0 9,308.4 11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/11 11,214.9 11,214.9

Amendment

signed&in 0.0

82 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 0.0 29,448.7 35,480.4 35,480.4 SSS Prior Multi 35,480.4

83 B-303.1-D- Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 0.0 887.0 1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,068.7 413.7 Contract 655.0

84 B-303.1-D- Educator Doctor (V.Oborina) (Contract+Am.1) CS 0.0 1,293.0 1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,557.8 989.0 Contract 568.8

85 B-303.1-D- Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 0.0 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,348.8 465.4 Contract 883.4

86 B-303.1-D- Educator Doctor (S.Mićanović) (Contract+Am.1) CS 0.0 2,541.2 3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 3,061.7 1,913.3 Contract 1,148.4

87 B-303.1-D- Educator Doctor (D.Radunović) (Contract+Am.1) CS 0.0 1,239.3 1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,493.2 1,236.8 Contract 256.4

88 B-303.1-D- Educator Doctor (M.Grbović) (Contract+Am.1) CS 0.0 2,146.0 2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,585.6 1,762.5 Contract 823.1

89 B-303.1-D- Educator Doctor (P.Divanović) (Contract+Am.1) CS 0.0 1,985.1 2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,391.7 1,368.2 Contract 1,023.5

90 B-303.1-D- Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 0.0 872.7 1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,051.5 396.5 Contract 655.0

91 B-303.1-D- Educator Doctor (J.Pepić) (Contract+Am.1) CS 0.0 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 344.7 Contract 172.4

92 B-303.1-D- Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 0.0 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,551.3 861.9 Contract 689.5

93 B-303.1-D- Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 0.0 1,234.0 1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,486.7 1,085.9 Contract 400.8

94 B-303.1-D- Educator Doctor (N.Janković) (Contract+Am.1) CS 0.0 1,008.6 1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,215.2 672.2 Contract 543.0

95 B-303.1-D- Educator Doctor (Božika Subašić) CS 0.0 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 689.5 517.1 Contract 172.4

96 B-303.1-D- Educator Doctor (R.Pajović) (Contract+Am.1) CS 0.0 1,180.3 1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,422.1 810.1 Contract 611.9

97 B-303.1-D- Educator Doctor (E.Bašović) (Contract+Am.1) CS 0.0 1,273.3 1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,534.1 965.3 Contract 568.8

98 B-303.1-D- Educator Doctor (M.Hodžić) (Contract+Am.1) CS 0.0 3,083.1 3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 3,714.6 2,344.2 Contract 1,370.4

99 B-303.1-D- Educator Doctor (L.Delević) (Contract+Am.1) CS 0.0 1,430.7 1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,723.7 1,034.2 Contract 689.5

100 B-303.1-D- Educator Doctor (V.Peranović) (Contract+Am.1) CS 0.0 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7 Contract 517.1

101 B-303.1-D- Educator Doctor (Z.Miljković) (Contract+Am.1) CS 0.0 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 172.4 Contract 689.5

102 B-303.1-D- Educator Doctor (V.Zelović) (Contract+Am.1) CS 0.0 1,144.5 1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,379.0 689.5 Contract 689.5

103 B-303.1-D- Educator Doctor (Julijana Zečević) CS 0.0 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 517.1 172.4 Contract 344.7

104 B-303.1-D- Educator Doctor (B.Radović) (Contract+Am.1) CS 0.0 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,034.2 689.5 Contract 344.7

105 B-303.1-D- Educator Doctor (M.Bogavac) (Contract+Am.1) CS 0.0 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 689.5 Contract 172.4

106 B-303.1-D- Educator Doctor (O.Poček) (Contract+Am.1) CS 0.0 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7 Contract 517.1

107 B-303.1-D- Educator Doctor (S.Šabović) (Contract+Am.1) CS 0.0 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 689.5 172.4 Contract 517.1

108 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 0.0 21,971.7 26,471.9 26,471.9 26,471.9

Subtotal A.2:

Subcomponent A.2: Health Information System

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Page 14: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

109 B-303.1-N- Educator Nurse (M.Pavićević) (Contract+Am.1) CS 0.0 4,692.6 5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 5,653.8 4,000.1 Contract 1,653.7

110 B-303.1-N- Educator Nurse (J.Radinović) (Contract+Am.1) CS 0.0 944.3 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,137.7 749.8 Contract 387.9

111 B-303.1-N- Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 0.0 1,309.1 1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,577.2 784.3 Contract 792.9

112 B-303.1-N- Educator Nurse (B.Mudreša) (Contract+Am.1) CS 0.0 472.1 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 568.8 237.0 Contract 331.8

113 B-303.1-N- Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 0.0 414.9 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 499.9 155.1 Contract 344.8

114 B-303.1-N- Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 0.0 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,172.1 573.1 Contract 599.0

115 B-303.1-N- Educator Nurse (D.Rakčević) (Contract+Am.1) CS 0.0 643.8 775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 775.7 465.4 Contract 310.3

116 B-303.1-N- Educator Nurse (M.Đeković) (Contract+Am.1) CS 0.0 4,338.5 5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 5,227.1 3,560.5 Contract 1,666.6

117 B-303.1-N- Educator Nurse (N.Božović) (Contract+Am.1) CS 0.0 658.1 792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 792.9 387.8 Contract 405.1

118 B-303.1-N- Educator Nurse (L.Vujović) (Contract+Am.1) CS 0.0 629.5 758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 758.4 724.0 Contract 34.5

119 B-303.1-N- Educator Nurse (V.Garović) (Contract+Am.1) CS 0.0 372.0 448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 448.2 103.4 Contract 344.7

120 B-303.1-N- Educator Nurse (M.Marković) (Contract+Am.1) CS 0.0 214.6 258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 258.6 103.4 Contract 155.2

121 B-303.1-N- Educator Nurse (R.Ostojić) (Contract+Am.1) CS 0.0 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 930.8 620.5 Contract 310.3

122 B-303.1-N- Educator Nurse (T.Đurić) (Contract+Am.1) CS 0.0 901.3 1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,085.9 637.8 Contract 448.2

123 B-303.1-N- Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 0.0 1,001.5 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,206.6 724.0 Contract 482.6

124 B-303.1-N- Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 0.0 314.7 379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 379.2 137.9 Contract 241.3

125 B-303.1-N- Educator Nurse (T.Šebek) (Contract+Am.1) CS 0.0 1,688.2 2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,034.0 1,241.1 Contract 792.9

126 B-303.1-N- Educator Nurse (L.Mitrović) (Contract+Am.1) CS 0.0 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 930.8 413.7 Contract 517.1

127 B-303.1-N- Educator Nurse (R.Džoganović) (Contract+Am.1) CS 0.0 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,034.2 1,034.2 Contract 0.0

128 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag,

Jovanović Danijela, Dašić Radmila) (Contract+Am.1)

CS

0.0 2,049.4 2,469.2 2,469.2

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10 2,469.2 1,034.2Contract

completed1,435.0

129 B-304.1-D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS 0.0 22,273.8 26,835.9 26,835.9 26,835.9

130 B-304.1-D- T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 0.0 1,641.7 1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,978.0 1,370.4 Contract 607.6

131 B-304.1-D- T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 0.0 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Contract 189.6

132 B-304.1-D- T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 0.0 865.6 1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,042.9 711.0 Contract 331.8

133 B-304.1-D- T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 0.0 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Contract 189.6

134 B-304.1-D- T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 0.0 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,172.1 775.7 Contract 396.5

135 B-304.1-D- T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 0.0 845.9 1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,019.1 687.3 Contract 331.8

136 B-304.1-D- T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 0.0 236.1 284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 284.4 189.6 Contract 94.8

137 B-304.1-D- T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 0.0 1,377.0 1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,659.1 1,090.3 Contract 568.8

138 B-304.1-D- T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 0.0 1,881.3 2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,266.7 1,525.5 Contract 741.2

139 B-304.1-D- T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 0.0 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 853.2 474.0 Contract 379.2

140 B-304.1-D- T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 0.0 536.5 646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 646.4 275.8 Contract 370.6

141 B-304.1-D- T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 0.0 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,551.3 706.7 Contract 844.6

142 B-304.1-D- T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 0.0 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 284.4 Contract 232.7

143 B-304.1-D- T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 0.0 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Contract 189.6

144 B-304.1-D- T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 0.0 432.8 521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 521.4 284.4 Contract 237.0

145 B-304.1-D- T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 0.0 944.2 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,137.7 711.0 Contract 426.7

146 B-304.1-D- T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 0.0 704.6 848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 848.9 331.8 Contract 517.1

147 B-304.1-D- T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 0.0 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 189.6 Contract 327.5

148 B-304.1-D- T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 0.0 425.6 512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 512.8 297.3 Contract 215.5

149 B-304.1-D- T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 0.0 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,348.8 801.5 Contract 547.3

150 B-304.1-D- T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 0.0 314.8 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 379.2 189.6 Contract 189.6

151 B-304.1-D- T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 0.0 482.9 581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 581.8 349.1 Contract 232.7

152 B-304.1-D- T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 0.0 1,960.0 2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,361.5 1,482.4 Contract 879.1

153 B-304.1-D- T. Lecturer Doctor (Jadranka Lakićević) CS 0.0 422.0 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 508.5 148.7 Contract 359.8

154 B-304.1-D- T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 0.0 1,244.7 1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,499.6 848.9 Contract 650.7

155 B-304.1-D- T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 0.0 293.3 353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 353.4 0.0 Contract 353.4

156 B-304.1-D- T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 0.0 1,169.6 1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,409.1 883.4 Contract 525.7

157 B-304.1-D- T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 0.0 368.4 443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 443.9 189.6 Contract 254.3

158 B-304.1-N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS 0.0 16,399.2 19,758.0 19,758.0 19,758.0

159 B-304.1-N- T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 0.0 597.3 719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 719.7 452.5 Contract 267.2

160 B-304.1-N- T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 0.0 1,083.7 1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,305.7 913.6 Contract 392.1

161 B-304.1-N- T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 0.0 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,318.6 879.1 Contract 439.6

162 B-304.1-N- T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 0.0 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,172.1 659.3 Contract 512.8

163 B-304.1-N- T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 0.0 543.7 655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 655.0 409.4 Contract 245.6

164 B-304.1-N- T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 0.0 1,409.2 1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,697.8 1,163.5 Contract 534.4

165 B-304.1-N- T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 0.0 1,631.0 1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,965.0 1,305.7 Contract 659.3

166 B-304.1-N- T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 0.0 1,616.7 1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,947.8 1,383.3 Contract 564.5

167 B-304.1-N- T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 0.0 2,539.5 3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 3,059.6 2,255.9 Contract 803.7

168 B-304.1-N- T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 0.0 851.2 1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,025.6 659.3 Contract 366.3

169 B-304.1-N- T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 0.0 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 853.2 547.3 Contract 306.0

170 B-304.1-N- T. Lecturer Med. Technician (Dragan Guberinić) CS 0.0 143.1 172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 172.4 120.7 Contract 51.7

171 B-304.1-N- T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 0.0 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,318.6 879.1 Contract 439.6

172 B-304.1-N- T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 0.0 608.0 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 732.6 439.6 Contract 293.0

173 B-304.1-N- T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 0.0 744.0 896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 896.3 581.8 Contract 314.6

174 B-304.1-N- T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 0.0 397.0 478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 478.3 284.4 Contract 193.9

175B-304.1-N-

17

T. Lecturer Med. Technician (G.Jokanović)

(Contract+Am.1)CS

0.0 364.8 439.6 439.6SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 439.6 219.8

Contract

completed219.8

176 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir

Dobričanin, Ognjen Jovićević, Nada Janković, Edita

Bašović) (round 9) (Miroslav Stanišljević)

(Contract+Am.1)

CS

0.0 4,077.4 4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10 4,912.6 2,363.6Contract

completed2,549.0

177 B-305

8th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 0.0 60,361.7 72,725.0 72,725.0

SoE Post Mar-10 Sep 22, 2010 Sep 24, 2010 Jun-10 72,725.0 72,725.0 Completed 0.0

178 B-306

9th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 0.0 68,265.8 82,248.0 82,248.0

SoE Post Sep-10Dec 20,

2010Dec 20, 2010 Jan-11 82,248.0 82,248.0 COmpleted 0.0

179 B-307

10th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 0.0 71,722.4 86,412.6 86,412.6

SoE Post Feb-11 June 1, 2011 June 1, 2011 June 25, 2011 86,412.6 86,412.6 COmpleted 0.0

180 B-308

11th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 0.0 101,307.5 122,057.2 122,057.2

SoE Post Sep-11 23-Nov-11 01-Dec-11 Jan-12 122,057.2 122,057.2 Completed 0.0

Page 15: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

181 B-3.1 Equipment - Diagnostic equipment

182 B-312Medical equipment for Primary Health Care Development

G525,000.0 413,483.8 498,173.2 0.0

ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12

183 B-312 Lot 1 Diagnostic equipment G 400,000.0 306,276.0 369,007.2 0.0 ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12 0.0 0.0

Response to

WB 0.0

184 B-312 Lot 2 Diagnostic and therapy equipment (PDG llc) G 50,000.0 35,901.6 43,254.9 43,254.9 ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12 43,254.9 0.0

Contract

signing in 0.0

185 B-312 Lot 3Small medical equipment and furniture (Inel Medica llc)

G75,000.0 71,306.2 85,911.1 85,911.1

ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12

85,911.10.0

Contract

signing in 0.0

186 B-3.2 Civil Works 1,050,000.0 1,057,579.3 2,748,701.1

187 B-321PHC facility DZ Bijelo Polje renovation (Contract + Am.1

(VO#1))W

1,000,000.0 1,000,000.0 2,679,328.4 2,679,328.4ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 5/31/12 2,679,328.4 2,029,243.88

Am. No.2

clearance in

progress

0.00

Amendment #2

188 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje (IGH Institut, Zagreb CRO)CS

50,000.0 53,942.7 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12 64,991.2 34,205.8

Contract

signed&in

progress

0.0

189 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

0.0 3,636.7 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10 4,381.5 4,381.5

Contract

completed0.0

190 B-324 PHC Bijelo Polje Waste Water Biological Treatment Facility Tech Spec.

2,275,000.0 1,894,462.1 3,756,993.6 3,387,986.4

2,385,000.0 2,128,673.3 4,039,175.7 3,670,168.5

191 C.1 PMN Personnel CS 56,900.0 136,797.9 164,816.8

192 C1.1 Coordinator, short-term (4months)( Pavle Aligrudić) CS 0.0 7,106.4 8,561.9 8,561.9 SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10 8,561.9 8,561.9Contract

completed0.0

193 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

0.0 3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10 3,995.6 3,995.6

Contract

completed0.0

194 C1.3Coordinator (24 months) (Majda Škrijelj)

(Contract+Am.1+Am.2)CS

0.0 53,298.0 64,214.4 64,214.3IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 31-Dec-12 64,214.3 51,371.5

Amendment

signed&in 0.0

195 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1+Am.2)CS

0.0 47,375.8 57,079.3 57,079.3IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 31-Dec-12 57,079.3 42,809.6

Amendment

signed&in 0.0

196 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS0.0 9,948.9 11,986.7 11,986.7

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 7/1/11 11,986.7 11,986.7Contract

completed0.0

197 C1.6Administrative Assistant (12 months) (Natasa Jolic)

(Contract + Am.1)CS

0.0 15,752.5 18,978.9 18,978.9IC Post 1

April 20,

2011

April 20,

2011

April 20,

2011

April 21,

2011- - - - June 6, 2011 31-Dec-12 18,978.9 11,986.7

Amendment

signed&in 0.0

198 C.2 PMN Trainings / Study tours TR 10,000.0 2,630.3 3,169.1 3,169.1 SoE/CQ Post Multi Ongoing throughout the life of the Project

199PMN Training (Sarajevo, Procurement Seminar, May 31-

Jun 4, 2010) (Boba Vukoslavovic)TR

0.0 633.5 763.2 763.2SoE Post 1 May-10 May 27,2012 May 27,2012 May-10 763.2 763.2

Activity

completed0.0

200PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj)TR

0.0 1,180.3 1,422.0 1,422.0SoE Post 1 Oct-10 4-Oct-10 4-Oct-10 Oct-10 1,422.0 1,422.0

Activity

completed0.0

201

PMN Study Tour (Belgrade, meetings regarding Serbian

Health Project DRG negotiations, October 7, 2011)

(Majda Skrijelj&Lidija Scepanovic)

TR

0.0 394.3 475.0 475.0

SoE Post 1 Sep-11 22-Sep-11 22-Sep-11 Oct-11 475.0 475.0Activity

completed0.0

202PMN Training (Skopje, IT Procurement, Oct 27, 2011)

(Boba Vukoslavovic)TR

0.0 422.4 508.9 508.9SoE Post 1 Oct-11 26-Oct-11 26-Oct-11 Oct-11 508.9 508.9

Activity

completed0.0

203 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 55,000.0 140,000.0 168,674.7 168,674.7SoE Post Ongoing throughout the life of the Project 168,674.7 120,000.0

Ongoing

thorugh the 0.0

204 C.4 Independent Financial Audit CS20,000.0 3,107.5 3,744.0 3,744.0

LCS Prior 1 Apr-11April 29,

2011May 6, 2011

May 10,

2011- 22-Jun-11 - 7-Jul-11 25-Jul-11 11-Sep-12 3,744.0 3,744.0

Contract

signed&in

progress

0.0

205 C.5 Annual survey CS40,000.0 111,191.0 133,965.0 133,965.0

CQ Prior 1 Jan-11February 1,

2011

February 2,

2011

February 2,

201110-Nov-11 - - 05-Mar-12 05-Dec-12 133,965.0 13,396.5

Contract

signed&in 0.0

206 C.6Local TA for Monitoring and Evaluation

CS40,000.0 20,000.0 24,096.4 0.0

IC / CQ Prior 1 Activity to be initiated towards the end of the Project 0.0 0.0Activity to

initiate in mid 0.0

207 C.7 Office Furniture/Equipment G

208 C 7.1 PMN Office Furniture G 0.0 1,079.0 1,300.0 1,300.0 S Prior 1 Jul-10 26-Jun-10 28-Jun-10 - Aug-10 Oct 12, 2010 - Nov 1, 2010 Nov 12, 2010 - 1,300.0 1,300.0Contract

completed0.0

209 C 7.2 PMN Office Equipment (Hardware) G 0.0 1,288.2 1,552.0 1,552.0 S Prior 1 Jul-11 1-Aug-11 3-Aug-11 - 14-Oct-11 25-Oct-11 - - 3-Nov-11 - 1,552.0 1,552.0Contract

completed0.0

221,900.0 416,093.9 501,317.9 477,221.5

210C.8 5-month TSU Operating Expenses 62,500.0 36,369.6 43,818.8 43,818.8

43,818.8 43,818.8

MHSIP

funding

completed

0.0

62,500.0 36,369.6 43,818.8 43,818.8

284,400.00 452,463.46 545,136.70 521,040.24

5,143,770.02 4,419,880.53 6,799,666.37 6,003,626.93

5,143,770.02 4,419,880.53 6,799,666.37 6,003,626.93 6,003,627.0 3,624,589.9 51,799.2

2,679,328.4 2,029,243.9 50,000.00

Total negotiated Loan amount 5,100,000.00 3,324,298.6 1,595,346.0

Savings (1) 680,119.47 1 2,759,167.8 1,324,137.2

Uncommitted (2) 660,712.64 2 1,000,000.0 1,000,000.0

Committed/contracted (3) 3,759,167.89 6,003,627.05 6,003,626.93 1+2 3,759,167.8 2,324,137.2

Total 1+2+3 5,100,000.00

Planned activities throughout 2012. 679,700.9 41,500.00

A-101.2Broadening the ToR for Int TA for STC Basic Benefits

PackageCS

Depending on B-

312 Lot 1 0.0 0.0 0.0

A-120 Project Closing Workshop TR 8,300.0 10,000.0 10,000.0

B-321 PHC Bijelo Polje CW - Additional and Surplus Works,

VO#1&VO#2W

484,876.9 0.0 0.0

B-324 PHC Bijelo Polje Waste Water Biological Treatment G 45,000.0 54,216.9 54,216.9

B-203Tuition for the first cohort of the Family Medicine Additional

Specialization Program (mentors-to-be)TR

Depending on B-

312 Lot 1 0.0 0.0 0.0

B-312 Lot 1Diagnostic equipment - difference in price of the only two bids

receivedG

141,524.0 170,510.8 170,510.8Price of the second bid for Med. Eq.Lot 1 447,800.0

C.3 Possible Operating Costs 0.00 0.0 0.0

Subtotal C.1:

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subcomponent C.1: Project Management Network

(Commited minus CW) * 0.83

Loan share for CW

Subtotal C.8:

TOTAL Component C:

Sub-total A+B+C

GRAND TOTAL Additional financing:

B-321 CW

Commited minus CW

Page 16: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Funds from contracts that ended without exhausting the entire

contracted amount (approx.)40,000.0 48,192.8 48,192.8

Page 17: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-MEN

o

Item Description

Type

Est

imat

. C

ost

/All

oca

ted a

mount

LO

AN

(EU

R)

Est

imat

. C

ost

/All

oca

ted a

mount

Wit

h G

over

nm

ent

Contr

ibuti

on

(EU

R)

Contr

acte

d A

mount

(EU

R)

Pro

c. M

ethod

Pri

or

/ P

ost

rev

iew

No o

f pac

kag

es

TS

U/P

MN

Fin

aliz

e S

hort

list

, T

S,

TO

R,

RF

, B

iddin

g D

oc/

Invit

atio

n

to Q

uote

TS

U S

ubm

it t

o I

BR

D f

or

NO

:

Short

list

, T

S,

TO

R,

RF

, B

iddin

g

Doc/

Invit

atio

n t

o Q

uote

Appro

ved

Short

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Invit

atio

n t

o Q

uote

SP

N/

RE

oI

Invit

atio

n o

f B

ids/

Ten

der

Invit

atio

n

Bid

open

ing-T

echnic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tec

hnic

al

Eval

uat

ion/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

final

eval

uat

ion

Contr

act

awar

d/S

ignin

g

Contr

act

com

ple

tion

Com

mit

ed

Dis

burs

ed

Act

ivit

y S

tatu

s

1 A.1.0Secondary and Tertiary Care Reform Strategy

Implementation

2 A-101 TA health institutions network & norms and standards and

STC Basic Benefits Package

3 A-101.1 Int TA health institutions Hospital Optimization Plan

(Jaanus Pikani) (Contract + Contract Am No. 1)CS 91,930.3 110,759.4 110,759.4 IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 - 25-Jan-12 - 07-Feb-12 29-Feb-12 30-Nov-12 110,759.4 49,579.9

Contract

signed&in

progress

4 A-101.2 Int TA for STC Basic Benefits Package (Euro Health

Group)CS 74,768.1 90,082.0 90,082.0 CQS Prior 1 Dec-10

Apr 06,

2011May 9, 2011

May 12,

2011- 07-Jul-11

July 22,

2011

August 3,

201123-Feb-12 30-Nov-12 90,082.0 22,520.5

Contract

signed&in

5 A-101.3 Loc TA Hospital Optimization Plan (IC) CS 17,436.6 21,008.0 0.0 IC Prior 2 Jul-12 Jul-12 Aug-12 Sep-12 - Sep-12 - Sep-12 Oct-12 Dec-12 0.0 0.0ToR NO in

progress

6 A-101.4 Loc TA for STC Basic Benefits Package (Institute for

Public Health of MNE)CS 115,852.2 139,581.0 139,581.0 SSS Prior 1 Apr-11

June 29,

2011

July 13,

2011- - - - - 01-Nov-11 31-Dec-12 139,581.0 34,895.3

Contract

signed&in

progressA-102 Analytical study on HR in Health System in MNA-102.1 Analytical study on HR in Health System in MN

7 A-103 STC payment model design and implementation

8 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)CS 180,478.9 217,444.5 217,444.5 CQS Prior 1

Oct/Nov

2010

February 2,

2011

February 2,

2011

Nov 23,

2010-

Dec 17,

2010

February

04, 2011

February 11,

2011June 3, 2011

November

30, 2012217,444.5 83,632.5

Contract

signed&in

progress

9 A-103.2-1

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting

(Vladimir Dobričanin)

CS 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

10 A-103.2-2

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting

(Mirjana Đukić)

CS 12,718.8 15,323.8 15,323.8 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 201315,323.8 6,895.7

Contract

signed&in

progress

11 A-103.2-3

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting

(Andrija Vujović)

CS 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

12 A-103.2-4

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting (Sadeta

Lopičič)

CS 11,072.1 13,339.9 13,339.9 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 201313,339.9 6,003.0

Contract

signed&in

progress

13 A-103.2-5

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting

(Dragana Milonjić)

CS 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

14 A-103.2-6

Loc TA for Adoption of the AR-DRG Patient Classification

System, Hospital Payment System and Contracting

(Milijana Đukanović)

CS 7,381.4 8,893.3 8,893.3 IC Post 1 Jan-12 23-Feb-12 24-Feb-12 - - - - - May-12November

30, 20138,893.3 4,002.0

Contract

signed&in

progress

15 A-103.3 Purchasing DRG Licence G 200,000.0 240,963.9 0.0 DC Prior 1 - - - - - - - - - Dec-12 0.0 0.0Trial Version

Contract

16 A-103.4 Purchasing DRG Casemix Material G 2,489.5 2,999.4 2,999.4 CoE 2,999.4 2,999.4Disbursed

and goods 17 A-104 Private public integration

18 A-104.1 Int TA Private public integration CS 47,628.3 57,383.5 57,383.5 IC Prior 1May/June

2011Jun-11 Jun-11

May 6,

2011- June 2, 2011

June 16,

2011

June 17,

2011Aug-11 Oct-12 57,383.5 53,361.7

Contract

signed&in

19 A-104.2/1 Loc TA - Integration of private HC institutions into the

network of health institutions (Dragoljub Perović)CS

4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - -

June 22,

2011June 23, 2011

June 25,

2012 5,171.12,154.7

Contract

signed&in

progress

20 A-104.2/2 Loc TA - Integration of private HC institutions into the

network of health institutions (Milan Mirković)CS

4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - -

June 22,

2011June 23, 2011

June 25,

2012 5,171.12,154.7

Contract

signed&in

21 A-104.2/3 Loc TA - Integration of private HC institutions into the

network of health institutions (Mladen Filipović)CS

4,292.0 5,171.1 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - -

June 22,

2011June 23, 2011

June 25,

2012 5,171.12,154.7

Contract

signed&in

progress

22 A-104.2/4 Loc TA - Integration of private HC institutions into the

network of health institutions (Srđan Popović)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

June 20,

2011

June 22,

2011- - -

June 22,

2011June 23, 2011

June 25,

2012 6,463.93,232.0

Contract

signed&in

23 A-105

TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision

24 A-105.1

Int TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and

protocols development and revision (Ana Stavljenic-

CS 86,019.8 103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February

14, 2011-

March 01,

2011

April 22,

2011- May 20, 2011

December 1,

2012103,638.3 69,960.6

Contract

signed&in

progress

25 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines

(Goran Nikolić)CS 6,706.3 8,079.9 8,079.9 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20128,079.9 7,541.2

Contract

signed&in

26 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines

(Abedin Adžović)CS 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20123,201.7 2,693.0

Contract

signed&in

progress

27 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines

(Vesna Miranović)CS 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20123,201.7 2,693.3

Contract

signed&in

28 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines

(Filip Vukmirović)CS 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20123,201.7 3,232.0

Contract

signed&in

progress

29 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines

(Sreten Kavarić) (Contract+Contract Am. 1)CS 5,314.8 6,403.4 6,403.4 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20126,403.4 3,770.7

Contract

signed&in

30 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines

(Nada Rondović)CS 2,146.0 2,585.5 2,585.5 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20122,585.5 2,370.1

Contract

signed&in A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines CS 0.0 0.0 0.0 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 0.0 0.0 Contract

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 3, 2012)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 18: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

31 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20123,201.7 2,693.3

Contract

signed&in

progressA-105.2/9 Loc TA for developing Clinical Protocols and Guidelines CS 0.0 0.0 0.0 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011 June 15, 0.0 0.0 Contract

32A-

105.2/10

Loc TA for developing Clinical Protocols and Guidelines

(Vladimir Todorovic)CS 2,682.6 3,232.0 3,232.0 SSS Prior 2 May-11 June 2, 2012 June 7, 2012 - - - - - July 1, 2012 31-Dec-12 3,232.0 0.0

Contract

signed&in

progress

33A-

105.2/10

Loc TA for developing Clinical Protocols and Guidelines

(Ljubica Pejakov)CS 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20123,201.7 1,616.0

Contract

signed&in

progress

34A-

105.2/11

Loc TA for developing Clinical Protocols and Guidelines

(Dragan Laušević)CS 2,657.4 3,201.7 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - - June 12, 2011

June 15,

20123,201.7 1,616.0

Contract

signed&in

35 A-106 TA PR campaign design and implementation

36 A-106.1 Loc TA - Capacity Building & Implementation of Public

Information Campaign (Lazar Pejović)CS 16,095.4 19,392.0 19,392.0 IC Post 1

Aug/Sep

20119-Sep-11 28-Sep-11 4-Oct-11 - 10-Nov-11 - - Dec-11 Dec-12 19,392.0 5,817.5

Contract

signed&in

progress

37 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC)

(Gorica Soković) (Contract+Contract Am. 1)CS 14,469.2 17,432.8 17,432.8 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 31-Dec-12 17,432.8 12,795.1

Contract

signed&in

38 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC)

(Vesna Nikaljević) (Contract+Contract Am. 1)CS 14,469.2 17,432.8 17,432.8 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 31-Dec-12 17,432.8 11,130.4

Contract

signed&in

39 A-106.3Loc TA - PR Strategy materials design & production (Video

Material) (Produkcija Vjeverica llc)G 3,884.4 4,680.0 4,680.0 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 23-Jul-12 4,680.0 0.0

Contract

signed&in

40 A-106.3/1Loc TA - PR Strategy materials design & production (Web

Site to support MHSIP) (Baroom Baroom llc)G 1,145.9 1,380.6 1,380.6 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 21-Aug-12 1,380.6 0.0

Contract

signed&in

41 A-106.3/2Loc TA - PR Strategy materials design & production

(Photographs) (Baroom Baroom llc)G 1,203.5 1,450.0 1,450.0 S Post 1 Mar-12 23-Apr-12 23-Apr-12 - 18-May-12 22-Jun-12 - - 17-Jul-12 01-Aug-12 1,450.0 0.0

Contract

signed&in

42 A-107 MoH capacity development

43 A-107.1

Int/Reg TA- Sr. Advisor to the Minister (Development of

two National Cancer Prevention Programs (colorectal and

cervical cancer)) (Milutin Bulajić) (Contract+Contract

Am. 1)

CS 28,455.9 34,284.2 34,284.2 IC Post 1 Mar-11April 5,

2011

April 22,

2011

February

21, 2011-

March 15,

2011- - May 25, 2011 31-Dec-12 34,284.2 22,466.0

Contract

signed&in

progress

44 A-107.2Loc TA for Development of National Colorectal Cancer

Prevention Program (Brigita Smolović)CS 5,365.1 6,463.9 6,463.9 IC Post 1 Jun-11

June 30,

2011

July 11,

2011- - 20-Jul-11 - - 27-Jul-11 5-Jun-12 6,463.9 6,463.9

Contract

completed

45 A-107.3 Loc TA for Development of National Cervical Cancer

Prevention Program (Milovan Jovanovic)CS 10,730.1 12,927.9 12,927.9 IC Post 1 Jun-11

July 26,

2011

August 4,

2011- - 12-Aug-11 - - 25-Aug-11 5-Jun-12 12,927.9 12,927.8

Contract

completed

46 A-1.1 Institutional Development of the Drugs Agency

47 A-111 TA Policy and capacity development

48 A-111.2Int TA for capacity development (In-country Training)

(ALIMS Serbia)CS

46,088.4 55,528.2 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February

10, 2011-

February

24,2011- - May 15, 2011

May 15,

201255,528.2 30,749.2

Contract

signed

49 A-111.3 Drugs Agency capacity development, out-of-country

Training, conducted in ALIMS, Belgrade, SerbiaTR

9,938.6 11,974.2 11,974.2SoE Post Multi Oct-10

Nov 24,

2010

February 8,

201111,974.2 11,974.2

Activity

completed

50 A-111.3/1

Study Tour (Belgrade, HC Quality&Accreditation in

SEE countries, March 16-18, 2011) (Jadranka Lakicevic

and Lorena Vlahovic)

TR

239.9 289.0 289.0

SoE Post 1 Mar-11 18-Mar-11 18-Mar-11 289.0 289.0Activity

completed

51 A-111.3/2 Drugs Agency capacity development, out-of-country

Training, conducted in HALMED, Zagreb, Croatia

TR

18,945.6 22,826.0 22,826.0

SoE Post Multi May-12 8-May-12 9-May-12 22,826.0 0.0Activity

completed

52 A-112 Information system for the Drugs' Agency

53 A-112.1Drugs' Agency Software development - Web Portal, DMS

and eCTD validation and review software (MG Soft)G

194,220.0 234,000.0 234,000.0ICB Prior 1

Jan-Sep

201119-Sep-11 02-Nov-11 - 5-Nov-11 16-Dec-11 - 02-Mar-12 03-Apr-12 29-Nov-12 234,000.0 23,400.0

Contract

signed&in

54 A-1.2 Trainings / study tours

55 A-120 Trainings / study tours (WG Capacity Dev.) TR Remaining amount/Throughout the life of the projectThroughout

the life of the

56 A-120/1

PR WG&PMN representatives/study visit to Macedonian

HIF, Skopje, June 27-29, 2011 (Amer Ramusovic, Lidija

Scepanovic&Boba Vukoslavovic)

TR

1,737.8 2,093.8 2,093.8

SoE Post 1 Jun-11 21-Jun-11 22-Jun-11 29-Jun-11 2,093.8 2,093.8Activity

completed

57 A-120/2Workshop "Guidelines for Good Clinical Practice", Sep

30, 2011, at Med. Fac in Podgorica, METR

1,020.4 1,229.4 1,229.4SoE Post 1 Sep-11 27-Sep-11 28-Sep-11 30-Sep-11 1,229.4 1,229.4

Activity

completed

58 A-120/34 Workshops "Guidelines for Good Clinical Practice",

Feb-May, 2012TR

21,123.5 25,450.0 25,450.0SoE Post 4 Dec-11 28-Dec-11 4-Jan-12 26 Apr, 2012 20,266.6 20,266.6

Activity

completed

59 A-120/4

ST for memebrs of the PPP WG to attend the 7th Annual

PPP in CEE/SEE Conference (April 18-20, 2012,

Vienna, Austria) (Cirgic, Todorovic, Filipovic)

TR

2,069.8 2,493.8 2,493.8

SoE Post 1 Mar-12Marr 9,

201213-Mar-12 20-Apr-12 2,493.8 2,493.8

Activity

completed

60 A-120/5

Study Tour (visit to the Agency for Quality and

Accreditaion of Serbia, Belgrade, May 23-25, 2012)

(Jadranka Lakicevic and Lorena Vlahovic)

TR

811.4 977.6 977.6

SoE Post 1 May-12 10-May-12 10-May-12 25-May-12 977.6 977.6Activity

completed

1,312,969.8 1,581,891.3 1,319,919.5

61 A.2.0 Hospital Information System/Hardware G 297,875.2 358,885.8 358,885.8 1ST ICB Prior 1May-Oct

201124-Oct-11 17-Nov-11

62A.2.0/Lot

1 Storadge system and Servers G 124,500.0 150,000.0 150,000.0 1ST ICB Prior 1May/-Oct

201125-May-12 5-Jun-12 - 7-Jun-12 19-Jul-12 - Aug-12 Sep-12 Dec-12 0.0 0.0

Evaluation in

process, BER

63A.2.0/Lot

2 Work stations and Printers (Informatika Montenegro llc) G 173,375.2 208,885.8 208,885.8 IST ICB Prior 1May/-

Oct201124-Oct-11 17-Nov-12 - 22-Nov-11 31-Jan-12 - 25-Apr-12 12-Jun-12 4-Sep-12 208,885.8 0.0

Contract

completed,

64 A.2.1 Information System / Software G

65 A-210Health Information System / Software for MOH

(Consortium Saga/Saga CG)G

114,589.8 138,060.0 138,060.0ICB Prior 1

Jan-July

201126-Jul-11 21-Oct-11 - 25-Oct-11 20-Dec-11 - 12-Mar-12 3-Apr-12 21-Aug-12 138,060.0 0.0

Contract

signed&in

66 A-211 Health Information System / Software for IPH (MG Soft) G86,427.9 104,130.0 104,130.0

ICB Prior 1June/July

20113-Oct-11 15-Nov-11 - 18-Nov-11 24-Jan-12 - 27-Feb-12 14-Mar-12 20-Dec-12 104,130.0 0.0

Contract

signed&in

67 A-211.1 Loc TA - System Analyst for the IPH (Branimir Bukilic) CS7,511.1 9,049.5 9,049.5

IC Post 1 Aug-11 9-Sep-11 15-Sep-11 17-Sep-11 - 19-Oct-11 - - 29-Dec-12 1-Jul-12 9,049.5 9,049.5Contract

completed

68 A-212/1

Loc TA - Hardware equipment needs assessment and

technical specification development (Sergej Lazović) (12

months)

CS

5,365.1 6,463.9 6,463.9

SSS Prior 1 May-11May 30,

2011

May 31,

2011- - - - - June 12, 2011

June 15,

20126,463.9 6,463.9

Contract

completed

69 A-212/2

Loc TA - Hardware equipment needs assessment and

technical specification development (Pavle Aligrudić) (12

months)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- - - - - June 12, 2011

June 15,

20126,463.9 6,463.9

Contract

completed

Subtotal A.1:

Subcomponent A.2: Health Information System

Page 19: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

70 A-212/3 Loc TA - Hardware equipment needs assessment and

technical specification development (Nataša Terzić)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- - - - - June 12, 2011

June 15,

20126,463.9 3,232.0

Contract

completed

71 A-212/4

Loc TA - Hardware equipment needs assessment and

technical specification development (Mensud Grbović) (12

months) Contract+ Am. No. 1CS

6,303.9 7,595.1 7,595.1SSS Prior 1 May-11

July 27,

2011

August 4,

2011- - - - - June 12, 2011

June 15,

20127,595.1 7,595.1

Contract

completed

72 A-213

TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement (Ljiljana Krejović)

Contract+Am.1

CS

4,470.9 5,386.6 5,386.6

IC Post 1 May-11May 31,

2011

May 31,

2011- - - - - June 8, 2011

June 15,

20125,386.6 5,386.6

Contract

completed

73 A-214 Loc TA for LAN Project Design for Hardware (selected

locations/hospitals outside PG)CS

2,000.0 2,409.6 0.0IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 - - Dec-11 Dec-11 Dec-11 0.0 0.0

To be

reconsidered

535,274.0 644,908.4 642,498.8

1,848,243.8 2,226,799.7 1,962,418.2

74 B.1.0 Operational Review of the PHC

75 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,546.8 16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010 7/9/10 - Oct 22, 2010October 23,

201116,321.5 16,321.5

Contract

completed

13,546.8 16,321.5 16,321.5

76 B.2.0 PHC Specialization Program Development &

Implementation

77 B-201 Int TA PHC Specialization Program Development &

Implementation (University of Ljubljana)CS 213,689.7 257,457.5 257,457.5 QCBS Prior 1

Oct/Nov

2010

Nov 22,

2010

Nov 22,

2010

January 10,

2011-

February 3,

2011

May 19,

2011- Jun-11 Dec-12 257,457.5 143,032.5

Contract

signed&in

progress

78 B-202Loc TA Family Medicine Specialization Program

Implementation Coordinator (Ljiljana Kezunovic)CS 6,974.6 8,403.1 8,403.1 IC Post 1 Jan-12 13-Feb-12 14-Feb-12 - - - - - 25-Apr-12 31-Dec-12 8,403.1 4,946.7

Contract

signed&in

progress220,664.3 265,860.6 265,860.6

79 B.3.0TA for PHC Specialist Medicine Training Program

(Medicine and Nursing, 4 rounds, 8-11)CS

423,399.1 510,119.3 510,119.3IC/CQ Prior Multi Ongoing throughout the life of the Project Dec-12

80 B-301Training Program (Education) Coordinator (rounds8-11)

(Mara Drecun) (Contract+Am.1)CS

16,213.0 19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/11

19,533.719,533.7

Amendment

signed&in

progress

81 B-302Training Implementation Specialist (rounds 8&9) (Igor

Švab) (Contract+Am.1)CS

9,308.4 11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/11 11,214.9 11,214.9

Amendment

signed&in

82B-303.1 -

D IC Educators (loc) Doctors(25), (rounds 8&9) CS 29,448.7 35,480.4 35,480.4 SSS Prior Multi

83 B-303.1- Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 887.0 1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,068.7 413.7 Amendment

84 B-303.1- Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,293.0 1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,557.8 989.0 Amendment

85 B-303.1- Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,348.8 465.4 Amendment

86 B-303.1- Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,541.2 3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 3,061.7 1,913.3 Amendment

87 B-303.1- Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,239.3 1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,493.2 1,236.8 Amendment

88 B-303.1- Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,146.0 2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,585.6 1,762.5 Amendment

89 B-303.1- Educator Doctor (P.Divanović) (Contract+Am.1) CS 1,985.1 2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,391.7 1,368.2 Amendment

90 B-303.1- Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 872.7 1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,051.5 396.5 Amendment

91 B-303.1- Educator Doctor (J.Pepić) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 344.7 Amendment

92 B-303.1- Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,551.3 861.9 Amendment

93 B-303.1- Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,234.0 1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,486.7 1,085.9 Amendment

94 B-303.1- Educator Doctor (N.Janković) (Contract+Am.1) CS 1,008.6 1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,215.2 672.2 Amendment

95 B-303.1- Educator Doctor (Božika Subašić) CS 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 689.5 517.1 Contract

96 B-303.1- Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,180.3 1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,422.1 810.1 Amendment

97 B-303.1- Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,273.3 1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,534.1 965.3 Amendment

98 B-303.1- Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,083.1 3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 3,714.6 2,344.2 Amendment

99 B-303.1- Educator Doctor (L.Delević) (Contract+Am.1) CS 1,430.7 1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,723.7 1,034.2 Amendment

100 B-303.1- Educator Doctor (V.Peranović) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7 Amendment

101 B-303.1- Educator Doctor (Z.Miljković) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 172.4 Amendment

102 B-303.1- Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,144.5 1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,379.0 689.5 Amendment

103 B-303.1- Educator Doctor (Julijana Zečević) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 517.1 172.4 Contract

104 B-303.1- Educator Doctor (B.Radović) (Contract+Am.1) CS 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,034.2 689.5 Amendment

105 B-303.1- Educator Doctor (M.Bogavac) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 689.5 Amendment

106 B-303.1- Educator Doctor (O.Poček) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7 Amendment

107 B-303.1- Educator Doctor (S.Šabović) (Contract+Am.1) CS 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 689.5 172.4 Amendment

108B-303.1-

N Educator (loc) Nurses(19), (rounds 8&9) CS 21,971.7 26,471.9 26,471.9

109 B-303.1- Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,692.6 5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 5,653.8 4,000.1 Amendment

110 B-303.1- Educator Nurse (J.Radinović) (Contract+Am.1) CS 944.3 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,137.7 749.8 Amendment

111 B-303.1- Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,309.1 1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,577.2 784.3 Amendment

112 B-303.1- Educator Nurse (B.Mudreša) (Contract+Am.1) CS 472.1 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 568.8 237.0 Amendment

113 B-303.1- Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 414.9 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 499.9 155.1 Amendment

114 B-303.1- Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,172.1 573.1 Amendment

115 B-303.1- Educator Nurse (D.Rakčević) (Contract+Am.1) CS 643.8 775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 775.7 465.4 Amendment

116 B-303.1- Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,338.5 5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 5,227.1 3,560.5 Amendment

117 B-303.1- Educator Nurse (N.Božović) (Contract+Am.1) CS 658.1 792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 792.9 387.8 Amendment

118 B-303.1- Educator Nurse (L.Vujović) (Contract+Am.1) CS 629.5 758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 758.4 724.0 Amendment

119 B-303.1- Educator Nurse (V.Garović) (Contract+Am.1) CS 372.0 448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 448.2 103.4 Amendment

120 B-303.1- Educator Nurse (M.Marković) (Contract+Am.1) CS 214.6 258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 258.6 103.4 Amendment

121 B-303.1- Educator Nurse (R.Ostojić) (Contract+Am.1) CS 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 930.8 620.5 Amendment

122 B-303.1- Educator Nurse (T.Đurić) (Contract+Am.1) CS 901.3 1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,085.9 637.8 Amendment

123 B-303.1- Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,001.5 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,206.6 724.0 Amendment

124 B-303.1- Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 314.7 379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 379.2 137.9 Amendment

125 B-303.1- Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,688.2 2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,034.0 1,241.1 Amendment

126 B-303.1- Educator Nurse (L.Mitrović) (Contract+Am.1) CS 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 930.8 413.7 Amendment

127 B-303.1- Educator Nurse (R.Džoganović) (Contract+Am.1) CS 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,034.2 1,034.2 Amendment

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional

Development

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Subtotal A.2:

Page 20: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

128 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag,

Jovanović Danijela, Dašić Radmila) (Contract+Am.1)

CS

2,049.4 2,469.2 2,469.2

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10 2,469.2 1,034.2

Amendment

signed&in

progress

129B-304.1-

D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS 22,273.8 26,835.9 26,835.9

130 B-304.1- T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,641.7 1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,978.0 1,370.4 Amendment

131 B-304.1- T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Amendment

132 B-304.1- T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 865.6 1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,042.9 711.0 Amendment

133 B-304.1- T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Amendment

134 B-304.1- T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,172.1 775.7 Amendment

135 B-304.1- T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 845.9 1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,019.1 687.3 Amendment

136 B-304.1- T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 236.1 284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 284.4 189.6 Amendment

137 B-304.1- T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,377.0 1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,659.1 1,090.3 Amendment

138 B-304.1- T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,881.3 2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,266.7 1,525.5 Amendment

139 B-304.1- T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 853.2 474.0 Amendment

140 B-304.1- T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 536.5 646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 646.4 275.8 Amendment

141 B-304.1- T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,551.3 706.7 Amendment

142 B-304.1- T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 284.4 Amendment

143 B-304.1- T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4 Amendment

144 B-304.1- T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 432.8 521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 521.4 284.4 Amendment

145 B-304.1- T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 944.2 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,137.7 711.0 Amendment

146 B-304.1- T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 704.6 848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 848.9 331.8 Amendment

147 B-304.1- T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 189.6 Amendment

148 B-304.1- T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 425.6 512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 512.8 297.3 Amendment

149 B-304.1- T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,348.8 801.5 Amendment

150 B-304.1- T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 314.8 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 379.2 189.6 Amendment

151 B-304.1- T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 482.9 581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 581.8 349.1 Amendment

152 B-304.1- T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 1,960.0 2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,361.5 1,482.4 Amendment

153 B-304.1- T. Lecturer Doctor (Jadranka Lakićević) CS 422.0 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 508.5 148.7 Contract

154 B-304.1- T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,244.7 1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,499.6 848.9 Amendment

155 B-304.1- T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 293.3 353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 353.4 0.0 Amendment

156 B-304.1- T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,169.6 1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,409.1 883.4 Amendment

157 B-304.1- T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 368.4 443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 443.9 189.6 Amendment

158B-304.1-

N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS 16,399.2 19,758.0 19,758.0

159 B-304.1- T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 597.3 719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 719.7 452.5 Amendment

160 B-304.1- T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,083.7 1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,305.7 913.6 Amendment

161 B-304.1- T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,318.6 879.1 Amendment

162 B-304.1- T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,172.1 659.3 Amendment

163 B-304.1- T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 543.7 655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 655.0 409.4 Amendment

164 B-304.1- T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,409.2 1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,697.8 1,163.5 Amendment

165 B-304.1- T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,631.0 1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,965.0 1,305.7 Amendment

166 B-304.1- T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,616.7 1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,947.8 1,383.3 Amendment

167 B-304.1- T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,539.5 3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 3,059.6 2,255.9 Amendment

168 B-304.1- T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 851.2 1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,025.6 659.3 Amendment

169 B-304.1- T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 853.2 547.3 Amendment

170 B-304.1- T. Lecturer Med. Technician (Dragan Guberinić) CS 143.1 172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 172.4 120.7 Contract

171 B-304.1- T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,318.6 879.1 Amendment

172 B-304.1- T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 608.0 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 732.6 439.6 Amendment

173 B-304.1- T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 744.0 896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 896.3 581.8 Amendment

174 B-304.1- T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 397.0 478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 478.3 284.4 Amendment

175B-304.1-

N-17

T. Lecturer Med. Technician (G.Jokanović)

(Contract+Am.1)CS

364.8 439.6 439.6SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 439.6 219.8

Amendment

signed&in

176 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9)

(Vujičić Vesko, Dragica Terzić, Rajka Pajović, Vladimir

Dobričanin, Ognjen Jovićević, Nada Janković, Edita

Bašović) (round 9) (Miroslav Stanišljević)

(Contract+Am.1)

CS

4,077.4 4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10 4,912.6 2,363.6

Amendment

signed&in

progress

Page 21: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

177 B-305

8th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers)

&accommodation, Logistical Assisstant, Rent, printing

certificates, office equipment, etc. 60,361.7 72,725.0 72,725.0

SoE Post Mar-10Sep 22,

2010Sep 24, 2010 Jun-10 72,725.0 72,725.0 Completed

178 B-306

9th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers)

&accommodation, Logistical Assisstant, Rent, printing

certificates, office equipment, etc. 68,265.8 82,248.0 82,248.0

SoE Post Sep-10Dec 20,

2010

Dec 20,

2010Jan-11 82,248.0 82,248.0 COmpleted

179 B-307

10th round operating expenses - appointed participants'

travel costs and per diems refund (to PH centers)

&accommodation, Logistical Assisstant, Rent, printing

certificates, office equipment, etc. 71,722.4 86,412.6 86,412.6

SoE Post Feb-11 June 1, 2011 June 1, 2011June 25,

201186,412.6 86,412.6 COmpleted

180 B-308

11th round operating expenses - appointed participants'

travel costs and per diems refund (to PH centers)

&accommodation, Logistical Assisstant, Rent, printing

certificates, office equipment, etc. 101,307.5 122,057.2 122,057.2

SoE Post Sep-11 23-Nov-11 01-Dec-11 Jan-12

122,057.2

122,057.2 Completed

181 B-3.1 Equipment - Diagnostic equipment

182 B-312Medical equipment for Primary Health Care Development

G413,483.8 666,526.0 666,526.0

ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12

183B-312 Lot

1Diagnostic equipment G 306,276.0 537,360.0 537,360.0 ICB Prior 1

June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12 0.0 0.0

Response to

WB 184

B-312 Lot

2 Diagnostic and therapy equipment (PDG llc) G 35,901.6 43,254.9 43,254.9 ICB Prior 1June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12 43,254.9 0.0

Contract

signing in

185B-312 Lot

3 Small medical equipment and furniture (Inel Medica llc)G

71,306.2 85,911.1 85,911.1ICB Prior 1

June/Aug

201130-Mar-12 6-Apr-12 - 10-Apr-12 13-Jun-12 - 25-Jul-12 Sep-12 Nov-12

85,911.10.0

Contract

signing in

186 B-3.2 Civil Works

187 B-321PHC facility DZ Bijelo Polje renovation (Contract + Am.1

(VO#1))W

1,000,000.0 2,679,328.4 2,679,328.4ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 5/31/12 2,679,328.4 2,029,243.88

Contract Am.

to be signed

(Completion

188 B-322Supervision of Works on renovation of PHC facility DZ

Bijelo Polje (IGH Institut, Zagreb CRO)CS

53,942.7 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12 64,991.2 34,205.8

Contract

signed&in

progress

189 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,636.7 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10 4,381.5 4,381.5

Contract

completed

190 B-324 PHC Bijelo Polje Waste Water Biological Treatment Tech Spec.

1,894,462.1 3,925,346.4 3,925,346.4

2,128,673.3 4,207,528.5 4,207,528.5

191 C.1 PMN Personnel CS

192 C1.1 Coordinator, short-term (4months)( Pavle Aligrudić) CS 7,106.4 8,561.9 8,561.9 SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10 8,561.9 8,561.9Contract

completed

193 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10

3,995.63,995.6

Contract

completed

194 C1.3Coordinator (24 months) (Majda Škrijelj)

(Contract+Am.1+Am.2)CS

53,298.0 64,214.4 64,214.3IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 31-Dec-12 64,214.3 51,371.5

Amendment

signed&in

195 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1+Am.2)CS

47,375.8 57,079.3 57,079.3IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 31-Dec-12 57,079.3 42,809.6

Amendment

signed&in

196 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS9,948.9 11,986.7 11,986.7

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 7/1/1111,986.7

11,986.7Contract

completed

197 C1.6Administrative Assistant (12 months) (Natasa Jolic)

(Contract + Am.1)CS

15,752.5 18,978.9 18,978.9IC Post 1

April 20,

2011

April 20,

2011

April 20,

2011

April 21,

2011- - - - June 6, 2011 31-Dec-12

18,978.911,986.7

Amendment

signed&in

198 C.2 PMN Trainings / Study tours TR 10,090.0 12,156.6 3,169.1 SoE/CQ Post Multi Ongoing throughout the life of the Project

199PMN Training (Sarajevo, Procurement Seminar, May 31-

Jun 4, 2010) (Boba Vukoslavovic)TR

633.5 763.2 763.2SoE Post 1 May-10

May

27,2012May 27,2012 May-10 763.2 763.2

Activity

completed

200PMN Training (Zagreb, Procurement Seminar, Oct 18-

22, 2010) (Majda Skrijelj)TR

1,180.3 1,422.0 1,422.0SoE Post 1 Oct-10 4-Oct-10 4-Oct-10 Oct-10 1,422.0 1,422.0

Activity

completed

201

PMN Study Tour (Belgrade, meetings regarding Serbian

Health Project DRG negotiations, October 7, 2011)

(Majda Skrijelj&Lidija Scepanovic)

TR

394.3 475.0 475.0

SoE Post 1 Sep-11 22-Sep-11 22-Sep-11 Oct-11 475.0 475.0Activity

completed

202PMN Training (Skopje, IT Procurement, Oct 27, 2011)

(Boba Vukoslavovic)TR

422.4 508.9 508.9SoE Post 1 Oct-11 26-Oct-11 26-Oct-11 Oct-11 508.9 508.9

Activity

completed

203 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 150,000.0 180,722.9 180,722.9SoE Post Ongoing throughout the life of the Project 180,722.9 120,000.0

Ongoing

thorugh the

204 C.4 Independent Financial Audit CS3,107.5 3,744.0 3,744.0

LCS Prior 1 Apr-11April 29,

2011May 6, 2011

May 10,

2011- 22-Jun-11 - 7-Jul-11 25-Jul-11 11-Sep-12 3,744.0 3,744.0

Contract

signed&in

progress

205 C.5 Annual survey CS111,191.0 133,965.0 133,965.0

CQ Prior 1 Jan-11February 1,

2011

February 2,

2011

February 2,

201110-Nov-11 - - 05-Mar-12 05-Dec-12 133,965.0 13,396.5

Contract

signed&in

206 C.6Local TA for Monitoring and Evaluation

CS20,000.0 24,096.4 0.0

IC / CQ Prior 1 Activity to be initiated towards the end of the Project 0.0 0.0Activity to

initiate in

207 C.7 Office Furniture/Equipment G

208 C 7.1 PMN Office Furniture G 1,079.0 1,300.0 1,300.0 S Prior 1 Jul-10 26-Jun-10 28-Jun-10 - Aug-10Oct 12,

2010- Nov 1, 2010 Nov 12, 2010 - 1,300.0 1,300.0

Contract

completed

209 C 7.2 PMN Office Equipment (Hardware) G 1,288.2 1,552.0 1,552.0 S Prior 1 Jul-11 1-Aug-11 3-Aug-11 - 14-Oct-11 25-Oct-11 - - 3-Nov-11 - 1,552.0 1,552.0Contract

completed

433,553.6 522,353.7 489,269.7

210C.8 5-month TSU Operating Expenses 36,369.6 43,818.8 43,818.8

43,818.8 43,818.8

MHSIP

funding

completed36,369.6 43,818.8 43,818.8

469,923.13 566,172.44 533,088.43

4,446,840.19 7,000,500.67 6,703,035.12

4,446,840.19 7,000,500.67 6,703,035.12 6,010,491.7 3,600,370.9

2,679,328.4 2,029,243.9

Total negotiated Loan amount 5,100,000.00 3,331,163.3 1,571,127.0

Savings 653,159.81 1 2,764,865.5 1,304,035.4

Uncommitted 670,212.64 2 1,000,000.0 1,000,000.0

Commited minus CW * 0.83

Loan share for CW

Subtotal C.8:

TOTAL Component C:

Sub-total A+B+C

GRAND TOTAL Additional financing:

B-321 CW

Commited minus CW

Subtotal C.1:

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subcomponent C.1: Project Management Network

Page 22: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Committed (contracted) 3,769,167.89 6,015,675.24 6,015,675.12 1+2 3,764,865.5 2,304,035.4

Total 5,092,540.34

Planned activities throughout 2012. 656,971.8

A-101.2Broadening the ToR for Int TA for STC Basic Benefits

PackageCS

40,000.0 48,192.8 48,192.8

A-120 Possible ST, WS, seminars TR 9,000.0 10,843.4 10,843.4

B-321 PHC Bijelo Polje CW - Additional Works, VO#2 W 402,447.8 484,876.9 484,876.9

B-324 PHC Bijelo Polje Waste Water Biological Treatment G 45,000.0 54,216.9 54,216.9

B-203Tuition for the first cohort of the Family Medicine

Additional Specialization Program (mentors to be)TR

0.0 0.0 0.0

B-312 Lot

1

Diagnostic equipment - difference in price of the only two

bids receivedG

141,524.0 170,510.8 170,510.8Price of the second Med. Eq. bid 447,800.0

C.3 Possible Operating Costs 19,000.00 22,891.6 22,891.6

Page 23: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

No

Item Description

Ty

pe

Est

imat

. C

ost

/All

oca

ted

amo

un

t L

OA

N

(E

UR

)

Est

imat

. C

ost

/All

oca

ted

amo

un

t

Wit

h

Go

ver

nm

ent

Co

ntr

ibu

tio

n

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

ho

rtli

st,

TS

,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o

Qu

ote

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Sh

ort

list

, T

S,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Inv

itat

ion

to

Qu

ote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

Bid

op

enin

g-

Tec

hn

ical

/Fin

anci

al

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Co

ntr

act

awar

d/S

ign

ing

Co

ntr

act

com

ple

tio

n

Co

mm

ited

Dis

bu

rsed

Act

ivit

y S

tatu

s

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and STC

Basic Benefits Package

3 A-101.1 Int TA health institutions Hospital Optimization Plan CS 64,286.8 77,454.0 77,454.0 IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 - 25-Jan-12 - 07-Feb-12 29-Feb-12 30-Nov-12 77,454.0 0.0Contract

signed&in

progress

4 A-101.2 Int TA for STC Basic Benefits Package CS 74,768.1 90,082.0 90,082.0 CQS Prior 1 Dec-10 Apr 06, 2011 May 9, 2011 May 12, 2011 - 07-Jul-11July 22,

2011

August 3,

201123-Feb-12 30-Nov-12 90,082.0 0.0

Contract

signed&in

5 A-101.3 Loc TA Hospital Optimization Plan (Firm/Organization) CS 50,000.00 60,241.0 0.0 CQS Prior 1 06-Oct-11 01-Nov-11 2-Nov-11 10-Nov-11 - Nov-11 - Dec-11 Dec-11 Dec-12 0.0 0.0Position to be

reconsidered

6 A-101.4 Loc TA for STC Basic Benefits Package (Firm/Organization) CS 115,852.2 139,581.0 139,581.0 SSS Prior 1 Apr-11June 29,

2011July 13, 2011 - - - - - 01-Nov-11 31-Dec-12 139,581.0 0.0

Contract

signed&in

progressA-102 Analytical study on HR in Health System in MNA-102.1 Analytical study on HR in Health System in MN

7 A-103 STC payment model design and implementation

8 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)CS 180,478.9 217,444.5 217,444.5 CQS Prior 1 Oct/Nov 2010

February 2,

2011

February 2,

2011Nov 23, 2010 - Dec 17, 2010

February 04,

2011

February 11,

2011June 3, 2011

November 30,

2012217,444.5 37,170.0

Contract

signed&in

progress

9 A-103.2 Loc TA STC payment model design and implementation CS 58,500.0 70,481.9 0.0 SSS* Post 7 Jan-12 Feb-12 24-Feb-12 - - - - - - Dec-12 0.0 0.0Selection in

progress

10 A-103.3 Purchasing DRG Licence G 70,000.0 84,337.3 0.0 DC Prior 1 - - - - - - - - - Dec-12 0.0 0.06-month Trial

Version Contract

signed by MoH

A-103.4 Purchasing DRG Casemix Material G 1,494.0 1,800.0 1,800.0 CoE 1,800.0 1,800.0Disbursed and

goods delivered

11 A-104 Private public integration

12 A-104.1 Int TA Private public integration CS 47,628.3 57,383.5 57,383.5 IC Prior 1May/June

2011Jun-11 Jun-11 May 6, 2011 - June 2, 2011

June 16,

2011June 17, 2011 Aug-11 Oct-12 57,383.5 12,123.8

Contract

signed&in

13 A-104.2/1 Loc TA - Integration of private HC institutions into the network of

health institutions (Dragoljub Perović)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - - June 22, 2011

June 23,

2011June 25, 2012

5,171.10.0

Contract

signed&in

progress

14 A-104.2/2 Loc TA - Integration of private HC institutions into the network of

health institutions (Milan Mirković)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - - June 22, 2011

June 23,

2011June 25, 2012

5,171.10.0

Contract

signed&in

progress

15 A-104.2/3 Loc TA - Integration of private HC institutions into the network of

health institutions (Mladen Filipović)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - - June 22, 2011

June 23,

2011June 25, 2012

5,171.10.0

Contract

signed&in

progress

16 A-104.2/4 Loc TA - Integration of private HC institutions into the network of

health institutions (Srđan Popović)CS

6,438.1 7,756.7 6,463.9SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - - June 22, 2011

June 23,

2011June 25, 2012

6,463.90.0

Contract

signed&in

progress

17 A-105 TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols Development

and Revision

18 A-105.1

Int TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and protocols development

and revision

CS 86,019.8 103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

March 01,

2011

April 22,

2011-

May 20,

2011

December 1,

2012103,638.3 35,000.0

Contract

signed&in

progress

19 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines (Goran

Nikolić)CS 10,059.5 12,119.9 8,079.9 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 8,079.9 3,770.6

Contract

signed&in

progress

20 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines (Abedin

Adžović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

21 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines (Vesna

Miranović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

22 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines (Filip

Vukmirović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

23 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines (Sreten

Kavarić)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

24 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines (Nada

Rondović)CS 3,219.0 3,878.3 2,585.5 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 2,585.5 1,508.3

Contract

signed&in

progress

25 A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines (Zorica

Dautović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

26 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines (Ljiljana

Musić-Gledović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of March 27, 2012)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 24: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

27 A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines (Ranko

Lazović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

28 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines (Ljubica

Pejakov)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

29 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines (Dragan

Laušević)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

30 A-106 TA PR campaign design and implementation

31 A-106.1 Loc TA - Capacity Building & Implementation of Public

Information Campaign (Lazar Pejović)CS 16,095.4 19,392.0 19,392.0 IC Post 1 Aug/Sep 2011 9-Sep-11 28-Sep-11 4-Oct-11 - 10-Nov-11 - - Dec-11 Dec-12 19,392.0 0.0

Contract

signed&in

progress

32 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC) (Gorica

Soković)CS 16,167.0 19,478.3 11,130.4 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 March 31, 2012 11,130.4 7,420.3

Contract

signed&in

progress

33 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC) (Vesna

Nikaljević)CS 16,167.0 19,478.3 11,130.4 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 March 31, 2012 11,130.4 7,420.3

Contract

signed&in

progress

34 A-106.3Loc TA - PR Strategy materials design & production (posters,

brochures, media buy) (Firm)G 34,468.2 41,528.0 0.0 S Post Multi Feb-12 Feb-12 Mar-12 Mar-12 Apr-12 Apr-12 Apr-12 May-11 Dec-12 0.0 0.0

Ongoing, to be

purchased on as

needed basis

35 A-107 MoH capacity development

36 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical

cancer)) (Milutin Bulajić)

CS 20,562.4 24,774.0 24,774.0 IC Post 1 Mar-11 April 5, 2011 April 22, 2011February 21,

2011-

March 15,

2011- -

May 25,

2011May 25, 2012 24,774.0 15,000.0

Contract

signed&in

progress

37 A-107.2Loc TA for Development of National Colorectal Cancer Prevention

Program (Brigita Smolović)CS 5,365.1 6,463.9 6,463.9 IC Post 1 Jun-11

June 30,

2011July 11, 2011 - - 20-Jul-11 - - 27-Jul-11 5-Jun-12 6,463.9 3,232.0

Contract

signed&in

progress

38 A-107.3Loc TA for Development of National Cervical Cancer Prevention

Program (Milovan Jovanovic)CS 10,730.1 12,927.9 12,927.9 IC Post 1 Jun-11 July 26, 2011 August 4, 2011 - - 12-Aug-11 - - 25-Aug-11 5-Jun-12 12,927.9 6,463.9

Contract

signed&in

progress

39 A-1.1 Institutional Development of the Drugs Agency

40 A-111 TA Policy and capacity development

41 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

46,088.4 55,528.2 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

February

24,2011- -

May 15,

2011May 15, 2012 55,528.2 15,000.0 Contract signed

42 A-111.3Drugs Agency capacity development, out-of-country Training

TR15,000.0 18,072.3 18,072.3

SoE Multi Oct-10 Nov 24, 2010February 8,

201118,072.3 2,000.0

Activity in

progress

A-111.3/1

Study Tour (Belgrade, HC Quality&Accreditation in SEE

countries, March 16-18, 2011) (Jadranka Lakicevic and Lorena

Vlahovic) 239.9 289.0 289.0

SoE 1 Mar-11 18-Mar-11 18-Mar-11 289.0 289.0Activity

completed

43 A-112 Information system for the Drugs' Agency

44 A-112.1Drugs' Agency Software development - Web Portal, DMS and

eCTD validation and review softwareG

194,220.0 234,000.0 234,000.0ICB Prior 1

July-Sep

201119-Sep-11 02-Nov-11 - 5-Nov-11 16-Dec-11 - 02-Mar-12 15-Mar-12 - 234,000.0 0.0

Contract signing

in progress

45 A-1.2 Trainings / study tours 67,172.2 80,930.3

46 A-120 Trainings / study tours (WG Capacity Dev.) TR 43,290.4 52,157.2 28,773.16 Remaining amount/Throughout the life of the projectThroughout the

life of the project

A-120/1

PR WG&PMN representatives/study visit to Macedonian HIF,

Skopje, June 27-29, 2011 (Amer Ramusovic, Lidija

Scepanovic&Boba Vukoslavovic) 1,737.8 2,093.8 2,093.8

SoE Post 1 Jun-11 21-Jun-11 22-Jun-11 29-Jun-11 2,093.8 2,093.8Activity

completed

A-120/2Workshop "Guidelines for Good Clinical Practice", Sep 30,

2011, at Med. Fac in Podgorica, ME 1,020.4 1,229.4 1,229.4SoE Post 1 Sep-11 27-Sep-11 28-Sep-11 30-Sep-11 1,229.4 1,229.4

Activity

completed

A-120/34 Workshops "Guidelines for Good Clinical Practice", Feb-May,

2012 21,123.5 25,450.0 25,450.025,450.0 13,000.0

Activity in

progress

1,266,209.6 1,525,553.8 1,171,322.7

47 A.2.0 Hospital Information System / Hardware G 406,700.0 490,000.0 0.0 1ST ICB Prior 1May/June

201124-Oct-11 Nov-11 Nov-11 22-Nov-11 16-Jan-12 Jan-12 Feb-12 Feb-12 Jun-12 0.0 0.0

Lot 1 to be

decided whether

48 A.2.1 Information System / Software G

49 A-210 Health Information System / Software for MOH G114,589.8 138,060.0 138,060.0

ICB Prior 1June/July

201117-Oct-11 21-Oct-11 - 25-Oct-11 6-Dec-11 - Dec-11 Jan-12 Dec-12 138,060.0 0.0

Contract signing

in progress

50 A-211 Health Information System / Software for IPH G86,427.9 104,130.0 104,130.0

ICB Prior 1June/July

201126-Oct-11 Nov-11 - 11-Nov-11 10-Jan-12 - Jan-12 Feb-12 Dec-12 104,130.0 0.0

Contract signing

in progress

51 A-211.1 Loc TA - System Analyst for the IPH (6 months) CS7,511.1 9,049.5 9,049.5

IC Post 1 Aug-11 9-Sep-11 15-Sep-11 17-Sep-11 - 19-Oct-11 - - Nov-11 May-11 9,049.5 5,000.0Contract

signed&in

progress

52 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović) (12 months)

CS

5,365.1 6,463.9 6,463.9

SSS Prior 1 May-11May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012 6,463.9 3,232.0

Contract

signed&in

progress

53 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić) (12 months)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012 6,463.9 3,232.0

Contract

signed&in

progress

54 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012 6,463.9 3,232.0

Contract

signed&in

progress

55 A-212/4

Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) (12 months)

Contract+ Am. No. 1CS

6,303.9 7,595.1 7,595.1SSS Prior 1 May-11 July 27, 2011 August 4, 2011 - - - - -

June 12,

2011June 15, 2012 7,595.1 3,232.0

Contract

Amendment to

be signed

56 A-213

TA for preparing MoH, IPH and Drug's Agency bidding documents

for software procurement (Ljiljana Krejović) CONTRACT

AMENDMENT

CS

3,576.7 4,309.3 4,309.3

IC Post 1 May-11May 31,

2011May 31, 2011 - - - - - June 8, 2011 June 15, 2012 4,309.3 4,309.3

Contract

signed&in

progress

Subtotal A.1:

Subcomponent A.2: Health Information System

Page 25: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

57 A-214 Loc TA for LAN Project Design for Hardware (selected

locations/hospitals outside PG)CS

2,000.0 2,409.6 0.0IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 - - Dec-11 Dec-11 Dec-11 0.0 0.0

Selection in

progress

643,204.6 774,945.3 282,535.6

1,909,414.2 2,300,499.0 1,453,858.4

58 B.1.0 Operational Review of the PHC

59 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,546.8 16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010 7/9/10 - Oct 22, 2010October 23,

201116,321.5 16,321.5

Contract

completed

13,546.8 16,321.5 16,321.5

60 B.2.0 PHC Specialization Program Development & Implementation

61 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 213,689.7 257,457.5 257,457.5 QCBS Prior 1 Oct/Nov 2010 Nov 22, 2010 Nov 22, 2010

January 10,

2011-

February 3,

2011

May 19,

2011- Jun-11 Dec-12 257,457.5 77,237.6

Contract signing

in progress

62 B-202Loc TA Family Medicine Specialization Program Implementation

CoordinatorCS 6,975.4 8,404.1 0.0 IC Post 1 Jan-12 13-Feb-12 14-Feb-12 - - - Dec-11 Dec-11 Dec-11 0.0 0.0

Sellection in

progress

220,665.1 265,861.6 257,457.5

63 B.3.0TA for PHC Specialist Medicine Training Program (Medicine and

Nursing, 4 rounds, 8-11)CS

423,399.1 510,119.3 510,119.3IC/CQ Prior Multi Ongoing throughout the life of the Project Dec-12

64 B-301Training Program (Education) Coordinator (rounds8-11) (Mara

Drecun) (Contract+Am.1)CS

16,213.0 19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/11

19,533.719,533.7

Amendment

signed&in

progress

65 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS

9,308.4 11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/11 11,214.9 11,214.9

Amendment

signed&in

progress

66 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 29,448.7 35,480.4 35,480.4 SSS Prior Multi

67 B-303.1-D-1 Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 887.0 1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,068.7 413.7Amendment

signed&in 68 B-303.1-D-2 Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,293.0 1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,557.8 989.0

Amendment

signed&in 69 B-303.1-D-3 Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,348.8 465.4

Amendment

signed&in 70 B-303.1-D-4 Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,541.2 3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 3,061.7 1,913.3

Amendment

signed&in 71 B-303.1-D-5 Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,239.3 1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,493.2 1,236.8

Amendment

signed&in 72 B-303.1-D-6 Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,146.0 2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,585.6 1,762.5

Amendment

signed&in 73 B-303.1-D-7 Educator Doctor (P.Divanović) (Contract+Am.1) CS 1,985.1 2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,391.7 1,368.2

Amendment

signed&in 74 B-303.1-D-8 Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 872.7 1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,051.5 396.5

Amendment

signed&in 75 B-303.1-D-9 Educator Doctor (J.Pepić) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 344.7

Amendment

signed&in 76 B-303.1-D-10 Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,551.3 861.9

Amendment

signed&in 77 B-303.1-D-11 Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,234.0 1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,486.7 1,085.9

Amendment

signed&in 78 B-303.1-D-12 Educator Doctor (N.Janković) (Contract+Am.1) CS 1,008.6 1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,215.2 672.2

Amendment

signed&in 79 B-303.1-D-13 Educator Doctor (Božika Subašić) CS 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 689.5 517.1

Contract

completed80 B-303.1-D-14 Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,180.3 1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,422.1 810.1

Amendment

signed&in 81 B-303.1-D-15 Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,273.3 1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,534.1 965.3

Amendment

signed&in 82 B-303.1-D-16 Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,083.1 3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 3,714.6 2,344.2

Amendment

signed&in 83 B-303.1-D-17 Educator Doctor (L.Delević) (Contract+Am.1) CS 1,430.7 1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,723.7 1,034.2

Amendment

signed&in 84 B-303.1-D-18 Educator Doctor (V.Peranović) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7

Amendment

signed&in 85 B-303.1-D-19 Educator Doctor (Z.Miljković) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 172.4

Amendment

signed&in 86 B-303.1-D-20 Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,144.5 1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,379.0 689.5

Amendment

signed&in 87 B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 517.1 172.4

Contract

completed88 B-303.1-D-22 Educator Doctor (B.Radović) (Contract+Am.1) CS 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,034.2 689.5

Amendment

signed&in 89 B-303.1-D-23 Educator Doctor (M.Bogavac) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 689.5

Amendment

signed&in 90 B-303.1-D-24 Educator Doctor (O.Poček) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7

Amendment

signed&in 91 B-303.1-D-25 Educator Doctor (S.Šabović) (Contract+Am.1) CS 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 689.5 172.4

Amendment

signed&in

92 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 21,971.7 26,471.9 26,471.9

93 B-303.1-N-1 Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,692.6 5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 5,653.8 4,000.1Amendment

signed&in 94 B-303.1-N-2 Educator Nurse (J.Radinović) (Contract+Am.1) CS 944.3 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,137.7 749.8

Amendment

signed&in 95 B-303.1-N-3 Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,309.1 1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,577.2 784.3

Amendment

signed&in 96 B-303.1-N-4 Educator Nurse (B.Mudreša) (Contract+Am.1) CS 472.1 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 568.8 237.0

Amendment

signed&in 97 B-303.1-N-5 Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 414.9 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 499.9 155.1

Amendment

signed&in 98 B-303.1-N-6 Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,172.1 573.1

Amendment

signed&in 99 B-303.1-N-7 Educator Nurse (D.Rakčević) (Contract+Am.1) CS 643.8 775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 775.7 465.4

Amendment

signed&in 100 B-303.1-N-8 Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,338.5 5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 5,227.1 3,560.5

Amendment

signed&in 101 B-303.1-N-9 Educator Nurse (N.Božović) (Contract+Am.1) CS 658.1 792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 792.9 387.8

Amendment

signed&in 102 B-303.1-N-10 Educator Nurse (L.Vujović) (Contract+Am.1) CS 629.5 758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 758.4 724.0

Amendment

signed&in 103 B-303.1-N-11 Educator Nurse (V.Garović) (Contract+Am.1) CS 372.0 448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 448.2 103.4

Amendment

signed&in 104 B-303.1-N-12 Educator Nurse (M.Marković) (Contract+Am.1) CS 214.6 258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 258.6 103.4

Amendment

signed&in 105 B-303.1-N-13 Educator Nurse (R.Ostojić) (Contract+Am.1) CS 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 930.8 620.5

Amendment

signed&in 106 B-303.1-N-14 Educator Nurse (T.Đurić) (Contract+Am.1) CS 901.3 1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,085.9 637.8

Amendment

signed&in

Subcomponent B.3: PHC Development Outside of Podgorica

Subtotal B.2:

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Page 26: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

107 B-303.1-N-15 Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,001.5 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,206.6 724.0Amendment

signed&in 108 B-303.1-N-16 Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 314.7 379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 379.2 137.9

Amendment

signed&in 109 B-303.1-N-17 Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,688.2 2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,034.0 1,241.1

Amendment

signed&in 110 B-303.1-N-18 Educator Nurse (L.Mitrović) (Contract+Am.1) CS 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 930.8 413.7

Amendment

signed&in 111 B-303.1-N-19 Educator Nurse (R.Džoganović) (Contract+Am.1) CS 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,034.2 1,034.2

Amendment

signed&in

112 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag, Jovanović

Danijela, Dašić Radmila) (Contract+Am.1)

CS

2,049.4 2,469.2 2,469.2

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10 2,469.2 1,034.2Amendment

signed&in

progress

113 B-304.1-D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS 22,273.8 26,835.9 26,835.9

114 B-304.1-D-1 T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,641.7 1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,978.0 1,370.4Amendment

signed&in 115 B-304.1-D-2 T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4

Amendment

signed&in 116 B-304.1-D-3 T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 865.6 1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,042.9 711.0

Amendment

signed&in 117 B-304.1-D-4 T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4

Amendment

signed&in 118 B-304.1-D-5 T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,172.1 775.7

Amendment

signed&in 119 B-304.1-D-6 T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 845.9 1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,019.1 687.3

Amendment

signed&in 120 B-304.1-D-7 T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 236.1 284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 284.4 189.6

Amendment

signed&in 121 B-304.1-D-8 T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,377.0 1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,659.1 1,090.3

Amendment

signed&in 122 B-304.1-D-9 T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,881.3 2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,266.7 1,525.5

Amendment

signed&in 123 B-304.1-D-10 T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 853.2 474.0

Amendment

signed&in 124 B-304.1-D-11 T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 536.5 646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 646.4 275.8

Amendment

signed&in 125 B-304.1-D-12 T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,551.3 706.7

Amendment

signed&in 126 B-304.1-D-13 T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 284.4

Amendment

signed&in 127 B-304.1-D-14 T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4

Amendment

signed&in 128 B-304.1-D-15 T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 432.8 521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 521.4 284.4

Amendment

signed&in 129 B-304.1-D-16 T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 944.2 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,137.7 711.0

Amendment

signed&in 130 B-304.1-D-17 T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 704.6 848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 848.9 331.8

Amendment

signed&in 131 B-304.1-D-18 T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 517.1 189.6

Amendment

signed&in 132 B-304.1-D-19 T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 425.6 512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 512.8 297.3

Amendment

signed&in 133 B-304.1-D-20 T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,348.8 801.5

Amendment

signed&in 134 B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 314.8 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 379.2 189.6

Amendment

signed&in 135 B-304.1-D-22 T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 482.9 581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 581.8 349.1

Amendment

signed&in 136 B-304.1-D-23 T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 1,960.0 2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 2,361.5 1,482.4

Amendment

signed&in 137 B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 422.0 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 508.5 148.7

Contract

completed138 B-304.1-D-25 T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,244.7 1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,499.6 848.9

Amendment

signed&in 139 B-304.1-D-26 T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 293.3 353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 353.4 0.0

Amendment

signed&in 140 B-304.1-D-27 T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,169.6 1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 1,409.1 883.4

Amendment

signed&in 141 B-304.1-D-28 T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 368.4 443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011 443.9 189.6

Amendment

signed&in

142 B-304.1-N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS 16,399.2 19,758.0 19,758.0

142 B-304.1-N-1 T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 597.3 719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 719.7 452.5Amendment

signed&in 144 B-304.1-N-2 T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,083.7 1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,305.7 913.6

Amendment

signed&in 145 B-304.1-N-3 T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,318.6 879.1

Amendment

signed&in 146 B-304.1-N-4 T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,172.1 659.3

Amendment

signed&in 147 B-304.1-N-5 T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 543.7 655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 655.0 409.4

Amendment

signed&in 148 B-304.1-N-6 T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,409.2 1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,697.8 1,163.5

Amendment

signed&in 149 B-304.1-N-7 T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,631.0 1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,965.0 1,305.7

Amendment

signed&in 150 B-304.1-N-8 T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,616.7 1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,947.8 1,383.3

Amendment

signed&in 151 B-304.1-N-9 T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,539.5 3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 3,059.6 2,255.9

Amendment

signed&in 152 B-304.1-N-10 T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 851.2 1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,025.6 659.3

Amendment

signed&in 153 B-304.1-N-11 T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 853.2 547.3

Amendment

signed&in 153 B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 143.1 172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010 172.4 120.7

Contract

completed155 B-304.1-N-13 T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 1,318.6 879.1

Amendment

signed&in 156 B-304.1-N-14 T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 608.0 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 732.6 439.6

Amendment

signed&in 157 B-304.1-N-15 T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 744.0 896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 896.3 581.8

Amendment

signed&in 158 B-304.1-N-16 T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 397.0 478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 478.3 284.4

Amendment

signed&in

159 B-304.1-N-17 T. Lecturer Med. Technician (G.Jokanović) (Contract+Am.1) CS364.8 439.6 439.6

SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10 439.6 219.8Amendment

signed&in

progress

160 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir Dobričanin,

Ognjen Jovićević, Nada Janković, Edita Bašović) (round 9)

(Miroslav Stanišljević) (Contract+Am.1)

CS

4,077.4 4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10 4,912.6 2,363.6Amendment

signed&in

progress

161 B-3058th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 60,361.7 72,725.0 72,725.0

SoE Post Mar-10 Sep 22, 2010 Sep 24, 2010 Jun-10 72,725.0 72,725.0 Completed

162 B-3069th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 68,265.8 82,248.0 82,248.0

SoE Post Sep-10 Dec 20, 2010 Dec 20, 2010 Jan-11 82,248.0 82,248.0 COmpleted

163 B-30710th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 71,722.4 86,412.6 86,412.6

SoE Post Feb-11 June 1, 2011 June 1, 2011 June 25, 2011 86,412.6 86,412.6 COmpleted

Page 27: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

164 B-30811th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 101,307.5 122,057.2 122,057.2

SoE Post Sep-11 23-Nov-11 01-Dec-11 Jan-12

122,057.2

122,057.2 Completed

165 B-3.1 Equipment - Diagnostic equipment

166 B-312Medical equipment for Primary Health Care Development

G448,200.0 540,000.0 0.0

ICB Prior 1June/July

201118-Oct-11 Dec-11 - Dec-11 Jan-12 Feb-12 Feb-12 Mar-12 Sep-12 0.0 0.0

TS revision in

progress, BD

prepared.

168 B-3.2 Civil Works

169 B-321 PHC facility DZ Bijelo Polje renovation (Contract + Am.1) W 1,000,000.0 2,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 5/31/12 2,679,328.4 2,029,243.88Contract Am. to

be signed

170 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

PoljeCS

53,942.7 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12 64,991.2 34,205.8

Contract

signed&in

progress

171 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,636.7 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10 4,381.5 4,381.5

Contract

completed

1,929,178.4 3,798,820.4 3,258,820.4

2,163,390.4 4,081,003.5 3,532,599.4

172 C.1 PMN Personnel CS

173 C1.1 Coordinator, short-term (4months)( Pavle Aligrudić) CS 7,106.4 8,561.9 8,561.9 SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10 8,561.9 8,561.9Contract

completed

174 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10

3,995.63,995.6

Contract

completed

175 C1.3Coordinator (24 months) (Majda Škrijelj) (Contract+Am.1)

CS53,298.0 64,214.4 51,371.5

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 6/28/11 51,371.5 51,371.5Amendment

signed&in

progress

176 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1)CS

45,895.4 55,295.7 42,809.6IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 5/1/11

42,809.642,809.6

Amendment

signed&in

progress

177 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS9,948.9 11,986.7 11,986.7

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 7/1/1111,986.7

11,986.7Contract

completed

178 C1.6 Administrative Assistant (12 months) (Natasa Jolic) CS 14,923.4 17,980.0 11,986.7 IC Post 1April 20,

2011

April 20,

2011April 20, 2011

April 21,

2011- - - - June 6, 2011 June 6, 2012 11,986.7 11,986.7

Contract

signed&in

179 C.2 PMN Trainings / Study tours TR 10,090.0 12,156.6 3,169.1 SoE/CQ Post Multi Ongoing throughout the life of the Project

180PMN Training (Sarajevo, Procurement Seminar, May 31-Jun 4,

2010) (Boba Vukoslavovic) 633.5 763.2 763.2SoE Post 1 May-10 27-May-10 27-May-10 May-10 763.2 763.2

Activity

completed

181PMN Training (Zagreb, Procurement Seminar, Oct 18-22, 2010)

(Majda Skrijelj) 1,180.3 1,422.0 1,422.0SoE Post 1 Oct-10 4-Oct-10 4-Oct-10 Oct-10 1,422.0 1,422.0

Activity

completed

182

PMN Study Tour (Belgrade, meetings regarding Serbian Health

Project DRG negotiations, October 7, 2011) (Majda

Skrijelj&Lidija Scepanovic) 394.3 475.0 475.0

SoE Post 1 Sep-11 22-Sep-11 22-Sep-11 Oct-11 475.0 475.0Activity

completed

183PMN Training (Skopje, IT Procurement, Oct 27, 2011) (Boba

Vukoslavovic) 422.4 508.9 508.9SoE Post 1 Oct-11 26-Oct-11 26-Oct-11 Oct-11 508.9 508.9

Activity

completed

184 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 125,000.0 150,602.4 150,602.4SoE Post Ongoing throughout the life of the Project

150,602.4100,000.0

Ongoing thorugh

the life of the

Project

185 C.4 Independent Financial Audit CS3,107.5 3,744.0 3,744.0

LCS Prior 1 Apr-11April 29,

2011May 6, 2011 May 10, 2011 - 22-Jun-11 - 7-Jul-11 25-Jul-11 11-Sep-12 3,744.0 3,744.0

Contract

signed&in

progress

186 C.5 Annual survey CS111,191.0 133,965.0 133,965.0

CQ Prior 1 Jan-11February 1,

2011

February 2,

2011

February 2,

201110-Nov-11 - - 05-Mar-12 05-Dec-12 133,965.0 0.0

Contract

signed&in

progress

187 C.6Local TA for Monitoring and Evaluation

CS20,000.0 24,096.4 0.0

IC / CQ Prior 1 Activity to be initiated towards the end of the Project 0.0 0.0Activity to

initiate in mid

2012188 C.7 Office Furniture/Equipment G

189 C 7.1 PMN Office Furniture G 1,079.0 1,300.0 1,300.0 S Prior 1 Jul-10 26-Jun-10 28-Jun-10 - Aug-10 Oct 12, 2010 - Nov 1, 2010 Nov 12, 2010 - 1,300.0 1,300.0Contract

completed

190 C 7.2 PMN Office Equipment (Hardware) G 1,288.2 1,552.0 1,552.0 S Prior 1 Jul-11 1-Aug-11 3-Aug-11 - 14-Oct-11 25-Oct-11 - - 3-Nov-11 - 1,552.0 1,552.0Contract

completed

406,244.1 489,450.7 425,044.4

191C.8 5-month TSU Operating Expenses 36,369.6 43,818.8 43,818.8

43,818.8 43,818.8MHSIP funding

completed

36,369.6 43,818.8 43,818.8

442,613.64 533,269.45 468,863.18

4,515,418.20 6,914,771.99 5,455,320.93

4,515,418.20 6,914,771.99 5,455,320.93 5,455,321.0 3,102,412.1

2,679,328.4 2,029,243.9

Total negotiated Loan amount 5,100,000.00 2,775,992.6 1,073,168.2

Savings 584,581.80 1 2,304,073.8 890,729.6

Uncommitted 1,096,843.64 2 1,000,000.0 1,000,000.0

Committed (contracted) 3,367,824.46 5,532,128.94 5,455,320.93 1+2 3,304,073.8 1,890,729.6

Total 5,049,249.90

Loan share for CW

Subtotal C.8:

TOTAL Component C:

Sub-total A+B+C

GRAND TOTAL Additional financing:

Component C: Project Management

Subcomponent C.1: Project Management Network

B-321 CW

Commited minus CW

Commited minus CW * 0.83

Subtotal C.1:

Subtotal B.3:

TOTAL Component B:

Page 28: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275N

o

Item Description

Ty

pe

Est

imat

. C

ost

/All

oca

ted

amo

un

t L

OA

N

(E

UR

)

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and STC

Basic Benefits Package

3 A-101.1 Int TA health institutions Hospital Optimization Plan CS 87,000.0

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0

5 A-101.3 Loc TA Hospital Optimization Plan (Firm/Organization) CS 50,000.00

6 A-101.4 Loc TA for STC Basic Benefits Package (Firm/Organization) CS 115,852.2

A-102 Analytical study on HR in Health System in MNA-102.1 Analytical study on HR in Health System in MN

7 A-103 STC payment model design and implementation

8 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)CS 180,478.9

9 A-103.2 Loc TA STC payment model design and implementation CS 58,500.0

10 A-103.3 Purchasing DRG Licence G 70,000.0

11 A-104 Private public integration

12 A-104.1 Int TA Private public integration CS 47,628.3

13 A-104.2/1 Loc TA - Integration of private HC institutions into the network

of health institutions (Dragoljub Perović)CS

6,438.1

14 A-104.2/2 Loc TA - Integration of private HC institutions into the network

of health institutions (Milan Mirković)CS

6,438.1

15 A-104.2/3 Loc TA - Integration of private HC institutions into the network

of health institutions (Mladen Filipović)CS

6,438.1

16 A-104.2/4 Loc TA - Integration of private HC institutions into the network

of health institutions (Srđan Popović)CS

6,438.1

17 A-105

TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of December 15, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 29: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

18 A-105.1

Int TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and protocols

development and revision

CS 86,019.8

19 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines (Goran

Nikolić)CS 10,059.5

20 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines

(Abedin Adžović)CS 3,986.1

21 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines (Vesna

Miranović)CS 3,986.1

22 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines (Filip

Vukmirović)CS 3,986.1

23 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines (Sreten

Kavarić)CS 3,986.1

24 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines (Nada

Rondović)CS 3,219.0

25 A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines

(Zorica Dautović)CS 3,986.1

26 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS 3,986.1

27 A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines

(Ranko Lazović)CS 3,986.1

28 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines

(Ljubica Pejakov)CS 3,986.1

29 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines

(Dragan Laušević)CS 3,986.1

30 A-106 TA PR campaign design and implementation

31 A-106.1 Loc TA - Capacity Building & Implementation of Public

Information CampaignCS 26,825.6

32 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC) (Gorica

Soković)CS 16,167.0

33 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC) (Vesna

Nikaljević)CS 16,167.0

34 A-106.3Loc TA - PR Strategy materials design & production (posters,

brochures, media buy) (Firm)G 34,468.2

35 A-107 MoH capacity development

36 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical

cancer)) (Milutin Bulajić)

CS 20,562.4

37 A-107.2Loc TA for Development of National Colorectal Cancer

Prevention Program (Brigita Smolović)CS 5,365.1

38 A-107.3Loc TA for Development of National Cervical Cancer Prevention

Program (Milovan Jovanovic)CS 10,730.1

39 A-1.1 Institutional Development of the Drugs Agency

40 A-111 TA Policy and capacity development

41 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

46,088.4

42 A-111.3Drugs Agency capacity development, out-of-country Training

TR15,000.0

A-111.3/1

Study Tour (Belgrade, HC Quality&Accreditation in SEE

countries, March 16-18, 2011) (Jadranka Lakicevic and

Lorena Vlahovic) 239.9

43 A-112 Information system for the Drugs' Agency

Page 30: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

44 A-112.1Drugs' Agency Software development - Web Portal, DMS and

eCTD validation and review softwareG

212,735.0

45 A-1.2 Trainings / study tours 67,172.2

46 A-120 Trainings / study tours (WG Capacity Dev.) TR 64,413.9

A-120/1

PR WG&PMN representatives/study visit to Macedonian HIF,

Skopje, June 27-29, 2011 (Amer Ramusovic, Lidija

Scepanovic&Boba Vukoslavovic) 1,737.8

A-120/2Workshop "Guidelines for Good Clinical Practice", Sep 30,

2011, at Med. Fac in Podgorica, ME 1,020.4

1,316,906.0

47 A.2.0 Hospital Information System / Hardware G 406,700.0

48 A.2.1 Information System / Software G

49 A-210 Health Information System / Software for MOH G212,735.0

50 A-211 Health Information System / Software for IPH G212,735.0

51 A-211.1 Loc TA - System Analyst for the IPH (6 months) CS7,511.1

52 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović) (12 months)

CS

5,365.1

53 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić) (12 months)CS

5,365.1

54 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS

5,365.1

55 A-212/4

Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) (12 months)

Contract+ Am. No. 1CS

6,303.9

56 A-213TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement (Ljiljana Krejović)CS

3,576.7

57 A-214Loc TA for LAN Project Design for Hardware (selected

locations/hospitals outside PG)CS

2,000.0

867,656.9

2,184,563.0

58 B.1.0 Operational Review of the PHC

59 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,546.8

13,546.8

60 B.2.0 PHC Specialization Program Development & Implementation

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal A.2:

Subtotal A.1:

Subcomponent A.2: Health Information System

Page 31: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

61 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 213,689.7

62 B-202Loc TA Family Medicine Specialization Program Implementation

Coordinator (12 months)CS 6,975.4

220,665.1

63 B.3.0TA for PHC Specialist Medicine Training Program (Medicine and

Nursing, 4 rounds, 8-11)CS

423,399.1

64 B-301Training Program (Education) Coordinator (rounds8-11) (Mara

Drecun) (Contract+Am.1)CS

16,213.0

65 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS

9,308.4

66 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 29,448.7

67 B-303.1-D-1 Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 887.0

68 B-303.1-D-2 Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,293.0

69 B-303.1-D-3 Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,119.5

70 B-303.1-D-4 Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,541.2

71 B-303.1-D-5 Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,239.3

72 B-303.1-D-6 Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,146.0

73 B-303.1-D-7 Educator Doctor (P.Divanović) (Contract+Am.1) CS 1,985.1

74 B-303.1-D-8 Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 872.7

75 B-303.1-D-9 Educator Doctor (J.Pepić) (Contract+Am.1) CS 429.2

76 B-303.1-D-10 Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,287.6

77 B-303.1-D-11 Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,234.0

78 B-303.1-D-12 Educator Doctor (N.Janković) (Contract+Am.1) CS 1,008.6

79 B-303.1-D-13 Educator Doctor (Božika Subašić) CS 572.3

80 B-303.1-D-14 Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,180.3

81 B-303.1-D-15 Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,273.3

82 B-303.1-D-16 Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,083.1

83 B-303.1-D-17 Educator Doctor (L.Delević) (Contract+Am.1) CS 1,430.7

84 B-303.1-D-18 Educator Doctor (V.Peranović) (Contract+Am.1) CS 715.3

85 B-303.1-D-19 Educator Doctor (Z.Miljković) (Contract+Am.1) CS 715.3

86 B-303.1-D-20 Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,144.5

87 B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 429.2

88 B-303.1-D-22 Educator Doctor (B.Radović) (Contract+Am.1) CS 858.4

89 B-303.1-D-23 Educator Doctor (M.Bogavac) (Contract+Am.1) CS 715.3

90 B-303.1-D-24 Educator Doctor (O.Poček) (Contract+Am.1) CS 715.3

91 B-303.1-D-25 Educator Doctor (S.Šabović) (Contract+Am.1) CS 572.3

92 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 21,971.7

93 B-303.1-N-1 Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,692.6

94 B-303.1-N-2 Educator Nurse (J.Radinović) (Contract+Am.1) CS 944.3

95 B-303.1-N-3 Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,309.1

96 B-303.1-N-4 Educator Nurse (B.Mudreša) (Contract+Am.1) CS 472.1

97 B-303.1-N-5 Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 414.9

98 B-303.1-N-6 Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 972.9

99 B-303.1-N-7 Educator Nurse (D.Rakčević) (Contract+Am.1) CS 643.8

100 B-303.1-N-8 Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,338.5

101 B-303.1-N-9 Educator Nurse (N.Božović) (Contract+Am.1) CS 658.1

102 B-303.1-N-10 Educator Nurse (L.Vujović) (Contract+Am.1) CS 629.5

103 B-303.1-N-11 Educator Nurse (V.Garović) (Contract+Am.1) CS 372.0

104 B-303.1-N-12 Educator Nurse (M.Marković) (Contract+Am.1) CS 214.6

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Page 32: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

105 B-303.1-N-13 Educator Nurse (R.Ostojić) (Contract+Am.1) CS 772.6

106 B-303.1-N-14 Educator Nurse (T.Đurić) (Contract+Am.1) CS 901.3

107 B-303.1-N-15 Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,001.5

108 B-303.1-N-16 Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 314.7

109 B-303.1-N-17 Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,688.2

110 B-303.1-N-18 Educator Nurse (L.Mitrović) (Contract+Am.1) CS 772.6

111 B-303.1-N-19 Educator Nurse (R.Džoganović) (Contract+Am.1) CS 858.4

112 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag, Jovanović

Danijela, Dašić Radmila) (Contract+Am.1)

CS

2,049.4

113 B-304.1-D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS 22,273.8

114 B-304.1-D-1 T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,641.7

115 B-304.1-D-2 T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 393.4

116 B-304.1-D-3 T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 865.6

117 B-304.1-D-4 T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 393.4

118 B-304.1-D-5 T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 972.9

119 B-304.1-D-6 T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 845.9

120 B-304.1-D-7 T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 236.1

121 B-304.1-D-8 T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,377.0

122 B-304.1-D-9 T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,881.3

123 B-304.1-D-10 T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 708.2

124 B-304.1-D-11 T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 536.5

125 B-304.1-D-12 T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,287.6

126 B-304.1-D-13 T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 429.2

127 B-304.1-D-14 T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 393.4

128 B-304.1-D-15 T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 432.8

129 B-304.1-D-16 T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 944.2

130 B-304.1-D-17 T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 704.6

131 B-304.1-D-18 T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 429.2

132 B-304.1-D-19 T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 425.6

133 B-304.1-D-20 T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,119.5

134 B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 314.8

135 B-304.1-D-22 T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 482.9

136 B-304.1-D-23 T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 1,960.0

137 B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 422.0

138 B-304.1-D-25 T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,244.7

139 B-304.1-D-26 T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 293.3

140 B-304.1-D-27 T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,169.6

141 B-304.1-D-28 T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 368.4

142 B-304.1-N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS 16,399.2

142 B-304.1-N-1 T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 597.3

144 B-304.1-N-2 T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,083.7

145 B-304.1-N-3 T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,094.5

146 B-304.1-N-4 T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 972.9

147 B-304.1-N-5 T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 543.7

148 B-304.1-N-6 T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,409.2

149 B-304.1-N-7 T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,631.0

150 B-304.1-N-8 T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,616.7

151 B-304.1-N-9 T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,539.5

152 B-304.1-N-10 T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 851.2

153 B-304.1-N-11 T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 708.2

153 B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 143.1

155 B-304.1-N-13 T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,094.5

Page 33: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

156 B-304.1-N-14 T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 608.0

157 B-304.1-N-15 T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 744.0

158 B-304.1-N-16 T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 397.0

159 B-304.1-N-17 T. Lecturer Med. Technician (G.Jokanović) (Contract+Am.1) CS364.8

160 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir Dobričanin,

Ognjen Jovićević, Nada Janković, Edita Bašović) (round 9)

(Miroslav Stanišljević) (Contract+Am.1)

CS

4,077.4

161 B-305

8th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 60,361.7

162 B-306

9th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 68,265.8

163 B-307

10th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 71,722.4

164 B-308

11th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 101,307.5

165 B-3.1 Equipment - Diagnostic equipment

166 B-312Medical equipment for Primary Health Care Development

G448,200.0

168 B-3.2 Civil Works

169 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0

170 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje CS

53,942.7

171 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,636.7

1,929,178.4

2,163,390.4

172 C.1 PMN Personnel CS

173 C1.1 Coordinator, short-term (4months)( Pavle Aligrudić) CS 7,106.4

174 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3

175 C1.3Coordinator (24 months) (Majda Škrijelj) (Contract+Am.1)

CS53,298.0

176 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1)CS

45,895.4

177 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS9,948.9

178 C1.6 Administrative Assistant (12 months) (Natasa Jolic) CS 14,923.4

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subcomponent C.1: Project Management Network

Page 34: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

179 C.2 PMN Trainings / Study tours TR 10,090.0

180PMN Training (Sarajevo, Procurement Seminar, May 31-Jun

4, 2010) (Boba Vukoslavovic) 633.5

181PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj) 1,180.3

182

PMN Study Tour (Belgrade, meetings regarding Serbian

Health Project DRG negotiations, October 7, 2011) (Majda

Skrijelj&Lidija Scepanovic) 394.3

183PMN Training (Skopje, IT Procurement, Oct 27, 2011) (Boba

Vukoslavovic) 422.4

184 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 125,000.0

185 C.4 Independent Financial Audit CS3,107.5

186 C.5 Annual survey CS99,600.0

187 C.6Local TA for Monitoring and Evaluation

CS20,000.0

188 C.7 Office Furniture/Equipment G

189 C 7.1 PMN Office Furniture G 1,079.0

190 C 7.2 PMN Office Equipment (Hardware) G 1,288.2

394,653.1

191C.8 5-month TSU Operating Expenses 36,369.6

36,369.6

431,022.69

4,778,976.02

4,778,976.02

Total negotiated Loan amount 5,100,000.00

321,023.98

Committed (contracted) 2,683,628.06

Subtotal C.8:

TOTAL Component C:

Sub-total A+B+C

GRAND TOTAL Additional financing:

Subtotal C.1:

Page 35: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Est

imat

. C

ost

/All

oca

ted

amo

un

t

Wit

h

Go

ver

nm

ent

Co

ntr

ibu

tio

n

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

ho

rtli

st,

TS

,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o

Qu

ote

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Sh

ort

list

, T

S,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Inv

itat

ion

to

Qu

ote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

104,819.3 0.0 IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 -

90,361.4 0.0 CQS Prior 1 Dec-10 Apr 06, 2011 May 9, 2011 May 12, 2011 -

60,241.0 0.0 CQS Prior 1 06-Oct-11 01-Nov-11 2-Nov-11 10-Nov-11 -

139,581.0 139,581.0 SSS Prior 1 Apr-11June 29,

2011July 13, 2011 - -

217,444.5 217,444.5 CQS Prior 1Oct/Nov

2010

February 2,

2011

February 2,

2011Nov 23, 2010 -

70,481.9 0.0 SSS* Prior Multi Nov-11 Nov-11 Nov-11 - -

84,337.3 0.0 DC Prior 1 - - - - -

57,383.5 57,383.5 IC Prior 1May/June

2011Jun-11 Jun-11 May 6, 2011 -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - -

7,756.7 6,463.9SSS Prior 1 May-11

June 20,

2011June 22, 2011 - -

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of December 15, 2011)

Page 36: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

12,119.9 8,079.9 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

3,878.3 2,585.5 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - -

32,320.0 0.0 IC Post 1Aug/Sep

20119-Sep-11 28-Sep-11 4-Oct-11 -

19,478.3 11,130.4 SSS Prior 1 Dec-10March 10,

2011

March 19,

2011- -

19,478.3 11,130.4 SSS Prior 1 Dec-10March 10,

2011

March 19,

2011- -

41,528.0 0.0 S Post Multi Feb-12 Feb-12 Mar-12 Mar-12

24,774.0 24,774.0 IC Post 1 Mar-11 April 5, 2011 April 22, 2011February 21,

2011-

6,463.9 6,463.9 IC Post 1 Jun-11June 30,

2011July 11, 2011 - -

12,927.9 12,927.9 IC Post 1 Jun-11July 26,

2011

August 4,

2011- -

55,528.2 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

18,072.3 18,072.3SoE Multi Oct-10

Nov 24,

2010

February 8,

2011

289.0 289.0

SoE 1 Mar-11 18-Mar-11 18-Mar-11

Page 37: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

256,307.3 0.0ICB Prior 1

June-Sep

201119-Sep-11 2-Nov-11 - 5-Nov-11

80,930.3

77,607.2 3,323.16 Remaining amount/Throughout the life of the project

2,093.8 2,093.8

SoE Post 1 Jun-11 21-Jun-11 22-Jun-11

1,229.4 1,229.4SoE Post 1 Sep-11 27-Sep-11 28-Sep-11

1,586,633.8 723,144.7

490,000.0 0.0 1ST ICB Prior 1May/June

201124-Oct-11 Nov-11 Nov-11 22-Nov-11

256,307.3 0.0ICB Prior 1

June/July

201117-Oct-11 21-Oct-11 - 25-Oct-11

256,307.3 0.0ICB Prior 1

June/July

201126-Oct-11 Nov-11 - 11-Nov-11

9,049.5 9,049.5IC Post 1 Aug-11 9-Sep-11 15-Sep-11 17-Sep-11 -

6,463.9 6,463.9

SSS Prior 1 May-11May 30,

2011May 31, 2011 - -

6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011May 31, 2011 - -

6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011May 31, 2011 - -

7,595.1 7,595.1SSS Prior 1 May-11

July 27,

2011

August 4,

2011- -

4,309.3 4,309.3

IC Post 1 May-11May 31,

2011May 31, 2011 - -

2,409.6 0.0IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 -

1,045,369.8 40,345.6

2,632,003.6 763,490.4

16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010

16,321.5 16,321.5

Page 38: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

257,457.5 257,457.5 QCBS Prior 1Oct/Nov

2010

Nov 22,

2010Nov 22, 2010

January 10,

2011-

8,404.1 0.0 IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 -

265,861.6 257,457.5

510,119.3 510,119.3IC/CQ Prior Multi Ongoing throughout the life of the Project

19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10

11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10

35,480.4 35,480.4 SSS Prior Multi

1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

26,471.9 26,471.9

5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10

448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

Page 39: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

2,469.2 2,469.2

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10

26,835.9 26,835.9

1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

19,758.0 19,758.0

719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

Page 40: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10

478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10

439.6 439.6SSS Prior 1 Mar-10 09/22/10 09/27/10

4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10

72,725.0 72,725.0

SoE Post Mar-10 Sep 22, 2010 Sep 24, 2010

82,248.0 82,248.0

SoE Post Sep-10 Dec 20, 2010 Dec 20, 2010

86,412.6 86,412.6

SoE Post Feb-11 June 1, 2011 June 1, 2011

122,057.2 122,057.2

SoE Post Sep-11 Sep-11 Sep-11

540,000.0 0.0ICB Prior 1

June/July

201118-Oct-11 Dec-11 - Dec-11

2,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10

64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10

4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 -

3,798,820.4 3,258,820.4

4,081,003.5 3,532,599.4

8,561.9 8,561.9 SSS Prior 1 Feb-10 2/4/10 2/4/10 - -

3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - -

64,214.4 51,371.5IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

55,295.7 42,809.6IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

11,986.7 11,986.7IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

17,980.0 11,986.7 IC Post 1April 20,

2011

April 20,

2011April 20, 2011

April 21,

2011-

Page 41: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

12,156.6 3,169.1 SoE/CQ Post Multi Ongoing throughout the life of the Project

763.2 763.2SoE Post 1 May-10 27-May-10 27-May-10

1,422.0 1,422.0SoE Post 1 Oct-10 4-Oct-10 4-Oct-10

475.0 475.0

SoE Post 1 Sep-11 22-Sep-11 22-Sep-11

508.9 508.9SoE Post 1 Oct-11 26-Oct-11 26-Oct-11

150,602.4 150,602.4SoE Post Ongoing throughout the life of the Project

3,744.0 3,744.0LCS Prior 1 Apr-11

April 29,

2011May 6, 2011 May 10, 2011 -

120,000.0 0.0CQ Prior 1 Jan-11

February 1,

2011

February 2,

2011

February 2,

2011

24,096.4 0.0IC / CQ Prior 1 Activity to be initiated towards the end of the Project

1,300.0 1,300.0 S Prior 1 Jul-10 26-Jun-10 28-Jun-10 - Aug-10

1,552.0 1,552.0 S Prior 1 Jul-11 1-Aug-11 3-Aug-11 - 14-Oct-11

475,485.7 291,079.4

43,818.8 43,818.8

43,818.8 43,818.8

519,304.45 334,898.18

7,232,311.53 4,630,987.92

7,232,311.53 4,630,987.92

4,707,795.93 4,630,987.92

Page 42: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Loan Number: 7819-MEB

id o

pen

ing

-

Tec

hn

ical

/Fin

anci

al

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Co

ntr

act

awar

d/S

ign

ing

Co

ntr

act

com

ple

tio

n

Co

mm

ited

Dis

bu

rsed

Act

ivit

y S

tatu

s

Dec-11 - Dec-11 Jan-12 Dec-12 0.0 0.0ToR to be

developed

July 7, 2011July 22,

2011

August 3,

2011- - 0.0 0.0

Negotiations in

progress.

Nov-11 - Dec-11 Dec-11 Dec-12 0.0 0.0Position

advertised

- - - Nov-11 Nov-12 139,581.0 0.0Contract

signed&in

progress

Dec 17, 2010February 04,

2011

February 11,

2011June 3, 2011

November 30,

2012217,444.5 37,170.0

Contract

signed&in

progress

- - - Dec-11 Dec-12 0.0 0.0ToR

development in

progress

- - - - Dec-12 0.0 0.06-month Trial

Version

Contract signed

June 2, 2011June 16,

2011

June 17,

2011Aug-11 Oct-12 57,383.5 12,123.8

Contract

signed&in

-June 22,

2011

June 23,

2011June 25, 2012

5,171.10.0

Contract

signed&in

progress

-June 22,

2011

June 23,

2011June 25, 2012

5,171.10.0

Contract

signed&in

progress

-June 22,

2011

June 23,

2011June 25, 2012

5,171.10.0

Contract

signed&in

progress

-June 22,

2011

June 23,

2011June 25, 2012

6,463.90.0

Contract

signed&in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of December 15, 2011)

Page 43: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

March 01,

2011

April 22,

2011-

May 20,

2011

December 1,

2012103,638.3 25,058.9

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 8,079.9 3,770.6

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 2,585.5 1,508.3

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 1,616.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 3,201.7 0.0

Contract

signed&in

progress

10-Nov-11 - - Dec-11 Dec-12 0.0 0.0PMN to

approach the

first-ranked

- - - April 1, 2011 March 31, 2012 11,130.4 7,420.3Contract

signed&in

progress

- - - April 1, 2011 March 31, 2012 11,130.4 7,420.3Contract

signed&in

progress

Apr-12 Apr-12 Apr-12 May-11 Dec-12 0.0 0.0TS to be

developed by

March 15,

2011- -

May 25,

2011May 25, 2012 24,774.0 12,974.5

Contract

signed&in

progress

20-Jul-11 - - 27-Jul-11 5-Jun-12 6,463.9 3,232.0Contract

signed&in

progress

12-Aug-11 - - 25-Aug-11 5-Jun-12 12,927.9 6,463.9Contract

signed&in

progress

February

24,2011- -

May 15,

2011May 15, 2012 55,528.2 9,262.5 Contract signed

18,072.3 1,014.9Activity in

progress

289.0 289.0Activity

completed

Page 44: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

16-Dec-11 Dec-11 Jan-12 Jan-12 Dec-12 0.0 0.0 ICB in progress

Throughout the

life of the

29-Jun-11 2,093.8 2,093.8Activity

completed

30-Sep-11 1,229.4 1,229.4Activity

completed

16-Jan-12 Jan-12 Feb-12 Feb-12 Jun-12 0.0 0.0 ICB in progress

6-Dec-11 Dec-11 Dec-11 Jan-12 Dec-12 0.0 0.0 ICB in progress

10-Jan-12 Jan-12 Jan-12 Feb-12 Dec-12 0.0 0.0 ICB in progress

19-Oct-11 - - Nov-11 May-11 9,049.5 0.0Contract signing

in progress

- - -June 12,

2011June 15, 2012 6,463.9 3,232.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 6,463.9 3,232.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 6,463.9 3,232.0

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012 7,595.1 3,232.0

Contract

Amendment to

be signed

- - - June 8, 2011 June 15, 2012 4,309.3 0.0Contract

signed&in

progress

- Dec-11 Dec-11 Dec-11 0.0 0.0ToR to be

developed

7/9/10 - Oct 22, 2010October 23,

201116,321.5 16,321.5

Contract

completed

Page 45: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

February 3,

2011

May 19,

2011- Jun-11 Dec-12 257,457.5 77,237.6

Contract signing

in progress

- Dec-11 Dec-11 Dec-11 0.0 0.0ToR to be

developed

Dec-12

4/24/10 Apr-10 12/31/1119,533.7

7,150.0Amendment

signed&in

progress

4/23/10 Apr-10 12/31/11 11,214.9 8,505.4Amendment

signed&in

progress

09/27/10 Sep-10 Dec 31, 2011 1,068.7 413.7Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,557.8 989.0

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,348.8 465.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 3,061.7 1,913.3

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,493.2 1,236.8

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 2,585.6 1,762.5

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 2,391.7 1,368.2

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,051.5 396.5

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 517.1 344.7

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,551.3 861.9

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,486.7 1,085.9

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,215.2 672.2

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010 689.5 517.1

Contract

completed09/27/10 Sep-10 Dec 31, 2011 1,422.1 810.1

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,534.1 965.3

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 3,714.6 2,344.2

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,723.7 1,034.2

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 861.9 172.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,379.0 689.5

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010 517.1 172.4

Contract

completed09/27/10 Sep-10 Dec 31, 2011 1,034.2 689.5

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 861.9 689.5

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 861.9 344.7

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 689.5 172.4

Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011 5,653.8 4,000.1Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,137.7 749.8

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,577.2 784.3

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 568.8 237.0

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010 499.9 155.1

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,172.1 573.1

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 775.7 465.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 5,227.1 3,560.5

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 792.9 387.8

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 758.4 724.0

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 448.2 103.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 258.6 103.4

Amendment

signed&in

Page 46: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec 31, 2011 930.8 620.5Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,085.9 637.8

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,206.6 724.0

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 379.2 137.9

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 2,034.0 1,241.1

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 930.8 413.7

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,034.2 1,034.2

Amendment

signed&in

05-15-2010 - - May-10 12/31/10 2,469.2 1,034.2Amendment

signed&in

progress

09/27/10 Sep-10 Dec 31, 2011 1,978.0 1,370.4Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,042.9 711.0

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,172.1 775.7

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,019.1 687.3

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 284.4 189.6

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,659.1 1,090.3

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 2,266.7 1,525.5

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 853.2 474.0

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 646.4 275.8

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,551.3 706.7

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 517.1 284.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 474.0 284.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 521.4 284.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,137.7 711.0

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 848.9 331.8

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 517.1 189.6

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 512.8 297.3

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,348.8 801.5

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010 379.2 189.6

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 581.8 349.1

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 2,361.5 1,482.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010 508.5 148.7

Contract

completed09/27/10 Sep-10 Dec 31, 2011 1,499.6 848.9

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010 353.4 0.0

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 1,409.1 883.4

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011 443.9 189.6

Amendment

signed&in

09/27/10 Sep-10 Dec-10 719.7 452.5Amendment

signed&in 09/27/10 Sep-10 Dec-10 1,305.7 913.6

Amendment

signed&in 09/27/10 Sep-10 Dec-10 1,318.6 879.1

Amendment

signed&in 09/27/10 Sep-10 Dec-10 1,172.1 659.3

Amendment

signed&in 09/27/10 Sep-10 Dec-10 655.0 409.4

Amendment

signed&in 09/27/10 Sep-10 Dec-10 1,697.8 1,163.5

Amendment

signed&in 09/27/10 Sep-10 Dec-10 1,965.0 1,305.7

Amendment

signed&in 09/27/10 Sep-10 Dec-10 1,947.8 1,383.3

Amendment

signed&in 09/27/10 Sep-10 Dec-10 3,059.6 2,255.9

Amendment

signed&in 09/27/10 Sep-10 Dec-10 1,025.6 659.3

Amendment

signed&in 09/27/10 Sep-10 Dec-10 853.2 547.3

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010 172.4 120.7

Contract

completed09/27/10 Sep-10 Dec-10 1,318.6 879.1

Amendment

signed&in

Page 47: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec-10 732.6 439.6Amendment

signed&in 09/27/10 Sep-10 Dec-10 896.3 581.8

Amendment

signed&in 09/27/10 Sep-10 Dec-10 478.3 284.4

Amendment

signed&in

09/27/10 Sep-10 Dec-10 439.6 219.8Amendment

signed&in

progress

05-15-2010 - - May-10 12/31/10 4,912.6 2,363.6Amendment

signed&in

progress

Jun-10 72,725.0 72,725.0 Completed

Jan-11 82,248.0 82,248.0 COmpleted

June 25, 2011 86,412.6 86,412.6 COmpleted

Jan-12

122,057.2

53,241.0Implementation

in progress

Jan-12 Feb-12 Feb-12 Mar-12 Sep-12 0.0 0.0TS approval in

progress, BD

prepared.

06-28-10 Sep-10 10/13/10 3/13/12 2,679,328.4 2,029,243.88Contract

signed&in

07-30-10 8/12/10 8/12/10 10/13/10 7/13/12 64,991.2 34,205.8Contract

signed&in

progress

04-15-10 Apr-10 06-30-10 4,381.5 4,381.5Contract

completed

- - - 2/8/10 4/30/10 8,561.9 8,561.9Contract

completed

- - - 2/8/10 4/30/103,995.6

3,995.6Contract

completed

- - 06-16-10 Jun-10 6/28/11 51,371.5 51,371.5Amendment

signed&in

progress

- - 06-16-10 Jun-10 5/1/1142,809.6

42,809.6Amendment

signed&in

progress

- - 06-16-10 Jun-10 7/1/1111,986.7

11,986.7Contract

completed

- - - June 6, 2011 June 6, 2012 11,986.7 11,986.7Contract

signed&in

Page 48: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

May-10 763.2 763.2Activity

completed

Oct-10 1,422.0 1,422.0Activity

completed

Oct-11 475.0 475.0Activity

completed

Oct-11 508.9 508.9Activity

completed

150,602.482,000.0

Ongoing

thorugh the life

of the Project

22-Jun-11 - 7-Jul-11 25-Jul-11 11-Sep-12 3,744.0 3,744.0Contract

signed&in

progress

10-Nov-11 Nov-11 Nov-11 Dec-11 Nov-12 0.0 0.0Negotiations to

initiate.

0.0 0.0Activity to

initiate in mid

2012

Oct 12, 2010 - Nov 1, 2010Nov 12,

2010- 1,300.0 1,300.0

Contract

completed

25-Oct-11 - - 3-Nov-11 - 1,552.0 1,552.0Contract

completed

43,818.8 43,818.8Activity in

progress

4,630,988.0 2,957,704.2

2,679,328.4 2,029,243.9

1,951,659.6 928,460.4

1 1,619,877.4 770,622.1

2 1,000,000.0 1,000,000.0

1+2 2,619,877.4 1,770,622.1

Commited minus CW * 0.83

Loan share for CW

B-321 CW

Commited minus CW

Page 49: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

No

Item Description

Type

Est

imat

. C

ost

/All

oca

ted

amo

un

t L

OA

N (E

UR

)

Est

imat

. C

ost

/All

oca

ted

amo

un

t W

ith

Go

ver

nm

ent

Co

ntr

ibu

tio

n

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

hort

list

, T

S,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o

Qu

ote

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Short

list

, T

S, T

OR

, R

F, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Invit

atio

n t

o Q

uote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

Bid

op

enin

g-

Tec

hn

ical

/Fin

anci

al

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Contr

act

awar

d/S

ignin

g

Contr

act

com

ple

tion

Act

ivit

y S

tatu

s

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and STC

Basic Benefits Package

3 A-101.1 Int TA health institutions Hospital Optimization Plan CS 87,000.0 104,819.3 0.0 IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 - Dec-11 - Dec-11 Jan-12 Dec-12ToR to be

developed

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0 90,361.4 0.0 CQS Prior 1 Dec-10 Apr 06, 2011 May 9, 2011 May 12, 2011 - July 7, 2011July 22,

2011

August 3,

2011- -

Negotiations in

progress.

5 A-101.3 Loc TA Hospital Optimization Plan (Firm/Organization) CS 50,000.00 60,241.0 0.0 CQS Prior 1 06-Oct-11 01-Nov-11 2-Nov-11 10-Nov-11 - Nov-11 - Dec-11 Dec-11 Dec-12Position

advertised

6 A-101.4 Loc TA for STC Basic Benefits Package (Firm/Organization) CS 115,852.2 139,581.0 139,581.0 SSS Prior 1 Apr-11June 29,

2011July 13, 2011 - - - - - Nov-11 Nov-12

Contract

signed&in

progressA-102 Analytical study on HR in Health System in MNA-102.1 Analytical study on HR in Health System in MN

7 A-103 STC payment model design and implementation

8 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)CS 180,478.9 217,444.5 217,444.5 CQS Prior 1

Oct/Nov

2010

February 2,

2011

February 2,

2011Nov 23, 2010 - Dec 17, 2010

February 04,

2011

February 11,

2011June 3, 2011

November 30,

2012

Contract

signed&in

progress

9 A-103.2 Loc TA STC payment model design and implementation CS 58,500.0 70,481.9 0.0 SSS* Prior Multi Nov-11 Nov-11 Nov-11 - - - - - Dec-11 Dec-12

ToR

development in

progress

10 A-103.3 Purchasing DRG Licence G 70,000.0 84,337.3 0.0 DC Prior 1 - - - - - - - - - Dec-12

6-month Trial

Version Contract

signed by MoH

11 A-104 Private public integration

12 A-104.1 Int TA Private public integration CS 47,628.3 57,383.5 57,383.5 IC Prior 1May/June

2011Jun-11 Jun-11 May 6, 2011 - June 2, 2011

June 16,

2011June 17, 2011 Aug-11 Oct-12

Contract

signed&in

13 A-104.2/1 Loc TA - Integration of private HC institutions into the network of

health institutions (Dragoljub Perović)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - - June 22, 2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

14 A-104.2/2 Loc TA - Integration of private HC institutions into the network of

health institutions (Milan Mirković)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - - June 22, 2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

15 A-104.2/3 Loc TA - Integration of private HC institutions into the network of

health institutions (Mladen Filipović)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - - June 22, 2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

16 A-104.2/4 Loc TA - Integration of private HC institutions into the network of

health institutions (Srđan Popović)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - - June 22, 2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

17 A-105

TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols Development

and Revision

18 A-105.1

Int TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and protocols development

and revision

CS 86,019.8 103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

March 01,

2011

April 22,

2011-

May 20,

2011

December 1,

2012

Contract

signed&in

progress

19 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines (Goran

Nikolić)CS 10,059.5 12,119.9 8,079.9 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

20 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines (Abedin

Adžović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

21 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines (Vesna

Miranović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

22 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines (Filip

Vukmirović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of November 23, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 50: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

23 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines (Sreten

Kavarić)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

24 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines (Nada

Rondović)CS 3,219.0 3,878.3 2,585.5 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

25 A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines (Zorica

Dautović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

26 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

27 A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines (Ranko

Lazović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

28 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines (Ljubica

Pejakov)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

29 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines (Dragan

Laušević)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

30 A-106 TA PR campaign design and implementation

31 A-106.1 Loc TA - Capacity Building & Implementation of Public

Information CampaignCS 26,825.6 32,320.0 0.0 IC Post 1

Aug/Sep

20119-Sep-11 28-Sep-11 4-Oct-11 - 10-Nov-11 - - Dec-11 Dec-12

PMN to

approach the

first-ranked

32 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC) (Gorica

Soković)CS 16,167.0 19,478.3 11,130.4 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 March 31, 2012

Contract

signed&in

progress

33 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC) (Vesna

Nikaljević)CS 16,167.0 19,478.3 11,130.4 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 March 31, 2012

Contract

signed&in

progress

34 A-106.3Loc TA - PR Strategy materials design & production (posters,

brochures, media buy) (Firm)G 34,468.2 41,528.0 0.0 S Post Multi Feb-12 Feb-12 Mar-12 Mar-12 Apr-12 Apr-12 Apr-12 May-11 Dec-12

TS to be

developed by

35 A-107 MoH capacity development

36 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical

cancer)) (Milutin Bulajić)

CS 20,562.4 24,774.0 24,774.0 IC Post 1 Mar-11 April 5, 2011 April 22, 2011February 21,

2011-

March 15,

2011- -

May 25,

2011May 25, 2012

Contract

signed&in

progress

37 A-107.2Loc TA for Development of National Colorectal Cancer Prevention

Program (Brigita Smolović)CS 5,365.1 6,463.9 6,463.9 IC Post 1 Jun-11

June 30,

2011July 11, 2011 - - 20-Jul-11 - - 27-Jul-11 5-Jun-12

Contract

signed&in

progress

38 A-107.3Loc TA for Development of National Cervical Cancer Prevention

Program (Milovan Jovanovic)CS 10,730.1 12,927.9 12,927.9 IC Post 1 Jun-11 July 26, 2011 August 4, 2011 - - 12-Aug-11 - - 25-Aug-11 5-Jun-12

Contract

signed&in

progress

39 A-1.1 Institutional Development of the Drugs Agency

40 A-111 TA Policy and capacity development

41 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

46,088.4 55,528.2 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

February

24,2011- -

May 15,

2011May 15, 2012 Contract signed

42 A-111.3Drugs Agency capacity development, out-of-country Training

TR15,000.0 18,072.3 0.0

SoE Multi Oct-10 Nov 24, 2010February 8,

2011

First visit

scheduled for

Nov 24-25, 2011

A-111.3/1

Study Tour (Belgrade, HC Quality&Accreditation in SEE

countries, March 16-18, 2011) (Jadranka Lakicevic and

Lorena Vlahovic) 239.9 289.0 289.0

SoE 1 Mar-11 18-Mar-11 18-Mar-11Activity

completed

43 A-112 Information system for the Drugs' Agency

44 A-112.1Drugs' Agency Software development

G212,735.0 256,307.3 0.0

ICB Prior 1June-Sep

201119-Sep-11 2-Nov-11 - 5-Nov-11 16-Dec-11 Dec-11 Jan-12 Jan-12 Dec-12 ICB in progress

45 A-1.2 Trainings / study tours 67,172.2 80,930.3

46 A-120 Trainings / study tours (WG Capacity Dev.) TR 64,413.9 77,607.2 3,323.16 Remaining amount/Throughout the life of the projectThroughout the

life of the project

A-120/1

PR WG&PMN representatives/study visit to Macedonian HIF,

Skopje, June 27-29, 2011 (Amer Ramusovic, Lidija

Scepanovic&Boba Vukoslavovic) 1,737.8 2,093.8 2,093.8

SoE Post 1 Jun-11 21-Jun-11 22-Jun-11 29-Jun-11Activity

completed

A-120/2Workshop "Guidelines for Good Clinical Practice", Sep 30,

2011, at Med. Fac in Podgorica, ME 1,020.4 1,229.4 1,229.4SoE Post 1 Sep-11 27-Sep-11 28-Sep-11 30-Sep-11

Activity

completed

1,316,906.0 1,586,633.8 703,779.7

47 A.2.0 Hospital Information System / Hardware G 406,700.0 490,000.0 0.0 1ST ICB Prior 1May/June

201124-Oct-11 Nov-11 Nov-11 22-Nov-11 16-Jan-12 Jan-12 Feb-12 Feb-12 Jun-12 ICB in progress

48 A.2.1 Information System / Software G

49 A-210 Health Information System / Software for MOH G212,735.0 256,307.3 0.0

ICB Prior 1June/July

201117-Oct-11 21-Oct-11 - 25-Oct-11 6-Dec-11 Dec-11 Dec-11 Jan-12 Dec-12 ICB in progress

50 A-211 Health Information System / Software for IPH G212,735.0 256,307.3 0.0

ICB Prior 1June/July

201126-Oct-11 Nov-11 - 11-Nov-11 10-Jan-12 Jan-12 Jan-12 Feb-12 Dec-12 ICB in progress

Subtotal A.1:

Subcomponent A.2: Health Information System

Page 51: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

51 A-211.1 Loc TA - System Analyst for the IPH (6 months) CS7,511.1 9,049.5 9,049.5

IC Post 1 Aug-11 9-Sep-11 15-Sep-11 17-Sep-11 - 19-Oct-11 - - Nov-11 May-11Contract signing

in progress

52 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović) (12 months)

CS

5,365.1 6,463.9 6,463.9

SSS Prior 1 May-11May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

53 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić) (12 months)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

54 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

55 A-212/4

Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) (12 months)

Contract+ Am. No. 1CS

6,303.9 7,595.1 7,595.1SSS Prior 1 May-11 July 27, 2011 August 4, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

Amendment to

be signed

56 A-213TA for preparing MoH, IPH and Drug's Agency bidding documents

for software procurement (Ljiljana Krejović)CS

3,576.7 4,309.3 4,309.3

IC Post 1 May-11May 31,

2011May 31, 2011 - - - - - June 8, 2011 June 15, 2012

Contract

signed&in

progress

57 A-214Loc TA for LAN Project Design for Hardware (selected

locations/hospitals outside PG)CS

2,000.0 2,409.6 0.0IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 - - Dec-11 Dec-11 Dec-11

ToR to be

developed

867,656.9 1,045,369.8 40,345.6

2,184,563.0 2,632,003.6 744,125.3

58 B.1.0 Operational Review of the PHC

59 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,546.8 16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010 7/9/10 - Oct 22, 2010October 23,

2011

Contract

completed

13,546.8 16,321.5 16,321.5

60 B.2.0 PHC Specialization Program Development & Implementation

61 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 213,689.7 257,457.5 257,457.5 QCBS Prior 1

Oct/Nov

2010Nov 22, 2010 Nov 22, 2010

January 10,

2011-

February 3,

2011

May 19,

2011- Jun-11 Dec-12

Contract signing

in progress

62 B-202Loc TA Family Medicine Specialization Program Implementation

Coordinator (12 months)CS 6,975.4 8,404.1 0.0 IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 - - Dec-11 Dec-11 Dec-11

ToR to be

developed

220,665.1 265,861.6 257,457.5

63 B.3.0TA for PHC Specialist Medicine Training Program (Medicine and

Nursing, 4 rounds, 8-11)CS

423,095.1 509,753.1 387,695.8IC/CQ Prior Multi Ongoing throughout the life of the Project Dec-12

64 B-301Training Program (Education) Coordinator (rounds8-11) (Mara

Drecun) (Contract+Am.1)CS

16,213.0 19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/11

Amendment

signed&in

progress

65 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1) CS9,308.4 11,214.9 11,214.9

SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/11

Amendment

signed&in

progress

66 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 29,448.7 35,480.4 35,480.4 SSS Prior Multi

67 B-303.1-D-1 Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 887.0 1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 68 B-303.1-D-2 Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,293.0 1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 69 B-303.1-D-3 Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 70 B-303.1-D-4 Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,541.2 3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 71 B-303.1-D-5 Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,239.3 1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 72 B-303.1-D-6 Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,146.0 2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 73 B-303.1-D-7 Educator Doctor (P.Divanović) (Contract+Am.1) CS 1,985.1 2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 74 B-303.1-D-8 Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 872.7 1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 75 B-303.1-D-9 Educator Doctor (J.Pepić) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 76 B-303.1-D-10 Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 77 B-303.1-D-11 Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,234.0 1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 78 B-303.1-D-12 Educator Doctor (N.Janković) (Contract+Am.1) CS 1,008.6 1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 79 B-303.1-D-13 Educator Doctor (Božika Subašić) CS 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed80 B-303.1-D-14 Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,180.3 1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 81 B-303.1-D-15 Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,273.3 1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

Subcomponent B.3: PHC Development Outside of Podgorica

Subtotal B.2:

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Page 52: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

82 B-303.1-D-16 Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,083.1 3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 83 B-303.1-D-17 Educator Doctor (L.Delević) (Contract+Am.1) CS 1,430.7 1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 84 B-303.1-D-18 Educator Doctor (V.Peranović) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 85 B-303.1-D-19 Educator Doctor (Z.Miljković) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 86 B-303.1-D-20 Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,144.5 1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 87 B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed88 B-303.1-D-22 Educator Doctor (B.Radović) (Contract+Am.1) CS 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 89 B-303.1-D-23 Educator Doctor (M.Bogavac) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 90 B-303.1-D-24 Educator Doctor (O.Poček) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 91 B-303.1-D-25 Educator Doctor (S.Šabović) (Contract+Am.1) CS 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

92 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 21,971.7 26,471.9 26,471.9

93 B-303.1-N-1 Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,692.6 5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 94 B-303.1-N-2 Educator Nurse (J.Radinović) (Contract+Am.1) CS 944.3 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 95 B-303.1-N-3 Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,309.1 1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 96 B-303.1-N-4 Educator Nurse (B.Mudreša) (Contract+Am.1) CS 472.1 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 97 B-303.1-N-5 Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 414.9 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Amendment

signed&in 98 B-303.1-N-6 Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 99 B-303.1-N-7 Educator Nurse (D.Rakčević) (Contract+Am.1) CS 643.8 775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 100 B-303.1-N-8 Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,338.5 5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 101 B-303.1-N-9 Educator Nurse (N.Božović) (Contract+Am.1) CS 658.1 792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 102 B-303.1-N-10 Educator Nurse (L.Vujović) (Contract+Am.1) CS 629.5 758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 103 B-303.1-N-11 Educator Nurse (V.Garović) (Contract+Am.1) CS 372.0 448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 104 B-303.1-N-12 Educator Nurse (M.Marković) (Contract+Am.1) CS 214.6 258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 105 B-303.1-N-13 Educator Nurse (R.Ostojić) (Contract+Am.1) CS 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 106 B-303.1-N-14 Educator Nurse (T.Đurić) (Contract+Am.1) CS 901.3 1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 107 B-303.1-N-15 Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,001.5 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 108 B-303.1-N-16 Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 314.7 379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 109 B-303.1-N-17 Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,688.2 2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 110 B-303.1-N-18 Educator Nurse (L.Mitrović) (Contract+Am.1) CS 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 111 B-303.1-N-19 Educator Nurse (R.Džoganović) (Contract+Am.1) CS 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

112 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag, Jovanović

Danijela, Dašić Radmila) (Contract+Am.1)

CS

2,446.5 2,947.6 2,947.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10

Amendment

signed&in

progress

113 B-304.1-D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS 22,273.8 26,835.9 26,835.9

114 B-304.1-D-1 T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,641.7 1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 115 B-304.1-D-2 T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 116 B-304.1-D-3 T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 865.6 1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 117 B-304.1-D-4 T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 118 B-304.1-D-5 T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 119 B-304.1-D-6 T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 845.9 1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 120 B-304.1-D-7 T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 236.1 284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 121 B-304.1-D-8 T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,377.0 1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 122 B-304.1-D-9 T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,881.3 2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 123 B-304.1-D-10 T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 124 B-304.1-D-11 T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 536.5 646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 125 B-304.1-D-12 T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 126 B-304.1-D-13 T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 127 B-304.1-D-14 T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 128 B-304.1-D-15 T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 432.8 521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 129 B-304.1-D-16 T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 944.2 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 130 B-304.1-D-17 T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 704.6 848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 131 B-304.1-D-18 T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 132 B-304.1-D-19 T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 425.6 512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 133 B-304.1-D-20 T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 134 B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 314.8 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Amendment

signed&in 135 B-304.1-D-22 T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 482.9 581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 136 B-304.1-D-23 T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 1,960.0 2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 137 B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 422.0 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed138 B-304.1-D-25 T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,244.7 1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 139 B-304.1-D-26 T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 293.3 353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Amendment

signed&in 140 B-304.1-D-27 T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,169.6 1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 141 B-304.1-D-28 T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 368.4 443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

Page 53: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

142 B-304.1-N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS 16,399.2 19,758.0 19,758.0

142 B-304.1-N-1 T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 597.3 719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10Amendment

signed&in 144 B-304.1-N-2 T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,083.7 1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 145 B-304.1-N-3 T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 146 B-304.1-N-4 T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 147 B-304.1-N-5 T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 543.7 655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 148 B-304.1-N-6 T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,409.2 1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 149 B-304.1-N-7 T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,631.0 1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 150 B-304.1-N-8 T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,616.7 1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 151 B-304.1-N-9 T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,539.5 3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 152 B-304.1-N-10 T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 851.2 1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 153 B-304.1-N-11 T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 153 B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 143.1 172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed155 B-304.1-N-13 T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 156 B-304.1-N-14 T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 608.0 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 157 B-304.1-N-15 T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 744.0 896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 158 B-304.1-N-16 T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 397.0 478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in

159 B-304.1-N-17 T. Lecturer Med. Technician (G.Jokanović) (Contract+Am.1) CS364.8 439.6 439.6

SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in

progress

160 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir Dobričanin,

Ognjen Jovićević, Nada Janković, Edita Bašović) (round 9)

(Miroslav Stanišljević) (Contract+Am.1)

CS

3,376.4 4,068.0 4,068.0

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10

Amendment

signed&in

progress

161 B-3058th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 60,361.7 72,725.0 72,725.0

SoE Post Mar-10 Sep 22, 2010 Sep 24, 2010 Jun-10 Completed

162 B-3069th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 68,265.8 82,248.0 82,248.0

SoE Post Sep-10 Dec 20, 2010 Dec 20, 2010 Jan-11 COmpleted

163 B-30710th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 71,722.4 86,412.6 86,412.6

SoE Post Feb-11 June 1, 2011 June 1, 2011 June 25, 2011Implementation

in progress

164 B-30811th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 101,307.5 122,057.2 0.0

SoE Post Sep-11 Sep-11 Sep-11 Jan-12

165 B-3.1 Equipment - Diagnostic equipment

166 B-312Medical equipment for Primary Health Care Development

G448,200.0 540,000.0 0.0

ICB Prior 1June/July

201118-Oct-11 Dec-11 - Dec-11 Jan-12 Feb-12 Feb-12 Mar-12 Sep-12

TS approval in

progress, BD

prepared.

168 B-3.2 Civil Works

169 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0 2,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 3/13/12Contract

signed&in

170 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje CS

53,942.7 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

Contract

signed&in

progress

171 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,636.7 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10

Contract

completed

1,928,874.4 3,798,454.2 3,136,396.9

2,163,086.4 4,080,637.3 3,410,175.9

172 C.1 PMN Personnel CS

173 C1.1 Coordinator, short-term (4months)( Pavle Aligrudić) CS 7,106.4 8,561.9 8,561.9 SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10Contract

completed

174 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10

Contract

completed

175 C1.3Coordinator (24 months) (Majda Škrijelj) (Contract+Am.1)

CS53,298.0 64,214.4 51,371.5

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 6/28/11

Amendment

signed&in

progress

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subcomponent C.1: Project Management Network

Page 54: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

176 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1)CS

45,895.4 55,295.7 42,809.6IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 5/1/11

Amendment

signed&in

progress

177 C1.5 Administrative Assistant (12 months) (Jelena Antonijević) CS 9,948.9 11,986.7 11,986.7 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 7/1/11Contract

completed

178 C1.6 Administrative Assistant (12 months) (Natasa Jolic) CS 14,923.4 17,980.0 11,986.7 IC Post 1April 20,

2011

April 20,

2011April 20, 2011 April 21, 2011 - - - - June 6, 2011 June 6, 2012

Contract

signed&in

179 C.2 PMN Trainings / Study tours TR 10,090.0 12,156.6 3,260.2 SoE/CQ Post Multi Ongoing throughout the life of the Project

180PMN Training (Sarajevo, Procurement Seminar, May 31-Jun 4,

2010) (Boba Vukoslavovic) 633.5 763.2 763.2SoE Post 1 May-10 27-May-10 27-May-10 May-10

Activity

completed

181PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj) 1,180.3 1,422.0 1,422.0SoE Post 1 Oct-10 4-Oct-10 4-Oct-10 Oct-10

Activity

completed

182

PMN Study Tour (Belgrade, meetings regarding Serbian Health

Project DRG negotiations, October 7, 2011) (Majda

Skrijelj&Lidija Scepanovic) 394.3 475.0 475.0

SoE Post 1 Sep-11 22-Sep-11 22-Sep-11 Oct-11Activity

completed

183PMN Training (Skopje, IT Procurement, Oct 27, 2011) (Boba

Vukoslavovic) 498.0 600.0 600.0SoE Post 1 Oct-11 26-Oct-11 26-Oct-11 Oct-11

Activity

completed

184 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 125,000.0 150,602.4 82,000.0SoE Post Ongoing throughout the life of the Project

Ongoing thorugh

the life of the

Project

185 C.4 Independent Financial Audit CS3,107.5 3,744.0 3,744.0

LCS Prior 1 Apr-11April 29,

2011May 6, 2011 May 10, 2011 - 22-Jun-11 - 7-Jul-11 25-Jul-11 11-Sep-12

Contract

signed&in

progress

186 C.5 Annual survey CS99,600.0 120,000.0 0.0

CQ Prior 1 Jan-11February 1,

2011

February 2,

2011

February 2,

201110-Nov-11 Nov-11 Nov-11 Dec-11 Nov-12

Negotiations to

initiate.

187 C.6Local TA for Monitoring and Evaluation

CS20,000.0 24,096.4 0.0

IC / CQ Prior 1 Activity to be initiated towards the end of the Project

Activity to

initiate in mid

2012

188 C.7 Office Furniture/Equipment G

189 C 7.1 PMN Office Furniture G 1,079.0 1,300.0 1,300.0 S Prior 1 Jul-10 26-Jun-10 28-Jun-10 - Aug-10 Oct 12, 2010 - Nov 1, 2010 Nov 12, 2010 -Contract

completed

190 C 7.2 PMN Office Equipment (Hardware) G 1,288.2 1,552.0 1,552.0 S Prior 1 Jul-11 1-Aug-11 3-Aug-11 - 14-Oct-11 25-Oct-11 - - 3-Nov-11 -Contract

completed

394,653.1 475,485.7 222,568.2

191C.8 5-month TSU Operating Expenses 36,369.6 43,818.8 43,818.8

36,369.6 43,818.8 43,818.8

431,022.69 519,304.45 266,386.92

4,778,672.03 7,231,945.27 4,420,688.12

4,778,672.03 7,231,945.27 4,420,688.12

Total negotiated Loan amount 5,100,000.00

321,327.97

Committed 2,567,092.20 4,567,391.28 4,420,688.12

Subtotal C.8:

TOTAL Component C:

Sub-total A+B+C

GRAND TOTAL Additional financing:

Subtotal C.1:

Page 55: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

No

Item Description

Ty

pe

Est

imat

. C

ost

/All

oca

ted

am

ou

nt

LO

AN

(EU

R)

Est

imat

. C

ost

/All

oca

ted

am

ou

nt

Wit

h G

ov

ern

men

t C

on

trib

uti

on

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

ali

ze S

ho

rtli

st,

TS

, T

OR

,

RF

, B

idd

ing

Do

c/I

nv

itati

on

to

Qu

ote

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Sh

ort

list

,

TS

, T

OR

, R

F,

Bid

din

g D

oc/I

nv

itati

on

to Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/I

nv

itati

on

to

Qu

ote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

en

der

Inv

itat

ion

Bid

op

enin

g-

Tech

nic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tech

nic

al

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Co

ntr

act

awar

d/S

ign

ing

Co

ntr

act

com

ple

tio

n

Acti

vit

y S

tatu

s

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and STC

Basic Benefits Package

3 A-101.1 Int TA health institutions network, minimum requirements & HR

PlanCS 87,000.0 104,819.3 0.0 IC Prior 1 Nov-11 Nov-11 Nov-11 Dec-11 - Dec-11 - Dec-11 Jan-12 Dec-12

ToR to be

developed

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0 90,361.4 0.0 CQS Prior 1 Dec-10 Apr 06, 2011 May 9, 2011 May 12, 2011 - July 7, 2011July 22,

2011

August 3,

2011- -

Negotiations in

progress.

5 A-101.3 Loc TA Hospital Optimization Plan (Firm/Organization) CS 50,000.00 60,241.0 0.0 CQS Prior 1 06-Oct-11 01-Nov-11 2-Nov-11 10-Nov-11 - Nov-11 - Dec-11 Dec-11 Dec-12Position

advertised

6 A-101.4 Loc TA for STC Basic Benefits Package (Firm/Organization) CS 115,852.2 139,581.0 139,581.0 SSS Prior 1 Apr-11June 29,

2011July 13, 2011 - - - - - Nov-11 Nov-12

Contract signing

in progress

A-102 Analytical study on HR in Health System in MNA-102.1 Analytical study on HR in Health System in MN

7 A-103 STC payment model design and implementation

8 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)CS 180,478.9 217,444.5 217,444.5 CQS Prior 1

Oct/Nov

2010

February 2,

2011

February 2,

2011Nov 23, 2010 - Dec 17, 2010

February

04, 2011

February 11,

2011June 3, 2011

November 30,

2012

Contract

signed&in

progress

9 A-103.2 Loc TA STC payment model design and implementation CS 58,500.0 70,481.9 0.0 SSS* Prior Multi Nov-11 Nov-11 Nov-11 - - - - - Dec-11 Dec-12

ToR

development in

progress

10 A-103.3 Purchasing DRG Licence G 70,000.0 84,337.3 0.0 DC Prior 1 - - - - - - - - - Dec-12

6-month Trial

Version

Contract signed

11 A-104 Private public integration

12 A-104.1 Int TA Private public integration CS 47,628.3 57,383.5 57,383.5 IC Prior 1May/June

2011Jun-11 Jun-11 May 6, 2011 - June 2, 2011

June 16,

2011

June 17,

2011Aug-11 Oct-12

Contract

signed&in

13 A-104.2/1 Loc TA - Integration of private HC institutions into the network

of health institutions (Dragoljub Perović)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - -

June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

14 A-104.2/2 Loc TA - Integration of private HC institutions into the network

of health institutions (Milan Mirković)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - -

June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

15 A-104.2/3 Loc TA - Integration of private HC institutions into the network

of health institutions (Mladen Filipović)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - -

June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

16 A-104.2/4 Loc TA - Integration of private HC institutions into the network

of health institutions (Srđan Popović)CS

6,438.1 7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011June 22, 2011 - - -

June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

17 A-105

TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision

18 A-105.1

Int TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and protocols development

and revision

CS 86,019.8 103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

March 01,

2011

April 22,

2011-

May 20,

2011

December 1,

2012

Contract

signed&in

progress

19 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines (Goran

Nikolić)CS 10,059.5 12,119.9 8,079.9 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

20 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines

(Abedin Adžović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

21 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines (Vesna

Miranović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

22 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines (Filip

Vukmirović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

23 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines (Sreten

Kavarić)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

24 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines (Nada

Rondović)CS 3,219.0 3,878.3 2,585.5 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

25 A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines (Zorica

Dautović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of November 17, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 56: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

26 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

27 A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines (Ranko

Lazović)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

28 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines

(Ljubica Pejakov)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

29 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines

(Dragan Laušević)CS 3,986.1 4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011 June 7, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

30 A-106 TA PR campaign design and implementation

31 A-106.1 Loc TA - Capacity Building & Implementation of Public

Information CampaignCS 26,825.6 32,320.0 0.0 IC Post 1

Aug/Sep

20119-Sep-11 28-Sep-11 4-Oct-11 - 10-Nov-11 - - Dec-11 Dec-12

PMN to

approach the

first-ranked

32 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC) (Gorica

Soković)CS 16,167.0 19,478.3 11,130.4 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 March 31, 2012

Contract

signed&in

progress

33 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC) (Vesna

Nikaljević)CS 16,167.0 19,478.3 11,130.4 SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- - - - - April 1, 2011 March 31, 2012

Contract

signed&in

progress

34 A-106.3Loc TA - PR Strategy materials design & production (posters,

brochures, media buy) (Firm)G 34,468.2 41,528.0 0.0 S Post Multi Feb-12 Feb-12 Mar-12 Mar-12 Apr-12 Apr-12 Apr-12 May-11 Dec-12

TS to be

developed by

35 A-107 MoH capacity development

36 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical

cancer)) (Milutin Bulajić)

CS 20,562.4 24,774.0 24,774.0 IC Post 1 Mar-11 April 5, 2011 April 22, 2011February 21,

2011-

March 15,

2011- -

May 25,

2011May 25, 2012

Contract

signed&in

progress

37 A-107.2Loc TA for Development of National Colorectal Cancer

Prevention Program (Brigita Smolović)CS 5,365.1 6,463.9 6,463.9 IC Post 1 Jun-11

June 30,

2011July 11, 2011 - - 20-Jul-11 - - 27-Jul-11 5-Jun-12

Contract

signed&in

progress

38 A-107.3Loc TA for Development of National Cervical Cancer Prevention

Program (Milovan Jovanovic)CS 10,730.1 12,927.9 12,927.9 IC Post 1 Jun-11

July 26,

2011

August 4,

2011- - 12-Aug-11 - - 25-Aug-11 5-Jun-12

Contract

signed&in

progress

39 A-1.1 Institutional Development of the Drugs Agency

40 A-111 TA Policy and capacity development

41 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

46,088.4 55,528.2 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

February

24,2011- -

May 15,

2011May 15, 2012 Contract signed

42 A-111.3Drugs Agency capacity development, out-of-country Training

TR15,000.0 18,072.3 0.0

SoE Multi Oct-10Nov 24,

2010

February 8,

2011

First visit

scheduled for

Nov 24-25,

A-111.3/1

Study Tour (Belgrade, HC Quality&Accreditation in SEE

countries, March 16-18, 2011) (Jadranka Lakicevic and

Lorena Vlahovic) 239.9 289.0 289.0

SoE 1 Mar-11 18-Mar-11 18-Mar-11Activity

completed

43 A-112 Information system for the Drugs' Agency

44 A-112.1Drugs' Agency Software development

G212,735.0 256,307.3 0.0

ICB Prior 1June-Sep

201119-Sep-11 2-Nov-11 - 5-Nov-11 16-Dec-11 Dec-11 Jan-12 Jan-12 Dec-12 BD published

45 A-1.2 Trainings / study tours 67,172.2 80,930.3

46 A-120 Trainings / study tours (WG Capacity Dev.) TR 64,413.9 77,607.2 3,323.16 Remaining amount/Throughout the life of the projectThroughout the

life of the

A-120/1

PR WG&PMN representatives/study visit to Macedonian HIF,

Skopje, June 27-29, 2011 (Amer Ramusovic, Lidija

Scepanovic&Boba Vukoslavovic) 1,737.8 2,093.8 2,093.8

SoE Post 1 Jun-11 21-Jun-11 22-Jun-11 29-Jun-11Activity

completed

A-120/2Workshop "Guidelines for Good Clinical Practice", Sep 30,

2011, at Med. Fac in Podgorica, ME 1,020.4 1,229.4 1,229.4SoE Post 1 Sep-11 27-Sep-11 28-Sep-11 30-Sep-11

Activity

completed

1,316,906.0 1,586,633.8 703,779.7

47 A.2.0 Hospital Information System / Hardware G 406,700.0 490,000.0 0.0 1ST ICB Prior 1May/June

201124-Oct-11 Nov-11 Nov-11 Nov-11 Dec-11 Dec-11 Dec-11 Jan-11 Jun-12

IT WG to

provide response

48 A.2.1 Information System / Software G 425,470.1 512,614.6

49 A-210 Health Information System / Software for MOH G212,735.0 256,307.3 0.0

ICB Prior 1June/July

201117-Oct-11 21-Oct-11 - 25-Oct-11 6-Dec-11 Dec-11 Dec-11 Jan-12 Dec-12 BD published

50 A-211 Health Information System / Software for IPH G212,735.0 256,307.3 0.0

ICB Prior 1June/July

201126-Oct-11 Nov-11 - Nov-11 Nov-11 Dec-11 Jan-12 Feb-12 Dec-12

WB NO on BD

in progress.

51 A-211.1 Loc TA - System Analyst for the IPH (6 months) CS7,511.1 9,049.5 9,049.5

IC Post 1 Aug-11 9-Sep-11 15-Sep-11 17-Sep-11 - 19-Oct-11 - - Nov-11 May-11Contract signing

in progress

52 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović) (12 months)

CS

5,365.1 6,463.9 6,463.9

SSS Prior 1 May-11May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

53 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić) (12 months)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

54 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS

5,365.1 6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011May 31, 2011 - - - - -

June 12,

2011June 15, 2012

Contract

signed&in

progress

Subtotal A.1:

Subcomponent A.2: Health Information System

Page 57: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

55 A-212/4

Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) (12 months)

Contract+ Am. No. 1CS

6,303.9 7,595.1 7,595.1SSS Prior 1 May-11

July 27,

2011

August 4,

2011- - - - -

June 12,

2011June 15, 2012

Contract

Amendment to

be signed

56 A-213TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement (Ljiljana Krejović)CS

3,576.7 4,309.3 4,309.3

IC Post 1 May-11May 31,

2011May 31, 2011 - - - - - June 8, 2011 June 15, 2012

Contract

signed&in

progress

57 A-214Loc TA for LAN Project Design for Hardware (selected

locations/hospitals outside PG)CS

2,000.0 2,409.6 0.0IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 - - Dec-11 Dec-11 Dec-11

ToR to be

developed

867,656.9 1,045,369.8 40,345.6

2,184,563.0 2,632,003.6 744,125.3

58 B.1.0 Operational Review of the PHC

59 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,546.8 16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010 7/9/10 - Oct 22, 2010October 23,

2011

Contract

completed

13,546.8 16,321.5 16,321.5

60 B.2.0 PHC Specialization Program Development & Implementation

61 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 213,689.7 257,457.5 257,457.5 QCBS Prior 1

Oct/Nov

2010

Nov 22,

2010Nov 22, 2010

January 10,

2011-

February 3,

2011

May 19,

2011- Jun-11 Dec-12

Contract signing

in progress

62 B-202Loc TA Family Medicine Specialization Program Implementation

Coordinator (12 months)CS 6,975.4 8,404.1 0.0 IC Post 1 Nov-11 Nov-11 Dec-11 Dec-11 - - Dec-11 Dec-11 Dec-11

ToR to be

developed

220,665.1 265,861.6 257,457.5

63 B.3.0TA for PHC Specialist Medicine Training Program (Medicine and

Nursing, 4 rounds, 8-11)CS

403,615.1 486,283.3 386,283.3IC/CQ Prior MultiOngoing through the life of the Project Dec-12

64 B-301Training Program (Education) Coordinator (rounds8-11) (Mara

Drecun) (Contract+Am.1)CS

16,213.0 19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/11

Amendment

signed&in

progress

65 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS

9,308.4 11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/11

Amendment

signed&in

progress

66 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 29,448.7 35,480.4 35,480.4 SSS Prior Multi

67 B-303.1-D-1 Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 887.0 1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 68 B-303.1-D-2 Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,293.0 1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 69 B-303.1-D-3 Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 70 B-303.1-D-4 Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,541.2 3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 71 B-303.1-D-5 Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,239.3 1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 72 B-303.1-D-6 Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,146.0 2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 73 B-303.1-D-7 Educator Doctor (P.Divanović) (Contract+Am.1) CS 1,985.1 2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 74 B-303.1-D-8 Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 872.7 1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 75 B-303.1-D-9 Educator Doctor (J.Pepić) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 76 B-303.1-D-10 Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 77 B-303.1-D-11 Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,234.0 1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 78 B-303.1-D-12 Educator Doctor (N.Janković) (Contract+Am.1) CS 1,008.6 1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 79 B-303.1-D-13 Educator Doctor (Božika Subašić) CS 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed80 B-303.1-D-14 Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,180.3 1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 81 B-303.1-D-15 Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,273.3 1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 82 B-303.1-D-16 Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,083.1 3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 83 B-303.1-D-17 Educator Doctor (L.Delević) (Contract+Am.1) CS 1,430.7 1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 84 B-303.1-D-18 Educator Doctor (V.Peranović) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 85 B-303.1-D-19 Educator Doctor (Z.Miljković) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 86 B-303.1-D-20 Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,144.5 1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 87 B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed88 B-303.1-D-22 Educator Doctor (B.Radović) (Contract+Am.1) CS 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 89 B-303.1-D-23 Educator Doctor (M.Bogavac) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 90 B-303.1-D-24 Educator Doctor (O.Poček) (Contract+Am.1) CS 715.3 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 91 B-303.1-D-25 Educator Doctor (S.Šabović) (Contract+Am.1) CS 572.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

92 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 21,971.7 26,471.9 26,471.9

93 B-303.1-N-1 Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,692.6 5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 94 B-303.1-N-2 Educator Nurse (J.Radinović) (Contract+Am.1) CS 944.3 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 95 B-303.1-N-3 Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,309.1 1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 96 B-303.1-N-4 Educator Nurse (B.Mudreša) (Contract+Am.1) CS 472.1 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Page 58: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

97 B-303.1-N-5 Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 414.9 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010Amendment

signed&in 98 B-303.1-N-6 Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 99 B-303.1-N-7 Educator Nurse (D.Rakčević) (Contract+Am.1) CS 643.8 775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 100 B-303.1-N-8 Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,338.5 5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 101 B-303.1-N-9 Educator Nurse (N.Božović) (Contract+Am.1) CS 658.1 792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 102 B-303.1-N-10 Educator Nurse (L.Vujović) (Contract+Am.1) CS 629.5 758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 103 B-303.1-N-11 Educator Nurse (V.Garović) (Contract+Am.1) CS 372.0 448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 104 B-303.1-N-12 Educator Nurse (M.Marković) (Contract+Am.1) CS 214.6 258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 105 B-303.1-N-13 Educator Nurse (R.Ostojić) (Contract+Am.1) CS 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 106 B-303.1-N-14 Educator Nurse (T.Đurić) (Contract+Am.1) CS 901.3 1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 107 B-303.1-N-15 Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,001.5 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 108 B-303.1-N-16 Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 314.7 379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 109 B-303.1-N-17 Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,688.2 2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 110 B-303.1-N-18 Educator Nurse (L.Mitrović) (Contract+Am.1) CS 772.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 111 B-303.1-N-19 Educator Nurse (R.Džoganović) (Contract+Am.1) CS 858.4 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

112 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag, Jovanović

Danijela, Dašić Radmila) (Contract+Am.1)

CS

2,446.5 2,947.6 2,947.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10

Amendment

signed&in

progress

113 B-304.1-D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS 22,273.8 26,835.9 26,835.9

114 B-304.1-D-1 T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,641.7 1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 115 B-304.1-D-2 T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 116 B-304.1-D-3 T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 865.6 1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 117 B-304.1-D-4 T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 118 B-304.1-D-5 T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 119 B-304.1-D-6 T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 845.9 1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 120 B-304.1-D-7 T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 236.1 284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 121 B-304.1-D-8 T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,377.0 1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 122 B-304.1-D-9 T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,881.3 2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 123 B-304.1-D-10 T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 124 B-304.1-D-11 T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 536.5 646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 125 B-304.1-D-12 T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,287.6 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 126 B-304.1-D-13 T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 127 B-304.1-D-14 T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 393.4 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 128 B-304.1-D-15 T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 432.8 521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 129 B-304.1-D-16 T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 944.2 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 130 B-304.1-D-17 T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 704.6 848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 131 B-304.1-D-18 T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 429.2 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 132 B-304.1-D-19 T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 425.6 512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 133 B-304.1-D-20 T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,119.5 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 134 B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 314.8 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Amendment

signed&in 135 B-304.1-D-22 T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 482.9 581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 136 B-304.1-D-23 T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 1,960.0 2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 137 B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 422.0 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed138 B-304.1-D-25 T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,244.7 1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 139 B-304.1-D-26 T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 293.3 353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Amendment

signed&in 140 B-304.1-D-27 T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,169.6 1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 141 B-304.1-D-28 T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 368.4 443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

142 B-304.1-N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS 16,399.2 19,758.0 19,758.0

142 B-304.1-N-1 T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 597.3 719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10Amendment

signed&in 144 B-304.1-N-2 T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,083.7 1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 145 B-304.1-N-3 T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 146 B-304.1-N-4 T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 972.9 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 147 B-304.1-N-5 T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 543.7 655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 148 B-304.1-N-6 T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,409.2 1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 149 B-304.1-N-7 T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,631.0 1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 150 B-304.1-N-8 T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,616.7 1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 151 B-304.1-N-9 T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,539.5 3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 152 B-304.1-N-10 T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 851.2 1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 153 B-304.1-N-11 T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 708.2 853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 153 B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 143.1 172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed155 B-304.1-N-13 T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,094.5 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 156 B-304.1-N-14 T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 608.0 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 157 B-304.1-N-15 T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 744.0 896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in 158 B-304.1-N-16 T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 397.0 478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in

159 B-304.1-N-17 T. Lecturer Med. Technician (G.Jokanović) (Contract+Am.1) CS364.8 439.6 439.6

SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Amendment

signed&in

progress

Page 59: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

160 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir Dobričanin,

Ognjen Jovićević, Nada Janković, Edita Bašović) (round 9)

(Miroslav Stanišljević) (Contract+Am.1)

CS

3,376.4 4,068.0 4,068.0

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10

Amendment

signed&in

progress

161 B-3058th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 60,361.7 72,725.0 72,725.0

SoE Post Mar-10 Sep 22, 2010 Sep 24, 2010 Jun-10 Completed

162 B-3069th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, Logistical

Assisstant, Rent, printing certificates, office equipment, etc. 68,265.8 82,248.0 82,248.0

SoE Post Sep-10Dec 20,

2010Dec 20, 2010 Jan-11 COmpleted

163 B-307

10th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 70,550.0 85,000.0 85,000.0

SoE Post Feb-11 June 1, 2011 June 1, 2011 June 25, 2011Implementation

in progress

164 B-308

11th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 83,000.0 100,000.0 0.0

SoE Post Sep-11 Sep-11 Sep-11 Jan-12

165 B-3.1 Equipment - Diagnostic equipment

166 B-312Medical equipment for Primary Health Care Development

G448,200.0 540,000.0 0.0

ICB Prior 1June/July

201118-Oct-11 Dec-11 - Dec-11 Jan-12 Feb-12 Feb-12 Mar-12 Sep-12

TS approval in

progress, BD

prepared.

168 B-3.2 Civil Works

169 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0 2,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 3/13/12Contract

signed&in

170 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje CS

53,942.7 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

Contract

signed&in

progress

171 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,636.7 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10

Contract

completed

1,909,394.5 3,774,984.4 3,134,984.4

2,143,606.4 4,057,167.5 3,408,763.4

172 C.1 PMN Personnel CS

173 C1.1 Coordinator, short-term (4months)( Pavle Aligrudić) CS 7,106.4 8,561.9 8,561.9 SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10Contract

completed

174 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10

Contract

completed

175 C1.3Coordinator (24 months) (Majda Škrijelj) (Contract+Am.1)

CS53,298.0 64,214.4 51,371.5

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 6/28/11

Amendment

signed&in

progress

176 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1)CS

45,895.4 55,295.7 42,809.6IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 5/1/11

Amendment

signed&in

progress

177 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS9,948.9 11,986.7 11,986.7

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 7/1/11Contract

completed

178 C1.6 Administrative Assistant (12 months) (Natasa Jolic) CS 14,923.4 17,980.0 11,986.7 IC Post 1April 20,

2011

April 20,

2011April 20, 2011

April 21,

2011- - - - June 6, 2011 June 6, 2012

Contract

signed&in

179 C.2 PMN Trainings / Study tours TR 10,090.0 12,156.6 3,260.2 SoE/CQ Post Multi

180PMN Training (Sarajevo, Procurement Seminar, May 31-Jun

4, 2010) (Boba Vukoslavovic) 633.5 763.2 763.2SoE Post 1 May-10 27-May-10 27-May-10 May-10

Activity

completed

181PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj) 1,180.3 1,422.0 1,422.0SoE Post 1 Oct-10 4-Oct-10 4-Oct-10 Oct-10

Activity

completed

182

PMN Study Tour (Belgrade, meetings regarding Serbian

Health Project DRG negotiations, October 7, 2011) (Majda

Skrijelj&Lidija Scepanovic) 394.3 475.0 475.0

SoE Post 1 Sep-11 22-Sep-11 22-Sep-11 Oct-11Activity

completed

183PMN Training (Skopje, IT Procurement, Oct 27, 2011) (Boba

Vukoslavovic) 498.0 600.0 600.0SoE Post 1 Oct-11 26-Oct-11 26-Oct-11 Oct-11

Activity

completed

184 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 85,000.0 102,409.6 50,000.0SoE PostOngoing through the life of the Project

Ongoing

thorugh the life

of the Project

185 C.4 Independent Financial Audit CS3,107.5 3,744.0 3,744.0

LCS Prior 1 Apr-11April 29,

2011May 6, 2011 May 10, 2011 - 22-Jun-11 - 7-Jul-11 25-Jul-11 11-Sep-12

Contract

signed&in

progress

186 C.5 Annual survey CS99,600.0 120,000.0 0.0

CQ Prior 1 Jan-11February 1,

2011

February 2,

2011

February 2,

201110-Nov-11 Nov-11 Nov-11 Dec-11 Nov-12

Negotiations to

initiate.

187 C.6Local TA for Monitoring and Evaluation

CS20,000.0 24,096.4 0.0

IC / CQ Prior 1 Activity to be initiated towards the end of the Project

Activity to

initiate in mid

2012

188 C.7 Office Furniture/Equipment G

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subcomponent C.1: Project Management Network

Page 60: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

189 C 7.1 PMN Office Furniture G 1,079.0 1,300.0 1,300.0 S Prior 1 Jul-10 26-Jun-10 28-Jun-10 - Aug-10 Oct 12, 2010 - Nov 1, 2010Nov 12,

2010-

Contract

completed

190 C 7.2 PMN Office Equipment (Hardware) G 1,288.2 1,552.0 1,552.0 S Prior 1 Jul-11 1-Aug-11 3-Aug-11 - 14-Oct-11 25-Oct-11 - - 3-Nov-11 -Contract

completed

354,653.1 427,292.9 190,568.2

191C.8 5-month TSU Operating Expenses 36,369.6 43,818.8 43,818.8

36,369.6 43,818.8

391,022.69 471,111.68 190,568.16

5,122,807.23 7,160,282.71 4,729,740.10

5,122,807.23 7,160,282.71 4,729,740.10

Total negotiated Loan amount 5,100,000.00

-22,807.23

Committed 2,525,919.78 4,517,785.96 4,387,275.57

Sub-total

GRAND TOTAL Additional financing:

Subtotal C.1:

Subtotal C.8:

TOTAL Component C:

Page 61: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275N

o

Item Description

Ty

pe

Est

imat

. C

ost

/All

oca

ted

amo

un

t L

OA

N

(E

UR

)

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and STC

Basic Benefits Package

3 A-101.1 Int TA health institutions network & norms and standards CS 87,000.0

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0

5 A-101.3 Loc TA health institutions network & norms and standards

(Firm/Organization)CS

100,000.00

6 A-101.4 Loc TA for STC Basic Benefits Package (Firm/Organization) CS 120,000.00

7 A-102 Analytical study on HR in Health System in MN

8 A-102.1Analytical study on HR in Health System in MN

(Firm/Organization)CS

100,000.00

9 A-103 STC payment model design and implementation

10 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)CS

180,478.9

11 A-103.2 Loc TA STC payment model design and implementation CS 58,500.0

12 A-103.3 Purchasing DRG Licence G 70,000.0

13 A-104 Private public integration

14 A-104.1 Int TA Private public integration

CS47,628.3

15 A-104.2/1 Loc TA - Integration of private HC institutions into the network

of health institutions (Dragoljub Perović)CS

6,438.1

16 A-104.2/2 Loc TA - Integration of private HC institutions into the network

of health institutions (Milan Mirković)CS

6,438.1

17 A-104.2/3 Loc TA - Integration of private HC institutions into the network

of health institutions (Mladen Filipović)CS

6,438.1

18 A-104.2/4 Loc TA - Integration of private HC institutions into the network

of health institutions (Srđan Popović)CS

6,438.1

19 A-105 TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

20 A-105.1 Int TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and protocols CS 86,019.8

21 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines (Goran

Nikolić)CS 10,059.5

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 12, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 62: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

22 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines

(Abedin Adžović)CS 3,986.1

23 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines (Vesna

Miranović)CS 3,986.1

24 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines (Filip

Vukmirović)CS 3,986.1

25 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines (Sreten

Kavarić)CS 3,986.1

26 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines (Nada

Rondović)CS 3,219.0

27 A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines

(Zorica Dautović)CS 3,986.1

28 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS 3,986.1

29 A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines

(Ranko Lazović)CS 3,986.1

30 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines

(Ljubica Pejakov)CS 3,986.1

31 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines

(Dragan Laušević)CS 3,986.1

32 A-106 TA PR campaign design and implementation

33 A-106.1 Loc TA - PR Strategy design, production and implementation

(Firm)CS

70,000.0

34 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC) (Gorica

Soković)CS

16,167.0

35 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC) (Vesna

Nikaljević)CS

16,167.0

36 A-107 MoH capacity development

37 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical CS

20,562.4

38 A-107.2Loc TA for Development of National Colorectal Cancer

Prevention Program (Brigita Smolović)CS

5,365.1

39 A-107.3Loc TA for Development of National Cervical Cancer Prevention

ProgramCS

10,790.0

40 A-107.4 Loc TA- Junior Advisor to the Minister CS 20,000.0

41 A-1.1 Institutional Development of the Drugs Agency

42 A-111 TA Policy and capacity development

43 A-111.1 Int TA for policy development CS 40,000.0

44 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

46,088.4

45 A-111.3 Drugs Agency capacity development, out-of-country Training TR 15,257.0

46 A-112 Information system for the Drugs' Agency

47 A-112.1 Drugs' Agency Software development G 212,735.0

48 A-1.2 Trainings / study tours

49 A-120 Trainings / study tours (WG Capacity Dev.) TR 67,172.2

50 PR WG&PMN representatives/study visit to Macedonian HIF 1,737.8

1,539,837.0Subtotal A.1:

Subcomponent A.2: Health Information System

Page 63: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

51 A.2.0 Hospital Information System / Hardware (*)

G490,000.0

52 A.2.1Information System / Software

G425,470.1

53 A-210 Health Information System / Software for MOH G 212,735.0

54 A-211 Health Information System / Software for IPH G 212,735.0

55 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović)CS

5,365.1

56 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić)CS

5,365.1

57 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS

5,365.1

58 A-212/4 Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) Contract+ Am. No. CS

6,303.9

59 A-213TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement (Ljiljana Krejović)CS

3,576.7

941,445.9

2,481,282.9

60 B.1.0 Operational Review of the PHC

61 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,546.8

13,546.8

62 B.2.0 PHC Specialization Program Development & Implementation

63 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 213,689.7

213,689.7

64 B.3.0TA for PHC Specialist Medicine Training Program (Medicine and

Nursing, 4 rounds, 8-11)CS

391,165.1

65 B-301Training Program (Education) Coordinator (rounds8-11) (Mara

Drecun) (Contract+Am.1)CS

16,213.0

66 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS

9,308.4

67 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 29,448.7

68 B-303.1-D-1 Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 887.0

69 B-303.1-D-2 Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,293.0

70 B-303.1-D-3 Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,119.5

Subcomponent B.3: PHC Development Outside of Podgorica

Subtotal B.2:

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Page 64: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

71 B-303.1-D-4 Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,541.2

72 B-303.1-D-5 Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,239.3

73 B-303.1-D-6 Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,146.0

74 B-303.1-D-7 Educator Doctor (P.Divanović) (Contract+Am.1) CS 1,985.1

75 B-303.1-D-8 Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 872.7

76 B-303.1-D-9 Educator Doctor (J.Pepić) (Contract+Am.1) CS 429.2

77 B-303.1-D-10 Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,287.6

78 B-303.1-D-11 Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,234.0

79 B-303.1-D-12 Educator Doctor (N.Janković) (Contract+Am.1) CS 1,008.6

80 B-303.1-D-13 Educator Doctor (Božika Subašić) CS 572.3

81 B-303.1-D-14 Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,180.3

82 B-303.1-D-15 Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,273.3

83 B-303.1-D-16 Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,083.1

84 B-303.1-D-17 Educator Doctor (L.Delević) (Contract+Am.1) CS 1,430.7

85 B-303.1-D-18 Educator Doctor (V.Peranović) (Contract+Am.1) CS 715.3

86 B-303.1-D-19 Educator Doctor (Z.Miljković) (Contract+Am.1) CS 715.3

87 B-303.1-D-20 Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,144.5

88 B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 429.2

89 B-303.1-D-22 Educator Doctor (B.Radović) (Contract+Am.1) CS 858.4

90 B-303.1-D-23 Educator Doctor (M.Bogavac) (Contract+Am.1) CS 715.3

91 B-303.1-D-24 Educator Doctor (O.Poček) (Contract+Am.1) CS 715.3

92 B-303.1-D-25 Educator Doctor (S.Šabović) (Contract+Am.1) CS 572.3

93 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 21,971.7

94 B-303.1-N-1 Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,692.6

95 B-303.1-N-2 Educator Nurse (J.Radinović) (Contract+Am.1) CS 944.3

96 B-303.1-N-3 Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,309.1

97 B-303.1-N-4 Educator Nurse (B.Mudreša) (Contract+Am.1) CS 472.1

98 B-303.1-N-5 Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 414.9

99 B-303.1-N-6 Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 972.9

100 B-303.1-N-7 Educator Nurse (D.Rakčević) (Contract+Am.1) CS 643.8

101 B-303.1-N-8 Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,338.5

102 B-303.1-N-9 Educator Nurse (N.Božović) (Contract+Am.1) CS 658.1

103 B-303.1-N-10 Educator Nurse (L.Vujović) (Contract+Am.1) CS 629.5

104 B-303.1-N-11 Educator Nurse (V.Garović) (Contract+Am.1) CS 372.0

105 B-303.1-N-12 Educator Nurse (M.Marković) (Contract+Am.1) CS 214.6

Page 65: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

106 B-303.1-N-13 Educator Nurse (R.Ostojić) (Contract+Am.1) CS 772.6

107 B-303.1-N-14 Educator Nurse (T.Đurić) (Contract+Am.1) CS 901.3

108 B-303.1-N-15 Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,001.5

109 B-303.1-N-16 Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 314.7

110 B-303.1-N-17 Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,688.2

111 B-303.1-N-18 Educator Nurse (L.Mitrović) (Contract+Am.1) CS 772.6

112 B-303.1-N-19 Educator Nurse (R.Džoganović) (Contract+Am.1) CS 858.4

113 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag, Jovanović CS 2,446.5

114 B-304.1-D Theoretical Lecturer (loc) Doctors(28), (rounds 8&9) CS 22,273.8

115 B-304.1-D-1 T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,641.7

116 B-304.1-D-2 T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 393.4

117 B-304.1-D-3 T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 865.6

118 B-304.1-D-4 T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 393.4

119 B-304.1-D-5 T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 972.9

120 B-304.1-D-6 T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 845.9

121 B-304.1-D-7 T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 236.1

122 B-304.1-D-8 T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,377.0

123 B-304.1-D-9 T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,881.3

124 B-304.1-D-10 T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 708.2

125 B-304.1-D-11 T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 536.5

126 B-304.1-D-12 T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,287.6

127 B-304.1-D-13 T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 429.2

128 B-304.1-D-14 T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 393.4

129 B-304.1-D-15 T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 432.8

130 B-304.1-D-16 T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 944.2

131 B-304.1-D-17 T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 704.6

132 B-304.1-D-18 T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 429.2

133 B-304.1-D-19 T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 425.6

134 B-304.1-D-20 T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,119.5

135 B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 314.8

136 B-304.1-D-22 T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 482.9

137 B-304.1-D-23 T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 1,960.0

138 B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 422.0

139 B-304.1-D-25 T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,244.7

140 B-304.1-D-26 T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 293.3

Page 66: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

141 B-304.1-D-27 T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,169.6

142 B-304.1-D-28 T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 368.4

142 B-304.1-N Theoretical Lecturer (loc) Nurses(17), (rounds 8&9) CS 16,399.2

144 B-304.1-N-1 T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 597.3

145 B-304.1-N-2 T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,083.7

146 B-304.1-N-3 T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,094.5

147 B-304.1-N-4 T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 972.9

148 B-304.1-N-5 T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 543.7

149 B-304.1-N-6 T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,409.2

150 B-304.1-N-7 T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,631.0

151 B-304.1-N-8 T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,616.7

152 B-304.1-N-9 T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,539.5

153 B-304.1-N-10 T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 851.2

153 B-304.1-N-11 T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 708.2

155 B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 143.1

156 B-304.1-N-13 T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,094.5

157 B-304.1-N-14 T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 608.0

158 B-304.1-N-15 T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 744.0

159 B-304.1-N-16 T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 397.0

160 B-304.1-N-17 T. Lecturer Med. Technician (G.Jokanović) (Contract+Am.1) CS 364.8

161 B-304.2T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir Dobričanin, CS 3,376.4

162 B-3058th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, 60,361.7

163 B-3069th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation, 68,265.8

164 B-30710th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation, 70,550.0

165 B-30811th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation, 70,550.0

166 B-3.1 Equipment - Diagnostic equipment

167 B-312 Medical equipment for Primary Health Care Development G 540,000.0

168 B-3.2 Civil Works

169 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0

170 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje CS

53,942.7

171 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,636.7

1,597,579.3

1,824,815.9

Subtotal B.3:

TOTAL Component B:

Page 67: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

172 C.1PMN Personnel

CS

173 C1.1Coordinator, short-term (4months)( Pavle Aligrudić)

CS7,106.4

174 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3175 C1.3 Coordinator (24 months) (Majda Škrijelj) (Contract+Am.1) CS 53,298.0

176 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1)CS

45,895.4177 C1.5 Administrative Assistant (12 months) (Jelena Antonijević) CS 9,948.9178 C1.6 Administrative Assistant (12 months) (Natasa Jolic) CS 14,923.4

179 C.2PMN Trainings / Study tours

TR10,090.0

180PMN Training (Sarajevo, Procurement Seminar, May 31-Jun

4, 2010) (Boba Vukoslavovic) 644.9

181PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj) 1,170.3

182 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 85,000.0

183 C.4 Independent Financial Audit CS3,107.5

184 C.5 Annual survey CS99,600.0

185 C.6Local TA for Monitoring and Evaluation

CS20,000.0

186 C.7Office Furniture/Equipment

G

187 C 7.1 PMN Office Furniture G 1,079.0

345,090.2

188C.8 5-month TSU Operating Expenses 36,369.6

36,369.6

381,459.74

5,078,723.63

5,078,723.63

Total negotiated Loan amount 5,100,000.00

21,276.37

Committed 2,352,017.62PHC Bijelo Polje Recon. Contract (B-321) deducted from Loan funds without B-321B-321 Loan amountActual commited Loan funds

Subtotal C.8:

TOTAL Component C:

Sub-total

GRAND TOTAL Additional financing:

Component C: Project Management

Subcomponent C.1: Project Management Network

Subtotal C.1:

Page 68: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Est

imat

. C

ost

/All

oca

ted

amo

un

t

Wit

h

Go

ver

nm

ent

Co

ntr

ibu

tio

n

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

ho

rtli

st,

TS

,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n

to Q

uo

te

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Sh

ort

list

, T

S,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Inv

itat

ion

to

Qu

ote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

104,819.3 0.0 IC Prior 1 Aug-11 Aug-11 Aug-11 Sep-11 -

90,361.4 0.0 CQS Prior 1 Dec-10 Apr 06, 2011May 9,

2011May 12, 2011 -

120,481.9 0.0SSS* Prior 1 Aug-11 Aug-11 Sep-11 - -

144,578.3 0.0 SSS Prior 1 Apr-11June 29,

2011

July 13,

2011- -

120,481.9 0.0CQS Prior 1 Aug-11 Sep-11 Sep-11 Oct-11 -

217,444.5 217,444.5CQS Prior 1 Oct/Nov 2010

February 2,

2011

February 2,

2011Nov 23, 2010 -

70,481.9 0.0 SSS* Prior Multi Jun-11 Jun-11 Jun-11 - -

84,337.3 0.0 DC Prior 1 Jul-11 Jul-11 Aug-11 - -

57,383.5 57,383.5IC Prior 1

May/June

2011Jun-11 Jun-11 May 6, 2011 -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- -

103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

12,119.9 8,079.9 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 12, 2011)

Page 69: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

3,878.3 2,585.5 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

84,337.3 0.0QCBS Prior 1 May-11 Jun-11 Jun-11 Jul-11 -

19,478.3 11,130.4SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- -

19,478.3 11,130.4SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- -

24,774.0 24,774.0IC Post 1 Mar-11 April 5, 2011

April 22,

2011

February 21,

2011-

6,463.9 6,463.9IC Post 1 Jun-11

June 30,

2011

July 11,

2011- -

13,000.0 0.0IC Post 1 Jun-11

July 26,

2011

August 4,

2011- -

24,096.4 0.0 IC Post 1 Sep-11 Sep-11 Sep-11 - -

48,192.8 0.0 IC Post 1 Oct/Nov 2011 Nov-11 Dec-11 Dec-11 -

55,528.2 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

18,381.9 289.0 SoE 1 Oct-11Nov 24,

2010

February 8,

2011

256,307.3 0.0 ICB Prior 1June/July

2011Aug-11 Aug-11 - Sep-11

80,930.3 2,093.78 Throughout the life of the project

2,093.8 2,093.8 SoE 1 Jun-11June 21,

2011

June 22,

2011

1,855,225.3 550,041.4

Page 70: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

590,361.4 0.01ST ICB Prior 1

May/June

2011July 6, 2011 Aug-11 -

Septemeber

2011

512,614.6 0.0

256,307.3 0.0 ICB Prior 1June/July

2011

July 26,

2011Aug-11 - Sep-11

256,307.3 0.0 ICB Prior 1June/July

2011

August 1,

2011Aug-11 - Sep-11

6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- -

6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- -

6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- -

7,595.1 7,595.1SSS Prior 1 May-11

July 27,

2011

August 4,

2011- -

4,309.3 4,309.3IC Post 1 May-11

May 31,

2011

May 31,

2011- -

1,134,272.2 31,296.2

2,989,497.4 581,337.6

16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010

16,321.5 16,321.5

257,457.5 257,457.5 QCBS Prior 1 Oct/Nov 2010Nov 22,

2010

Nov 22,

2010

January 10,

2011-

257,457.5 257,457.5

457,663.2 386,283.3IC/CQ Prior MultiOngoing through the life of the Project

19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10

11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10

35,480.4 35,480.4 SSS Prior Multi

1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

Page 71: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

26,471.9 26,471.9

5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10

448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

Page 72: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

2,947.6 2,947.6 IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10

26,835.9 26,835.9

1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

Page 73: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

19,758.0 19,758.0

719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10

478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10

439.6 439.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

4,068.0 4,068.0 IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10

72,725.0 72,725.0 SoE Post Mar-10 Sep 22, 2010Sep 24,

2010

82,248.0 82,248.0 SoE Post Sep-10 Dec 20, 2010Dec 20,

2010

85,000.0 85,000.0 SoE Post Feb-11 June 1, 2011June 1,

2011

85,000.0 0.0 SoE Post Sep-11 Sep-11 Sep-11

650,602.4 0.0 ICB Prior 1May/June

2011Jul-11 Aug-11 - Sep-11

2,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10

64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10

4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 -

3,856,966.7 3,134,984.4

4,130,745.7 3,408,763.4

Page 74: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

8,561.9 8,561.9SSS Prior 1 Feb-10 2/4/10 2/4/10 - -

3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - -

64,214.4 51,371.5 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

55,295.7 42,809.6IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

11,986.7 11,986.7 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

17,980.0 11,986.7 IC Post 1 April 20, April 20, April 20, April 21, -

SoE/CQ Post Multi

777.0 777.0SoE Post Multi May-10 05-27-10 05-27-10

1,410.0 1,410.0SoE Post Multi Oct-10 Oct-10

102,409.6 50,000.0SoE PostOngoing through the life of the Project

3,744.0 3,744.0LCS Prior 1 Apr-11

April 29,

2011

May 6,

2011May 10, 2011 -

120,000.0 0.0CQ Prior 1 Jan-11

February 1,

2011

February 2,

2011

February 2,

2011

24,096.4 0.0IC / CQ Prior 1

1,300.0 1,300.0 S Prior 1 Jul-10 06-26-10 06-28-10 - Aug-10

415,771.3 187,942.9

43,818.8 0.00

43,818.8

459,590.05 187,942.94

7,579,833.16 4,564,327.18

7,579,833.16 4,564,327.18

4,308,265.28 4,177,754.891,498,426.501,243,694.001,000,000.002,243,694.00

Page 75: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Loan Number: 7819-MEB

id o

pen

ing

-

Tec

hn

ical

/Fin

anci

al

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Co

ntr

act

awar

d/S

ign

ing

Co

ntr

act

com

ple

tio

n

Act

ivit

y S

tatu

s- - Sep-11 Oct-11 Nov-12

Assignment to

be re-defined.

July 7, 2011July 22,

2011

August 3,

2011Sep-11 Sep-12

RFP to be sent

to the 1st ranked

- - - Oct-11 Oct-12Assignment to

be re-defined.

- - - Aug-11 Dec-12Financial

negotitation in

Oct-11 Oct-11 Nov-11 Nov-11 Jun-12

ToR

development to

be initiated upon

Dec 17, 2010February 04,

2011

February 11,

2011June 3, 2011

November 30,

2012

Contract

signed&in

progress

- - - Jun-11 Oct-12ToR

development in

- - - Sep-11 Dec-11Awaiting

response from

June 2, 2011June 16,

2011

June 17,

2011Aug-11 Oct-12

Contract signing

in progress

-June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

-June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

-June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

-June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

March 01,

2011

April 22,

2011-

May 20,

2011

December 1,

2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 12, 2011)

Page 76: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

Jul-11 Aug-11 Sep-11 Oct-11 Dec-12

ToR

development in

progress

- - - April 1, 2011 March 31, 2012

Contract

signed&in

progress

- - - April 1, 2011 March 31, 2012

Contract

signed&in

progress

March 15,

2011- -

May 25,

2011May 25, 2012

Contract

signed&in

progress

- - -July 27,

2011June 5, 2012

Contract

signed&in

progress

- - - Aug-11 Aug-12 ToR approved

Oct-11 - - Oct-11 Nov-12ToR

development in

Jan-12 Feb-12 Feb-12 Mar-12 Sep-12ToR to be

developedFebruary

24,2011- -

May 15,

2011May 15, 2012 Contract signed

May 15,

2011May 15, 2012

In parallel to the

above position

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12MoH to approve

Technical

Throughout the

life of the

June 29, 2011Activity

completed

Page 77: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Oct-11 Nov-11 Dec-11 Jan/Feb 2011 Jun-12

IT WG to

provide response

to WB

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12MoH to provide

response to WB

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12Awaiting WB

comments on

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

Amendment to

be signed

- - - June 8, 2011 June 15, 2012

Contract

signed&in

progress

7/9/10 - Oct 22, 2010October 23,

2011

Contract

completed

February 3,

2011

May 19,

2011- Jun-11 Dec-12

Contract signing

in progress

Dec-12

4/24/10 Apr-10 12/31/11

Amendment

signed&in

progress

4/23/10 Apr-10 12/31/11

Amendment

signed&in

progress

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

Page 78: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2010Contract

completed

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2010Contract

completed

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2010Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

Page 79: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

05-15-2010 - - May-10 12/31/10Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2010Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2010Contract

completed

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2010Amendment

signed&in

Page 80: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2010Contract

completed

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in

05-15-2010 - - May-10 12/31/10Amendment

signed&in

Jun-10 Completed

Jan-11 COmpleted

June 25, 2011Implementation

in progress

Jan-12

Oct-11 Nov-11 Dec-11 Jan/Feb 2012 Septemebr 2012Needs

assessment in

06-28-10 Sep-10 10/13/10 3/13/12Contract

signed&in

07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

Contract

signed&in

progress

04-15-10 Apr-10 06-30-10Contract

completed

Page 81: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

- - - 2/8/10 4/30/10Contract

completed

- - - 2/8/10 4/30/10Contract

completed

- - 06-16-10 Jun-10 6/28/11Amendment

signed&in

- - 06-16-10 Jun-10 5/1/11

Amendment

signed&in

progress- - 06-16-10 Jun-10 7/1/11 Contract

- - - June 6, 2011 June 6, 2012 Contract

May-10Activity

completed

Oct-10Activity

completedOngoing

thorugh the life

of the Project

Jun-11 Jul-11 - Aug-11 Jul-13

Contract

signed&in

progressFebruary 23,

2011

March 10,

2011Jul-11 Aug-11

December 31,

2012

Contract

negotitations in

progress

Oct 12, 2010 - Nov 1, 2010Nov 12,

2010Nov 20, 2010

Contract

completed

Page 82: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275

No

Item Description

Ty

pe

Est

imat

. C

ost

/All

oca

ted

amo

un

t L

OA

N

(E

UR

)

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

2 A-101 TA health institutions network & norms and standards and STC

Basic Benefits Package

3 A-101.1 Int TA health institutions network & norms and standards

CS87,000.0

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0

5 A-101.3 Loc TA health institutions network & norms and standards

(Firm/Organization)CS

100,000.00

6 A-101.4 Loc TA for STC Basic Benefits Package (Firm/Organization)

CS120,000.00

7 A-102 Analytical study on HR in Health System in MN

8 A-102.1Analytical study on HR in Health System in MN

(Firm/Organization)CS

100,000.00

9 A-103 STC payment model design and implementation

10 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)

CS

185,850.0

11 A-103.2 Loc TA STC payment model design and implementation

CS58,500.0

12 A-103.3 Purchasing DRG Licence G 70,000.0

13 A-104 Private public integration

14 A-104.1 Int TA Private public integration

CS47,628.3

15 A-104.2/1 Loc TA - Integration of private HC institutions into the network

of health institutions (Dragoljub Perović)

CS

6,438.1

16 A-104.2/2 Loc TA - Integration of private HC institutions into the network

of health institutions (Milan Mirković)CS

6,438.1

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 4, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 83: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

17 A-104.2/3 Loc TA - Integration of private HC institutions into the network

of health institutions (Mladen Filipović)

CS

6,438.1

18 A-104.2/4 Loc TA - Integration of private HC institutions into the network

of health institutions (Srđan Popović)CS

6,438.1

19 A-105

TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision

20 A-105.1

Int TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and protocols

development and revision

CS 86,019.8

21 A-105.2/1 Loc TA for developing Clinical Protocols and Guidelines (Goran

Nikolić)CS 10,059.5

22 A-105.2/2 Loc TA for developing Clinical Protocols and Guidelines

(Abedin Adžović)CS 3,986.1

23 A-105.2/3 Loc TA for developing Clinical Protocols and Guidelines (Vesna

Miranović)CS 3,986.1

24 A-105.2/4 Loc TA for developing Clinical Protocols and Guidelines (Filip

Vukmirović)CS 3,986.1

25 A-105.2/5 Loc TA for developing Clinical Protocols and Guidelines (Sreten

Kavarić)CS 3,986.1

26 A-105.2/6 Loc TA for developing Clinical Protocols and Guidelines (Nada

Rondović)CS 3,219.0

27 A-105.2/7 Loc TA for developing Clinical Protocols and Guidelines

(Zorica Dautović)CS 3,986.1

28 A-105.2/8 Loc TA for developing Clinical Protocols and Guidelines

(Ljiljana Musić-Gledović)CS 3,986.1

29 A-105.2/9 Loc TA for developing Clinical Protocols and Guidelines

(Ranko Lazović)CS 3,986.1

30 A-105.2/10 Loc TA for developing Clinical Protocols and Guidelines

(Ljubica Pejakov)CS 3,986.1

31 A-105.2/11 Loc TA for developing Clinical Protocols and Guidelines

(Dragan Laušević)CS 3,986.1

32 A-106 TA PR campaign design and implementation

33 A-106.1 Loc TA - PR Strategy design, production and implementation

(Firm)CS

70,000.0

34 A-106.2/1 Loc TA - PR Campaign Design and Implementation (IC) (Gorica

Soković)CS

16,167.0

35 A-106.2/2 Loc TA - PR Campaign Design and Implementation (IC) (Vesna

Nikaljević)CS

16,167.0

36 A-107 MoH capacity development

37 A-107.1 Int/Reg TA- Sr. Advisor to the Minister (Development of two

National Cancer Prevention Programs (colorectal and cervical

cancer)) (Milutin Bulajić)

CS

20,562.4

38 A-107.2Loc TA for Development of National Colorectal Cancer

Prevention Program (Brigita Smolović)CS

5,365.1

39 A-107.3Loc TA for Development of National Cervical Cancer Prevention

ProgramCS

10,790.0

40 A-107.4 Loc TA- Junior Advisor to the Minister

CS20,000.0

Page 84: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

41 A-1.1 Institutional Development of the Drugs Agency

42 A-111 TA Policy and capacity development

43 A-111.1 Int TA for policy development CS 40,000.0

44 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

48,872.4

45 A-111.3Drugs Agency capacity development, out-of-country Training

TR15,257.0

46 A-112 Information system for the Drugs' Agency

47 A-112.1Drugs' Agency Software development

G212,735.0

48 A-1.2 Trainings / study tours

49 A-120Trainings / study tours (WG Capacity Dev.)

TR67,172.2

50PR WG&PMN representatives/study visit to Macedonian HIF 1,737.8

1,547,992.0

51 A.2.0 Hospital Information System / Hardware (*) G 490,000.0

52 A.2.1 Information System / Software G 425,470.1

53 A-210 Health Information System / Software for MOH G212,735.0

54 A-211 Health Information System / Software for IPH G212,735.0

55 A-212/1 Loc TA - Hardware equipment needs assessment and technical

specification development (Sergej Lazović)CS

5,365.1

56 A-212/2 Loc TA - Hardware equipment needs assessment and technical

specification development (Pavle Aligrudić)CS

5,365.1

57 A-212/3 Loc TA - Hardware equipment needs assessment and technical

specification development (Nataša Terzić)CS

5,365.1

58 A-212/4

Loc TA - Hardware equipment needs assessment and technical

specification development (Mensud Grbović) Contract+ Am. No.

1CS

6,303.9

59 A-213TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement (Ljiljana Krejović)CS

3,576.7

941,445.9

2,489,437.9

60 B.1.0 Operational Review of the PHC

61 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,950.0

13,950.0

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subtotal A.1:

Subcomponent A.2: Health Information System*

Page 85: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

62 B.2.0 PHC Specialization Program Development & Implementation

63 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 220,000.0

220,000.0

64 B.3.0TA for PHC Specialist Medicine Training Program (Medicine and

Nursing, 4 rounds, 8-11)CS

391,165.1

65 B-301Training Program (Education) Coordinator (rounds8-11) (Mara

Drecun) (Contract+Am.1)CS

16,213.0

66 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS

9,308.4

67 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 29,448.7

68 B-303.1-D-1 Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 887.0

69 B-303.1-D-2 Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,293.0

70 B-303.1-D-3 Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,119.5

71 B-303.1-D-4 Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,541.2

72 B-303.1-D-5 Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,239.3

73 B-303.1-D-6 Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,146.0

74 B-303.1-D-7 Educator Doctor (P.Divanović) (Contract+Am.1) CS 1,985.1

75 B-303.1-D-8 Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 872.7

76 B-303.1-D-9 Educator Doctor (J.Pepić) (Contract+Am.1) CS 429.2

77 B-303.1-D-10 Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,287.6

78 B-303.1-D-11 Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,234.0

79 B-303.1-D-12 Educator Doctor (N.Janković) (Contract+Am.1) CS 1,008.6

80 B-303.1-D-13 Educator Doctor (Božika Subašić) CS 572.3

81 B-303.1-D-14 Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,180.3

82 B-303.1-D-15 Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,273.3

83 B-303.1-D-16 Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,083.1

84 B-303.1-D-17 Educator Doctor (L.Delević) (Contract+Am.1) CS 1,430.7

85 B-303.1-D-18 Educator Doctor (V.Peranović) (Contract+Am.1) CS 715.3

86 B-303.1-D-19 Educator Doctor (Z.Miljković) (Contract+Am.1) CS 715.3

87 B-303.1-D-20 Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,144.5

88 B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 429.2

89 B-303.1-D-22 Educator Doctor (B.Radović) (Contract+Am.1) CS 858.4

90 B-303.1-D-23 Educator Doctor (M.Bogavac) (Contract+Am.1) CS 715.3

91 B-303.1-D-24 Educator Doctor (O.Poček) (Contract+Am.1) CS 715.3

92 B-303.1-D-25 Educator Doctor (S.Šabović) (Contract+Am.1) CS 572.3

93 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 21,971.7

94 B-303.1-N-1 Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,692.6

95 B-303.1-N-2 Educator Nurse (J.Radinović) (Contract+Am.1) CS 944.3

96 B-303.1-N-3 Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,309.1

97 B-303.1-N-4 Educator Nurse (B.Mudreša) (Contract+Am.1) CS 472.1

98 B-303.1-N-5 Educator Nurse (Jovanka Prelević) (Contract+Am.1) CS 414.9

99 B-303.1-N-6 Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 972.9

100 B-303.1-N-7 Educator Nurse (D.Rakčević) (Contract+Am.1) CS 643.8

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Page 86: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

101 B-303.1-N-8 Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,338.5

102 B-303.1-N-9 Educator Nurse (N.Božović) (Contract+Am.1) CS 658.1

103 B-303.1-N-10 Educator Nurse (L.Vujović) (Contract+Am.1) CS 629.5

104 B-303.1-N-11 Educator Nurse (V.Garović) (Contract+Am.1) CS 372.0

105 B-303.1-N-12 Educator Nurse (M.Marković) (Contract+Am.1) CS 214.6

106 B-303.1-N-13 Educator Nurse (R.Ostojić) (Contract+Am.1) CS 772.6

107 B-303.1-N-14 Educator Nurse (T.Đurić) (Contract+Am.1) CS 901.3

108 B-303.1-N-15 Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,001.5

109 B-303.1-N-16 Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 314.7

110 B-303.1-N-17 Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,688.2

111 B-303.1-N-18 Educator Nurse (L.Mitrović) (Contract+Am.1) CS 772.6

112 B-303.1-N-19 Educator Nurse (R.Džoganović) (Contract+Am.1) CS 858.4

113 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag, Jovanović

Danijela, Dašić Radmila) (Contract+Am.1)

CS

2,446.5

114 B-304.1-DTheoretical Lecturer (loc) Doctors(28), (rounds 8&9)

CS22,273.8

115 B-304.1-D-1 T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,641.7

116 B-304.1-D-2 T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 393.4

117 B-304.1-D-3 T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 865.6

118 B-304.1-D-4 T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 393.4

119 B-304.1-D-5 T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 972.9

120 B-304.1-D-6 T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 845.9

121 B-304.1-D-7 T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 236.1

122 B-304.1-D-8 T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,377.0

123 B-304.1-D-9 T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,881.3

124 B-304.1-D-10 T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 708.2

125 B-304.1-D-11 T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 536.5

126 B-304.1-D-12 T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,287.6

127 B-304.1-D-13 T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 429.2

128 B-304.1-D-14 T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 393.4

129 B-304.1-D-15 T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 432.8

130 B-304.1-D-16 T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 944.2

131 B-304.1-D-17 T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 704.6

132 B-304.1-D-18 T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 429.2

133 B-304.1-D-19 T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 425.6

134 B-304.1-D-20 T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,119.5

135 B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) (Contract+Am.1) CS 314.8

136 B-304.1-D-22 T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 482.9

137 B-304.1-D-23 T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 1,960.0

138 B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 422.0

139 B-304.1-D-25 T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,244.7

140 B-304.1-D-26 T. Lecturer Doctor (D. Radunović (Contract+Am.1) CS 293.3

141 B-304.1-D-27 T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,169.6

142 B-304.1-D-28 T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 368.4

142 B-304.1-NTheoretical Lecturer (loc) Nurses(17), (rounds 8&9)

CS16,399.2

144 B-304.1-N-1 T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 597.3

145 B-304.1-N-2 T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,083.7

146 B-304.1-N-3 T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,094.5

Page 87: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

147 B-304.1-N-4 T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 972.9

148 B-304.1-N-5 T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 543.7

149 B-304.1-N-6 T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,409.2

150 B-304.1-N-7 T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,631.0

151 B-304.1-N-8 T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,616.7

152 B-304.1-N-9 T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,539.5

153 B-304.1-N-10 T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 851.2

153 B-304.1-N-11 T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 708.2

155 B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 143.1

156 B-304.1-N-13 T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,094.5

157 B-304.1-N-14 T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 608.0

158 B-304.1-N-15 T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 744.0

159 B-304.1-N-16 T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 397.0

160 B-304.1-N-17 T. Lecturer Med. Technician (G.Jokanović) (Contract+Am.1) CS364.8

161 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir Dobričanin,

Ognjen Jovićević, Nada Janković, Edita Bašović) (round 9)

(Miroslav Stanišljević) (Contract+Am.1)

CS

3,376.4

162 B-305

8th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 60,361.7

163 B-306

9th round operating expenses - appointed participants' travel costs

and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 68,265.8

164 B-307

10th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 70,550.0

165 B-308

11th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office equipment,

etc. 70,550.0

166 B-3.1 Equipment - Diagnostic equipment

167 B-312Medical equipment for Primary Health Care Development

G540,000.0

168 B-3.2 Civil Works

169 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0

170 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje CS

55,548.0

171 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,636.7

1,599,184.7

1,833,134.7

Component C: Project Management

Subtotal B.3:

TOTAL Component B:

Page 88: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

172 C.1 PMN Personnel CS

173 C1.1Coordinator, short-term (4months)( Pavle Aligrudić)

CS7,106.4

174 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3

175 C1.3Coordinator (24 months) (Majda Škrijelj) (Contract+Am.1)

CS42,638.4

176 C1.4 Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1)CS

35,531.9

177 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS9,948.9

178 C1.6 Administrative Assistant (12 months) (Natasa Jolic) CS 9,948.9

179 C.2 PMN Trainings / Study tours TR 10,090.0

180PMN Training (Sarajevo, Procurement Seminar, May 31-Jun

4, 2010) (Boba Vukoslavovic) 644.9

181PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj) 1,205.1

182 C.3 PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 85,000.0

183 C.4 Independent Financial Audit CS 20,000.0

184 C.5 Annual survey CS 99,600.0

185 C.6 Local TA for Monitoring and Evaluation CS 20,000.0

186 C.7 Office Furniture/Equipment G

187 C 7.1 PMN Office Furniture G 1,111.1

336,052.1

188 C.UUnallocated, savings from the positions: 0.0

0.0

336,052.06

5,049,789.78

5,049,789.78

Total negotiated Loan amount 5,100,000.00

50,210.22

Committed 2,071,825.02

Date 05/31/2011

Sub-total

GRAND TOTAL Additional financing:

Subcomponent C.1: Project Management Network

Subtotal C.1:

Subtotal C.U:

TOTAL Component C:

Page 89: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Committed 1,632,363.97

Page 90: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Est

imat

. C

ost

/All

oca

ted

amo

un

t

Wit

h

Go

ver

nm

ent

Co

ntr

ibu

tio

n

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

ho

rtli

st,

TS

,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o

Qu

ote

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Sh

ort

list

, T

S,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Inv

itat

ion

to

Qu

ote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

104,819.3 0.0IC Prior 1 Aug-11 Aug-11 Aug-11 Sep-11 -

90,361.4 0.0 CQS Prior 1 Dec-10 Apr 06, 2011May 9,

2011May 12, 2011 -

120,481.9 0.0SSS* Prior 1 Aug-11 Aug-11 Sep-11 - -

144,578.3 0.0SSS Prior 1 Apr-11

June 29,

2011

July 13,

2011- -

120,481.9 0.0CQS Prior 1 Aug-11 Sep-11 Sep-11 Oct-11 -

223,915.7 217,444.5

CQS Prior 1 Oct/Nov 2010February 2,

2011

February 2,

2011Nov 23, 2010 -

70,481.9 0.0SSS* Prior Multi Jun-11 Jun-11 Jun-11 - -

84,337.3 0.0DC Prior 1 Jul-11 Jul-11 Aug-11 - -

57,383.5 0.0IC Prior 1

May/June

2011Jun-11 Jun-11 May 6, 2011 -

7,756.7 5,171.1

SSS Prior 1 May-11June 20,

2011

June 22,

2011- -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- -

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 4, 2011)

Page 91: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

7,756.7 5,171.1

SSS Prior 1 May-11June 20,

2011

June 22,

2011- -

7,756.7 5,171.1SSS Prior 1 May-11

June 20,

2011

June 22,

2011- -

103,638.3 103,638.3 IC Prior 1 Dec-10February 28,

2011Apr-11

February 14,

2011-

12,119.9 8,079.9 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

3,878.3 2,585.5 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

4,802.6 3,201.7 SSS Prior 1 May-11 June 2, 2011June 7,

2011- -

84,337.3 0.0QCBS Prior 1 May-11 Jun-11 Jun-11 Jul-11 -

19,478.3 11,130.4SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- -

19,478.3 11,130.4SSS Prior 1 Dec-10

March 10,

2011

March 19,

2011- -

24,774.0 24,774.0

IC Post 1 Mar-11 April 5, 2011April 22,

2011

February 21,

2011-

6,463.9 6,463.9IC Post 1 Jun-11

June 30,

2011

July 11,

2011- -

13,000.0 0.0IC Post 1 Jun-11

July 26,

2011

August 4,

2011- -

24,096.4 0.0IC Post 1 Sep-11 Sep-11 Sep-11 - -

Page 92: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

48,192.8 0.0 IC Post 1 Oct/Nov 2011 Nov-11 Dec-11 Dec-11 -

57,180.7 55,528.2CQS Post 1 Jan-11

February 8,

2011

February 8,

2011

February 10,

2011-

18,381.9 289.0SoE 1 Oct-11

Nov 24,

2010

February 8,

2011

256,307.3 0.0ICB Prior 1

June/July

2011Aug-11 Aug-11 - Sep-11

80,930.3 2,093.78Throughout the life of the project

2,093.8 2,093.8SoE 1 Jun-11

June 21,

2011

June 22,

2011

1,863,348.9 492,657.9

590,361.4 0.0 1ST ICB Prior 1May/June

2011July 6, 2011 Aug-11 -

Septemeber

2011

512,614.6 0.0

256,307.3 0.0ICB Prior 1

June/July

2011

July 26,

2011Aug-11 - Sep-11

256,307.3 0.0ICB Prior 1

June/July

2011

August 1,

2011Aug-11 - Sep-11

6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- -

6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- -

6,463.9 6,463.9SSS Prior 1 May-11

May 30,

2011

May 31,

2011- -

7,595.1 6,463.9SSS Prior 1 May-11

July 27,

2011

August 4,

2011- -

4,309.3 4,309.3

IC Post 1 May-11May 31,

2011

May 31,

2011- -

1,134,272.2 30,165.0

2,997,621.1 522,822.9

16,807.2 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10 08-17-2010

16,807.2 16,321.5

Page 93: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

265,060.2 0.0 QCBS Prior 1 Oct/Nov 2010Nov 22,

2010

Nov 22,

2010

January 10,

2011-

265,060.2 0.0

457,663.2 371,283.3IC/CQ Prior MultiOngoing through the life of the Project

19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10

11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10

35,480.4 35,480.4 SSS Prior Multi

1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

26,471.9 26,471.9

5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

Page 94: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10

448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

2,947.6 2,947.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10

26,835.9 26,835.9

1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

19,758.0 19,758.0

719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

Page 95: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10

478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10

439.6 439.6SSS Prior 1 Mar-10 09/22/10 09/27/10

4,068.0 4,068.0

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10

72,725.0 72,725.0

SoE Post Mar-10 Sep 22, 2010Sep 24,

2010

82,248.0 82,248.0

SoE Post Sep-10 Dec 20, 2010Dec 20,

2010

85,000.0 70,000.0

SoE Post Feb-11 June 1, 2011June 1,

2011

85,000.0 0.0

SoE Post Sep-11 Sep-11 Sep-11

650,602.4 0.0ICB Prior 1

May/June

2011Jul-11 Aug-11 - Sep-11

2,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10

66,925.3 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10

4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 -

3,858,900.8 3,119,984.4

4,140,768.3 3,136,305.9

Page 96: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

8,561.9 8,561.9SSS Prior 1 Feb-10 2/4/10 2/4/10 - -

3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - -

51,371.5 25,685.8IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

42,809.6 21,404.8IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

11,986.7 11,986.7IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

11,986.7 11,986.7 IC Post 1April 20,

2011

April 20,

2011

April 20,

2011

April 21,

2011-

SoE/CQ Post Multi

777.0 777.0SoE Post Multi May-10 05-27-10 05-27-10

1,410.0 1,410.0SoE Post Multi Oct-10 Oct-10

102,409.6

47,151.0

SoE PostOngoing through the life of the Project

24,096.40.0

LCS Prior 1 Apr-11April 29,

2011

May 6,

2011May 10, 2011 -

120,000.00.0

CQ Prior 1 Jan-11February 1,

2011

February 2,

2011

February 2,

2011

24,096.4 0.0 IC / CQ Prior 1

1,300.0 1,300.0 S Prior 1 Jul-10 06-26-10 06-28-10 - Aug-10

404,801.3 134,259.4

0.0

0.0

404,801.35 134,259.40

7,543,190.75 4,164,671.43

7,543,190.75 4,164,671.43

Page 97: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No
Page 98: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Loan Number: 7819-MEB

id o

pen

ing

-

Tec

hn

ical

/Fin

anci

al

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Co

ntr

act

awar

d/S

ign

ing

Co

ntr

act

com

ple

tio

n

Act

ivit

y S

tatu

s

- - Sep-11 Oct-11 Nov-12Assignment to

be re-defined.

July 7, 2011July 22,

2011

August 3,

2011Sep-11 Sep-12

RFP to be sent

to the 1st ranked

- - - Oct-11 Oct-12Assignment to

be re-defined.

- - - Aug-11 Dec-12

Financial

negotitation in

progress

Oct-11 Oct-11 Nov-11 Nov-11 Jun-12

ToR

development to

be initiated upon

Dec 17, 2010February 04,

2011

February 11,

2011June 3, 2011

November 30,

2012

Contract

signed&in

progress

- - - Jun-11 Oct-12

ToR

development in

progress

- - - Sep-11 Dec-11

Awaiting

response from

Australian

June 2, 2011June 16,

2011

June 17,

2011Aug-11 Oct-12

Contract

negotiation in

progress

-June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

-June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of August 4, 2011)

Page 99: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

-June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

-June 22,

2011

June 23,

2011June 25, 2012

Contract

signed&in

progress

March 01,

2011

April 22,

2011-

May 20,

2011

December 1,

2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

Jul-11 Aug-11 Sep-11 Oct-11 Dec-12

ToR

development in

progress

- - - April 1, 2011 March 31, 2012

Contract

signed&in

progress

- - - April 1, 2011 March 31, 2012

Contract

signed&in

progress

March 15,

2011- -

May 25,

2011May 25, 2012

Contract

signed&in

progress

- - -July 27,

2011June 5, 2012

Contract

signed&in

progress

- - - Aug-11 Aug-12 ToR approved

Oct-11 - - Oct-11 Nov-12

ToR

development in

progress

Page 100: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Jan-12 Feb-12 Feb-12 Mar-12 Sep-12ToR to be

developed

February

24,2011- -

May 15,

2011May 15, 2012 Contract signed

May 15,

2011May 15, 2012

In parallel to the

above position

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12

MoH to approve

Technical

Description. BD

Throughout the

life of the

project

June 29, 2011Activity

completed

Oct-11 Nov-11 Dec-11 Jan/Feb 2011 Jun-12IT WG to

provide response

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12

MoH to provide

response to WB

comments on

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12

Awaiting WB

comments on

Technical

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

signed&in

progress

- - -June 12,

2011June 15, 2012

Contract

Amendment to

be signed

- - - June 8, 2011 June 15, 2012

Contract

signed&in

progress

7/9/10 - Oct 22, 2010October 23,

2011

Contract

completed

Page 101: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

February 3,

2011

May 19,

2011- Jun-11 Dec-12

Contract signing

in progress

Dec-12

4/24/10 Apr-10 12/31/11

Amendment

signed&in

progress

4/23/10 Apr-10 12/31/11

Amendment

signed&in

progress

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010

Contract

completed09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010

Contract

completed09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

Page 102: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

05-15-2010 - - May-10 12/31/10

Amendment

signed&in

progress

09/27/10 Sep-10 Dec 31, 2011Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010

Contract

completed09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2011

Amendment

signed&in

09/27/10 Sep-10 Dec-10Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in

Page 103: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec-10Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec 31, 2010

Contract

completed09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in 09/27/10 Sep-10 Dec-10

Amendment

signed&in

09/27/10 Sep-10 Dec-10

Amendment

signed&in

progress

05-15-2010 - - May-10 12/31/10

Amendment

signed&in

progress

Jun-10 Completed

Jan-11 COmpleted

June 25, 2011Implementation

in progress

Jan-12

Oct-11 Nov-11 Dec-11 Jan/Feb 2012 Septemebr 2012

Needs

assessment in

progress

06-28-10 Sep-10 10/13/10 3/13/12Contract

signed&in

07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

Contract

signed&in

progress

04-15-10 Apr-10 06-30-10Contract

completed

Page 104: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

- - - 2/8/10 4/30/10Contract

completed

- - - 2/8/10 4/30/10Contract

completed

- - 06-16-10 Jun-10 6/28/11

Amendment

signed&in

progress

- - 06-16-10 Jun-10 5/1/11

Amendment

signed&in

progress

- - 06-16-10 Jun-10 7/1/11Contract

completed

- - - June 6, 2011 June 6, 2012Contract

signed&in

May-10Activity

completed

Oct-10Activity

completed

Ongoing

thorugh the life

of the Project

Jun-11 Jul-11 - Aug-11 Jul-13

Deadline for

application June

8, 2011

February 23,

2011

March 10,

2011Jul-11 Aug-11

December 31,

2012

ToR

development in

progress

Oct 12, 2010 - Nov 1, 2010Nov 12,

2010Nov 20, 2010

Contract

completed

Page 105: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

No

Item Description

Type

Est

imat

. C

ost

/All

oca

ted

amo

un

t L

OA

N (E

UR

)

Est

imat

. C

ost

/All

oca

ted

amo

un

t W

ith

Go

ver

nm

ent

Co

ntr

ibu

tio

n

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

hort

list

, T

S,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o

Qu

ote

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Short

list

, T

S, T

OR

, R

F, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Invit

atio

n t

o Q

uote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

Bid

op

enin

g-

Tec

hn

ical

/Fin

anci

al

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Contr

act

awar

d/S

ignin

g

Contr

act

com

ple

tion

Act

ivit

y S

tatu

s

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

CS

2 A-101 TA health institutions network & norms and standards and

STC Basic Benefits Package

3 A-101.1 Int TA health institutions network & norms and standards

CS87,000.0 101,790.0 0.0

IC Prior 1 Aug-11 Aug-11 Aug-11 Sep-11 - - - Sep-11 Oct-11 Nov-12Assignment to be

re-defined.

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0 87,750.0 0.0 CQS Prior 1 Dec-10Apr 06,

2011

May 9,

2011

May 12,

2011- Jun-11 Jun-11 Jun-11 Jul-11 Aug-12

Applicants to be

evaluated

5 A-101.3 Loc TA health institutions network & norms and standards

(Firm/Organization)CS

100,000.00 117,000.0 0.0SSS* Prior 1 Aug-11 Aug-11 Sep-11 - - - - - Oct-11 Oct-12

Assignment to be

re-defined.

6 A-101.4 Loc TA for STC Basic Benefits Package (Firm/Organization)

CS120,000.00 140,400.0 0.0

SSS* Prior 1 Apr-11May 26,

2011Jun-11 - - - - - Jul-11 Nov-12

Awaiting NO for

SSS selection of

IPH

7 A-102 Analytical study on HR in Health System in MN

8 A-102.1Analytical study on HR in Health System in MN

(Firm/Organization)CS

100,000.00 117,000.0 0.0CQS Prior 1 Aug-11 Sep-11 Sep-11 Oct-11 - Oct-11 Oct-11 Nov-11 Nov-11 Jun-12

ToR

development to

be initiated upon

9 A-103 STC payment model design and implementation

10 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)CS

186,000.0 217,620.0 0.0CQS Prior 1

Oct/Nov

2010

February

2, 2011

February

2, 2011

Nov 23,

2010-

Dec 17,

2010

February

04, 2011

February

11, 2011Jun-11 Oct-12

Contract to be

signed

11 A-103.2 Loc TA STC payment model design and implementation

CS58,500.0 68,445.0 0.0

SSS Prior Multi Jun-11 Jun-11 Jun-11 - - - - - Jun-11 Oct-12ToR

development in

progress

12 A-103.3 Purchasing DRG Licence G 70,000.0 81,900.00.0

DC Prior 1 Jul-11 Jul-11 Aug-11 - - - - - Sep-11 Dec-11Preparations for

initiating

negotiations in

13 A-104 Private public integration

14 A-104.1 Int TA Private public integration

CS60,000.0 70,200.0 0.0

IC Prior 1May/June

2011Jun-11 Jun-11

May 6,

2011-

June 2,

2011Jun-11 Jun-11 Jul-11 Aug-12

Readvertised,

applicants to be

evaluated

15 A-104.2 Loc TA Private public integration CS 23,400.0 27,378.0 0.0 SSS* Prior Multi May-11 Jun-11 Jun-11 - - - Jun-11 Jul-11 Sep-12ToR

development in

17 A-105

TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision

18 A-105.1

Int TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and protocols

development and revision

CS 88,579.7 103,638.3 103,638.3 IC Prior 1 Dec-10February

28, 2011Apr-11

February

14, 2011-

March 01,

2011

April 22,

2011- May-11 Dec-12 Contract signed

19 A-105.2

Loc TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and Protocols

development and revision

CS 36,000.0 42,120.0 0.0 IC Post Multi May-11 Jun-11 Jun-11 Jun-11 - Jul-11 Aug-11 Aug-11 Aug-11 Aug-12ToR

development in

progress

20 A-106 TA PR campaign design and implementation

21 A-106.1 Loc TA - PR Strategy design, production and implementation

(Firm)CS

70,000.0 81,900.0 0.0QCBS Prior 1 May-11 Jun-11 Jun-11 Jul-11 - Jul-11 Aug-11 Sep-11 Oct-11 Dec-12

ToR

development in

progress

22 A-106.2 Loc TA - PR Campaign Design and Implementation (IC)

(Gorica Sokovic and Vesna Nikaljevic)CS

31,000.0 36,270.0 22,260.8SSS Prior Multi Dec-10

March 10,

2011

March

19, 2011- - - - - Apr-11 Apr-12 Contracts signed

23 A-107 MoH capacity development

24 A-107.1

Int/Reg TA- Senior Advisor to the Minister (Development of

two National Cancer Prevention Programs (colorectal and

cervical cancer))

CS

21,174.4 24,774.0 24,774.0

IC Post 1 Mar-11April 5,

2011

April 22,

2011

February

21, 2011-

March 15,

2011- -

May 25,

2011

May 25,

2012Contract signed

25 A-107.2 Int/Reg TA- Senior Advisor to the Minister CS 20,000.0 23,400.0 0.0 IC Post 1 Jun-11 Jun-11 Jun-11 - - Jul-11 - - Jul-11 Aug-12ToR

development in

26 A-107.3 Int/Reg TA- Senior Advisor to the Minister CS 20,000.0 23,400.0 0.0 IC Post 1 Jun-11 Jun-11 Jun-11 - - Jul-11 - - Jul-11 Aug-12ToR

development in

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of June 3, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 106: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

27 A-107.4 Loc TA- Junior Advisor to the Minister

CS20,000.0 23,400.0 0.0

IC Post 1 Sep-11 Sep-11 Sep-11 - - Oct-11 - - Oct-11 Nov-12ToR

development in

progress28 A-1.1 Institutional Development of the Drugs Agency

29 A-111 TA Policy and capacity development

30 A-111.1 Int TA for policy development CS 40,000.0 46,800.0 0.0 IC Post 1Oct/Nov

2011Nov-11 Dec-11 Dec-11 - Jan-12 Feb-12 Feb-12 Mar-12 Sep-12

ToR to be

developed

31 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

47,460.0 55,528.2 55,528.2CQS Post 1 Jan-11

February

8, 2011

February

8, 2011

February

10, 2011-

February

24,2011- -

May 15,

2011

May 15,

2012Contract signed

32 A-111.3 Drugs Agency capacity development, out-of-country Training TR 15,257.0 17,850.7 289.0 SoE 1 Oct-11Nov 24,

2010

February

8, 2011

May 15,

2011

May 15,

2012

In parallel to the

above position

33 A-112 Information system

34 A-112.1Software development

G212,735.0 248,900.0 0.0

ICB Prior 1June/July

2011Jul-11 Aug-11 - Sep-11 Nov-11 Dec-11 Jan-12 Feb-12 Dec-12

TS/BD

development in

progress

35 A-1.2 Trainings / study tours

36 A-120Trainings / study tours (WG Capacity Dev.)

TR68,910.0 80,624.7

Throughout the life of the projectThroughout the

life of the project

1,571,016.1 1,838,088.9 206,490.3

37 A.2.0 Hospital Information System / Hardware (*) G 490,000.0 573,300.0 0.0 1ST ICB Prior 1May/June

2011Jul-11 Aug-11 -

Septemebe

r 2011Oct-11 Nov-11 Dec-11

Jan/Feb

2011Jun-12

Needs

assessment in

38 A-201 Work stations G 0.0 0.0 0.0 1ST ICB Prior 1Needs

assessment in

39 A-202 Printers G 0.0 0.0Needs

assessment in

40 A-203 Servers G 0.0 0.0Needs

assessment in

41 A-204 Lan network G 0.0 0.0Needs

assessment in

42 A-205 Communication equipment G 0.0 0.0Needs

assessment in

43 A.2.1 Information System / Software G 425,470.1 497,800.0 0.0

44 A-210 Health Information System / Software for MOH G212,735.0 248,900.0 0.0

ICB Prior 1June/July

2011Jul-11 Aug-11 - Sep-11 Nov-11 Dec-11 Jan-12 Feb-12 Dec-12

TS/BD

development in

progress

45 A-211 Health Information System / Software for IPH G212,735.0 248,900.0 0.0

ICB Prior 1June/July

2011Jul-11 Aug-11 - Sep-11 Nov-11 Dec-11 Jan-12 Feb-12 Dec-12

TS/BD

development in

progress

46 A-212 Loc TA - Hardware equipment needs assessment and technical

specification developmentCS

22,098.9 25,855.7 25,855.7SSS Prior Multi May-11 Jun-11 Jun-11 - - - - - Jun-11 Jul-12 NO in progress

47 A-213TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement CS

4,500.0 5,265.0 0.0IC Post 1 May-11

May 31,

2011

May 31,

2011- - - - - Jun-11 Apr-12

ToRdevelopment

in progress

942,069.0 1,102,220.7 0.0

2,513,085.1 2,940,309.6 206,490.3

48 B.1.0 Operational Review of the PHC

49 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,950.0 16,321.5 16,321.5 CQS Post 1 Jun/Jul-1006-28-

20108/10/10

08-17-

20107/9/10 -

Oct 22,

2010

October 23,

2011

Implementation

in progress

13,950.0 16,321.5 16,321.5

50 B.2.0 PHC Specialization Program Development & Implementation

51 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 220,000.0 257,400.0 0.0 QCBS Prior 1

Oct/Nov

2010

Nov 22,

2010

Nov 22,

2010

January 10,

2011-

February 3,

2011

May 19,

2011- Jun-11 Dec-12

Financial

negotiations to

initiate

220,000.0 257,400.0 0.0

52 B.3.0TA for PHC Specialist Medicine Training Program (Medicine

and Nursing, 4 rounds, 8-11)CS

403,959.1 472,632.1 372,632.1IC/CQ Prior MultiOngoing through the life of the Project Dec-12

53 B-301Training Program (Education) Coordinator (rounds8-11)

(Mara Drecun) (Contract+Am.1)CS

16,695.5 19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/11

Implementation

in progress

54 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1) CS9,585.4 11,214.9 11,214.9

SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/11Implementation

in progress

55 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 30,325.1 35,480.4 35,480.4 SSS Prior Multi

56 B-303.1-D-1 Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 913.4 1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Implementation

in progress57 B-303.1-D-2 Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,331.5 1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress58 B-303.1-D-3 Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,152.8 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress59 B-303.1-D-4 Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,616.9 3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress

Subcomponent B.3: PHC Development Outside of Podgorica

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal B.2:

Subcomponent A.2: Health Information System*

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subtotal A.1:

Page 107: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

60 B-303.1-D-5 Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,276.2 1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Implementation

in progress61 B-303.1-D-6 Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,209.9 2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress62 B-303.1-D-7 Educator Doctor (P.Divanović) (Contract+Am.1) CS 2,044.1 2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress63 B-303.1-D-8 Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 898.7 1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress64 B-303.1-D-9 Educator Doctor (J.Pepić) (Contract+Am.1) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress65 B-303.1-D-10 Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,325.9 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress66 B-303.1-D-11 Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,270.7 1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress67 B-303.1-D-12 Educator Doctor (N.Janković) (Contract+Am.1) CS 1,038.6 1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress68 B-303.1-D-13 Educator Doctor (Božika Subašić) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed69 B-303.1-D-14 Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,215.4 1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress70 B-303.1-D-15 Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,311.2 1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress71 B-303.1-D-16 Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,174.9 3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress72 B-303.1-D-17 Educator Doctor (L.Delević) (Contract+Am.1) CS 1,473.3 1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress73 B-303.1-D-18 Educator Doctor (V.Peranović) (Contract+Am.1) CS 736.6 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress74 B-303.1-D-19 Educator Doctor (Z.Miljković) (Contract+Am.1) CS 736.6 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress75 B-303.1-D-20 Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,178.6 1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress76 B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed77 B-303.1-D-22 Educator Doctor (B.Radović) (Contract+Am.1) CS 883.9 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress78 B-303.1-D-23 Educator Doctor (M.Bogavac) (Contract+Am.1) CS 736.6 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress79 B-303.1-D-24 Educator Doctor (O.Poček) (Contract+Am.1) CS 736.6 861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress80 B-303.1-D-25 Educator Doctor (S.Šabović) (Contract+Am.1) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress

81 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 22,625.6 26,471.9 26,471.9

82 B-303.1-N-1 Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,832.3 5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Implementation

in progress83 B-303.1-N-2 Educator Nurse (J.Radinović) (Contract+Am.1) CS 972.4 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress84 B-303.1-N-3 Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,348.0 1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress85 B-303.1-N-4 Educator Nurse (B.Mudreša) (Contract+Am.1) CS 486.2 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress86 B-303.1-N-5 Educator Nurse (Jovanka Prelević) CS 427.2 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed87 B-303.1-N-6 Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 1,001.8 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress88 B-303.1-N-7 Educator Nurse (D.Rakčević) (Contract+Am.1) CS 663.0 775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress89 B-303.1-N-8 Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,467.6 5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress90 B-303.1-N-9 Educator Nurse (N.Božović) (Contract+Am.1) CS 677.7 792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress100 B-303.1-N-10 Educator Nurse (L.Vujović) (Contract+Am.1) CS 648.2 758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress101 B-303.1-N-11 Educator Nurse (V.Garović) (Contract+Am.1) CS 383.0 448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress102 B-303.1-N-12 Educator Nurse (M.Marković) (Contract+Am.1) CS 221.0 258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress103 B-303.1-N-13 Educator Nurse (R.Ostojić) (Contract+Am.1) CS 795.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress104 B-303.1-N-14 Educator Nurse (T.Đurić) (Contract+Am.1) CS 928.1 1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress105 B-303.1-N-15 Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,031.3 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress106 B-303.1-N-16 Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 324.1 379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress107 B-303.1-N-17 Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,738.4 2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress108 B-303.1-N-18 Educator Nurse (L.Mitrović) (Contract+Am.1) CS 795.6 930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress109 B-303.1-N-19 Educator Nurse (R.Džoganović) (Contract+Am.1) CS 884.0 1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress

110 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag, Jovanović

Danijela, Dašić Radmila) (Contract+Am.1)

CS

2,950.2 3,451.8 3,451.8

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/1005-15-

2010- - May-10 12/31/10

Implementation

in progress

111 B-304.1-DTheoretical Lecturer (loc) Doctors(28), (rounds 8&9)

CS22,936.7 26,835.9 26,835.9

112 B-304.1-D-1 T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,690.6 1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011Implementation

in progress113 B-304.1-D-2 T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 405.1 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress114 B-304.1-D-3 T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 891.3 1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress115 B-304.1-D-4 T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 405.1 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress116 B-304.1-D-5 T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 1,001.8 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress117 B-304.1-D-6 T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 871.1 1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress118 B-304.1-D-7 T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 243.1 284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress119 B-304.1-D-8 T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,418.0 1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress120 B-304.1-D-9 T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,937.3 2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress121 B-304.1-D-10 T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 729.3 853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress122 B-304.1-D-11 T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 552.5 646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress123 B-304.1-D-12 T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,325.9 1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress124 B-304.1-D-13 T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress125 B-304.1-D-14 T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 405.1 474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress126 B-304.1-D-15 T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 445.7 521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress127 B-304.1-D-16 T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 972.4 1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress128 B-304.1-D-17 T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 725.6 848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress129 B-304.1-D-18 T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress130 B-304.1-D-19 T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 438.3 512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress131 B-304.1-D-20 T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,152.8 1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress132 B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) CS 324.1 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed133 B-304.1-D-22 T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 497.2 581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress134 B-304.1-D-23 T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 2,018.4 2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress

Page 108: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

135 B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 434.6 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010Contract

completed136 B-304.1-D-25 T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,281.7 1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress137 B-304.1-D-26 T. Lecturer Doctor (Draginja Radunović) CS 302.0 353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed138 B-304.1-D-27 T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,204.4 1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress139 B-304.1-D-28 T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 379.4 443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec 31, 2011

Implementation

in progress

140 B-304.1-NTheoretical Lecturer (loc) Nurses(17), (rounds 8&9)

CS16,887.2 19,758.0 19,758.0

141 B-304.1-N-1 T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 615.1 719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10Implementation

in progress142 B-304.1-N-2 T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,116.0 1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress143 B-304.1-N-3 T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,127.0 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress144 B-304.1-N-4 T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 1,001.8 1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress145 B-304.1-N-5 T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 559.8 655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress146 B-304.1-N-6 T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,451.1 1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress147 B-304.1-N-7 T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,679.5 1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress148 B-304.1-N-8 T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,664.8 1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress149 B-304.1-N-9 T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,615.0 3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress150 B-304.1-N-10 T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 876.6 1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress151 B-304.1-N-11 T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 729.3 853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress152 B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 147.3 172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec 31, 2010

Contract

completed153 B-304.1-N-13 T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,127.0 1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress154 B-304.1-N-14 T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 626.1 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress155 B-304.1-N-15 T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 766.1 896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress156 B-304.1-N-16 T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 408.8 478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress

157 B-304.1-N-17T. Lecturer Med. Technician (G.Jokanović)

(Contract+Am.1)CS 375.7 439.6 439.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Implementation

in progress

158 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir

Dobričanin, Ognjen Jovićević, Nada Janković, Edita

Bašović) (round 9) (Miroslav Stanišljević)

(Contract+Am.1)

CS

4,198.8 4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/1005-15-

2010- - May-10 12/31/10

Implementation

in progress

159 B-305

8th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 62,158.1 72,725.0 72,725.0

SoE Post Mar-10Sep 22,

2010

Sep 24,

2010Jun-10 Completed

160 B-306

9th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 70,297.4 82,248.0 82,248.0

SoE Post Sep-10Dec 20,

2010

Dec 20,

2010Jan-11 COmpleted

161 B-307

10th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 72,649.6 85,000.0 70,000.0

SoE Post Feb-11June 1,

2011

June 1,

2011

June 25,

2011

Implementation

in progress

162 B-308

11th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 72,649.6 85,000.0 0.0

SoE Post Sep-11 Sep-11 Sep-11 Jan-12

163 B-3.1 Equipment - Diagnostic equipment

164 B-312Medical equipment for Primary Health Care Development

G540,000.0 631,800.0 0.0

ICB Prior 1May/June

2011Jul-11 Aug-11 - Sep-11 Oct-11 Nov-11 Dec-11

Jan/Feb

2012

Septemebr

2012

Needs

assessment in

progress

165 B-3.2 Civil Works

166 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0 2,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 3/13/12Contract

implementation

167 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje CS

55,548.0 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

Contract

implementation

in progress

168 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,744.9 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10

Contract

completed

1,599,292.9 3,853,133.2 3,121,333.2

1,833,242.9 4,126,854.7 3,137,654.7

169 C.1 PMN Personnel CS

170 C1.1Coordinator, short-term (4months)( Pavle Aligrudić)

CS7,106.4 8,561.9 8,561.9

SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10Contract

completed

171 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - - - - - 2/8/10 4/30/10

Contract

completed

172 C1.3Coordinator (24 months) (Majda Škrijelj) (Contract+Am.1)

CS43,907.3 51,371.5 25,685.8

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 6/28/11Amendment 1 to

be signed

Subcomponent C.1: Project Management Network

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Page 109: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

173 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1)CS

36,589.4 42,809.6 21,404.8IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 5/1/11

Amendment 1 to

be signed

174 C1.5Administrative Assistant (24 months) (Jelena Antonijević)

CS10,245.0 11,986.7 11,986.7

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 - - - 06-16-10 Jun-10 7/1/11Contract

completed

175 C1.6 Administrative Assistant (12 months) (Natasa Jolic) CS 10,245.0 11,986.7 11,986.7 IC Post 1April 20,

2011

April 20,

2011

April 20,

2011

April 21,

2011- - - -

June 6,

2011June 6, 2012

Contract to be

signed

176 C.2 PMN Trainings / Study tours TR 10,090.0 SoE/CQ Post Multi

177PMN Training (Sarajevo, Procurement Seminar, May 31-

Jun 4, 2010) (Boba Vukoslavovic) 644.9 777.0 777.0SoE Post Multi May-10 05-27-10 05-27-10 May-10

Activity

completed

178PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj) 1,205.1 1,410.0 1,410.0SoE Post Multi Oct-10 Oct-10 Oct-10

Activity

completed

179 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 85,000.0 99,450.0 47,151.0SoE PostOngoing through the life of the Project

180 C.4 Independent Financial Audit CS 20,000.0 23,400.00.0

LCS Prior 1 Apr-11April 29,

2011

May 6,

2011

May 10,

2011- Jun-11 Jul-11 - Aug-11 Jul-13

Deadline for

application June

8, 2011

181 C.5 Annual survey CS 99,600.0 116,532.00.0

CQ Prior 1 Jan-11February

1, 2011

February

2, 2011

February 2,

2011

February

23, 2011

March 10,

2011Jul-11 Aug-11

December

31, 2012

ToR

development in

progress

182 C.6 Local TA for Monitoring and Evaluation CS 20,000.0 23,400.0 0.0 IC / CQ Prior 1

183 C.7 Office Furniture/Equipment G

184 C 7.1 PMN Office Furniture G 1,111.1 1,300.0 1,300.0 S Prior 1 Jul-10 06-26-10 06-28-10 - Aug-10Oct 12,

2010-

Nov 1,

2010

Nov 12,

2010

Nov 20,

2010

Contract

completed

338,970.6 396,980.9 134,259.4

185 C.UUnallocated, savings from the positions: 0.0 0.0

0.0 0.0

338,970.55 396,980.94 134,259.40

5,089,257.62 7,464,145.20 3,851,036.56

5,089,257.62 7,464,145.20 3,851,036.56

Total negotiated Loan amount 5,100,000.00

10,742.38

Committed 1,521,028.35

Date 05/31/2011

Committed 1,767,106.56

Sub-total

GRAND TOTAL Additional financing:

Subtotal C.1:

Subtotal C.U:

TOTAL Component C:

Page 110: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275

No

Item Description

Ty

pe

Est

imat

. C

ost

/All

oca

ted

amo

un

t L

OA

N

(E

UR

)

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

CS

2 A-101 TA health institutions network & norms and standards and

STC Basic Benefits Package

3 A-101.1 Int TA health institutions network & norms and standards

CS87,000.0

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0

5 A-101.3 Loc TA health institutions network & norms and standards

(Firm/Organization)CS

100,000.00

6 A-101.4 Loc TA for STC Basic Benefits Package (Firm/Organization)

CS120,000.00

7 A-102 Analytical study on HR in Health System in MN

8 A-102.1Analytical study on HR in Health System in MN

(Firm/Organization)CS

100,000.00

9 A-103 STC payment model design and implementation

10 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)

CS

186,000.0

11 A-103.2 Loc TA STC payment model design and implementation

CS58,500.0

12 A-103.3 Purchasing DRG Licence G 100,000.0

13 A-104 Private public integration

14 A-104.1 Int TA Private public integration

CS60,000.0

15 A-104.2 Loc TA Private public integration CS 23,400.0

17 A-105

TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of May 31, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 111: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

18 A-105.1

Int TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and protocols

development and revision

CS 88,579.7

19 A-105.2

Loc TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and Protocols

development and revision

CS 36,000.0

20 A-106 TA PR campaign design and implementation

21 A-106.1 Loc TA - PR Strategy design, production and implementation

(Firm)CS

100,000.0

22 A-106.2 Loc TA - PR Campaign Design and Implementation (IC)

(Gorica Sokovic and Vesna Nikaljevic)CS

31,000.0

23 A-107 MoH capacity development

24 A-107.1

Int/Reg TA- Senior Advisor to the Minister (Development of

two National Cancer Prevention Programs (colorectal and

cervical cancer))

CS

21,174.4

25 A-107.2 Int/Reg TA- Senior Advisor to the Minister CS 20,000.0

26 A-107.3 Int/Reg TA- Senior Advisor to the Minister CS 20,000.0

27 A-107.4 Loc TA- Junior Advisor to the Minister

CS20,000.0

28 A-1.1 Institutional Development of the Drugs Agency

29 A-111 TA Policy and capacity development

30 A-111.1 Int TA for policy development CS 40,000.0

31 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

47,460.0

32 A-111.3Drugs Agency capacity development, out-of-country Training

TR15,257.0

33 A-112 Information system

34 A-112.1Software development

G192,735.0

35 A-1.2 Trainings / study tours

36 A-120Trainings / study tours (WG Capacity Dev.)

TR68,910.0

1,611,016.1

37 A.2.0 Hospital Information System / Hardware (*) G 410,000.0

38 A-201 Work stations G 0.0

39 A-202 Printers G 0.0

40 A-203 Servers G 0.0

41 A-204 Lan network G 0.0

42 A-205 Communication equipment G 0.0

43 A.2.1 Information System / Software G 385,470.1

44 A-210 Health Information System / Software for MOH G192,735.0

45 A-211 Health Information System / Software for IPH G192,735.0

Subtotal A.1:

Subcomponent A.2: Health Information System*

Page 112: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

46 A-212 Loc TA - Hardware and Medical equipment needs

assessment and technical specification developmentCS

29,500.0

47 A-213TA for preparing MoH, IPH and Drug's Agency bidding

documents for software procurement CS

4,500.0

829,470.1

2,440,486.2

48 B.1.0 Operational Review of the PHC

49 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,950.0

13,950.0

50 B.2.0 PHC Specialization Program Development &

Implementation

51 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 220,000.0

220,000.0

52 B.3.0TA for PHC Specialist Medicine Training Program (Medicine

and Nursing, 4 rounds, 8-11)CS

53 B-301Training Program (Education) Coordinator (rounds8&9)

(Mara Drecun) (Contract+Am.1)CS

16,695.5

54 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

(Contract+Am.1)CS

9,585.4

55 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 30,325.1

56 B-303.1-D-1 Educator Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 913.4

57 B-303.1-D-2 Educator Doctor (V.Oborina) (Contract+Am.1) CS 1,331.5

58 B-303.1-D-3 Educator Doctor (V.S.Lalović) (Contract+Am.1) CS 1,152.8

59 B-303.1-D-4 Educator Doctor (S.Mićanović) (Contract+Am.1) CS 2,616.9

60 B-303.1-D-5 Educator Doctor (D.Radunović) (Contract+Am.1) CS 1,276.2

61 B-303.1-D-6 Educator Doctor (M.Grbović) (Contract+Am.1) CS 2,209.9

62 B-303.1-D-7 Educator Doctor (P.Divanović) (Contract+Am.1) CS 2,044.1

63 B-303.1-D-8 Educator Doctor (Lj.Z.Vuković) (Contract+Am.1) CS 898.7

64 B-303.1-D-9 Educator Doctor (J.Pepić) (Contract+Am.1) CS 442.0

65 B-303.1-D-10 Educator Doctor (B.Hadžiosmanović) (Contract+Am.1) CS 1,325.9

66 B-303.1-D-11 Educator Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,270.7

67 B-303.1-D-12 Educator Doctor (N.Janković) (Contract+Am.1) CS 1,038.6

68 B-303.1-D-13 Educator Doctor (Božika Subašić) CS 589.3

69 B-303.1-D-14 Educator Doctor (R.Pajović) (Contract+Am.1) CS 1,215.4

70 B-303.1-D-15 Educator Doctor (E.Bašović) (Contract+Am.1) CS 1,311.2

71 B-303.1-D-16 Educator Doctor (M.Hodžić) (Contract+Am.1) CS 3,174.9

72 B-303.1-D-17 Educator Doctor (L.Delević) (Contract+Am.1) CS 1,473.3

73 B-303.1-D-18 Educator Doctor (V.Peranović) (Contract+Am.1) CS 736.6

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Page 113: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

74 B-303.1-D-19 Educator Doctor (Z.Miljković) (Contract+Am.1) CS 736.6

75 B-303.1-D-20 Educator Doctor (V.Zelović) (Contract+Am.1) CS 1,178.6

76 B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 442.0

77 B-303.1-D-22 Educator Doctor (B.Radović) (Contract+Am.1) CS 883.9

78 B-303.1-D-23 Educator Doctor (M.Bogavac) (Contract+Am.1) CS 736.6

79 B-303.1-D-24 Educator Doctor (O.Poček) (Contract+Am.1) CS 736.6

80 B-303.1-D-25 Educator Doctor (S.Šabović) (Contract+Am.1) CS 589.3

81 B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 22,625.6

82 B-303.1-N-1 Educator Nurse (M.Pavićević) (Contract+Am.1) CS 4,832.3

83 B-303.1-N-2 Educator Nurse (J.Radinović) (Contract+Am.1) CS 972.4

84 B-303.1-N-3 Educator Nurse (Lj.Milićević) (Contract+Am.1) CS 1,348.0

85 B-303.1-N-4 Educator Nurse (B.Mudreša) (Contract+Am.1) CS 486.2

86 B-303.1-N-5 Educator Nurse (Jovanka Prelević) CS 427.2

87 B-303.1-N-6 Educator Med.Technician (M.Kažić) (Contract+Am.1) CS 1,001.8

88 B-303.1-N-7 Educator Nurse (D.Rakčević) (Contract+Am.1) CS 663.0

89 B-303.1-N-8 Educator Nurse (M.Đeković) (Contract+Am.1) CS 4,467.6

90 B-303.1-N-9 Educator Nurse (N.Božović) (Contract+Am.1) CS 677.7

100 B-303.1-N-10 Educator Nurse (L.Vujović) (Contract+Am.1) CS 648.2

101 B-303.1-N-11 Educator Nurse (V.Garović) (Contract+Am.1) CS 383.0

102 B-303.1-N-12 Educator Nurse (M.Marković) (Contract+Am.1) CS 221.0

103 B-303.1-N-13 Educator Nurse (R.Ostojić) (Contract+Am.1) CS 795.6

104 B-303.1-N-14 Educator Nurse (T.Đurić) (Contract+Am.1) CS 928.1

105 B-303.1-N-15 Educator Med. Technician (Ž.Malić) (Contract+Am.1) CS 1,031.3

106 B-303.1-N-16 Educator Nurse (B.O.Samardžić) (Contract+Am.1) CS 324.1

107 B-303.1-N-17 Educator Nurse (T.Šebek) (Contract+Am.1) CS 1,738.4

108 B-303.1-N-18 Educator Nurse (L.Mitrović) (Contract+Am.1) CS 795.6

109 B-303.1-N-19 Educator Nurse (R.Džoganović) (Contract+Am.1) CS 884.0

110 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag,

Jovanović Danijela, Dašić Radmila) (Contract+Am.1)

CS

2,950.2

111 B-304.1-DTheoretical Lecturer (loc) Doctors(28), (rounds 8&9)

CS22,936.7

112 B-304.1-D-1 T. Lecturer Doctor (Lj.C.Kezunović) (Contract+Am.1) CS 1,690.6

113 B-304.1-D-2 T. Lecturer Doctor (Đ.Ostojić) (Contract+Am.1) CS 405.1

114 B-304.1-D-3 T. Lecturer Doctor (B.Čolaković) (Contract+Am.1) CS 891.3

115 B-304.1-D-4 T. Lecturer Doctor (A.Ljaljević) (Contract+Am.1) CS 405.1

116 B-304.1-D-5 T. Lecturer Doctor (S.Vujisić) (Contract+Am.1) CS 1,001.8

117 B-304.1-D-6 T. Lecturer Doctor (B.Andrić) (Contract+Am.1) CS 871.1

118 B-304.1-D-7 T. Lecturer Doctor (R.Mirković) (Contract+Am.1) CS 243.1

119 B-304.1-D-8 T. Lecturer Doctor (V.Oborina) (Contract+Am.1) CS 1,418.0

120 B-304.1-D-9 T. Lecturer Doctor (Lj.M.Gledović) (Contract+Am.1) CS 1,937.3

121 B-304.1-D-10 T. Lecturer Doctor (M.Ratković) (Contract+Am.1) CS 729.3

122 B-304.1-D-11 T. Lecturer Doctor (M.Medenica) (Contract+Am.1) CS 552.5

123 B-304.1-D-12 T. Lecturer Doctor (M.Samardžić) (Contract+Am.1) CS 1,325.9

124 B-304.1-D-13 T. Lecturer Doctor (A.A.Zečević) (Contract+Am.1) CS 442.0

125 B-304.1-D-14 T. Lecturer Doctor (N.D.Kovačević) (Contract+Am.1) CS 405.1

126 B-304.1-D-15 T. Lecturer Doctor (M.Peković) (Contract+Am.1) CS 445.7

127 B-304.1-D-16 T. Lecturer Doctor (O.Bošković) (Contract+Am.1) CS 972.4

128 B-304.1-D-17 T. Lecturer Doctor (P.Divanović) (Contract+Am.1) CS 725.6

129 B-304.1-D-18 T. Lecturer Doctor (G.Mijović) (Contract+Am.1) CS 442.0

Page 114: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

130 B-304.1-D-19 T. Lecturer Doctor (V.S.Lalović) (Contract+Am.1) CS 438.3

131 B-304.1-D-20 T. Lecturer Doctor (S.Mićanović) (Contract+Am.1) CS 1,152.8

132 B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) CS 324.1

133 B-304.1-D-22 T. Lecturer Doctor (M.Radonjić) (Contract+Am.1) CS 497.2

134 B-304.1-D-23 T. Lecturer Doctor (M.Grbović) (Contract+Am.1) CS 2,018.4

135 B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 434.6

136 B-304.1-D-25 T. Lecturer Doctor (P.Bajagić) (Contract+Am.1) CS 1,281.7

137 B-304.1-D-26 T. Lecturer Doctor (Draginja Radunović) CS 302.0

138 B-304.1-D-27 T. Lecturer Doctor (O.V.Vlahović) (Contract+Am.1) CS 1,204.4

139 B-304.1-D-28 T. Lecturer Doctor (M.Hodžić) (Contract+Am.1) CS 379.4

140 B-304.1-NTheoretical Lecturer (loc) Nurses(17), (rounds 8&9)

CS16,887.2

141 B-304.1-N-1 T. Lecturer Nurse (B.Kraljević) (Contract+Am.1) CS 615.1

142 B-304.1-N-2 T. Lecturer Nurse (J.Radinović) (Contract+Am.1) CS 1,116.0

143 B-304.1-N-3 T. Lecturer Nurse (Đ.Garić) (Contract+Am.1) CS 1,127.0

144 B-304.1-N-4 T. Lecturer Nurse (V.Raičković) (Contract+Am.1) CS 1,001.8

145 B-304.1-N-5 T. Lecturer Nurse (N.Božović) (Contract+Am.1) CS 559.8

146 B-304.1-N-6 T. Lecturer Nurse (R.Srdanović) (Contract+Am.1) CS 1,451.1

147 B-304.1-N-7 T. Lecturer Nurse (N.Rondović) (Contract+Am.1) CS 1,679.5

148 B-304.1-N-8 T. Lecturer Nurse (M.Đeković) (Contract+Am.1) CS 1,664.8

149 B-304.1-N-9 T. Lecturer Nurse (M.Pavićević) (Contract+Am.1) CS 2,615.0

150 B-304.1-N-10 T. Lecturer Nurse (D.B.Backović) (Contract+Am.1) CS 876.6

151 B-304.1-N-11 T. Lecturer Nurse (M.Kaluđerović) (Contract+Am.1) CS 729.3

152 B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 147.3

153 B-304.1-N-13 T. Lecturer Nurse (D.Dobrović) (Contract+Am.1) CS 1,127.0

154 B-304.1-N-14 T. Lecturer Nurse (M.Bogavac) (Contract+Am.1) CS 626.1

155 B-304.1-N-15 T. Lecturer Nurse (A.Mutapčić) (Contract+Am.1) CS 766.1

156 B-304.1-N-16 T. Lecturer Nurse (S.Minić) (Contract+Am.1) CS 408.8

157 B-304.1-N-17T. Lecturer Med. Technician (G.Jokanović)

(Contract+Am.1)CS 375.7

158 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir

Dobričanin, Ognjen Jovićević, Nada Janković, Edita

Bašović) (round 9) (Miroslav Stanišljević)

(Contract+Am.1)

CS

4,198.8

159 B-305

8th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 62,158.1

160 B-306

9th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 70,297.4

161 B-307

10th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 72,649.6

162 B-308

11th round operating expenses - appointed participants' travel

costs and per diems refund (to PH centers) &accommodation,

Logistical Assisstant, Rent, printing certificates, office

equipment, etc. 72,649.6

163 B-3.1 Equipment - Diagnostic equipment 403,959.1

Page 115: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

164 B-311 Medical equipment for Primary Health Care Development G 540,000.0

165 B-3.2 Civil Works

166 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0

167 B-322Supervision of Works on renovation of PHC facility DZ

Bijelo Polje CS

55,548.0

168 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,744.9

2,003,252.0

2,237,202.0

169 C.1 PMN Personnel CS

170 C1.1Coordinator, short-term (4months)( Pavle Aligrudić)

CS7,106.4

171 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3

172 C1.3Coordinator (24 months) (Majda Škrijelj) (Contract+Am.1)

CS43,907.3

173 C1.4 Deputy Coordinator (12 months) (Boba Vukoslavović)

(Contract+Am.1)CS

36,589.4

174 C1.5Administrative Assistant (24 months) (Jelena Antonijević)

CS10,245.0

175 C.1.5Administrative Assistant (12 months) (evaluation in process)

CS10,245.0

176 C.2 PMN Trainings / Study tours TR 10,090.0

177PMN Training (Sarajevo, Procurement Seminar, May 31-

Jun 4, 2010) (Boba Vukoslavovic) 644.9

178PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj) 1,205.1

179 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 85,000.0

180 C.4 Independent Financial Audit CS 20,000.0

181 C.5 Annual survey CS 99,600.0

182 C.6 Local TA for Monitoring and Evaluation CS 20,000.0

183 C.7 Office Furniture/Equipment G

184 C 7.1 PMN Office Furniture G 1,111.1

338,970.6

185 C.UUnallocated, savings from the positions: 83,341.3

83,341.3

422,311.80

Component C: Project Management

Subcomponent C.1: Project Management Network

Subtotal C.1:

Subtotal C.U:

TOTAL Component C:

Subtotal B.3:

TOTAL Component B:

Page 116: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

5,100,000.00

5,100,000.00

Total negotiated Loan amount 5,100,000.00

0.00

Committed 1,521,028.35

Sub-total

GRAND TOTAL Additional financing:

Page 117: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

DRAFTE

stim

at.

Co

st/A

llo

cate

d

amo

un

t

Wit

h

Go

ver

nm

ent

Co

ntr

ibu

tio

n

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

ho

rtli

st,

TS

,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o

Qu

ote

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Sh

ort

list

, T

S,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Inv

itat

ion

to

Qu

ote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

101,790.0 0.0IC Prior 1 Aug-11 Aug-11 Aug-11 Sep-11 -

87,750.0 0.0 CQS Prior 1 Dec-10Apr 06,

2011

May 9,

2011

May 12,

2011-

117,000.0 0.0SSS* Prior 1 Aug-11 Aug-11 Sep-11 - -

140,400.0 0.0SSS* Prior 1 Apr-11

May 26,

2011Jun-11 - -

117,000.0 0.0CQS Prior 1 Aug-11 Sep-11 Sep-11 Oct-11 -

217,620.0 0.0

CQS Prior 1Oct/Nov

2010

February

2, 2011

February

2, 2011

Nov 23,

2010-

68,445.0 0.0SSS Prior Multi Jun-11 Jun-11 Jun-11 - -

117,000.00.0

DC Prior 1 Jul-11 Jul-11 Aug-11 - -

70,200.0 0.0IC Prior 1

May/June

2011Jun-11 Jun-11

May 6,

2011-

27,378.0 0.0 SSS* Prior Multi May-11 Jun-11 Jun-11 - -

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of May 31, 2011)

Page 118: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

103,638.3 0.0 IC Prior 1 Dec-10February

28, 2011Apr-11

February

14, 2011-

42,120.0 0.0 IC Post Multi May-11 Jun-11 Jun-11 Jun-11 -

117,000.0 0.0QCBS Prior 1 May-11 Jun-11 Jun-11 Jul-11 -

36,270.0 0.0SSS Prior Multi Dec-10

March 10,

2011

March

19, 2011- -

24,774.0 24,774.0

IC Post 1 Mar-11April 5,

2011

April 22,

2011

February

21, 2011-

23,400.0 0.0 IC Post 1 Jun-11 Jun-11 Jun-11 - -

23,400.0 0.0 IC Post 1 Jun-11 Jun-11 Jun-11 - -

23,400.0 0.0IC Post 1 Sep-11 Sep-11 Sep-11 - -

46,800.0 0.0 IC Post 1Oct/Nov

2011Nov-11 Dec-11 Dec-11 -

55,528.2 55,528.2CQS Post 1 Jan-11

February

8, 2011

February

8, 2011

February

10, 2011-

17,850.7 289.0SoE 1 Oct-11

Nov 24,

2010

February

8, 2011

225,500.0 0.0ICB Prior 1

June/July

2011Jul-11 Aug-11 - Sep-11

80,624.7Throughout the life of the project

1,884,888.9 80,591.2

0.0 0.0 1ST ICB Prior 1May/June

2011Jul-11 Aug-11 -

Septemebe

r 20110.0 0.0 1ST ICB Prior 1

0.0

0.0

0.0

0.0

451,000.0 0.0

225,500.0 0.0ICB Prior 1

June/July

2011Jul-11 Aug-11 - Sep-11

225,500.0 0.0ICB Prior 1

June/July

2011Jul-11 Aug-11 - Sep-11

Page 119: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

34,515.0 0.0SSS Prior Multi May-11 Jun-11 Jun-11 - -

5,265.0 0.0IC Post 1 May-11

May 31,

2011

May 31,

2011- -

490,780.0 0.0

2,375,668.9 80,591.2

16,321.5 16,321.5 CQS Post 1 Jun/Jul-1006-28-

20108/10/10

08-17-

2010

16,321.5 16,321.5

257,400.0 0.0 QCBS Prior 1Oct/Nov

2010

Nov 22,

2010

Nov 22,

2010

January

10, 2011-

257,400.0 0.0

0.0IC/CQ Prior MultiOngoing through the life of the Project

19,533.7 19,533.7SSS Prior 1 Mar-10 4/1/10 4/24/10

11,214.9 11,214.9SSS Prior 1 Mar-10 4/1/10 4/23/10

35,480.4 35,480.4 SSS Prior Multi

1,068.7 1,068.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,557.8 1,557.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

3,061.7 3,061.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,493.2 1,493.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,585.6 2,585.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,391.7 2,391.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,486.7 1,486.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,215.2 1,215.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,422.1 1,422.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,534.1 1,534.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

3,714.6 3,714.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,723.7 1,723.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

Page 120: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,379.0 1,379.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,034.2 1,034.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

861.9 861.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

26,471.9 26,471.9

5,653.8 5,653.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,137.7 1,137.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,577.2 1,577.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

775.7 775.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

5,227.1 5,227.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

792.9 792.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

758.4 758.4 SSS Prior 1 Mar-10 09/22/10 09/27/10

448.2 448.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

258.6 258.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,085.9 1,085.9 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

379.2 379.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

2,034.0 2,034.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

930.8 930.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,034.2 1,034.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

3,451.8 3,451.8

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10

26,835.9 26,835.9

1,978.0 1,978.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,042.9 1,042.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,019.1 1,019.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,659.1 1,659.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,266.7 2,266.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

853.2 853.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

646.4 646.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,551.3 1,551.3 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

474.0 474.0 SSS Prior 1 Mar-10 09/24/10 09/27/10

521.4 521.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,137.7 1,137.7 SSS Prior 1 Mar-10 09/24/10 09/27/10

848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

Page 121: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

512.8 512.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,348.8 1,348.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10

581.8 581.8 SSS Prior 1 Mar-10 09/24/10 09/27/10

2,361.5 2,361.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,499.6 1,499.6 SSS Prior 1 Mar-10 09/24/10 09/27/10

353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10

1,409.1 1,409.1 SSS Prior 1 Mar-10 09/24/10 09/27/10

443.9 443.9 SSS Prior 1 Mar-10 09/24/10 09/27/10

19,758.0 19,758.0

719.7 719.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,305.7 1,305.7 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,172.1 1,172.1 SSS Prior 1 Mar-10 09/22/10 09/27/10

655.0 655.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,697.8 1,697.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,965.0 1,965.0 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,947.8 1,947.8 SSS Prior 1 Mar-10 09/22/10 09/27/10

3,059.6 3,059.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,025.6 1,025.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

853.2 853.2 SSS Prior 1 Mar-10 09/22/10 09/27/10

172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10

1,318.6 1,318.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

896.3 896.3 SSS Prior 1 Mar-10 09/22/10 09/27/10

478.3 478.3 SSS Prior 1 Mar-10 09/22/10 09/27/10

439.6 439.6 SSS Prior 1 Mar-10 09/22/10 09/27/10

4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10

72,725.0 72,725.0

SoE Post Mar-10 Mar-10

82,248.0 82,248.0

SoE Post Sep-10 Sep-10

85,000.0 85,000.0

SoE Post Feb-11 Jun-11 Jun-11

85,000.0 85,000.0

SoE Post Sep-11 Sep-11 Sep-11

472,632.1 472,632.1

Page 122: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

631,800.0 0.0 ICB Prior 1May/June

2011Jul-11 Aug-11 - Sep-11

2,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10

64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10

4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 -

3,380,501.1 2,748,701.1

3,654,222.6 2,765,022.6

8,561.9 8,561.9SSS Prior 1 Feb-10 2/4/10 2/4/10 - -

3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 - -

51,371.5 25,685.8IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

42,809.6 21,404.8IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

11,986.7 11,986.7IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 -

11,986.7 11,986.7IC Post 1

April 20,

2011

April 20,

2011

April 20,

2011

April 21,

2011-

SoE/CQ Post Multi

777.0 777.0SoE Post Multi May-10 05-27-10 05-27-10

1,410.0 1,410.0SoE Post Multi Oct-10 Oct-10

99,450.0 47,151.0SoE PostOngoing through the life of the Project

23,400.00.0

LCS Prior 1 Apr-11April 29,

2011

May 6,

2011

May 10,

2011-

116,532.00.0

CQ Prior 1 Jan-11February

1, 2011

February

2, 2011

February

2, 2011

23,400.0 0.0 IC / CQ Prior 1

1,300.0 1,300.0 S Prior 1 Jul-10 06-26-10 06-28-10 - Aug-10

396,980.9 134,259.4

97,509.3

97,509.3

494,490.20 134,259.40

Page 123: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

6,524,381.66 2,979,873.18

6,524,381.66 2,979,873.18

Page 124: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Loan Number: 7819-MEB

id o

pen

ing

-

Tec

hn

ical

/Fin

anci

al

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Co

ntr

act

awar

d/S

ign

ing

Co

ntr

act

com

ple

tio

n

Act

ivit

y S

tatu

s

- - Sep-11 Oct-11 Nov-12Assignment to

be re-defined.

Jun-11 Jun-11 Jun-11 Jul-11 Aug-12Applicants to be

evaluated

- - - Oct-11 Oct-12Assignment to

be re-defined.

- - - Jul-11 Nov-12Awaiting NO for

SSS selection of

IPH

Oct-11 Oct-11 Nov-11 Nov-11 Jun-12ToR

development to

be initiated upon

Dec 17,

2010

February

04, 2011

February

11, 2011Jun-11 Oct-12

Contract to be

signed

- - - Jun-11 Oct-12ToR

development in

progress

- - - Sep-11 Dec-11Preparations for

initiating

negotiations in

June 2,

2011Jun-11 Jun-11 Jul-11 Aug-12

Readvertised,

applicants to be

evaluated

- Jun-11 Jul-11 Sep-12ToR

development in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of May 31, 2011)

Page 125: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

March 01,

2011

April 22,

2011- May-11 Dec-12 Contract signed

Jul-11 Aug-11 Aug-11 Aug-11 Aug-12ToR

development in

progress

Jul-11 Aug-11 Sep-11 Oct-11 Dec-12ToR

development in

progress

- - - Apr-11 Apr-12 Contracts signed

March 15,

2011- -

May 25,

2011

May 25,

2012Contract signed

Jul-11 - - Jul-11 Aug-12ToR

development in

progress

Jul-11 - - Jul-11 Aug-12ToR

development in

Oct-11 - - Oct-11 Nov-12ToR

development in

progress

Jan-12 Feb-12 Feb-12 Mar-12 Sep-12ToR to be

developed

February

24,2011- -

May 15,

2011

May 15,

2012Contract signed

May 15,

2011

May 15,

2012

In parallel to the

above position

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12TS/BD

development in

progress

Throughout the

life of the

project

Oct-11 Nov-11 Dec-11Jan/Feb

2011Jun-12

Needs

assessment in Needs

assessment in Needs

assessment in Needs

assessment in Needs

assessment in Needs

assessment in

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12TS/BD

development in

progress

Nov-11 Dec-11 Jan-12 Feb-12 Dec-12TS/BD

development in

progress

Page 126: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

- - - Jun-11 Jul-12ToRdevelopmen

t in progress

- - - Jun-11 Apr-12ToRdevelopmen

t in progress

7/9/10 -Oct 22,

2010

October 23,

2011

Implementation

in progress

February 3,

2011

May 19,

2011- Jun-11 Dec-12

Financial

negotiations to

initiate

Dec-12

4/24/10 Apr-10 12/31/11Implementation

in progress

4/23/10 Apr-10 12/31/11Implementation

in progress

09/27/10 Sep-10 Dec 31, Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Contract

completed09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress

Page 127: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec 31, Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Contract

completed09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress

09/27/10 Sep-10 Dec 31, Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Contract

completed09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress

05-15-

2010- - May-10 12/31/10

Implementation

in progress

09/27/10 Sep-10 Dec 31, Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress

Page 128: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

09/27/10 Sep-10 Dec 31, Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Contract

completed09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Contract

completed09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Contract

completed09/27/10 Sep-10 Dec 31,

Implementation

in progress09/27/10 Sep-10 Dec 31,

Implementation

in progress

09/27/10 Sep-10 Dec-10Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec 31,

Contract

completed09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress09/27/10 Sep-10 Dec-10

Implementation

in progress

09/27/10 Sep-10 Dec-10Implementation

in progress

05-15-

2010- - May-10 12/31/10

Implementation

in progress

Dec-10 Completed

Jan-11 COmpleted

Jun-11Implementation

in progress

Jan-12

Page 129: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Oct-11 Nov-11 Dec-11Jan/Feb

2012

Septemebr

2012

Needs

assessment in

06-28-10 Sep-10 10/13/10 3/13/12Contract

implementation

07-30-10 8/12/10 8/12/10 10/13/10 7/13/12Contract

implementation

in progress

04-15-10 Apr-10 06-30-10Contract

completed

- - - 2/8/10 4/30/10Contract

completed

- - - 2/8/10 4/30/10Contract

completed

- - 06-16-10 Jun-10 6/28/11Amendment 1 to

be signed

- - 06-16-10 Jun-10 5/1/11Amendment 1 to

be signed

- - 06-16-10 Jun-10 7/1/11Contract

completed

- - -June 6,

2011June 6, 2012

Contract to be

signed

May-10Activity

completed

Oct-10Activity

completed

Jun-11 Jul-11 - Aug-11 Jul-13Deadline for

application June

8, 2011

February

23, 2011

March

10, 2011Jul-11 Aug-11

December

31, 2012

ToR

development in

progress

Oct 12,

2010-

Nov 1,

2010

Nov 12,

2010

Nov 20,

2010

Contract

completed

Page 130: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No
Page 131: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

No

Item Description

Type

Est

imat

. C

ost

/All

oca

ted

am

ou

nt

LO

AN

(EU

R)

Est

imat

. C

ost

/All

oca

ted

am

ou

nt

Wit

h G

ov

ern

men

t C

on

trib

uti

on

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

ho

rtli

st, T

S, T

OR

,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Sh

ort

list

,

TS

, T

OR

, R

F, B

idd

ing

Do

c/In

vit

atio

n t

o

Qu

ote

Ap

pro

ved

Sh

ort

list

, T

S, T

OR

, R

F,

Bid

din

g D

oc/

Inv

itat

ion

to

Qu

ote

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

Bid

op

enin

g-T

ech

nic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Contr

act

awar

d/S

ignin

g

Contr

act

com

ple

tion

1 A.1.0Secondary and Tertiary Care Reform Strategy Implementation

CS

2 A-101 TA health institutions network & norms and standards and STC

Basic Benefits Package

3 A-101.1 Int TA health institutions network & norms and standards

CS87,000.0 101,790.0 0.0

IC Prior 1 Jun-11 Jul-11 Aug-11 Aug-11 - - May-11 Jun-12

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0 87,750.0 0.0 CQS Prior 1 Dec-10Apr 06,

2011- Apr-11 Apr-11 May-11 May-11 Mar-12

5 A-101.3 Loc TA health institutions network & norms and standards, and

Loc TA for STC Basic Benefits Package (Firm/Organization)CS

220,000.00 257,400.0 0.0SSS* Prior 1 Apr-11 May-11 May-11 - - - Jun-11 Jun-11 Jul-12

6 A-101.4 Trainings / study tours (WG Capacity Dev.) TR 50,000.00 58,500.0 0.0 Prior Multi Sep-11

7 A-102 Analytical study on HR in Health System in MN

8 A-102.1Analytical study on HR in Health System in MN

(Firm/Organization)CS

100,000.00 117,000.0 0.0QCBS Prior 1 Jun-11 Jul-11 Aug-11 Aug-11 - - May-11 Jul-11 Feb-12

9 A-103 STC payment model design and implementation

10 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)

CS

120,000.0 140,400.0 0.0

CQS Prior 1Oct/Nov

2010

Nov/Dec

2010

Dec 22,

2010

Nov 23,

2010-

Dec 17,

2010

February

04, 2011

February

11, 2011Apr-11 Aug-12

11 A-103.2 Loc TA STC payment model design and implementation

CS90,000.0 105,300.0 0.0

IC Post Multi Jun-11 Mar-11 Mar-11 Mar-11 - Apr-11 Apr-11 Apr-11April/May

2011Jul-12

12 A-103.3 Purchasing DRG Licence G 100,000.0 117,000.00.0

DC Prior

13 A-104 Private public integration

14 A-104.1 Int TA Private public integration

CS60,000.0 70,200.0 0.0

IC Prior 1 Dec-10 Feb-11 Feb-11February 4,

2011-

March 16,

2011Mar-11 Mar-11 Apr-11 May-12

15 A-104.2 Loc TA Private public integration CS 40,000.0 46,800.0 0.0 SSS* Prior Multi May-11 May-11 Jun-11 - - - Jun-11 Jul-11 Sep-12

16 A-104.3 Training on private public integration (WG Capacity

Development)TR

60,410.0 70,679.7 0.0Multi

June/July

2011

17 A-105

TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and Protocols

Development and Revision

18 A-105.1

Int TA for Quality Assurance Strategic Framework (QA Model

Design&Impl.) and Clinical Guidelines and protocols

development and revision

CS 100,000.0 117,000.0 0.0 IC Prior 1 Dec-10February

28, 2011Apr-11

February

14, 2011-

March 01,

2011

April 1,

2011Apr-11 May-11 Jun-12

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of April 11, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 132: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

19 A-105.2

Loc TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and Protocols

development and revision

CS 120,000.0 140,400.0 0.0 IC Post Multi May-11 May-11 Jun-11 Jun-11 - Jul-11 Aug-11 Aug-11 Aug-11 Aug-12

20 A-105.3Acquiring licences for Clinical Guidelines and protocols from

the Republic of Srpska and Serbia TO BE DELETED 0.0

21 A-106 TA PR campaign design and implementation

22 A-106.1 Loc TA - PR Strategy design, production and implementation

(Firm)CS

100,000.0 117,000.0 0.0QCBS Prior 1 May-11 May-11 Jun-11 Feb-11 Apr-11 Apr-11 Apr-11 May-11 Nov-12

23 A-106.2 Loc TA - PR Campaign Design and Implementation (IC)

CS31,000.0 36,270.0 0.0

SSS Prior Multi Dec-10March 10,

2011

March

19, 2011- Apr-11 Apr-11 Dec-12

24 A-107 MoH capacity development

25 A-107.1

Int/Reg TA- Senior Advisor to the Minister (Coordinating

Development of 2 National Cancer Prevention Programs and

developing one National cancer Prevention Program (colorectal

cancer))

CS

20,000.0 23,400.0 0.0

IC Prior 1 Feb-11April 5,

2011

February

18, 2011

March 15,

2011Apr-11 May-12

A-107.2 Int/Reg TA- Senior Advisor to the Minister (Development of

National Cancer Prevention Program (cervical cancer))

CS

20,000.0 23,400.0 0.0

IC Prior 1 May-11

A-107.3

Int/Reg TA- Senior Advisor to the Minister (Development of

two National Cancer Prevention Programs (colorectal and

cervical cancer))CS

20,000.0 23,400.0 0.0IC Prior 1 May-11

26 A-107.4 Loc TA- Junior Advisor to the Minister

CS20,000.0 23,400.0 0.0

IC Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Apr-11 Apr-11 May-11 May-12

27 A-107.5 National Health Account TR 20,000.0 23,400.0 0.0 Apr-11

28 A-1.1 Institutional Development of the Drugs Agency

29 A-111 TA Policy and capacity development

30 A-111.1 Int TA for policy development CS 40,000.0 46,800.0 0.0 IC Post 1 Apr-11 Apr-11 May-11 May-11 May-11 May-11 Jun-11 Mar-12

31 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

45,000.0 52,650.0 0.0CQS Post 1 Jan-11

February

8, 2011

February

8, 2011

February

10, 2011

February

24,2011

February

25,2011Mar-11 Apr-11 Dec-11

32 A-111.3Drugs Agency capacity development, out-of-country Training

TR15,000.0 17,550.0 0.0

SoE 1 Oct-10Nov 24,

2010

February

8, 2011Apr-11 Dec-11

33 A-112 Information system

34 A-112.1Software development

G150,000.0 175,500.0 0.0

ICB Prior 1 Dec-10 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Aug-12

1,703,410.0 1,992,989.7 0.0

35 A.2.0 Hospital Information System / Hardware (*) G 232,000.0 271,440.0 0.0 1ST ICB Prior 1 Mar-11 Apr-11 Apr-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

36 A-201 Work stations G 232,000.0 271,440.0 0.0 1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

A-202

A-203

A-204

A-205

37 A.2.1 Information System / Software G 300,000.0 351,000.0 0.0

38 A-210 Health Information System / Software for MOH G150,000.0 175,500.0 0.0

ICB Prior 1Jan/Feb

2011Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-12

39 A-211 Health Information System / Software for IPH G150,000.0 175,500.0 0.0

ICB Prior 1 Dec-10 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-12

532,000.0 622,440.0 0.0

2,235,410.0 2,615,429.7 0.0TOTAL Component A:

Component B: Primary Health Care Development

Subtotal A.1:

Subcomponent A.2: Health Information System*

Subtotal A.2:

Subcomponent B.1: Primary Health Care Policy Standards

Page 133: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

40 B.1.0 Operational Review of the PHC

41 B-101 Int TA Operational Review of the PHC (Firm/Organization) CS 13,950.0 16,321.5 16,321.5 CQS Post 1 Jun/Jul-1006-28-

20108/10/10 08-17-2010 7/9/10 Oct-10 Oct-10 Oct-11

13,950.0 16,321.5 16,321.5

42 B.2.0 PHC Specialization Program Development & Implementation

43 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 220,000.0 257,400.0 0.0 QCBS Prior 1

Oct/Nov

2010

Nov 22,

2010

Nov 22,

2010

January 10,

2011-

February 3,

2011

February

4, 2011Feb-11 Mar-11 Dec-12

220,000.0 257,400.0 0.0

44 B.3.0TA for PHC Specialist Medicine Training Program (Medicine

and Nursing, 4 rounds, 8-11)CS

540,000.0 631,800.0 267,110.2IC/CQ Prior MultiOngoing through the life of the Project Dec-12

45 B-301Training Program (Education) Coordinator (rounds8&9) (Mara

Drecun)CS

9,513.3 11,130.6 11,130.6SSS Prior 1 Mar-10 4/1/10 4/24/10 4/24/10 Apr-10 12/31/10

46 B-302Training Implementation Specialist (rounds 8&9) (Igor Švab)

CS4,953.8 5,796.0 5,796.0

SSS Prior 1 Mar-10 4/1/10 4/23/10 4/23/10 Apr-10 12/31/10

47 B-303.1 -D IC Educators (loc) Doctors(25), (rounds 8&9) CS 18,196.5 21,289.9 21,289.9 SSS Prior Multi

48 B-303.1-D-1 Educator Doctor (Ljiljana Cvejanov-Kezunović) CS 548.8 642.1 642.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-2 Educator Doctor (Vesna Oborina) CS 771.6 902.8 902.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-3 Educator Doctor (Vesna Strainović Lalović) CS 725.6 848.9 848.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-4 Educator Doctor (Snežana Mićanović) CS 1,476.9 1,728.0 1,728.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-5 Educator Doctor (Draginja Radunović) CS 651.9 762.7 762.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-6 Educator Doctor (Mensud Grbović) CS 906.1 1,060.1 1,060.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-7 Educator Doctor (Paša Divanović) CS 1,318.6 1,542.7 1,542.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-8 Educator Doctor (Ljiljana Zogović Vuković) CS 828.7 969.6 969.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-9 Educator Doctor (Jaho Pepić) CS 368.3 430.9 430.9 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-10 Educator Doctor (Belma Hadžiosmanović) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-11 Educator Doctor (Olivera Vojvodić Vlahović) CS 1,027.6 1,202.3 1,202.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-12 Educator Doctor (Nada Janković) CS 858.2 1,004.1 1,004.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-13 Educator Doctor (Božika Subašić) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-14 Educator Doctor (Rajka Pajović) CS 659.3 771.4 771.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-15 Educator Doctor (Edita Bašović) CS 814.0 952.4 952.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-16 Educator Doctor (Merzika Hodžić) CS 2,084.7 2,439.1 2,439.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-17 Educator Doctor (Lidija Delević) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-18 Educator Doctor (Vesna Peranović) CS 294.6 344.7 344.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-19 Educator Doctor (Zinaida Miljković) CS 294.6 344.7 344.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-20 Educator Doctor (Vesna Zelović) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-21 Educator Doctor (Julijana Zečević) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-22 Educator Doctor (Bosiljka Radović) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-23 Educator Doctor (Milovan Bogavac) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-24 Educator Doctor (Olivera Poček) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-D-25 Educator Doctor (Sabit Šabović) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N Educator (loc) Nurses(19), (rounds 8&9) CS 14,629.4 17,116.4 17,116.4

B-303.1-N-1 Educator Nurse (Mirjana Pavićević) CS 3,141.7 3,675.8 3,675.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-2 Educator Nurse (Jadranka Radinović) CS 574.6 672.3 672.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-3 Educator Nurse (Ljiljana Milićević) CS 825.0 965.3 965.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-4 Educator Nurse (Branka Mudreša) CS 486.2 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-5 Educator Nurse (Jovanka Prelević) CS 427.2 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-6 Educator Med.Technician (Miodrag Kažić) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-7 Educator Nurse (Desanka Rakčević) CS 427.2 499.9 499.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-8 Educator Nurse (Marija Đeković) CS 3,141.7 3,675.8 3,675.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Subtotal B.1:

Subcomponent B.3: PHC Development Outside of Podgorica

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional Development

Subtotal B.2:

Page 134: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

B-303.1-N-9 Educator Nurse (Nevena Božović) CS 486.2 568.8 568.8 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-10 Educator Nurse (Lidija Vujović) CS 368.3 430.9 430.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-11 Educator Nurse (Vesna Garović) CS 294.6 344.7 344.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-12 Educator Nurse (Milena Marković) CS 132.6 155.1 155.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-13 Educator Nurse (Radmila Ostojić) CS 368.3 430.9 430.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-14 Educator Nurse (Tanja Đurić) CS 537.7 629.2 629.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-15 Educator Med. Technician (Željko Malić) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-16 Educator Nurse (Biljana Ostojić Samardžić) CS 176.8 206.9 206.9 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-17 Educator Nurse (Tina Šebek) CS 1,031.3 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-18 Educator Nurse (Lidija Mitrović) CS 442.0 517.1 517.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-303.1-N-19 Educator Nurse (Ranka Džoganović) CS 589.3 689.5 689.5 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

49 B-303.2

Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag, Jovanović

Danijela, Dašić Radmila)CS

1,966.8 2,301.2 2,301.2IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10

50 B-304.1-DTheoretical Lecturer (loc) Doctors(28), (rounds 8&9)

CS14,946.2 17,487.0 17,487.0

51 B-304.1-D-1 T. Lecturer Doctor (Ljiljana Cvejanov Kezunović) CS 950.2 1,111.8 1,111.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-2 T. Lecturer Doctor (Đurđica Ostojić) CS 360.9 422.3 422.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-3 T. Lecturer Doctor (Borislav Čolaković) CS 486.2 568.8 568.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-4 T. Lecturer Doctor (Agima Ljaljević) CS 324.1 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-5 T. Lecturer Doctor (Slavica Vujisić) CS 559.8 655.0 655.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-6 T. Lecturer Doctor (Bogdanka Andrić) CS 486.2 568.8 568.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-7 T. Lecturer Doctor (Ranka Mirković) CS 162.1 189.6 189.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-8 T. Lecturer Doctor (Vesna Oborina) CS 810.3 948.0 948.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-9 T. Lecturer Doctor (Ljiljana Musić Gledović) CS 1,068.1 1,249.7 1,249.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-10 T. Lecturer Doctor (Marina Ratković) CS 486.2 568.8 568.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-11 T. Lecturer Doctor (Milić Medenica) CS 434.6 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-12 T. Lecturer Doctor (Mira Samardžić) CS 721.9 844.6 844.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-13 T. Lecturer Doctor (Antoaneta Adžić Zečević) CS 360.9 422.3 422.3 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-14 T. Lecturer Doctor (Nataša Duborija Kovačević) CS 324.1 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-15 T. Lecturer Doctor (Mirko Peković) CS 243.1 284.4 284.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-16 T. Lecturer Doctor (Olivera Bošković) CS 567.2 663.6 663.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-17 T. Lecturer Doctor (Paša Divanović) CS 559.8 655.0 655.0 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-18 T. Lecturer Doctor (Gordana Mijović) CS 397.8 465.4 465.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-19 T. Lecturer Doctor (Vesna Strainović Lalović) CS 397.8 465.4 465.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-20 T. Lecturer Doctor (Snežana Mićanović) CS 898.7 1,051.5 1,051.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-21 T. Lecturer Doctor (Vuko Nikolić) CS 324.1 379.2 379.2 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-22 T. Lecturer Doctor (Mladen Radonjić) CS 397.8 465.4 465.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-23 T. Lecturer Doctor (Mensud Grbović) CS 1,112.3 1,301.4 1,301.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-24 T. Lecturer Doctor (Jadranka Lakićević) CS 434.6 508.5 508.5 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-25 T. Lecturer Doctor (Pavle Bajagić) CS 721.9 844.6 844.6 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-26 T. Lecturer Doctor (Draginja Radunović) CS 302.0 353.4 353.4 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-27 T. Lecturer Doctor (Olivera Vojvodić Vlahović) CS 854.5 999.8 999.8 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-D-28 T. Lecturer Doctor (Merzika Hodžić) CS 198.9 232.7 232.7 SSS Prior 1 Mar-10 09/24/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-NTheoretical Lecturer (loc) Nurses(17), (rounds 8&9)

CS9,384.6 10,980.0 10,980.0

B-304.1-N-1 T. Lecturer Nurse (Biljana Kraljević) CS 353.6 413.7 413.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-2 T. Lecturer Nurse (Jadranka Radinović) CS 611.4 715.3 715.3 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-3 T. Lecturer Nurse (Đurđa Garić) CS 626.1 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-4 T. Lecturer Nurse (Vesna Raičković) CS 500.9 586.1 586.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-5 T. Lecturer Nurse (Nevena Božović) CS 309.4 362.0 362.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-6 T. Lecturer Nurse (Rajka Srdanović) CS 788.2 922.2 922.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-7 T. Lecturer Nurse (Nada Rondović) CS 1,031.3 1,206.6 1,206.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-8 T. Lecturer Nurse (Marija Đeković) CS 839.8 982.5 982.5 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-9 T. Lecturer Nurse (Mirjana Pavićević) CS 1,370.1 1,603.1 1,603.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-10 T. Lecturer Nurse (Dragana Bojanović Backović) CS 500.9 586.1 586.1 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-11 T. Lecturer Nurse (Mirjana Kaluđerović) CS 372.0 435.2 435.2 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-12 T. Lecturer Med. Technician (Dragan Guberinić) CS 147.3 172.4 172.4 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

Page 135: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

B-304.1-N-13 T. Lecturer Nurse (Dragica Dobrović) CS 626.1 732.6 732.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-14 T. Lecturer Nurse (Marijana Bogavac) CS 375.7 439.6 439.6 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-15 T. Lecturer Nurse (Alma Mutapčić) CS 434.6 508.5 508.5 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-16 T. Lecturer Nurse (Sanja Minić) CS 246.8 288.7 288.7 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

B-304.1-N-17 T. Lecturer Med. Technician (Goran Jokanović) CS 250.5 293.0 293.0 SSS Prior 1 Mar-10 09/22/10 09/27/10 09/27/10 Sep-10 Dec-10

52 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9) (Vujičić

Vesko, Dragica Terzić, Rajka Pajović, Vladimir Dobričanin,

Ognjen Jovićević, Nada Janković, Edita Bašović) (round 9)

(Miroslav Stanišljević)

CS

4,198.8 4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/10 05-15-2010 - - May-10 12/31/10

53 B-305

8th and 9th round operating expenses - appointed participants'

travel costs and per diems refund (to PH centers)

&accommodation, Logistical Assisstant, Rent, printing

certificates, office equipment, etc. 135,042.7 158,000.0 148,000.0

SoE Post Mar-10 Mar-10 Dec-10

B-3.1 Equipment - Diagnostic equipment

B-311

B-312

54 B-3.2 Civil Works

55 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0 1,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 3/13/12

56 B-322Supervision of Works on renovation of PHC facility DZ Bijelo

Polje CS

55,548.0 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

57 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,744.9 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10

1,599,292.9 2,380,501.1 3,015,811.3

1,833,242.9 2,654,222.6 3,032,132.8

63 C.1 PMN Personnel CS 56,910.0 105,121.7

64 C1.1Coordinator, short-term (4months)( Pavle Aligrudić)

CS7,106.4 8,561.9 8,561.9

SSS Prior 1 Feb-10 2/4/10 2/4/10 2/8/10 4/30/10

65 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 2/8/10 4/30/10

66 C1.3 Coordinator (12 months) (Majda Škrijelj) CS 21,319.2 25,685.8 25,685.8 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 6/28/11

67 C1.4 Deputy Coordinator (12 months) (Boba Vukoslavović) CS 17,766.0 21,404.8 21,404.8 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 5/1/11

68 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS9,948.9 11,986.7 11,986.7

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 7/1/11

69 C.2 PMN Trainings / Study tours TR 10,090.0 SoE/CQ Post Multi

70PMN Training (Sarajevo, Procurement Seminar, May 31-Jun

4, 2010) (Boba Vukoslavovic) 644.9 777.0 777.0SoE Post Multi May-10 05-27-10 05-27-10 May-10

71PMN Training (Zagreb, Procurement Seminar, Oct 18-22,

2010) (Majda Skrijelj) 1,205.1 1,410.0 1,410.0SoE Post Multi Oct-10 Oct-10 Oct-10

72 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 55,000.0 64,350.0 30,000.0SoE Post Ongoing through the life of the Project

73 C.4 Independent Financial Audit CS 20,000.0 23,400.00.0

LCS Prior 1 Dec-10 Feb-11 Feb-11 Feb-11 Mar-11 Apr-11 Apr-11 May-11 Jun-11

74 C.5 Annual survey CS 80,000.0 93,600.00.0

CQ Prior 1 Jan-11 Jan-11 Feb-11 Feb-11 Mar-11 Mar-11 Mar-11 Apr-11 May-11

75 C.6 Local TA for Monitoring and Evaluation CS 20,000.0 23,400.0 0.0 IC / CQ Prior 1

76 C.7 Office Furniture/Equipment G

77 C 7.1 PMN Office Furniture G 1,111.1 1,300.0 1,300.0 S Prior 1 Jul-10 06-26-10 06-28-10 Aug-10Oct 12,

2010

Nov 1,

2010

Subcomponent C.1: Project Management Network

TOTAL Component B:

Component C: Project Management

Subtotal B.3:

Page 136: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

237,417.9 279,871.7 105,121.7

78 C.U Unallocated, savings from the positions: IC Post Multi

79 A-101.2 Loc TA health institutions network & norms and standards 120,960.0 141,523.2

80 A-103.1 Int TA STC payment model design and implementation 0.0 0.0

81 B-101 Int TA Operational Review of the PHC 36,050.3 42,178.9

82 A-202 Printers G 42,000.0 49,140.0

83 A-203 Servers G 50,000.0 58,500.0

84 A-204 Lan network G 344,000.0 402,480.0

85 A-205 Communication equipment G 12,000.0 14,040.0

86 B-311 Int TA revision of tech specification CS 25,000.0 29,250.0

97 B-312 Diagnostic equipment G 200,000.0 234,000.0

830,010.3 971,112.1

1,067,428.21 1,250,983.77 105,121.72

5,136,081.11 6,520,636.05 3,137,254.47

5,136,081.11 6,520,636.05 3,137,254.47

(*)A2.0 Single procurement activity

* IPH responsibility

* HIF responsilibility

* MoH responsibility

1,427,507.11

Sub-total

GRAND TOTAL Additional financing:

Subtotal C.1:

Subtotal C.U:

TOTAL Component C:

Page 137: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Loan Number: 7819-ME

Act

ivit

y S

tatu

s

Assignment to be

re-defined. ToR

development in ToR NO in

progressAssignment to be

re-defined. ToR

development in

progress.

ToR

development to

be initiated.

Financial

negotiations with

the 1st ranked

firm in progress

ToR

development in

progress

REoI to be

advertised/ToR

to be resubmitted ToR

development in

progress

ToR and BER

NO in progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of April 11, 2011)

Page 138: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

ToR

development in

progress

ToR

development in

progress

Contracts NO in

progress

ToR NO in

progress

ToR

development in

progress

ToR to be

developed

Advertising in

progressActivity to be

conducted in

parallel to the

TS/BD

development in

progress

TS/BD

development in

progressTS/BD

development in

progress

Page 139: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Contract

implementation

in progress

BER NO in

progress

Contract

completed

Contract

completed

Contract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completed

Contract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completed

Page 140: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Contract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completed

Contract

completed

Contract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completed

Contract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completedContract

completed

Page 141: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Contract

completedContract

completedContract

completedContract

completedContract

completed

Contract

completed

Contract

implementation Contract

implementation

in progressContract

completed

Contract

completed

Contract

completed

Contract signed

Contract signed

Contract signed

Activity

completed

Activity

completed

ToR

development in

progress

ToR

development in

progress

Contract

completed

Page 142: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No
Page 143: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

No

Item Description

Ty

pe

Est

imat

. C

ost

/All

oca

ted

am

ou

nt

LO

AN

(EU

R)

Est

imat

. C

ost

/All

oca

ted

am

ou

nt

Wit

h G

ov

ern

men

t C

on

trib

uti

on

(EU

R)

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

ho

rtli

st, T

S, T

OR

, R

F,

Bid

din

g D

oc/

Inv

itat

ion

to

Qu

ote

TS

U S

ub

mit

to

IB

RD

fo

r N

O:

Sh

ort

list

, T

S,

TO

R, R

F, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

Ap

pro

ved

Sh

ort

list

, T

S, T

OR

, R

F, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

SP

N/

RE

oI

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

Bid

op

enin

g-T

ech

nic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

fin

al

eval

uat

ion

Co

ntr

act

awar

d/S

ign

ing

Co

ntr

act

com

ple

tio

n

Act

ivit

y S

tatu

s

1 A.1.0Secondary and Tertiary Care Reform Strategy

ImplementationCS

2 A-101 TA health institutions network & norms and standards and

STC Basic Benefits Package

3 A-101.1 Int TA health institutions network & norms and standards

CS87,000.0 101,790.0 0.0

IC Prior 1 Feb-11 Mar-11 Apr-11 Apr-11 - - May-11 Jun-12ToR

development in

progress

4 A-101.2 Int TA for STC Basic Benefits Package CS 75,000.0 87,750.0 0.0 IC Prior 1 Dec-10 Feb-11 Mar-11 Mar-11 - Apr-11 Apr-11 May-11 May-11 Mar-12 ToR in progress

5 A-101.3

Loc TA health institutions network & norms and

standards, and Loc TA for STC Basic Benefits Package

(Firm/Organization)CS

220,000.00 257,400.0 0.0SSS* Prior 1 Feb-11 Mar-11 Apr-11 Apr-11 - - May-11 Jun-12

ToR

development in

progress

6 A-101.4 Trainings / study tours (WG Capacity Dev.) TR 50,000.00 58,500.0 0.0 Prior Multi Sep-11

7 A-102 Analytical study on HR in Health System in MN

8 A-102.1Analytical study on HR in Health System in MN

(Firm/Organization)CS

100,000.00 117,000.0 0.0CQS Prior 1 Mar-11

March/Apri

l 2011Apr-11 Apr-11 - - May-11 Jul-11 Feb-12

ToR

development to

be initiated.

9 A-103 STC payment model design and implementation

10 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)

CS

120,000.0 140,400.0 0.0

CQS Prior 1Oct/Nov

2010

Nov/Dec

2010

Dec 22,

2010

Nov 23,

2010-

Dec 17,

2010

February

04, 2011Feb-11 Mar-11 Jul-12

BER NO in

progress

11 A-103.2 Loc TA STC payment model design and implementation

CS90,000.0 105,300.0 0.0

IC Post Multi Feb-11 Mar-11 Mar-11 Mar-11 - Apr-11 Apr-11 Apr-11April/May

2011Jul-12

ToR

development in

progress

12 A-103.3 Purchasing DRG Licence G 100,000.0 117,000.00.0

13 A-104 Private public integration

14 A-104.1 Int TA Private public integration

CS60,000.0 70,200.0 0.0

IC Prior 1 Dec-10 Feb-11 Feb-11February

4, 2011- Mar-11 Mar-11 Mar-11 Apr-11 May-12

REoI to be

advertised/ToR

to be resubmitted

15 A-104.2 Loc TA Private public integration CS 40,000.0 46,800.0 0.0 SSS* Prior Multi Feb-11 Feb-11 Apr-11 - - - Apr-11 Jun-12ToR

development in

progress

16 A-104.3 Training on private public integration (WG Capacity

Development)TR

60,410.0 70,679.7 0.0Multi

June/July

2011

17 A-105 TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and

Protocols Development and Revision

18 A-105.1

Int TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and

protocols development and revision

CS 100,000.0 117,000.0 0.0 IC Post 1 Dec-10February

28, 2011Apr-11

February

14, 2011-

March 01,

2011

April 1,

2011Apr-11 May-11 Jun-12

ToR and BER

NO in progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT/AFMHSIP - Procurement Plan (Situation as of January 27, 2011)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 144: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

19 A-105.2

Loc TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical Guidelines and

Protocols development and revision

CS 120,000.0 140,400.0 0.0 IC Post Multi May-11 May-11 Jun-11 Jun-11 - Jul-11 Aug-11 Aug-11 Aug-11 Aug-12ToR

development in

progress

20 A-105.3Acquiring licences for Clinical Guidelines and protocols

from the Republic of Srpska and Serbia 0.0

21 A-106 TA PR campaign design and implementation

22 A-106.1 Loc TA - PR Strategy design, production and

implementation (Firm)CS

100,000.0 117,000.0 0.0CQS Post 1 Dec-10 Feb-11 Feb-11 Feb-11 Apr-11 Apr-11 Apr-11 May-11 Nov-12

ToR

development in

progress

23 A-106.2 Loc TA - PR Campaign Design and Implementation (IC)

CS31,000.0 36,270.0 0.0

SSS Prior Multi Dec-10 Feb-11 Feb-11 -Feb/Marc

h 2011Dec-12

ToR to be

resubmitted for

NO.

24 A-107 MoH capacity development

25 A-107.1 Int/Reg TA- Senior Advisor to the Minister

CS60,000.0 70,200.0 0.0

IC Post 1 Jan-11 Feb-11Feb/Marc

h 2011Mar-11 Mar-11 Mar-11 Mar-11 Mar-11 Apr-11 May-12

ToR

development in

progress

26 A-107.2 Loc TA- Junior Advisor to the Minister

CS20,000.0 23,400.0 0.0

IC Post 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Apr-11 Apr-11 May-11 May-12ToR

development in

progress

27 A-107.3 National Health Account TR 20,000.0 23,400.0 0.0 Apr-11

28 A-1.1 Institutional Development of the Drugs Agency

29 A-111 TA Policy and capacity development

30 A-111.1 Int TA for policy development CS 40,000.0 46,800.0 0.0 IC Post 1 Apr-11 Apr-11 May-11 May-11 May-11 May-11 Jun-11 Mar-12ToR to be

developed

31 A-111.2Int TA for capacity development (In-country Training)

(Firm/Organization)CS

45,000.0 52,650.0 0.0CQS Post 1 Jan-11

February 8,

2011

February

8, 2011

February

10, 2011

February

24,2011

February

25,2011Mar-11 Apr-11 Dec-11

Advertising in

progress

32 A-111.3Drugs Agency capacity development, out-of-country

TrainingTR

15,000.0 17,550.0 0.0SoE Prior 1 Oct-10

Nov 24,

2010

February

8, 2011Apr-11 Dec-11

Activity to be

conducted in

parallel to the

33 A-112 Information system

34 A-112.1Software development

G150,000.0 175,500.0 0.0

ICB Prior 1 Dec-10 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Aug-12TS/BD

development in

progress

A.1.2

A-121

A-122

1,703,410.0 1,992,989.7 0.0

35 A.2.0 Hospital Information System / Hardware (*) G 232,000.0 271,440.0 0.0 1ST ICB Prior 1 Mar-11 Apr-11 Apr-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

36 A-201 Work stations G 232,000.0 271,440.0 0.0 1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

A-202

A-203

A-204

A-205

37 A.2.1 Information System / Software G 300,000.0 351,000.0 0.0

38 A-210 Health Information System / Software for MOH G150,000.0 175,500.0 0.0

ICB Prior 1Jan/Feb

2011Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-12

TS/BD

development in

progress

39 A-211 Health Information System / Software for IPH G150,000.0 175,500.0 0.0

ICB Prior 1 Dec-10 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-12TS/BD

development in

progress

532,000.0 622,440.0 0.0

2,235,410.0 2,615,429.7 0.0

40 B.1.0 Operational Review of the PHC

Subcomponent B.1: Primary Health Care Policy Standards

Subcomponent A.2: Health Information System*

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subtotal A.1:

Page 145: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

41 B-101 Int TA Operational Review of the PHC

(Firm/Organization)CS 13,950.0 16,321.5 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/10

08-17-

20107/9/10 Oct-10 Oct-10 Oct-11

Contract

implementation

in progress

13,950.0 16,321.5 16,321.5

42 B.2.0 PHC Specialization Program Development &

Implementation

43 B-201 Int TA PHC Specialization Program Development &

Implementation (Firm/Organization)CS 220,000.0 257,400.0 0.0 QCBS Prior 1

Oct/Nov

2010

Nov 22,

2010

Nov 22,

2010

January

10, 2011-

February 3,

2011

February

4, 2011Feb-11 Mar-11 Dec-12

BER NO in

progress

220,000.0 257,400.0 0.0

44 B.3.0TA for PHC Specialist Medicine Training Program

(Medicine and Nursing, 4 rounds, 8-11)TR-CS

540,000.0 631,800.0 239,013.8IC/CQ Prior MultiOngoing through the life of the Project Dec-12

45 B-301Training Program (Education) Coordinator (rounds8&9)

(Mara Drecun)CS

9,513.3 11,130.6 11,130.6SSS Prior 1 Mar-10 4/1/10 4/24/10 Apr-10 12/31/10

Contract

completed

46 B-302Training Implementation Specialist (rounds 8&9) (Igor

Švab)CS

4,953.8 5,796.0 5,796.0SSS Prior 1 Mar-10 4/1/10 4/23/10 Apr-10 12/31/10

Contract

completed

47 B-303 Educator (loc) Doctors/Nurses (2 Courses) CS 0.0

48 B-303.1Educator (loc) Doctors(25)/Nurses(19), (rounds 8&9)

CS32,826.0 38,406.4 38,406.4

SSS Prior Multi Mar-10 4/1/10Aug/Sep

10Dec-10

Contract

completed

49 B-303.2

Educator (loc) Nurses(6) (NEW) (round 9) (Perović

Stela, Kažanegra Sunita, Dedić Roza, Ašanin Predrag,

Jovanović Danijela, Dašić Radmila)

CS

1,966.8 2,301.2 2,301.2

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/1005-15-

2010- - May-10 12/31/10

Contract

completed

50 B-304Theoretical Lecturer (loc) Doctors/Nurses (2 Courses)

CS0.0

51 B-304.1T. Lecturer (loc) Doctors(28)/Nurses(17), (rounds 8&9)

CS24,330.8 28,467.1 28,467.1

SSS Prior Multi Mar-10 4/1/10Aug/Sep

10Dec-10

Contract

completed

52 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9)

(Vujičić Vesko, Dragica Terzić, Rajka Pajović,

Vladimir Dobričanin, Ognjen Jovićević, Nada

Janković, Edita Bašović) (round 9) (Miroslav

Stanišljević)

TR-CS

4,198.8 4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/1005-15-

2010- - May-10 12/31/10

Contract

completed

53 B-305

8th and 9th round operating expenses - appointed

participants' travel costs and per diems refund (to PH

centers) &accommodation, Logistical Assisstant, Rent,

printing certificates, office equipment, etc. 135,042.7 158,000.0 148,000.0

SoE Post Mar-10 Mar-10 Dec-10

B-3.1 Equipment - Diagnostic equipment

B-311

B-312

54 B-3.2 Civil Works

55 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0 1,679,328.4 2,679,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 3/13/12Contract

implementation

56 B-322Supervision of Works on renovation of PHC facility DZ

Bijelo Polje CS

55,548.0 64,991.2 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

Contract

implementation

in progress

57 B-323TA for preparing Bijelo Polje bidding document (3

months) (Aleksandar Milojković)CS

3,744.9 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10

Contract

completed

1,599,292.9 2,380,501.1 2,987,714.9

1,833,242.9 2,654,222.6 3,004,036.4

Subcomponent C.1: Project Management Network

Subcomponent B.3: PHC Development Outside of Podgorica

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional

Development

Subtotal B.2:

Page 146: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

63 C.1 PMN Personnel CS 56,910.0 105,121.7

64 C1.1Coordinator, short-term (4months)( Pavle Aligrudić)

CS7,106.4 8,561.9 8,561.9

SSS Prior 1 Feb-10 2/4/10 2/4/10 2/8/10 4/30/10Contract

completed

65 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 2/8/10 4/30/10

Contract

completed

66 C1.3 Coordinator (12 months) (Majda Škrijelj) CS 21,319.2 25,685.8 25,685.8 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 6/28/11 Contract signed

67 C1.4 Deputy Coordinator (12 months) (Boba Vukoslavović) CS 17,766.0 21,404.8 21,404.8 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 5/1/11 Contract signed

68 C1.5Administrative Assistant (12 months) (Jelena

Antonijević)CS

9,948.9 11,986.7 11,986.7IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 7/1/11 Contract signed

69 C.2 PMN Trainings / Study tours TR 10,090.0 SoE/CQ Post Multi

70PMN Training (Sarajevo, Procurement Seminar, May

31-Jun 4, 2010) (Boba Vukoslavovic) 644.9 777.0 777.0SoE Post Multi May-10 05-27-10 05-27-10 May-10

Activity

completed

71PMN Training (Zagreb, Procurement Seminar, Oct 18-

22, 2010) (Majda Skrijelj) 1,205.1 1,410.0 1,410.0SoE Post Multi Oct-10 Oct-10 Oct-10

Activity

completed

72 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 55,000.0 64,350.0 30,000.0SoE Post Ongoing through the life of the Project

73 C.4 Independent Financial Audit CS 20,000.0 23,400.00.0

LCS Prior 1 Dec-10 Feb-11 Feb-11 Feb-11 Mar-11 Apr-11 Apr-11 May-11 Jun-11ToR

development in

progress

74 C.5 Annual survey CS 80,000.0 93,600.00.0

CQ Prior 1 Jan-11 Jan-11 Feb-11 Feb-11 Mar-11 Mar-11 Mar-11 Apr-11 May-11ToR

development in

progress

75 C.6 Local TA for Monitoring and Evaluation CS 20,000.0 23,400.0 0.0 IC / CQ Prior 1

76 C.7 Office Furniture/Equipment G

77 C 7.1 PMN Office Furniture G 1,111.1 1,300.0 1,300.0 S Prior 1 Jul-10 06-26-10 06-28-10 Aug-10Oct 12,

2010Nov 1, 2010

Contract

completed

237,417.9 279,871.7 105,121.7

78 C.U Unallocated, savings from the positions: IC Post Multi

79 A-101.2 Loc TA health institutions network & norms and standards 120,960.0 141,523.2

80 A-103.1 Int TA STC payment model design and implementation 0.0 0.0

81 B-101 Int TA Operational Review of the PHC 36,050.3 42,178.9

82 A-202 Printers G 42,000.0 49,140.0

83 A-203 Servers G 50,000.0 58,500.0

84 A-204 Lan network G 344,000.0 402,480.0

85 A-205 Communication equipment G 12,000.0 14,040.0

86 B-311 Int TA revision of tech specification CS 25,000.0 29,250.0

97 B-312 Diagnostic equipment G 200,000.0 234,000.0

830,010.3 971,112.1

1,067,428.21 1,250,983.77 105,121.72

5,136,081.11 6,520,636.05 3,109,158.07

5,136,081.11 6,520,636.05 3,109,158.07

(*)A2.0 Single procurement activity

* IPH responsibility

* HIF responsilibility

* MoH responsibility

Sub-total

GRAND TOTAL Additional financing:

Subtotal C.1:

Subtotal C.U:

TOTAL Component C:

Page 147: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

1,403,493.09

Page 148: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275 Loan Number: 7819-ME

No

Item Description

Type

Est

imat

. C

ost

/All

oca

ted a

mount

LO

AN

(E

UR

)

Est

imat

. C

ost

/All

oca

ted a

mount

Wit

h G

over

nm

ent

Contr

ibuti

on

(EU

R)

Contr

acte

d A

mount

(EU

R)

Pro

c. M

ethod

Pri

or

/ P

ost

rev

iew

No o

f pac

kag

es

TS

U/P

MN

Fin

aliz

e S

hort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Invit

atio

n t

o Q

uote

TS

U S

ubm

it t

o I

DA

for

NO

: S

hort

list

, T

S,

TO

R,

RF

, B

iddin

g D

oc/

Invit

atio

n t

o Q

uote

Appro

ved

Short

list

, T

S,

TO

R,

RF

, B

iddin

g

Doc/

Invit

atio

n t

o Q

uote

SP

N

Invit

atio

n o

f B

ids/

Ten

der

Invit

atio

n

Bid

open

ing-T

echnic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tec

hnic

al

Eval

uat

ion/Q

ual

ific

atio

n

Req

ues

t an

d N

O f

or

final

eval

uat

ion

Contr

act

awar

d/S

ignin

g

Contr

act

com

ple

tion

1 A.1.0Secondary and Tertiary Care Reform Strategy

ImplementationCS

2 A-101 TA health institutions network & norms and standards

3 A-101.1 Int TA health institutions network & norms and standards

CS87,000.0 101,790.0

IC Prior 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 May-12

4 A-101.2 Loc TA health institutions network & norms and standards

(Firm/Organization)CS

130,000.00 152,100.0SSS* Prior 1 Oct-10 Nov-10

Nov/Dec-

10Dec-10 - - Dec-10 May-12

5 A-101.3 Analytical study on HR in Health System in MN CS 100,000.00 117,000.0 CQS Prior 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 May-12

6 A-101.4 Training / study tour (WG Capacity Dev.) TR 25,000.00 29,250.0 Prior

7 A-102 TA basic benefit package

8 A-102.1 Int TA basic benefit package (costing) CS 75,000.0 87,750.0 IC Prior 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 May-12

9 A-102.2 Loc TA basic benefit package (Firm/Organization)

CS90,000.0 105,300.0

SSS* Prior 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 May-12

10 A-102.3 Training / study tour (WG Capacity Dev.) TR 25,000.0 29,250.0

11 A-103 STC payment model design and implementation

12 A-103.1 Int TA STC payment model design and implementation

(Firm/Organization)CS

120,000.0 140,400.0CQS Prior 1 Oct-10 Nov-10

Nov/Dec-

10Dec-10 - - Dec-10 Dec-10 Jan-11 Jul-12

13 A-103.2 Loc TA STC payment model design and implementation

CS90,000.0 105,300.0

IC Post Multi Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 Dec-10 Jan-11 Jul-12

14 A-103.3Purchasing DRG Licence

G100,000.0 117,000.0

15 A-104 Private public integration

16 A-104.1 Int TA Private public integration

CS60,000.0 70,200.0

IC Prior 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 Dec-10 Jan-11 Dec-11

17 A-104.2 Loc TA Private public integration CS 40,000.0 46,800.0 IC Post Multi Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 Dec-10 Jan-11 Dec-11

18 A-104.3 Training on private public integration TR 60,410.0 70,679.7 Multi

19 A-105 TA Clinical guidelines development and revision

20 A-105.1

Int TA for Quality Assurance Strategic Framework (QA

Model Design&Impl.) and Clinical guidelines development

and revision

CS

70,000.0 81,900.0

IC Post 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 Dec-10 Jan-11 Dec-11

21 A-105.2 Loc TA Clinical guidelines development and revision

CS90,000.0 105,300.0

IC Post Multi Oct-10 Nov-10Nov/Dec-

10Dec-10 - - Dec-10 Dec-10 Jan-11 Dec-11

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT - Procurement Plan (Situation as of November 12, 2010)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 149: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

22 A-105.3Acquiring licences for Clinical Guidelines and protocols frm

the Republic of Srpska and Serbia

23 A-106 TA PR campaign design and implementation

24 A-106.1 Loc TA - PR campaign design and production CS 75,000.0 87,750.0 IC/CQ Post 1 Dec-10 Dec-10 Jan-11 Jan-11 Jan-11 Jan-11 Jan-11 Jan-11 Feb-11 Dec-12

25 A-107 MoH capacity development

26 A-107.1 Int/Reg TA- Senior Advisor to the Minister CS 60,000.0 70,200.0 IC Post 1 Dec-10 Jan-11 Jan-11 Feb-11 Feb-11 Feb-11 Feb-11 Feb-11 Mar-10 Dec-12

27 A-107.2 Loc TA- Junior Advisor to the Minister CS 20,000.0 23,400.0 IC Post 1 Dec-10 Jan-11 Jan-11 Feb-11 Feb-11 Feb-11 Feb-11 Feb-11 Mar-10 Dec-12

28 A-107.3 National Health Account TR 20,000.0 23,400.0 Mar-11

29 A-1.1 Institutional Development of the Drugs Agency

30 A-111 TA Policy and capacity development

31 A-111.1 Int TA for policy development CS 40,000.0 46,800.0 IC Post 1 Feb-11 Mar-10 Mar-10 Mar-10 Mar-10 Apr-10 Apr-10 Apr-10 Apr-10 Dec-11

32 A-111.2 Int TA for capacity development (Training) CS 45,000.0 52,650.0 SSS* Prior 1 Oct-10 Nov-10Nov/Dec-

10

33 A-111.3In-country Training

TR15,000.0 17,550.0

Prior 1 Oct-10 Nov-10Nov/Dec-

10

34 A-112 Information system

35 A-112.1Software development

G150,000.0 175,500.0

ICB Prior 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 Feb-11 Mar-11 Mar-12

36 A.1.2Development & Implementation of Quality Assurance

System*

37 A-121 Int TA for QA model design & implementation CS 40,000.0 46,800.0 IC Post 1 Jan-11 Feb-11 Feb-11 Mar-11 Apr-11 May-11 Aug-11

38 A-122 Loc TA for QA model design & implementation CS 60,000.0 70,200.0 IC Post Multi Jan-11 Feb-11 Feb-11 Mar-11 Apr-11 May-11 Aug-11

1,687,410.0 1,974,269.7 0.0

39 A.2.0 Hospital Information System / Hardware (*) G 1,020,000.0 842,400.0 1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

40 A-201 Work stations G 272,000.0 318,240.0 1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

41 A-202 Printers G 42,000.0 49,140.0 1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

42 A-203 Servers G 50,000.0 58,500.0 1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

43 A-204 Lan network G 344,000.0 402,480.0 1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

44 A-205 Communication equipment G 12,000.0 14,040.0 1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

45 A-206 Health Information System / Software for MOH G150,000.0 175,500.0

ICB Prior 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 Feb-11 Mar-11 Mar-12

46 A-207 Health Information System / Software for IPH G150,000.0 175,500.0

ICB Prior 1 Oct-10 Nov-10Nov/Dec-

10Dec-10 Feb-11 Mar-11 Mar-12

1,020,000.0 1,193,400.0 0.0

2,707,410.0 3,167,669.7 0.0

47 B.1.0 Operational Review of the PHC

48 B-101 Int TA Operational Review of the PHC CS 50,000.0 58,500.0 16,321.5 CQS Post 1 Jun/Jul-10 06-28-2010 8/10/1008-17-

20107/9/10 Oct-10 Oct-10 Oct-11

50,000.0 58,500.0 16,321.5

49 B.2.0 PHC Specialization Program Development &

Implementation

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional

Development

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subtotal B.1:

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal A.1:

Subcomponent A.2: Health Information System*

Page 150: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

50 B-201 Int TA PHC Specialization Program Development &

ImplementationCS 220,000.0 257,400.0 SSS* Prior 1 Oct-10 Nov-10

Nov/Dec-

10Dec-10 - - Dec-10 Dec-10 Dec-10 Dec-12

220,000.0 257,400.0 0.0

51 B.3.0TA for PHC Specialist Medicine Training Program

(Medicine and Nursing, 4 rounds, 8-11)TR-CS

540,000.0 631,800.0 183,853.8IC/CQ Prior MultiOngoing through the life of the Project Dec-12

52 B-301Training Program (Education) Coordinator (rounds8&9)

(Mara Drecun)CS

9,513.3 11,130.6 11,130.6SSS Prior 1 Mar-10 4/1/10 4/24/10 Apr-10 12/31/10

53 B-302Training Implementation Specialist (rounds 8&9) (Igor

Švab)CS

4,953.8 5,796.0 5,796.0SSS Prior 1 Mar-10 4/1/10 4/23/10 Apr-10 12/31/10

54 B-303Educator (loc) Doctors/Nurses (2 Courses)

CS0.0

55 B-303.1Educator (loc) Doctors(25)/Nurses(19), (rounds 8&9)

CS32,826.0 38,406.4 38,406.4

SSS Prior Multi Mar-10 4/1/10Aug/Sep

10Dec-10

56 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović Stela,

Kažanegra Sunita, Dedić Roza, Ašanin Predrag,

Jovanović Danijela, Dašić Radmila)

CS

1,966.8 2,301.2 2,301.2

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/1005-15-

2010- - May-10 12/31/10

57 B-304Theoretical Lecturer (loc) Doctors/Nurses (2 Courses)

CS0.0

58 B-304.1T. Lecturer (loc) Doctors(28)/Nurses(17), (rounds 8&9)

CS24,330.8 28,467.1 28,467.1

SSS Prior Multi Mar-10 4/1/10Aug/Sep

10Dec-10

59 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9)

(Vujičić Vesko, Dragica Terzić, Rajka Pajović, Vladimir

Dobričanin, Ognjen Jovićević, Nada Janković, Edita

Bašović) (round 9) (Miroslav Stanišljević)

TR-CS

4,198.8 4,912.6 4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/1005-15-

2010- - May-10 12/31/10

60 B-305

8th and 9th round operating expenses - appointed

participants' travel costs and per diems refund (to PH

centers) &accommodation, Logistical Assisstant, Rent,

printing certificates, office equipment, etc. 126,495.7 148,000.0 92,840.0

SoE Post Mar-10 Mar-10 Dec-10

61 B-3.1 Equipment - Diagnostic equipment

62 B-311 Int TA revision of tech specification CS 25,000.0 29,250.0 IC Prior 1 Oct-10 Nov-10 Dec-10 Dec-10 Jan-11

63 B-312 Diagnostic equipment G 200,000.0 234,000.0 ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11 Aug-11 Sep-11 Dec-11

64 B-3.2 Civil Works

65 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0 2,600,000.0 2,678,328.4 ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10 Sep-10 10/13/10 3/13/12

66 B-322Supervision of Works on renovation of PHC facility DZ

Bijelo Polje CS

50,000.0 58,500.0 64,991.2CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/12/10 8/12/10 10/13/10 7/13/12

67 B-323TA for preparing Bijelo Polje bidding document (3 months)

(Aleksandar Milojković)CS

3,744.9 4,381.5 4,381.5CQ Prior 1 Apr-10 04-14-10 04-15-10 - 04-15-10 Apr-10 06-30-10

1,818,744.9 3,557,931.5 2,931,554.9

2,088,744.9 3,873,831.5 2,947,876.4

68 C.1 PMN Personnel CS 56,910.0

69 C1.1Coordinator, short-term (4months)( Pavle Aligrudić)

CS7,106.4 8,561.9 8,561.9

SSS Prior 1 Feb-10 2/4/10 2/4/10 2/8/10 4/30/10

70 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6 3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10 2/8/10 4/30/10

Subtotal B.3:

TOTAL Component B:

Component C: Project Management

Subcomponent C.1: Project Management Network

Subtotal B.2:

Subcomponent B.3: PHC Development Outside of Podgorica

Page 151: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

71 C1.3 Coordinator (12 months) (Majda Škrijelj) CS 21,319.2 25,685.8 25,685.8 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 6/28/11

72 C1.4 Deputy Coordinator (12 months) (Boba Vukoslavović) CS 17,766.0 21,404.8 21,404.8 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 5/1/11

73 C1.5Administrative Assistant (12 months) (Jelena Antonijević)

CS9,948.9 11,986.7 11,986.7

IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10 06-16-10 7/1/11

C.2 PMN Trainings / Study tours TR 10,090.0 SoE/CQ Post Multi

74PMN Training (Sarajevo, Procurement Seminar, May 31-

Jun 4, 2010) (Boba Vukoslavovic) 644.9 777.0 777.0SoE Post Multi May-10 05-27-10 05-27-10 May-10

75PMN Training (Zagreb, Procurement Seminar, Oct 18-

22, 2010) (Majda Skrijelj) 1,205.1 1,410.0 1,410.0SoE Post Multi Oct-10 Oct-10 Oct-10

76 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 55,000.0 64,350.0 27,000.0SoE Post

77 C.4 Independent Financial Audit CS 20,000.0 23,400.0 LCS Prior 1 Nov-10 Nov-10Nov/Dec-

10Dec-10 Jan-11 Jan-11 Jan-11 Jan-11 Feb-11 Jun-14

78 C.5 Annual survey CS 80,000.0 93,600.0 CQ Prior 1 Nov-10 Nov-10Nov/Dec-

10Dec-10 Jan-11 Jan-11 Jan-11 Jan-11 Feb-11 Dec-12

79 C.6 Local TA for Monitoring and Evaluation CS 20,000.0 23,400.0 IC / CQ Prior 1

80 C.7 Office Furniture/Equipment G

81 C 7.1 PMN Office Furniture G 1,111.1 1,300.0 S Prior 1 Jul-10 06-26-10 06-28-10 Aug-10 10/12/2010 11/01/2010

237,417.9 279,871.7 100,821.7

82 Unallocated, savings from the positions: IC Post Multi

83 A-101.2 Loc TA health institutions network & norms and standards 155,960.0 182,473.2

84 A-103.1 Int TA STC payment model design and implementation 56,000.0 65,520.0

85 B-101 Int TA Operational Review of the PHC 36,050.3 42,178.9

211,960.0 247,993.2

237,417.91 279,871.72 100,821.72

5,033,572.81 7,321,372.95 3,048,698.07

5,033,572.81 7,321,372.95 3,048,698.07

(*)A2.0 Single procurement activity

* IPH responsibility

* HIF responsilibility

* MoH responsibility

Sub-total

GRAND TOTAL Additional financing:

Subtotal C.1:

Subtotal C.2:

TOTAL Component C:

Page 152: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Loan Number: 7819-ME

Act

ivit

y S

tatu

s

ToR in

progress

ToR in

progressToR in

progress

ToR in

progressToR in

progress

ToR in

progress

ToR in

progress

ToR in

progressToR in

progress

ToR in

progress

ToR in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT - Procurement Plan (Situation as of November 12, 2010)

Page 153: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

ToR

developed

ToR in

progress

ToR in

progress

ToR in

progress

BER in

progress

Page 154: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

ToR in

progress

Contract

signedContract

signed

Contract

completed

Contract

completed

Contract

completed

Page 155: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Contract

signedContract

signedContract

signed

Activity

completed

Activity

completed

Contract

signing in

Page 156: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Project ID: P082223, sub-code P114275

No

Item Description

Ty

pe

Est

imat

. C

ost

/All

oca

ted

am

ou

nt

LO

AN

(EU

R)

Est

imat

. C

ost

/All

oca

ted

am

ou

nt

Wit

h G

ov

ern

men

t C

on

trib

uti

on

(EU

R)

1 A.1.0Secondary and Tertiary Care Reform Strategy

ImplementationCS

2 A-101 TA health institutions network & norms and standards*

3 A-101.1 Int TA health institutions network & norms and standards

CS87,000.0 104,817.6

4 A-101.2 Loc TA health institutions network & norms and standards

CS328,560.00 395,849.1

5 A-101.3 Analytical study on HR in Health System in MN CS 100,000.00 120,480.0

6 A-101.4 Training / study tour TR 50,000.00 60,240.0

7 A-102 TA basic benefit package*

8 A-102.1 Int TA basic benefit package CS 33,400.0 40,240.3

9 A-102.2 Loc TA basic benefit package

CS74,000.0 89,155.2

10 A-102.3 Training / study tour TR 15,000.0 18,072.0

11 A-103 STC payment model design and implementation*

12 A-103.1 Int TA STC payment model design and implementation

CS176,000.0 212,044.8

13 A-103.2 Loc TA STC payment model design and implementation

CS90,000.0 108,432.0

14 A-104 Private public integration*

15 A-104.1 Int TA Private public integration

CS60,000.0

72,288.0

16 A-104.2 Loc TA Private public integration CS 40,000.0 48,192.0

17 A-104.3 Training on private public integration TR 60,410.0 72,288.0

18 A-105 TA Clinical guidelines development and revision*

19 A-105.1 Int TA Clinical guidelines development and revision

CS30,000.0 36,144.0

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT - Procurement Plan (Situation as of September 15, 2010)

Component A: Health Policy Reform

Subcomponent A.1: Health Policy Development and Capacity Development

Page 157: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

20 A-105.2 Loc TA Clinical guidelines development and revision

CS90,000.0 108,432.0

21 A-106 TA PR campaign design and implementation*

22 A-106.1 Loc TA - PR campaign design and production CS 75,000.0 90,360.0

24 A-107 MoH capacity development*

25 A-107.1 Int/Reg TA- Senior Advisor to the Minister CS 60,000.0 72,288.0

26 A-107.2 Loc TA- Junior Advisor to the Minister CS 20,000.0 24,096.0

27 A-107.3 NHA TR 20,000.0 24,096.0

28 A-1.1 Institutional Development of the Drugs Agency

29 A-111 TA Policy and capacity development

30 A-111.1 Int TA for policy development CS 60,000.0 72,288.0

31 A-111.2 Int TA for capacity development CS 40,000.0 48,192.0

A-111.3In-country Training

TR0.0

32 A-112 Information system

33 A-112.1Software development

G150,000.0 180,720.0

34 A.1.2Development & Implementation of Quality Assurance

System*

35 A-121 Int TA for QA model design & implementation CS 40,000.0 48,192.0

36 A-122 Loc TA for QA model design & implementation CS 60,000.0 72,288.0

1,759,370.0 2,119,195.0

36 A.2.0 Hospital Information System / Hardware (*) G 720,000.0 867,456.0

37 A-201 Work stations G 272,000.0 327,705.6

38 A-202 Printers G 42,000.0 50,601.6

39 A-203 Servers G 50,000.0 60,240.0

40 A-204 Lan network G 344,000.0 414,451.2

41 A-205 Communication equipment G 12,000.0 14,457.6

42 A.2.1

720,000.0 867,456.0

2,479,370.0 2,986,651.0

43 B.1.0 Operational Review of the PHC

44 B-101 Int TA Operational Review of the PHC

CS 50,000.060,240.0

50,000.0 60,240.0

Subcomponent B.1: Primary Health Care Policy Standards

Subtotal B.1:

Subcomponent B.2: Primary Health Care Specialization and Continuous Professional

Development

Subcomponent A.2: Health Information System*

Subtotal A.2:

TOTAL Component A:

Component B: Primary Health Care Development

Subtotal A.1:

Page 158: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

45 B.2.0 PHC Specialization Program Development &

Implementation

46 B-201 Int TA PHC Specialization Program Development &

ImplementationCS 60,000.0 72,288.0

60,000.0 72,288.0

47 B.3.0TA for PHC Specialist Medicine Training Program

(Medicine and Nursing, 4 rounds, 8-11)TR-CS

700,000.0 843,360.0

48 B-301Training Program (Education) Coordinator (rounds8&9)

(Mara Drecun)CS

9,238.4 11,130.6

49 B-302Training Implementation Specialist (rounds 8&9) (Igor

Švab)CS

4,810.7 5,796.0

50 B-303 Educator (loc) Doctors/Nurses (2 Courses) TR-CS 0.0

51 B-303.1Educator (loc) Doctors()/Nurses(), (rounds 8&9)

TR-CS0.0

52 B-303.2Educator (loc) Nurses(6) (NEW) (round 9) (Perović

Stela, Kažanegra Sunita, Dedić Roza, Ašanin Predrag,

Jovanović Danijela, Dašić Radmila)

TR-CS

1,910.0 2,301.2

53 B-304Theoretical Lecturer (loc) Doctors/Nurses (2 Courses)

TR-CS0.0

54 B-304.1T. Lecturer (loc) Doctors()/Nurses(), (rounds 8&9)

TR-CS0.0

55 B-304.2

T. Lecturer (loc) Doctors(8), (NEW) (rounds 8 &9)

(Vujičić Vesko, Dragica Terzić, Rajka Pajović,

Vladimir Dobričanin, Ognjen Jovićević, Nada

Janković, Edita Bašović) (round 9) (Miroslav

Stanišljević)

TR-CS

4,077.4 4,912.6

56 B-305

8th round operating expenses - appointed participants'

travel costs and per diems refund (to PH centers)

&accommodation, Logistical Assisstant, Rent, printing

certificates, office equipment, etc.

0

57 B-3.1 Equipment - Diagnostic equipment

58 B-311 Int TA revision of tech specification CS 25,000.0 30,120.0

59 B-312 Diagnostic equipment G 500,000.0 602,400.0

60 B-3.2 Civil Works

61 B-321 PHC facility DZ Bijelo Polje renovation W 1,000,000.0 2,600,000.0

62 B-322Supervision of Works on renovation of PHC facility DZ

Bijelo Polje CS

50,000.0 60,240.0

63 B-323

Serbian Project Procurement Officer, TA for preparing

Bijelo Polje bidding document (3 months) (Aleksandar

Milojković)

CS

3,636.7 4,381.5

2,278,636.7 4,140,501.5

2,388,636.7 4,273,029.5

Subcomponent B.3: PHC Development Outside of Podgorica

Subtotal B.3:

TOTAL Component B:

Subtotal B.2:

Page 159: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

64 C.1 PMN Personnel CS 56,910.0

65 C1.1Coordinator, short-term (4months)( Pavle Aligrudić)

CS7,106.4 8,561.9

66 C1.2Administrative Assistant, short-term (4 months) ( Boba

Vukoslavović)CS

3,316.3 3,995.6

67 C1.3 Coordinator (12 months) (Majda Škrijelj) CS 21,319.2 25,685.8

68 C1.4Deputy Coordinator (12 months) (Boba Vukoslavović)

CS17,766.0 21,404.8

69 C1.5Administrative Assistant (12 months) (Jelena

Antonijević)CS

9,948.9 11,986.7

70 C.2 PMN Trainings / Study tours TR 10,090.0

PMN Training (Sarajevo, Procurement Seminar, May

31-Jun 4, 2010) 644.9 777.0

71 C.3PMN Operating expenses (office rent, utilities, supplies,

translation/interpretation, local travel, etc.) 55,000.0 66,264.0

72 C.4 Independent Financial Audit CS 20,000.0 24,096.0

73 C.5 Annual survey CS 40,000.0 48,192.0

74 C.6 Monitoring and Evaluation CS 40,000.0 48,192.0

75 C.7 Office Furniture/Equipment G

76 C 7.1 PMN Office Furniture G 1,079.0 1,300.0

216,180.7 260,455.7

3.2.1 TSU personnel CS 0.0

3.2.2 TSU operating expenses 0.0

0.0

216,180.67 260,455.72

5,084,187.34 7,520,136.26

5,084,187.34 7,520,136.26

(*)A2.0 Single procurement activity

* IPH responsibility

* HIF responsilibility

* MoH responsibility

TOTAL Component C:

Sub-total

GRAND TOTAL Additional financing:

Subcomponent C.1: Project Management Network

Subtotal C.1:

Subcomponent C.2: TSU (30%)

Subtotal C.2:

Component C: Project Management

Page 160: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Co

ntr

acte

d A

mo

un

t (E

UR

)

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

TS

U/P

MN

Fin

aliz

e S

ho

rtli

st,

TS

, T

OR

,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o Q

uo

te

TS

U S

ub

mit

to

ID

A f

or

NO

: S

ho

rtli

st,

TS

,

TO

R,

RF

, B

idd

ing

Do

c/In

vit

atio

n t

o

Qu

ote

Ap

pro

ved

Sh

ort

list

, T

S,

TO

R,

RF

,

Bid

din

g D

oc/

Inv

itat

ion

to

Qu

ote

SP

N

Inv

itat

ion

of

Bid

s/T

end

er

Inv

itat

ion

Bid

op

enin

g-T

ech

nic

al/F

inan

cial

Req

ues

t an

d N

O f

or

Tec

hn

ical

Ev

alu

atio

n/Q

ual

ific

atio

n

IC Prior 1 Sep-10 Oct-10 Oct-10 Oct-10 - -

IC Prior 1 Sep-10 Oct-10 Oct-10 Oct-10 - -

QCBS Prior 1 Sep-10 Oct-10 Oct-10 Oct-10 - -

IC Prior 1 Sep-10 Oct-10 Oct-10 Oct-10 - -

IC Prior 1 Sep-10 Oct-10 Oct-10 Oct-10 - -

IC Prior 1 Oct-10 Nov-10 Nov-10Nov/Dec-

10- - Dec-10

IC Post Multi Oct-10 Nov-10 Nov-10Nov/Dec-

10- - Dec-10

IC Prior 1 Sep-10 Oct-10 Oct-10 Nov-10 - - Dec-10

IC Post Multi Sep-10 Oct-10 Oct-10 Nov-10 - - Dec-10

IC/CQ Post Multi

IC Post 1 Sep-10 Oct-10 Oct-10 Nov-10 - - Dec-10

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT - Procurement Plan (Situation as of September 15, 2010)

Page 161: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

IC Post Multi Sep-10 Oct-10 Oct-10 Nov-10 - - Dec-10

IC/CQ Post 1 Feb-11 Feb-11 Mar-11 Mar-11 Mar-11 Apr-11 May-11

IC Post 1 Mar-11 Apr-11 Apr-11 May-11 - -

IC Post 1 Mar-11 Apr-11 Apr-11 May-11 - -

Mar-11

IC Post 1 Mar-10 Mar-10 Apr-10

IC Post 1 Jun-10 Jun-10 Jul-10

IC/CQ Post Multi Sep-10 Sep-10 Sep-10 Oct-10 Oct-10 Oct-10

1ST ICB Prior 1 Sep-10 Oct-10 Oct-10 Nov-10 Nov-10 Jan-11

IC Post 1 Jan-11 Feb-11 Feb-11 Mar-11 Apr-11

IC Post Multi Jan-11 Feb-11 Feb-11 Mar-11 Apr-11

0.0

1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11

1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11

1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11

1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11

1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11

1ST ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11

0.0

0.0

IC Post 1 Jun/Jul-10 06-28-2010 8/10/1008-17-

20107/9/10 Sep-10

0.0

Page 162: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

IC Post 1 Sep-10 Sep/Oct-10 Oct-10 Oct-10Oct/Nov-

10Nov-10

0.0

24,140.3IC/CQ Prior MultiOngoing through the life of the Project

11,130.6SSS Prior 1 Mar-10 4/1/10 4/24/10

5,796.0SSS Prior 1 Mar-10 4/1/10 4/23/10

SSS Prior Multi Mar-10 4/1/10

2,301.2

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/1005-15-

2010-

SSS Prior Multi Mar-10 4/1/10

4,912.6

IC Post Multi Mar-10 4/1/10 4/23/10 4/24/1005-15-

2010-

SoE Post Mar-10 Mar-10

IC Prior 1 Oct-10 Nov-10 Dec-10

ICB Prior 1 Mar-11 Mar-11 Mar-11 Apr-11 Apr-11 Jun-11 Jul-11

ICB Prior 1 May-10 5/5/10 5/10/10 5/12/10 5/12/10 06-28-10

CQ Prior 1 May-10 05-18-10 5/21/10 5/25/10 5/25/10 07-30-10 8/4/10

4,381.5

CQ Prior 1 Apr-10 04-14-10 04-15-10 -

28,521.8

28,521.8

Page 163: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

8,561.9SSS Prior 1 Feb-10 2/4/10 2/4/10

3,995.6SSS Prior 1 Feb-10 2/4/10 2/4/10

25,685.8 IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10

21,404.8IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10

11,986.7IC Prior 1 Feb-10 3/9/10 3/11/10 3/16/10

SoE/CQ Post Multi

777.0SoE Post Multi May-10 05-27-10 05-27-10

27,000.0SoE Post

LCS Prior 1 Oct-10 Oct-10 Oct-10 Nov-10 Nov-10 Nov-10

IC / CQ Prior 1 Feb-11 Mar-11 Mar-11 Apr-11 Apr-11 Apr-11

IC / CQ Prior 1 Feb-11 Mar-11 Mar-11 Apr-11 Apr-11 Apr-11

S Prior 1 Jul-10 06-26-10 06-28-10 #########

99,411.7

IC Post Multi

99,411.72

127,933.54

127,933.54

Page 164: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Loan Number: 7819-MER

equ

est

and

NO

fo

r fi

nal

eval

uat

ion

Co

ntr

act

awar

d/S

ign

ing

Co

ntr

act

com

ple

tio

n

Act

ivit

y S

tatu

s

Nov-10 May-12ToR in

progress

Nov-10 May-12ToR in

progress

Nov-10 May-12ToR in

progress

Nov-10 May-12ToR in

progress

Nov-10 May-12ToR in

progress

Dec-10 Jan-11 Jul-12ToR in

progress

Dec-10 Jan-11 Jul-12ToR in

progress

Dec-10 Jan-11 Dec-11ToR in

progress

Dec-10 Jan-11 Dec-11ToR in

progress

Dec-10 Jan-11 Dec-11ToR in

progress

ADDITIONAL FINANCING FOR MONTENEGRO HEALTH SYSTEM IMPROVEMENT PROJECT - Procurement Plan (Situation as of September 15, 2010)

Page 165: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Dec-10 Jan-11 Dec-11ToR in

progress

May-11 Jun-11 Dec-12

Apr-10 Dec-11

Apr-10 Dec-11

Apr-10 Sep-11

Jul-10 Sep-11

Oct-10 - Apr-11ToR in

progress

Feb-11 Mar-11 Mar-12ToR in

progress

May-11 Aug-11

May-11 Aug-11

Aug-11 Sep-11 Dec-11

Aug-11 Sep-11 Dec-11

Aug-11 Sep-11 Dec-11

Aug-11 Sep-11 Dec-11

Aug-11 Sep-11 Dec-11

Aug-11 Sep-11 Dec-11

Sep-10 Sep-10 Dec-10BER in

progress

Page 166: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Nov-10 Nov-10 Jul-12ToR in

progress

Dec-12

Apr-10 12/31/10

Apr-10 12/31/10

Apr-10 Dec-10

- May-10 12/31/10

Apr-10 Dec-10

- May-10 12/31/10

Apr-10 Dec-10

Dec-10 Jan-11

Aug-11 Sep-11 Dec-11

04-15-10 Apr-10 06-30-10

Page 167: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

2/8/10 4/30/10

2/8/10 4/30/10

06-16-10 6/28/11

06-16-10 5/1/11

06-16-10 7/1/11

Dec-10 Dec-1- Dec-12

May-10 May-10 Dec-12

May-10 May-10 Dec-12

Page 168: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

Item Activity Titles / Description

Total

in

EUR

'000

Define

Unit

Rate /

Unit in

EUR

'000

QtyNo. of

Units

Amount

in

EUR

'000

No. of

Units

Amount

in

EUR

'000

No. of

Units

Amount

in

EUR

'000

No. of

Units

Amount

in

EUR

'000

No. of

Units

Amount

in

EUR

'000

No. of

Units

Amount

in

EUR

'000

No. of

Units

Amount

in

EUR

'000

No. of

Units

Amount

in

EUR

'000

No. of

Units

Amount

in

EUR

'000

1 Component 1. Health Policy Reform 2,474.45

1.1

Subcomponent 1.1 Health Policy

Development and Capacity Development 1,754.57

1.1.1

Secondary and Tertiary Care Reform

Strategy Implementation

1.1.1.1

TA health institutions network & norms and

standards 565.56 46.55 71.51 76.51 71.51 76.51 76.51 46.55

1.1.1.1.1 Int TA 87.00 person 0.40 1 18 8.70 28 13.92 28 13.92 28 13.92 28 13.92 28 13.92 18 8.70

1.1.1.1.2 Loc TA 328.56 person 0.20 5 164 32.85 263 52.59 263 52.59 263 52.59 263 52.59 263 52.59 164 32.85

1.1.1.1.3 Analytical Study on HR in Health System of Mn 100.00 firm

1.1.1.1.4 Training / study tour 50.00 event 20 2 5.00 2 5.00 4 10.00 2 5.00 4 10.00 4 10.00 2 5.00

1.1.1.2 TA basic benefit package 122.40 10.74 24.63 24.63 13.51 22.13 13.51 13.24

1.1.1.2.1 Int TA 33.40 person 0.40 1 6 3.34 16 7.79 16 7.79 3 1.67 16 7.79 3 1.67 6 3.34

1.1.1.2.2 Loc TA 74.00 person 0.20 2 37 7.40 60 11.84 60 11.84 60 11.84 60 11.84 60 11.84 37 7.40

1.1.1.2.3 Training / study tour 15.00 event 3 1 5.00 1 5.00 1 2.50 1 2.50

1.1.1.3

STC payment model design and

implementation 266.00 26.60 46.16 46.16 11.54 46.16 34.62 26.60

1.1.1.3.1 Int TA 176.00 person 0.40 2 44 17.60 88 28.16 88 28.16 22 7.04 88 28.16 66 21.12 44 17.60

1.1.1.3.2 Loc TA 90.00 person 0.20 6 45 9.00 90 18.00 90 18.00 23 4.50 90 18.00 68 13.50 45 9.00

1.1.1.4 Private public integration 160.41 22.50 35.00 37.50 10.00

1.1.1.4.1 Int TA 60.00 person 0.40 1 24 12.00 42 21.00 42 21.00 12 6.00

1.1.1.4.2 Loc TA 40.00 person 0.20 2 40 8.00 70 14.00 70 14.00 20 4.00

1.1.1.4.3 Training, Workshops, Roundtables 60.41 multi 1 2.50 1 2.50

1.1.1.5

TA Clinical guidelines development and

revision 120.00 12.00 24.00 24.00 24.00 24.00 12.00

1.1.1.5.1 Int TA 30.00 person 0.40 1 6 3.00 12 6.00 12 6.00 12 6.00 12 6.00 6 3.00

1.1.1.5.2 Loc TA 90.00 person 0.20 5 45 9.00 90 18.00 90 18.00 90 18.00 90 18.00 45 9.00

1.1.1.6TA PR campaign design and implementation

70.00 28.00 21.00 7.00 7.00

1.1.1.6.1 Loc TA - PR campaign design 35.00 person 0.20 1 18 3.50 18 3.50 34 7.00 35 7.00 35 7.00 35 7.00

1.1.1.6.2 PR campaign production 35.00 firm 2 1 21.00 14.00

1.1.1.7 MOH capacity development 100.00 7.28 13.88 13.88 13.88 13.88 13.88 13.28

1.1.1.7.1Int/reg TA Senior Advisor to the Minister

60.00 person 0.40 1 6 3.00 19 9.60 19 9.60 19 9.60 19 9.60 19 9.60 19 9.00

1.1.1.7.2 Loc TA Junior Advisor to the Minister 20.000 person 0.07 1 61 4.28 61 4.28 61 4.28 61 4.28 61 4.28 61 4.28 61 4.28

1.1.1.7.3 NHA 20.0 event

1.1.2

Institutional Development of the Drugs

Agency 250.20

1.1.2.1 TA Policy and capacity development 100.20

1.1.2.1.1 Int TA for policy development 60.00 person 0.40 1 12 6.00 24 12.00 24 12.00 24 12.00 24 12.00 12 6.00

1.1.2.1.2 Int TA for capacity development 40.00 person 0.40 1 12 8.00 12 8.00 12 8.00 12 8.00 12 8.00

1.1.2.2 1.1.2.2 Information system 150.00

1.1.2.2.1 Software development 150.00 PCs 1 125.00

1.1.3

Development & Implementation of Quality

Assurance System 100.00 10.00 20.00 20.00 20.00 20.00 10.00

1.1.3.1

Int TA for QA model design &

implementation 40.00 person 0.40 1 8 4.00 16 8.00 16 8.00 16 8.00 16 8.00 8 4.00

1.1.3.2

Loc TA for QA model

design&implementation 60.00 person 0.20 2 30 6.00 60 12.00 60 12.00 60 12.00 60 12.00 30 6.00

Jul - Aug - Sept Oct -Nov - Dec

Q3 Q4 Q1

20122011

Q1 Q2

Jan - Feb - March April - May - June Jul - Aug - Sept Oct -Nov - Dec

Q1

2010

Q2 Q3 Q4

Jan - Feb - MarchJan - Feb - March April - May - June

Page 168 of 175

Page 169: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

1.2 Subcomponent 1.2 Health Information Systems

1.2.1

Hospital Information Systems&Hardware

procurement 719.88

1.2.1.1 Work stations 271.96 PCs multi 523 271.96

1.2.1.2 Printers 41.92 PCs multi 262 41.92

1.2.1.3 Servers 50.00 PCs multi 25 50.00

1.2.1.4 Lan network 344.00 PCs multi 344.00

1.2.1.5 Communication equipment 12.00 PCs multi 25 12.00

2 Component 2. Primary Health Care Development2,385.0

2.1

Subcomponent 2.1 Primary Health Care

Policy Standards 50.0

2.1.1 Operational Review of the PHC 5.00 5.00 17.50 10.00 7.50 5.00

2.1.1.1 Int TA 50.0 person 0.40 1 9 5.00 9 5.00 32 17.50 18 10.00 13 7.50 9 5.00

Subcomponent 2.2 Primary Health Care

Specialization and Continuous

Professional Development 60.0

2.2.1

PHC Specialization Program Development

& Implementation 12 6.00 24 12.00 24 12.00 12 6.00 36 18.00 12 6.00

2.2.1.1 Int TA 60.0 person 0.40 1 12 6.00 24 12.00 24 12.00 12 6.00 36 18.00 12 6.00

2.3 Subcomponent 2.3 PHC Development Outside of Podgorica2,275.0

2.3.1 2.3.1 Training 700.0 person 3.00 280 87.00 190.40 60 190.40 60 190.40 60 190.4

2.3.2 2.3.2 Equipment 525.0

2.3.2.1 2.3.2.1 TA revision of tech specification 25.0 25.00

2.3.2.2 2.3.2.2 Diagnostic equipment 500.0 500.00

2.3.3 2.3.3 Civil Works 1,050.0

2.3.1.1 2.3.3.1 DZ Bijelo Polje rehabilitation 1,000.0 m2 500 200 350.00 350.00 300.00

2.3.1.2 2.3.1.2 Supervision of Works - BP 50 firm

3 Component 3. Project Management 284.4

3.1

Subcomponent 3.1. Project Management

Network 221.9 9.68 12.18 12.18 9.68 9.68 12.18 12.18 9.68

3.1.1 PMN Personel 56.9 person 2 6.32 6.32 6.32 6.32 6.32 6.32 6.32 6.32 6.32

3.1.2 PMN Trainings & trips 10.0 event 2.50 4 1.00 2.50 1.00 2.50 1.00 2.50 1 2.50

3.1.3 PMN Operational expenditures 55.0 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36

3.1..4 Project Financial Audit 20.0 firm 10.0 10.0

3.1.5 Annual Survey 40.0 firm 2

3.1.6 Monitoring and Evaluation 40.0 firm443.8

3.2 Subcomponent 3.2 TSU 62.5 1.16 1.16 1.16 1.16 1.16 1.16

3.2.1 3.2.1 TSU personel 60.0 person 3 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88

3.2.2 3.2.3 TSU operational expenditures 2.5 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28

Unallocated

Sub-total 5,143.840

Grand Total 5,143.84

Page 169 of 175

Page 170: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

#P082223, subordinate #P114275 Montenegro Health System Improvement Project - Additional financing

02_03 PP

No

Item Description

Type

Est

imat

. co

st i

n '0

00

EU

R.

Pro

c. M

eth

od

Pri

or

/ P

ost

rev

iew

No

of

pac

kag

es

Do

c. P

rep

arat

.

Inv

itat

ion

of

Bid

Bid

op

enin

g

Contr

act

awar

d

Contr

act

com

ple

tion

1 1.1.1 Secondary and Tertiary Care Reform Strategy Implementation

CS

2 1.1.1.1 TA health institutions network & norms and standards

31.1.1.1.

1 Int TA health institutions network & norms and standards CS 87.00 IC Prior Single Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

41.1.1.1.

2 Loc TA health institutions network & norms and standards CS 328.56 IC Post Single Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

51.1.1.1.

3Analytical study on HR in Health System in MN CS 100.00 QCBS Prior Single

61.1.1.1.

4 Training / study tour TR 50.00 IC/CQ Post Multi Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

7 1.1.1.2 TA basic benefit package

81.1.1.2.

1 Int TA basic benefit package CS 33.40 IC Prior Single Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

91.1.1.2.

2 Loc TA basic benefit package CS 74.00 IC Post Single Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

101.1.1.2.

3 Training / study tour TR 15.00 IC/CQ Post Multi May-10 May-10 Jun-10 Jul-10 Jun-11

11 1.1.1.3 STC payment model design and implementation

121.1.1.3.

1 Int TA STC payment model design and implementation CS 176.00 IC Prior Single Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

131.1.1.3.

2 Loc TA STC payment model design and implementation CS 90.00 IC Post Multi Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

14 1.1.1.4 Private public integration

151.1.1.4.

1 Int TA Private public integration CS 60.00 IC Prior Single Sep-10 Sep-10 Oct-10 Oct-10 Sep-11

161.1.1.4.

2 Loc TA Private public integration CS 40.00 IC Post Multi Sep-10 Sep-10 Oct-10 Oct-10 Sep-11

171.1.1.4.

3 Training on private public integration TR 60.41 IC/CQ Post Multi Sep-10 Sep-10 Oct-10 Oct-10 Sep-11

18 1.1.1.5 TA Clinical guidelines development and revision

191.1.1.5.

1 Int TA Clinical guidelines development and revision CS 30.00 IC Post Single Mar-10 Mar-10 Apr-10 Apr-10 Sep-11

201.1.1.5.

2 Loc TA Clinical guidelines development and revision CS 90.00 IC Post Multi Mar-10 Mar-10 Apr-10 Apr-10 Sep-11

Component 1. Health Policy Reform

Subcomponent 1.1 Health Policy Development and Capacity Development

170 of 175

Page 171: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

#P082223, subordinate #P114275 Montenegro Health System Improvement Project - Additional financing

21 1.1.1.6 TA PR campaign design and implementation

221.1.1.6.

1 Loc TA - PR campaign design CS 35.00 IC Post Single Jun-10 Jun-10 Jul-10 Jul-10 Dec-11

231.1.1.6.

2 PR campaign production CS 35.00 CQ Post Single Dec-10 Dec-10 Jan-11 Jan-11 Jun-11

24 1.1.1.7 MoH capacity development

251.1.1.7.

1 Int/Reg TA- Senior Advisor to the Minister CS 60.00 IC Post Single Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

261.1.1.7.

2 Loc TA- Junior Advisor to the Minister CS 20.00 IC Post Single Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

271.1.1.7.

3NHA TR 20.00 IC Post Single

28 1.1.2 Institutional Development of the Drugs Agency

29 1.1.2.1 TA Policy and capacity development

301.1.2.1.

1 Int TA for policy development CS 60.00 IC Post Single Mar-10 Mar-10 Apr-10 Apr-10 Sep-11

311.1.2.1.

2 Int TA for capacity development CS 40.00 IC Post Single Jun-10 Jun-10 Jul-10 Jul-10 Sep-11

32 1.1.2.2 Information system

331.1.2.2.

1 Software development G 150.00 1ST ICB Prior Single Sep-10 Nov-10 Jan-10 Jan-11 Jun-11

34 1.1.3 Development & Implementation of Quality Assurance System

35 1.1.3.1 Int TA for QA model design & implementation CS 40.00 IC Post Single Aug-10 Aug-10 Oct-10 Oct-10 Dec-11

36 1.1.3.2 Loc TA for QA model design & implementation CS 60.00 IC Post Multi Aug-10 Aug-10 Sep-10 Sep-10 Dec-11

1,754.37

36 1.2.1 Hospital Information Systems / Hardware * G 720.00 1ST ICB Prior Single Jan-11 Feb-11 Apr-11 Apr-11 Jun-11

37 1.2.1.1 Work stations G 271.96 1ST ICB Prior Single Jan-11 Feb-11 Apr-11 Apr-11 Jun-11

38 1.2.1.2 Printers G 41.92 1ST ICB Prior Single Jan-11 Feb-11 Apr-11 Apr-11 Jun-11

39 1.2.1.3 Servers G 50.00 1ST ICB Prior Single Jan-11 Feb-11 Apr-11 Apr-11 Jun-11

40 1.2.1.4 Lan network G 344.00 1ST ICB Prior Single Jan-11 Feb-11 Apr-11 Apr-11 Jun-11

41 1.2.1.5 Communication equipment G 12.00 1ST ICB Prior Single Jan-11 Feb-11 Apr-11 Apr-11 Jun-11

720

2,474.37

42 2.1.1 Operational Review of the PHC

Subtotal 1.1:

TOTAL Component 1:

Subcomponent 2.1 Primary Health Care Policy Standards

Subcomponent 1.2 Health Information Systems

Subtotal 1.2:

Component 2. Primary Health Care Development

171 of 175

Page 172: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

#P082223, subordinate #P114275 Montenegro Health System Improvement Project - Additional financing

43 2.1.1.1 Int TA Operational Review of the PHC CS 50 IC Post Single Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

50

44 2.2.1 PHC Specialization Program Development & Implementation

45 2.2.1.1 Int TA PHC Specialization Program Development & Implementation CS 60 IC Post Single Mar-10 Mar-10 Apr-10 Apr-10 Sep-11

60

46 2.3.1 Training TR 700.0 IC/CQ Multi Mar-10 Mar-10 Apr-10 Apr-10 Dec-11

47 2.3.2 Equipment - Diagnostic equipment

48 2.3.2.1 Int TA revision of tech specification CS 25.0 IC Prior Single Oct-10 Nov-10 Dec-10 Dec-10 Jan-11

49 2.3.2.2 Diagnostic equipment G 500.0 ICB Prior Single Jan-11 Feb-11 Apr-11 Apr-11 Jun-11

50 2.3.3 Civil Works

51 2.3.3.1Health facility DZ Bijelo Polje renovation

W1,000.0

ICB Prior Single Jan-10 Feb-10 Apr-10 Apr-10 Dec-10

51 2.3.3.2 Supervision of Works on renovation of Health facility DZ Bijelo Polje CS50.0

CQ Prior Single Jan-10 Feb-10 Apr-10 Apr-10 Dec-10

2,275.00

2,385.00

52 3.1.1 PMN Personel CS 56.9 IC Post Multi Feb-10 Feb-10 Feb-10 Feb-10 Mar-12

53 3.1.2 PMN Trainings / Study tour TR 10.0 IC/CQ Post Multi Apr-10 Apr-10 May-10 Jun-10 Sep-11

54 3.1.3 PMN Operational expenditures 55.0

55 3.1.4Independent Financial Audit

CS20.0

LCS Prior Single

56 3.1.5Annual survey

CS40.0

IC / CQ Prior Single

57 3.1.6Monitoring and Evaluation

CS40.0

IC / CQ Prior Single

Subtotal 2.3:

Subtotal 2.1:

Subcomponent 2.2 Primary Health Care Specialization and Continuous Professional Development

Subcomponent 3.1. Project Management Network

Subtotal 2.2:

TOTAL Component 2:

Component 3. Project Management

Subcomponent 2.3 PHC Development Outside of Podgorica

172 of 175

Page 173: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

#P082223, subordinate #P114275 Montenegro Health System Improvement Project - Additional financing

222

58 3.2.1 3.2.1 TSU personel CS 60 IC Post Multi Feb-10 Feb-10 Feb-10 Feb-10 Mar-12

59 3.2.2 3.2.2 TSU operational expenditures 2.5

62.5

284.41

5,143.78

5,143.78

(*) Single procurement activity

Goods 1,370.00 26.63%

Works 1,000.00 19.44%

Consultant Services 1,743.96 33.90%

Training/Workshops/Study Tours

THIS CATEGORY CONSISTS OF TWO TYPES OF EXPENSE:845.41 16.43%

Implementing 4 training courses for primary level chosen doctor (CD) teams. Thus, the

remaining required 120 CD teams outside Podgorica (1 team=1 doctor+1 nurse) would be

trained for purposes of finalizing the PHC CD concept implementation on the national level .

So far, ( within the existing credit ) 6 courses have been conducted and 135 teams trained

(85 from PG and 50 outside PG) and additional 28 nurses , whereas conducting the 7th

course is planned in the period Sep 24-Dec 18,2009 ( by the conclusion of the current

project ).

Note: for purposes of conducting one course 109 local educators and theoretical lectirers

need to be hired (58 doctors and 51 nurse) for different teaching sections of the curriculum.

Study tours, workshops and seminars under the activities 1) network of health institutions ,

2) developing norms and standards for II and III level , 3) basic benefits package for II and

III level, 4) private public integration and 5) national health account.

PMN/TSU 184.41 3.58%

TOTAL 5,143.78 99.98%

ALL ACTIVITIES WITH THE VALUE EXCEEDING THE AMOUNT OF

For Goods and Works 75.00 € are subject to WB prior review/clearance

For Consultant Service/Firm 40.00 € are subject to WB prior review/clearance

For Consultant Services/Individual Consultants 20.00 € are subject to WB prior review/clearance

700.00

145.41

GRAND TOTAL Additional financing:

Subcomponent 3.2 TSU (30%)

Subtotal 3.2:

TOTAL Component 3:

Sub-total

Subtotal 3.1:

173 of 175

Page 174: documents.worldbank.orgdocuments.worldbank.org/curated/en/683631468273917712/pdf/729… · Project ID: P082223, sub-code P114275 Loan Number: 7819-ME WITH INITIAL COST ESTIMATES No

#P082223, subordinate #P114275 Montenegro Health System Improvement Project - Additional financing

Also, all Terms of Reference and budgets for all study tours, workshops and

seminars

All Tors and

budgetsare subject to WB prior review/clearance