Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Type of solar power plant
PVI d.o.o. Sunčana elektrana PVI SUNCE 24 15,00 Official Gazette No 133/13
15,00 No. of power plants: 1
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
20.649,00 No. of power plants: 9
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
2.000,00 No. of power plants: 2
No. of power plants:
23.468,00
14
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 31/12/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Biogas power plants
Total planned capacity
Total planned capacity of all power plants (kW)
Total number of power plants
Total planned capacity
Wind power plants
Total planned capacity
Page 1 of 1
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Type of solar power plant
0,00 No. of power plants: 0
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
ENERGANA GOSPIĆ 1 d.o.o.EG1 kogeneracijsko postrojenje na drvnu biomasu 5 MW
4.960,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
25.609,00 No. of power plants: 10
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
2.000,00 No. of power plants: 2
No. of power plants:
28.413,00
14
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 30/11/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Biogas power plants
Total planned capacity
Total planned capacity of all power plants (kW)
Total number of power plants
Total planned capacity
Wind power plants
Total planned capacity
Page 1 of 1
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Type of solar power plant
0,00 No. of power plants: 0
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
ENERGANA GOSPIĆ 1 d.o.o.EG1 kogeneracijsko postrojenje na drvnu biomasu 5 MW
4.960,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
25.609,00 No. of power plants: 10
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
2.000,00 No. of power plants: 2
No. of power plants:
28.413,00
14
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 28/09/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Biogas power plants
Total planned capacity
Total planned capacity of all power plants (kW)
Total number of power plants
Total planned capacity
Wind power plants
Total planned capacity
Page 1 of 1
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Type of solar power plant
0,00 No. of power plants: 0
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
BE-TO KARLOVAC d.o.o.Elektrana na biomasu BE-TO Karlovac
5.000,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
ENERGANA GOSPIĆ 1 d.o.o.EG1 kogeneracijsko postrojenje na drvnu biomasu 5 MW
4.960,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
30.609,00 No. of power plants: 11
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
2.000,00 No. of power plants: 2
No. of power plants:
33.413,00
15
Biogas power plants
Total planned capacity
Total planned capacity of all power plants (kW)
Total number of power plants
Total planned capacity
Wind power plants
Total planned capacity
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 04/09/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Page 1 of 1
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Type of solar power plant
0,00 No. of power plants: 0
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
BE-TO KARLOVAC d.o.o.Elektrana na biomasu BE-TO Karlovac
5.000,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
ENERGANA GOSPIĆ 1 d.o.o.EG1 kogeneracijsko postrojenje na drvnu biomasu 5 MW
4.960,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
30.609,00 No. of power plants: 11
ECO-BIOGAS d.o.o.Bioplinsko postrojenje Pisarovina 1200kWel
1.200,00 Official Gazette No 133/13
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
3.200,00 No. of power plants: 3
No. of power plants:
34.613,00
16
Biogas power plants
Total planned capacity
Total planned capacity of all power plants (kW)
Total number of power plants
Total planned capacity
Wind power plants
Total planned capacity
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 13/08/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Page 1 of 1
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Type of solar power plant
0,00 No. of power plants: 0
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
BIOENERGETIKA d.o.o.Izgradnja kogeneracijskog postrojenja na bazi izgaranja biomase
1.000,00 Official Gazette No 133/13
CARPE DIEM d.o.o.Kogeneracijsko postrojenje na biomasu "Antunovac 1"
990,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
VIŠEVICA ENERGO d.o.o. VIŠEVICA ENERGO PERUŠIĆ 2.000,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
BE-TO KARLOVAC d.o.o.Elektrana na biomasu BE-TO Karlovac
5.000,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
ENERGANA GOSPIĆ 1 d.o.o.EG1 kogeneracijsko postrojenje na drvnu biomasu 5 MW
4.960,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
34.599,00 No. of power plants: 14
SIZIM BIO-NERG d.o.o.Bioplinsko postrojenje "SIZIM BIO-NERG"
2.000,00 Official Gazette No 133/13
ECO-BIOGAS d.o.o.Bioplinsko postrojenje Pisarovina 1200kWel
1.200,00 Official Gazette No 133/13
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
5.200,00 No. of power plants: 4
No. of power plants:
40.603,00
20
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 01/06/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Biogas power plants
Total planned capacity
Total planned capacity of all power plants (kW)
Total number of power plants
Total planned capacity
Wind power plants
Total planned capacity
Page 1 of 1
Power plantPlanned capacity
(kW)
Tariff system under which electricity purchase contract was signed
Type of solar power plant
0,00 No. of power plants: 0
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
BIOENERGETIKA d.o.o.Izgradnja kogeneracijskog postrojenja na bazi izgaranja biomase
1.000,00 Official Gazette No 133/13
CARPE DIEM d.o.o.Kogeneracijsko postrojenje na biomasu "Antunovac 1"
990,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
VIŠEVICA ENERGO d.o.o. VIŠEVICA ENERGO PERUŠIĆ 2.000,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
MAKSIM TRADE ENERGIJA d.o.o.Kogeneracijsko postrojenje na drvnu biomasu 1MWe MKSIM TRADE ENERGIJA - ŽAKANJE
1.000,00 Official Gazette No 133/13
BE-TO KARLOVAC d.o.o.Elektrana na biomasu BE-TO Karlovac
5.000,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
ENERGANA GOSPIĆ 1 d.o.o.EG1 kogeneracijsko postrojenje na drvnu biomasu 5 MW
4.960,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
35.599,00 No. of power plants: 15
SIZIM BIO-NERG d.o.o.Bioplinsko postrojenje "SIZIM BIO-NERG"
2.000,00 Official Gazette No 133/13
NTC GAJ d.o.o. Bioplinsko postrojenje "Gaj" 2.000,00 Official Gazette No 133/13
ECO-BIOGAS d.o.o.Bioplinsko postrojenje Pisarovina 1200kWel
1.200,00 Official Gazette No 133/13
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
7.200,00 No. of power plants: 5
C.E.M.P. d.o.o. Vjetroelektrana Krš Pađene 80.000,00 Official Gazette No 63/12
80.000,00 No. of power plants: 1
Biogas power plants
Total planned capacity
Total planned capacity
Wind power plants
Total planned capacity
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 04/05/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Page 1 of 2
Power plantPlanned capacity
(kW)
Tariff system under which electricity purchase contract was signed
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 04/05/2020)
123.603,00
23
Total planned capacity of all power plants (kW)
Total number of power plants
Page 2 of 2
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Type of solar power plant
0,00 No. of power plants: 0
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
BIOENERGETIKA d.o.o.Izgradnja kogeneracijskog postrojenja na bazi izgaranja biomase
1.000,00 Official Gazette No 133/13
CARPE DIEM d.o.o.Kogeneracijsko postrojenje na biomasu "Antunovac 1"
990,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
VIŠEVICA ENERGO d.o.o. VIŠEVICA ENERGO PERUŠIĆ 2.000,00 Official Gazette No 133/13
AGER ALPHA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Alpha"
495,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
MAKSIM TRADE ENERGIJA d.o.o.Kogeneracijsko postrojenje na drvnu biomasu 1MWe MKSIM TRADE ENERGIJA - ŽAKANJE
1.000,00 Official Gazette No 133/13
BE-TO KARLOVAC d.o.o.Elektrana na biomasu BE-TO Karlovac
5.000,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
ENERGANA GOSPIĆ 1 d.o.o.EG1 kogeneracijsko postrojenje na drvnu biomasu 5 MW
4.960,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
36.094,00 No. of power plants: 16
SIZIM BIO-NERG d.o.o.Bioplinsko postrojenje "SIZIM BIO-NERG"
2.000,00 Official Gazette No 133/13
NTC GAJ d.o.o. Bioplinsko postrojenje "Gaj" 2.000,00 Official Gazette No 133/13
ECO-BIOGAS d.o.o.Bioplinsko postrojenje Pisarovina 1200kWel
1.200,00 Official Gazette No 133/13
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
7.200,00 No. of power plants: 5
VJETROELEKTRANA ORJAK d.o.o. Vjetroelektrana Kom-Orjak-Greda 10.000,00 Official Gazette No 63/12
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 11/03/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Biogas power plants
Total planned capacity
Total planned capacity
Wind power plants
Page 1 of 2
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 11/03/2020)
C.E.M.P. d.o.o. Vjetroelektrana Krš Pađene 80.000,00 Official Gazette No 63/12
C.E.M.P. d.o.o.Vjetroelektrana Krš Pađene - proširenje
42.000,00 Official Gazette No 63/12
132.000,00 No. of power plants: 3
176.098,00
26
Total planned capacity of all power plants (kW)
Total number of power plants
Total planned capacity
Page 2 of 2
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Type of solar power plant
0,00 No. of power plants: 0
EKOLOŠKI SISTEMI d.o.o.Mala hidroelektrana KORANA 1 - KARLOVAC
354,00 Official Gazette No 133/13
EKO ENERGIJA JOSIP CERJAK d.o.o. MHE Fajerov mlin na rijeci Glini 450,00 Official Gazette No 133/13
804,00 No. of power plants: 2
RENETEH OGULIN d.o.o. Kogeneracija Ogulin 4.900,00 Official Gazette No 133/13
BIOENERGETIKA d.o.o.Izgradnja kogeneracijskog postrojenja na bazi izgaranja biomase
1.000,00 Official Gazette No 133/13
CARPE DIEM d.o.o.Kogeneracijsko postrojenje na biomasu "Antunovac 1"
990,00 Official Gazette No 133/13
DEPOD PROJEKTI d.o.o.Projekt proizvodnje energije iz biomase na području općine Brinje
5.000,00 Official Gazette No 133/13
VIŠEVICA ENERGO d.o.o. VIŠEVICA ENERGO PERUŠIĆ 2.000,00 Official Gazette No 133/13
AGER ALPHA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Alpha"
495,00 Official Gazette No 133/13
PANONSKA BIOMASA d.o.o.Kogeneracijsko postrojenje za proizvodnju električne energije iz drvne biomase "Panonska biomasa"
495,00 Official Gazette No 133/13
MAKSIM TRADE ENERGIJA d.o.o.Kogeneracijsko postrojenje na drvnu biomasu 1MWe MKSIM TRADE ENERGIJA - ŽAKANJE
1.000,00 Official Gazette No 133/13
BE-TO KARLOVAC d.o.o.Elektrana na biomasu BE-TO Karlovac
5.000,00 Official Gazette No 133/13
SOLARIS PONS d.o.o.Elektrana na biomasu-SOLARIS PONS
300,00 Official Gazette No 133/13
IGS BIOMASA d.o.o.IGS kogeneracijsko postrojenje na drvnu biomasu 1 MW
1.000,00 Official Gazette No 133/13
ENERGANA GOSPIĆ 1 d.o.o.EG1 kogeneracijsko postrojenje na drvnu biomasu 5 MW
4.960,00 Official Gazette No 133/13
SENSE ESCO BELIŠĆE d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Belišće 2
1.170,00 Official Gazette No 133/13
SENSE ESCO ŠIBENIK d.o.o.Plinifikacijsko kogeneracijsko postrojenje na biomasu Šibenik
1.795,00 Official Gazette No 133/13
ENERGIJA VIROVITICA d.o.o. Energana Virovitica 4.990,00 Official Gazette No 133/13
DRVNA INDUSTRIJA NOVOSELEC d.o.o.
Kogeneracijsko postrojenje na biomasu DIN Energo
999,00 Official Gazette No 133/13
36.094,00 No. of power plants: 16
SIZIM BIO-NERG d.o.o.Bioplinsko postrojenje "SIZIM BIO-NERG"
2.000,00 Official Gazette No 133/13
NTC GAJ d.o.o. Bioplinsko postrojenje "Gaj" 2.000,00 Official Gazette No 133/13
ECO-BIOGAS d.o.o.Bioplinsko postrojenje Pisarovina 1200kWel
1.200,00 Official Gazette No 133/13
ENERGANA CERNA d.o.o. Bioplinsko postrojenje Cerna 1.000,00 Official Gazette No 133/13
BIONARDO GUNJA d.o.o. Bioplinska elektrana Gunja 1.000,00 Official Gazette No 133/13
7.200,00 No. of power plants: 5
VJETROPARK JASENICE d.o.o.Kompleks male vjetroelektrane Jasenice
10.000,00 Official Gazette No 63/12
Biogas power plants
Total planned capacity
Total planned capacity
Wind power plants
Biomass power plants
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 03/01/2020)
Solar power plants
Total planned capacity
Hydro power plants
Total planned capacity
Page 1 of 2
Power plantPlanned capacity
(kW)
Tariff system under which
electricity purchase
contract was signed
Project holders who have signed the Electricity Purchase Contract with HROTE, but their power plants are not in the operation yet
(state on date 03/01/2020)
VJETROELEKTRANA ORJAK d.o.o. Vjetroelektrana Kom-Orjak-Greda 10.000,00 Official Gazette No 63/12
C.E.M.P. d.o.o. Vjetroelektrana Krš Pađene 80.000,00 Official Gazette No 63/12
C.E.M.P. d.o.o.Vjetroelektrana Krš Pađene - proširenje
42.000,00 Official Gazette No 63/12
142.000,00 No. of power plants: 4
186.098,00
27
Total planned capacity of all power plants (kW)
Total number of power plants
Total planned capacity