project feasibility report - welcome to...

25
1 - PRE FEASIBILITY REPORT FOR PROPOSED EXPANSION OF SYNTHETIC ORGANIC CHEMICALS AND PESTICIDE INTERMEDIATES IN EXISTING UNIT of M/s. ORGANIC INDUSTRIES PVT. LTD. PLOT NO. S/163, GIDC, DAHEJ-I, TALUKA: VAGRA, DISTRICT: BHARUCH-392 130, GUJARAT

Upload: trinhtram

Post on 26-Feb-2018

229 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

1

-

PRE FEASIBILITY REPORT

FOR

PROPOSED EXPANSION OF SYNTHETIC ORGANIC

CHEMICALS AND PESTICIDE INTERMEDIATES IN

EXISTING UNIT

of

M/s. ORGANIC INDUSTRIES PVT. LTD.

PLOT NO. S/163, GIDC, DAHEJ-I, TALUKA: VAGRA,

DISTRICT: BHARUCH-392 130, GUJARAT

Page 2: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

2

CONTENTS

Sr. No. Description Page No.

1. Executive Summary 3

2. Introduction of the Project/Background information 9

3. Project Description 11

4. Site Analysis 17

5. Planning Brief 21

6. Proposed Infrastructure 22

7. Rehabilitation and resettlement (R & R) Plan 24

8. Project Schedule & Cost Estimates 24

9. Analysis of Proposal (Final Recommendations) 25

Page 3: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

3

1.0 EXECUTIVE SUMMARY

1.1 Company Profile

M/s. Organic Industries Pvt Ltd is a leading polymer processing products and chemicals

manufacturing company in india Driven by state of the art Production facility having

multiple products at multiple locations. The Company has been a Customer-Oriented

organization ever since its inception in 1980.

1.2 Project Details

SR.

NO.

PRODUCT NAME EXISTING

CAPACITY

(MT/Annum)

ADDITIONAL

PROPOSED

CAPACITY

(MT/Annum)

TOTAL

PROPOSED

CAPACITY

(MT/Annum)

Plant-01 (Existing)

1 Potassium Permanganate 8400 - 8400

2 Boric Acid Technical (All Grades) 24000 - 24000

3 Borax Decahydrate (All Grades) 8400 - 8400

4 Di-Sodium Octaborate Tetrahydrate 1200 - 1200

Plant-02 (Existing)

5 Herbal Products by Herbal Extracts (Water Based) 1020 - 1020

i. Aswagandha – Withania Somanifera

ii. Brami – Bacopa Monnieri

iii. Andhrographis Pariculata – Kalmegh

iv. Asphalt – Shilajit

v. Azartica Indica – Neem

vi. Asparagus Racemogus – Shatavari

vii. Boswllia Serrata – Salaji Guggal

viii. Commiphora Mukal – Guggal

ix. Garcinia Combogia

x. Glycyrliza Glabra – Mulethi

xi. Gymnema Sylvester – Gurmar

xii. Lagastrolmia Splciosa – Karela

xiii. Momordica Pureins – Kaunch

xiv. Mucana Pureins – kaunch

xv. Ocimum Santium – Tulsi

xvi. Terminalia Arjuna – Arjuna

xvii. Tribulus Terestris - Gokharu

Plant-03 (Existing)

6 Roasted Bentonite Granules 9000 - 9000

7 Soil Conditioner 28800 - 28800

8 Plant Growth Regulator 120 - 120

9 NPK Mixed Granulated Fertilizer 6000 - 6000

Plant-02-A (Proposed)

10 Herbal Products by Herbal Extract (Solvent based) - 1020 1020

Plant-04-A (Proposed) - ETHOXILATES & PROPOXYLATES and there condensates

11 Ethylene Oxide / Propylene Oxide Condensate -- 4000 4000

Page 4: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

4

- Direct Sale

- Internal Consumption

12 Anionic Surfactants -- 1000 1000

13 Cationic Surfactants -- 1000 1000

14 Blended Surfactants (using Intermediates) -- 2000 2000

15 Powder Surfactants -- 1000 1000

Plant-04-B (Proposed)

16 Sulphocuecinated Products - 250 250

17 Phosphatised Products - 100 100

Plant-04-C (Proposed)

18 Alkonol Amines (Methyl Diethanol Amines) - 10000 10000

Plant-04-D (Proposed)

19 Single Compound 1200 1200

20 Double Compound

21 CBS (50%, 60% & 70%)

Plant-05 (Proposed)

22 Di-Ethyl-Phthalate - 2400 2400

23 Di-Methyl – Phthalate - 2400 2400

24 Di-Methyl – Sulphate - 5400 5400

25 Di-Methyl - Aniline - 2400 2400

26 Di-Ethyl-Aniline - 960 960

27 N-Ethyl-Aniline - 1440 1440

28 Ethyl – Benzyl Aniline - 1200 1200

29 Di-Ethyl-Ether - 1200 1200

Plant-06 (Proposed)

30 Sodium Saccharine - 350 350

31 Lasamide - 350 350

32 3,3’ DINITRODIPHENYL SULFONE - 350 350

Plant-07 (Proposed) – Pesticide Intermediates

33 2- Chloro 6- Nitro Benzonitrile - 300 300

34 4 - Amino Dimethyl Pyridine -

35 4-Amino-2,5-dimethylphenol -

36 4-Chloro-2,6-dimethylbromobenzene (CLDMBB) -

TOTAL 86940 40,320 1,27,260

List of By-Products By-Products Existing Quantity Proposed Quantity Total Quantity

Manganese -Silicon 5460 MT/Year i.e.

455 MT/Month

-- 5460 MT/Year i.e. 455

MT/Month

Gypsum 288000 MT/Year i.e.

24000 MT/Month

-- 288000 MT/Year i.e.

24000 MT/Month

Calcium Sulphate

sludge generated

during the production

of CABS 70%

-- 1200 MT/Year i.e.

100 MT/Month

1200 MT/Year i.e.

100 MT/Month

Page 5: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

5

Dil. H2SO4 -- 2727

MT/Year i.e.

227 MT/Month

2727

MT/Year i.e.

227 MT/Month

Sodium Phthalate -- 65

MT/Year i.e.

5.4 MT/Month

65

MT/Year i.e.

5.4 MT/Month

Poly -- 375

MT/Year i.e.

32 MT/Month

375

MT/Year i.e.

32 MT/Month

Liquor Ammonia -- 300

MT/Year i.e.

25 MT/Month

300

MT/Year i.e.

25 MT/Month

Ammonium Chloride -- 600

MT/Year i.e.

50 MT/Month

600

MT/Year i.e.

50 MT/Month

Cuprous Chloride -- 185

MT/Year i.e.

15.4 MT/Month

185

MT/Year i.e.

15.4 MT/Month

1.3 Green Belt Development

M/s. Organic Industries Pvt. Ltd. has develop an effective green belt within the factory and

on periphery of the factory. In addition to this, majority of the vacant land is planted with

trees, shrubs and grasses.

1.4 Power & Fuel Requirement

Power requirement:

Existing:

Power requirement= 1300 KVA from DGVCL and D.G.Set= 125 KVA

After Proposed Expansion:

Power requirement= 4500 KVA from DGVCL and D.G.Set= 1500 KVA

Fuel Requirement

EXISTING

Sr. No. Fuel Requirement

1. Coal 100 MT/Day

2. HSD 12 Lit/Hr

AFTER PROPOSED EXPANSION

1. Coal 200 MT/Day

2. HSD 35 Lit/Hr

Page 6: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

6

1.5 Water Requirement and Wastewater Generation & Treatment

• After Proposed Expansion, fresh water requirement will be met through GIDC, Dahej.

Total water requirement after proposed expansion will 655 m3/day (Fresh= 526 m

3/day +

Recycle= 129 m3/day). Total wastewater generation after proposed expansion will be

193 m3/day. The Low COD= effluent (50 m

3/day) shall be treated in proposed effluent

treatment plant consisting of primary treatment and secondary treatment & dispose it to

GIDC Drain.

• The High COD & High TDS-effluent (138 m3/day) shall be treated in proposed effluent

treatment plant consisting of primary treatment, MEE and Secondary & Tertiary

Treatment & send it to plant for reuse purpose.

• Domestic Effluent (17 m3/day) will be disposed through septic tank & soak pit.

1.6 Air Pollution Source and Control Management

Particulars Fuel Fuel Quantity Stack height Emission

Norms

APCM

Existing scenario

Boiler Coal 100 MT/Day 31 m PM<150 mg/Nm3

SO2< 100 ppm

NOx< 50 ppm

Dust Collector +

Bag filter

Thermic Fluid

Heater (2 Nos)

Cyclone Separator

+ Bag Filter

D.G.Set (125 KVA) Diesel 12 lit/hr. 11 m PM<150 mg/Nm3

SO2< 100 ppm

NOx< 50 ppm

Proposed Scenario after expansion (Flue Gas Emission)

Boiler -1 Coal 100 MT/Day 31 m PM<150 mg/Nm3

SO2< 100 ppm

NOx< 50 ppm

Dust Collector +

Bag filter

Thermic Fluid

Heater (2 Nos)

Cyclone Separator

+ Bag Filter

Boiler -2

(7 MT/Hr)

Coal 100 MT/Day 31 m PM<150 mg/Nm3

SO2< 100 ppm

NOx< 50 ppm

Multi Cyclone

Separator + Bag

filter

Thermic Fluid

Heater (1 Nos)

31 m Cyclone Separator

+ Bag Filter

D.G.Set (500 KVA) Diesel 83 lit/hr. 11 m PM<150 mg/Nm3

SO2< 100 ppm

NOx< 50 ppm

Proposed Scenario (Process Gas Emission)

Process Vent-1 -- -- 11m HCl < 20 mg/Nm3 Two Stage

Page 7: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

7

Particulars Fuel Fuel Quantity Stack height Emission

Norms

APCM

Scrubber

Process Vent-2 -- -- 11m SO2 < 40 mg/Nm3 Two Stage

Scrubber

Process Vent-3 -- -- 11m NH3 < 175 mg/Nm3 Two Stage

Scrubber

1.7 Hazardous Waste Management

Sr.

No.

Type of Waste Category

No.

Quantity Method of Disposal

Existing Additional Total

1. Discarded

Containers/Barrels/Carboys

33.1 1500

Nos/Year

2000

Nos/Year

3500

Nos/Year

Collection, Storage,

Reuse or sale to

authorized vendor Bags/Liners - 2500

Nos/Year

2500

Nos/Year

2. Used Oil 5.1 0.6 KL/Year

i.e.

50

Liter/Month

0.6

KL/Year

i.e.

50

Liter/Month

1.2 KL/Year

i.e.

100

Liter/Month

Collection, Storage,

Transportation,

disposal by sale to

registered recycler

3. ETP Sludge 35.3 0.6

MT/Year

i.e.

50 Kg/Month

119.4

MT/Year

i.e.

9.95

MT/Month

120

MT/Year

i.e.

10 MT/Month

Collection, Storage,

Transportation,

disposal at TSDF site

of BEIL, Ankleshwar

4. Resin from softening plant DM

plant

35.2 450 Lit/year

i.e.

38

Liter/Month

240

Lit/year

i.e.

20

Liter/Month

690

Lit/Year

i.e.

58

Liter/Month

Collection, Storage,

Transportation,

disposal at TSDF site

of BEIL, Ankleshwar

5. Distillation Residue 36.1 -- 392 MT/Year

i.e. 32

MT/Month

392 MT/Year

i.e. 32

MT/Month

Collection, Storage,

Transportation, sale

to cement industries

for co-processing or

disposal at common

incineration site of

BEIL, Ankleshwar

6. Manganese -Silicon -- 5460 MT/Year

i.e. 455

MT/Month

-- 5460 MT/Year

i.e. 455

MT/Month

Sell to end user

7. Gypsum A2040 288000

MT/Year i.e.

24000

MT/Month

-- 288000

MT/Year i.e.

24000

MT/Month

Sell to end user

8. Calcium Sulphate sludge

generated during the production

of CABS 70%

-- -- 1200 MT/Year

i.e. 100

MT/Month

1200 MT/Year

i.e. 100

MT/Month

White calcium salt

CaSO4 used

especially as a

Page 8: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

8

diluent in tablets and

in hydrated form as

plaster of Paris.

White salt CaSO4 that

occurs especially as

anhydrite, gypsum,

and plaster of Paris

and that in hydrated

form is used as a

building material and

in anhydrous form is

used as a drying

agent.

9. Dil. HCl 29.6 -- 2659 MT/Year

i.e.

221

MT/Month

2659 MT/Year

i.e.

221

MT/Month

Sell to end user

10. Dil. H2SO4 29.6 -- 2727

MT/Year i.e.

227

MT/Month

2727

MT/Year i.e.

227

MT/Month

Sell to end user

11. Sodium Phthalate -- -- 65

MT/Year i.e.

5.4

MT/Month

65

MT/Year i.e.

5.4

MT/Month

Sell to end user

12. Poly -- -- 375

MT/Year i.e.

32 MT/Month

375

MT/Year i.e.

32 MT/Month

Sell to end user

13. Liquor Ammonia -- -- 300

MT/Year i.e.

25 MT/Month

300

MT/Year i.e.

25 MT/Month

Sell to end user

14. Ammonium Chloride -- -- 600

MT/Year i.e.

50 MT/Month

600

MT/Year i.e.

50 MT/Month

Sell to end user

15. Cuprous Chloride -- -- 185

MT/Year i.e.

15.4

MT/Month

185

MT/Year i.e.

15.4

MT/Month

Sell to end user

Solid Waste:

1. Fly Ash -- -- 3600 MT/Year

i.e.

300

MT/Month

3600 MT/Year

i.e.

300

MT/Month

Sell to brick

manufacturer

Page 9: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

9

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of the project and project proponent. In case of mining project, a copy

of mining lease/letter of intent should be given.

Identification of the project

Proposed expansion of Organic Specialty Chemicals and Pesticide Intermediates in Existing

Unit.

Identification of the project proponent

The company is managed by Directors. Name of the directors are given below:

Sr

No.

Name of Directors Designation Address

1 Mr. Anand M Shetty Director 1801, Odyssey – 1, 18th

Floor,

Hiranandani Gardens, A.S. Marg,

Powai, Mumbai– 400 076

2 Mrs. Shashirekha A

Shetty

Director 1801, Odyssey – 1, 18th

Floor,

Hiranandani Gardens, A.S. Marg,

Powai, Mumbai– 400 076

3 Mr. Pravir A Shetty Director 1801, Odyssey – 1, 18th

Floor,

Hiranandani Gardens, A.S. Marg,

Powai, Mumbai– 400 076

4 Mr. Adish A Shetty Director 1801, Odyssey – 1, 18th

Floor,

Hiranandani Gardens, A.S. Marg,

Powai, Mumbai– 400 076

2.2 Brief description of nature of the Project

The proposed expansion project involves the production of Organic Specialty Chemicals &

Pesticide Intermediates which falls under item no 5(f) - synthetic organic chemicals & 5(b) –

Pesticide Intermediates as per the EIA notification, Sept. 14, 2006 (as amended time to

time), Since The project is located in Dahej-I, GIDC and due to pesticide intermediates, it is

to be treated as Category 'A', and needs to obtain the prior Environmental Clearance from

MoEFCC, New Delhi.

Page 10: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

10

2.3 Need for the project and its importance to the country and or region

The products are widely used in pesticide industries, pharma industries and construction

chemicals. The proposed products range having good demand in the Market & as per

market survey by the company there is a less supply of the products against its demand, to

overcome this shortage & to bridge demand-supply gap, the company proposed to have this

expansion.

2.4 Demand-Supply Gap

Based on our informal survey of the market with our current customers and various

traders, we have found that there is a big potential for the range of the products we are

planning. These products will be an addition to the current range of our products.

2.5 Imports vs. Indigenous production

Based on the current cost of indigenous raw materials, it will make us very competitive

against imported finished products and we will be able to increase the export of our

finished products.

2.6 Export possibility

As per market survey by the company, these proposed products are having a domestic as

well as export market due to its application in various types of pesticide industries, pharma

industries and construction chemicals.

2.7 Domestic/Export Markets

According to our principal customer, there is very good possibility of export of the products.

2.8 Employment Generation (Direct and Indirect) due to project.

Employment would be as per prevailing norms of state government for skilled and unskilled

people for the proposed expansion project.

Page 11: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

11

3.0 Project Description

3.1 Type of Project including interlinked and interdependent projects, if any.

Proposed expansion of Organic Specialty Chemicals and addition of Pesticide Intermediates

in Existing Unit. Category: 'A'-5(f) & 5(b).

3.2 Location (map showing general location, specific location and project boundary &

project site layout) with coordinates.

Map showing general location

Page 12: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

12

Project Site:

Page 13: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

13

Plant Layout

Page 14: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

14

3.3 Details of alternate sites considered and the basis of selecting the proposed site,

particularly the environmental considerations gone into should be highlighted.

Major factors involved in the selection of site are listed below:

• Site is very well connected by road

• Proximity to Raw Material suppliers

• Availability of sufficient land free from cultivation

• Availability of power evacuation facilities

• Availability of abundant water for industrial use

• Availability of Port, common MEE, common TSDF & CETP

Modern infrastructure support and amenities at par with industrial estates in other global

markets, including:

� Efficient transport facilities within the industrial estate.

� Environment-friendly zone.

� Uninterrupted power supply.

3.4 Size or Magnitude of Operation

Please refer section 1.2 of PFR.

3.5 Project Description with process details (a schematic diagram/flow chart showing the

project layout, components of the project etc. should be given)

Please refer Annexure-III in Form-I.

3.6 Raw material required along with estimated quantity, likely source, marketing area of

final products. Mode of transport of raw materials and finished products.

Please refer Annexure-II in Form-I.

3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be

briefly outlined.

There will not be resource optimization/recycling and reuse envisaged in the proposed

expansion project.

Page 15: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

15

3.8 Availability of water its source, energy/power requirement and source should be

given.

Water Source

After proposed expansion, quantity of water consumption will be 655 KL/Day. The entire

water requirement will be met through GIDC Water Supply.

Power & Fuel Requirement

Power requirement:

Existing:

Power requirement= 1300 KVA from DGVCL and D.G.Set= 125 KVA

After Proposed Expansion:

Power requirement= 4500 KVA from DGVCL and D.G.Set= 1500 KVA

FUEL REQUIREMENT

EXISTING

Sr.

No.

Fuel Requirement

1. Coal 100 MT/Day

2. HSD 12 Lit/Hr

AFTER PROPOSED EXPANSION

1. Coal 200 MT/Day

2. HSD 35 Lit/Hr

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal.

• After Proposed Expansion, fresh water requirement will be met through GIDC, Vapi.

Total water requirement after proposed expansion will 655 m3/day (Fresh= 526 m

3/day +

Recycle= 129 m3/day). Total wastewater generation after proposed expansion will be

193 m3/day. The Low COD effluent (50 m

3/day) shall be treated in proposed effluent

treatment plant consisting of primary treatment and secondary treatment & dispose it to

GIDC Drain.

Page 16: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

16

• The High COD & High TDS-effluent (138 m3/day) shall be treated in proposed effluent

treatment plant consisting of primary treatment, MEE and Secondary & Tertiary

Treatment & send it to plant for reuse purpose.

• Domestic Effluent (17 m3/day) is disposed through septic tank & soak pit.

3.10 Schematic representations of the feasibility drawing which give information of EIA

purpose.

RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT

MARKET ASSESSMENT

FINANCIAL REPORT

PROJECT REPORT

INTRODUCTION

MONITORING OF AIR, WATER & SOIL QUALITY & NOISE

LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS

& BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH

LOCALS

BASELINE

ENVIRONMENTAL

STATUS

ENVIRONMENTAL INFORMATION CENTRE

CENTRAL GROUND WATER BOARD

GUJARAT POLLUTION CONTROL BOARD (GPCB)

PUBLIC HEALTH ENGINEERING DEPT.

AGRICULTURE DEPARTMENT

FOREST DEPARTMENT

IRRIGATION DEPARTMENT

EMPLOYMENT EXCHANGE

HEALTH CENTER

CENSUS DEPT.

INDIAN METEOROLOGICAL DEPT.

SOCIOECONOMIC

STATUS &

INFRASTRUCTURE

PROPOSED

EXPANSION PLANT

FACILITY DESCRIPTION

IMPACTS

METHODOLOGY OF

IMPACT

ASSESSMENT

IDENTIFICATION & ASSESSMENT OF IMPACTS

EVALUATION OF IMPACTS BY MATRIX METHOD

SOURCE OF INFORMATION OVERVIEW OF

E. I. A. STUDIES

ACTIVITIES

ENVIRONMENTAL

MANAGEMENT PLAN

DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR

POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT,

GREEN BELT DEVELOPMENT MONITORING PROGRAM

RISK ANALYSIS

STUDIES &

DISASTER

MANAGEMENT PLAN

SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY

DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. CONSEQUENCE ANALYSIS

PREPARATION OF DISASTER MANAGEMENT PLAN

Page 17: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

17

4.0 Site Analysis

4.1 Connectivity

• Site is very well connected by road

• Availability of power evacuation facilities

• Availability of abundant water for industrial use

4.2 Land Form, Land Use and Land Ownership

Page 18: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

18

4.3 Topography (along with map)

Page 19: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

19

4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including

area under CRZ)), shortest distances from the periphery of the project to periphery of the

forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from

HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette

notification should be given.

CRZ Clearance is not applicable to our industry.

Page 20: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

20

4.5 Existing Infrastructure

Major factors involved in the selection of site are listed below:

Site is very well connected by road

Proximity to Raw Material suppliers

Availability of sufficient land free form cultivation

Availability of power evacuation facilities

4.6 Soil Classification

It will be incorporated in EIA Studies.

4.7 Climatic data from secondary sources.

Primary source: Our own weather station & Secondary Source: Indian Meteorological

Department.

4.8 Social infrastructure available.

Depending on the growth of the company the required social infrastructure will be

provided.

Page 21: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

21

5.0 Planning Brief

5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country

planning/Development authority classification.

Type of Industry: Proposed expansion of Organic Specialty Chemicals & addition of Pesticide

intermediates in Existing Unit.

5.2 Population Projection

It will be incorporated in EIA Studies.

5.3 Land use planning (breakup along with green belt etc.)

Total Plot Area: 1,71,579 m2

5.4 Assessment of Infrastructure Demand (Physical & Social)

• Employment would be as per prevailing norms of state government for skilled and

unskilled people for the proposed expansion project.

• Social Welfare

• Cordial relation with the industry shall be established and representation shall be made

to villagers for help for creation of facilities related to health, education, etc.

5.5 Amenities/Facilities

It will be incorporated in EIA Studies.

Page 22: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

22

6.0 Proposed Infrastructure

6.1 Industrial Area (Processing Area)

Processing Area (Processing Zone, ETP Area and Utility Area): 26000 m2

6.2 Residential Area (Non Processing Area)

Non Processing Area (Green belt, Raw material storage area, finished storage area and open

area): 145579 m2

6.3 Green Belt

M/s. Organic Industries Pvt. Ltd. has developed an effective green belt within the factory

and on periphery of the factory. In addition to this, majority of the vacant land is planted

with trees, shrubs and grasses.

6.4 Social Infrastructure

Depending on the growth of the company the required social infrastructure will be

provided.

6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc)

Major factors involved in the selection of site are listed below:

• Site is very well connected by road

• Proximity to Raw Material suppliers

• Availability of sufficient land free from cultivation

• Availability of power evacuation facilities

• Availability of abundant water for industrial use

6.6 Drinking water Management (Source & Supply of water)

Water requirement will meet through GIDC Water Supply.

Page 23: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

23

6.7 Sewerage System

Sewage pipes are laid in entire company for the removal and disposal of mainly non-

harmful liquid wastes from the offices, canteen and domestic waste coming from different

sections. These liquid wastes are treated and disposed of by septic tank & soak pit.

6.8 Solid Waste Management

Details of Hazardous Waste Generation & Disposal

Please refer Topic No. 1.7 of PFR.

6.9 Power Requirement & Supply/Source

Power requirement:

Existing:

Power requirement= 1300 KVA from DGVCL and D.G.Set= 125 KVA

After Proposed Expansion:

Power requirement= 2800 KVA from DGVCL and D.G.Set= 1500 KVA

Fuel Requirement

EXISTING

Sr.

No.

Fuel Requirement

1. Coal 100 MT/Day

2. HSD 12 Lit/Hr

AFTER PROPOSED EXPANSION

1. Coal 200 MT/Day

2. HSD 35 Lit/Hr

Page 24: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

24

7.0 Rehabilitation and Resettlement (R & R) Plan

7.1 Policy to be adopted (central/state) in respect of the project affected including home

oustees, land ouatees and landless laborers (a brief outline to be given)

There is no habitation on the proposed expansion project area and it is within existing

industry, so that R & R policy is not applicable to this project.

There shall be no displacement of any population in the project area. Any major activity that

may lead to resettlement of the people is considered as permanent impact. Hence, there is

no permanent impact on this account. The increasing industrial activity will boost the

commercial and economical status of the locality up to some extent.

8. Project Schedule & Cost Estimates

8.1 Likely date of start of construction and likely date of completion (Time schedule for

the project to be given).

We hereby state that the existing plant is operating as per present CC&A and will seek

revised CC&A only after obtaining the environmental clearance & CTE as per this

application.

Project can be implemented in 8 months after obtaining EC & CTE.

8.2 Estimated Project cost along with analysis in terms of economic viability of the

project.

Total costs of the project will Rs. 12.95 Crore (Proposed Expansion). Capital cost of air &

water pollution control system and environmental monitoring equipments will be Rs. 2.5

Crore (Proposed Expansion).

Page 25: Project Feasibility Report - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/Online/TOR/30_Jun_2016... · 26 Di-Ethyl-Aniline ... during the production of CABS 70%

25

9. Analysis of Proposal (Final Recommendations)

9.1 Financial and social benefits with special emphasis on the benefit to be local people

including tribal population, if any, in the area.

• Employment would be as per prevailing norms of state government for skilled and

unskilled people for the proposed project.

• Social Welfare shall be done.

• Cordial relation with the industry shall be established and representation shall be made

to villagers for help for creation of facilities related to health, education, etc.