PRE FEASIBILITY REPORT
FOR
PROPOSED EXPANSION OF SYNTHETIC ORGANIC
CHEMICALS AND PESTICIDE INTERMEDIATES IN
EXISTING UNIT
of
M/s. ORGANIC INDUSTRIES PVT. LTD.
PLOT NO. S/163, GIDC, DAHEJ-I, TALUKA: VAGRA,
DISTRICT: BHARUCH-392 130, GUJARAT
2
CONTENTS
Sr. No. Description Page No.
1. Executive Summary 3
2. Introduction of the Project/Background information 9
3. Project Description 11
4. Site Analysis 17
5. Planning Brief 21
6. Proposed Infrastructure 22
7. Rehabilitation and resettlement (R & R) Plan 24
8. Project Schedule & Cost Estimates 24
9. Analysis of Proposal (Final Recommendations) 25
3
1.0 EXECUTIVE SUMMARY
1.1 Company Profile
M/s. Organic Industries Pvt Ltd is a leading polymer processing products and chemicals
manufacturing company in india Driven by state of the art Production facility having
multiple products at multiple locations. The Company has been a Customer-Oriented
organization ever since its inception in 1980.
1.2 Project Details
SR.
NO.
PRODUCT NAME EXISTING
CAPACITY
(MT/Annum)
ADDITIONAL
PROPOSED
CAPACITY
(MT/Annum)
TOTAL
PROPOSED
CAPACITY
(MT/Annum)
Plant-01 (Existing)
1 Potassium Permanganate 8400 - 8400
2 Boric Acid Technical (All Grades) 24000 - 24000
3 Borax Decahydrate (All Grades) 8400 - 8400
4 Di-Sodium Octaborate Tetrahydrate 1200 - 1200
Plant-02 (Existing)
5 Herbal Products by Herbal Extracts (Water Based) 1020 - 1020
i. Aswagandha – Withania Somanifera
ii. Brami – Bacopa Monnieri
iii. Andhrographis Pariculata – Kalmegh
iv. Asphalt – Shilajit
v. Azartica Indica – Neem
vi. Asparagus Racemogus – Shatavari
vii. Boswllia Serrata – Salaji Guggal
viii. Commiphora Mukal – Guggal
ix. Garcinia Combogia
x. Glycyrliza Glabra – Mulethi
xi. Gymnema Sylvester – Gurmar
xii. Lagastrolmia Splciosa – Karela
xiii. Momordica Pureins – Kaunch
xiv. Mucana Pureins – kaunch
xv. Ocimum Santium – Tulsi
xvi. Terminalia Arjuna – Arjuna
xvii. Tribulus Terestris - Gokharu
Plant-03 (Existing)
6 Roasted Bentonite Granules 9000 - 9000
7 Soil Conditioner 28800 - 28800
8 Plant Growth Regulator 120 - 120
9 NPK Mixed Granulated Fertilizer 6000 - 6000
Plant-02-A (Proposed)
10 Herbal Products by Herbal Extract (Solvent based) - 1020 1020
Plant-04-A (Proposed) - ETHOXILATES & PROPOXYLATES and there condensates
11 Ethylene Oxide / Propylene Oxide Condensate -- 4000 4000
4
- Direct Sale
- Internal Consumption
12 Anionic Surfactants -- 1000 1000
13 Cationic Surfactants -- 1000 1000
14 Blended Surfactants (using Intermediates) -- 2000 2000
15 Powder Surfactants -- 1000 1000
Plant-04-B (Proposed)
16 Sulphocuecinated Products - 250 250
17 Phosphatised Products - 100 100
Plant-04-C (Proposed)
18 Alkonol Amines (Methyl Diethanol Amines) - 10000 10000
Plant-04-D (Proposed)
19 Single Compound 1200 1200
20 Double Compound
21 CBS (50%, 60% & 70%)
Plant-05 (Proposed)
22 Di-Ethyl-Phthalate - 2400 2400
23 Di-Methyl – Phthalate - 2400 2400
24 Di-Methyl – Sulphate - 5400 5400
25 Di-Methyl - Aniline - 2400 2400
26 Di-Ethyl-Aniline - 960 960
27 N-Ethyl-Aniline - 1440 1440
28 Ethyl – Benzyl Aniline - 1200 1200
29 Di-Ethyl-Ether - 1200 1200
Plant-06 (Proposed)
30 Sodium Saccharine - 350 350
31 Lasamide - 350 350
32 3,3’ DINITRODIPHENYL SULFONE - 350 350
Plant-07 (Proposed) – Pesticide Intermediates
33 2- Chloro 6- Nitro Benzonitrile - 300 300
34 4 - Amino Dimethyl Pyridine -
35 4-Amino-2,5-dimethylphenol -
36 4-Chloro-2,6-dimethylbromobenzene (CLDMBB) -
TOTAL 86940 40,320 1,27,260
List of By-Products By-Products Existing Quantity Proposed Quantity Total Quantity
Manganese -Silicon 5460 MT/Year i.e.
455 MT/Month
-- 5460 MT/Year i.e. 455
MT/Month
Gypsum 288000 MT/Year i.e.
24000 MT/Month
-- 288000 MT/Year i.e.
24000 MT/Month
Calcium Sulphate
sludge generated
during the production
of CABS 70%
-- 1200 MT/Year i.e.
100 MT/Month
1200 MT/Year i.e.
100 MT/Month
5
Dil. H2SO4 -- 2727
MT/Year i.e.
227 MT/Month
2727
MT/Year i.e.
227 MT/Month
Sodium Phthalate -- 65
MT/Year i.e.
5.4 MT/Month
65
MT/Year i.e.
5.4 MT/Month
Poly -- 375
MT/Year i.e.
32 MT/Month
375
MT/Year i.e.
32 MT/Month
Liquor Ammonia -- 300
MT/Year i.e.
25 MT/Month
300
MT/Year i.e.
25 MT/Month
Ammonium Chloride -- 600
MT/Year i.e.
50 MT/Month
600
MT/Year i.e.
50 MT/Month
Cuprous Chloride -- 185
MT/Year i.e.
15.4 MT/Month
185
MT/Year i.e.
15.4 MT/Month
1.3 Green Belt Development
M/s. Organic Industries Pvt. Ltd. has develop an effective green belt within the factory and
on periphery of the factory. In addition to this, majority of the vacant land is planted with
trees, shrubs and grasses.
1.4 Power & Fuel Requirement
Power requirement:
Existing:
Power requirement= 1300 KVA from DGVCL and D.G.Set= 125 KVA
After Proposed Expansion:
Power requirement= 4500 KVA from DGVCL and D.G.Set= 1500 KVA
Fuel Requirement
EXISTING
Sr. No. Fuel Requirement
1. Coal 100 MT/Day
2. HSD 12 Lit/Hr
AFTER PROPOSED EXPANSION
1. Coal 200 MT/Day
2. HSD 35 Lit/Hr
6
1.5 Water Requirement and Wastewater Generation & Treatment
• After Proposed Expansion, fresh water requirement will be met through GIDC, Dahej.
Total water requirement after proposed expansion will 655 m3/day (Fresh= 526 m
3/day +
Recycle= 129 m3/day). Total wastewater generation after proposed expansion will be
193 m3/day. The Low COD= effluent (50 m
3/day) shall be treated in proposed effluent
treatment plant consisting of primary treatment and secondary treatment & dispose it to
GIDC Drain.
• The High COD & High TDS-effluent (138 m3/day) shall be treated in proposed effluent
treatment plant consisting of primary treatment, MEE and Secondary & Tertiary
Treatment & send it to plant for reuse purpose.
• Domestic Effluent (17 m3/day) will be disposed through septic tank & soak pit.
1.6 Air Pollution Source and Control Management
Particulars Fuel Fuel Quantity Stack height Emission
Norms
APCM
Existing scenario
Boiler Coal 100 MT/Day 31 m PM<150 mg/Nm3
SO2< 100 ppm
NOx< 50 ppm
Dust Collector +
Bag filter
Thermic Fluid
Heater (2 Nos)
Cyclone Separator
+ Bag Filter
D.G.Set (125 KVA) Diesel 12 lit/hr. 11 m PM<150 mg/Nm3
SO2< 100 ppm
NOx< 50 ppm
Proposed Scenario after expansion (Flue Gas Emission)
Boiler -1 Coal 100 MT/Day 31 m PM<150 mg/Nm3
SO2< 100 ppm
NOx< 50 ppm
Dust Collector +
Bag filter
Thermic Fluid
Heater (2 Nos)
Cyclone Separator
+ Bag Filter
Boiler -2
(7 MT/Hr)
Coal 100 MT/Day 31 m PM<150 mg/Nm3
SO2< 100 ppm
NOx< 50 ppm
Multi Cyclone
Separator + Bag
filter
Thermic Fluid
Heater (1 Nos)
31 m Cyclone Separator
+ Bag Filter
D.G.Set (500 KVA) Diesel 83 lit/hr. 11 m PM<150 mg/Nm3
SO2< 100 ppm
NOx< 50 ppm
Proposed Scenario (Process Gas Emission)
Process Vent-1 -- -- 11m HCl < 20 mg/Nm3 Two Stage
7
Particulars Fuel Fuel Quantity Stack height Emission
Norms
APCM
Scrubber
Process Vent-2 -- -- 11m SO2 < 40 mg/Nm3 Two Stage
Scrubber
Process Vent-3 -- -- 11m NH3 < 175 mg/Nm3 Two Stage
Scrubber
1.7 Hazardous Waste Management
Sr.
No.
Type of Waste Category
No.
Quantity Method of Disposal
Existing Additional Total
1. Discarded
Containers/Barrels/Carboys
33.1 1500
Nos/Year
2000
Nos/Year
3500
Nos/Year
Collection, Storage,
Reuse or sale to
authorized vendor Bags/Liners - 2500
Nos/Year
2500
Nos/Year
2. Used Oil 5.1 0.6 KL/Year
i.e.
50
Liter/Month
0.6
KL/Year
i.e.
50
Liter/Month
1.2 KL/Year
i.e.
100
Liter/Month
Collection, Storage,
Transportation,
disposal by sale to
registered recycler
3. ETP Sludge 35.3 0.6
MT/Year
i.e.
50 Kg/Month
119.4
MT/Year
i.e.
9.95
MT/Month
120
MT/Year
i.e.
10 MT/Month
Collection, Storage,
Transportation,
disposal at TSDF site
of BEIL, Ankleshwar
4. Resin from softening plant DM
plant
35.2 450 Lit/year
i.e.
38
Liter/Month
240
Lit/year
i.e.
20
Liter/Month
690
Lit/Year
i.e.
58
Liter/Month
Collection, Storage,
Transportation,
disposal at TSDF site
of BEIL, Ankleshwar
5. Distillation Residue 36.1 -- 392 MT/Year
i.e. 32
MT/Month
392 MT/Year
i.e. 32
MT/Month
Collection, Storage,
Transportation, sale
to cement industries
for co-processing or
disposal at common
incineration site of
BEIL, Ankleshwar
6. Manganese -Silicon -- 5460 MT/Year
i.e. 455
MT/Month
-- 5460 MT/Year
i.e. 455
MT/Month
Sell to end user
7. Gypsum A2040 288000
MT/Year i.e.
24000
MT/Month
-- 288000
MT/Year i.e.
24000
MT/Month
Sell to end user
8. Calcium Sulphate sludge
generated during the production
of CABS 70%
-- -- 1200 MT/Year
i.e. 100
MT/Month
1200 MT/Year
i.e. 100
MT/Month
White calcium salt
CaSO4 used
especially as a
8
diluent in tablets and
in hydrated form as
plaster of Paris.
White salt CaSO4 that
occurs especially as
anhydrite, gypsum,
and plaster of Paris
and that in hydrated
form is used as a
building material and
in anhydrous form is
used as a drying
agent.
9. Dil. HCl 29.6 -- 2659 MT/Year
i.e.
221
MT/Month
2659 MT/Year
i.e.
221
MT/Month
Sell to end user
10. Dil. H2SO4 29.6 -- 2727
MT/Year i.e.
227
MT/Month
2727
MT/Year i.e.
227
MT/Month
Sell to end user
11. Sodium Phthalate -- -- 65
MT/Year i.e.
5.4
MT/Month
65
MT/Year i.e.
5.4
MT/Month
Sell to end user
12. Poly -- -- 375
MT/Year i.e.
32 MT/Month
375
MT/Year i.e.
32 MT/Month
Sell to end user
13. Liquor Ammonia -- -- 300
MT/Year i.e.
25 MT/Month
300
MT/Year i.e.
25 MT/Month
Sell to end user
14. Ammonium Chloride -- -- 600
MT/Year i.e.
50 MT/Month
600
MT/Year i.e.
50 MT/Month
Sell to end user
15. Cuprous Chloride -- -- 185
MT/Year i.e.
15.4
MT/Month
185
MT/Year i.e.
15.4
MT/Month
Sell to end user
Solid Waste:
1. Fly Ash -- -- 3600 MT/Year
i.e.
300
MT/Month
3600 MT/Year
i.e.
300
MT/Month
Sell to brick
manufacturer
9
2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of the project and project proponent. In case of mining project, a copy
of mining lease/letter of intent should be given.
Identification of the project
Proposed expansion of Organic Specialty Chemicals and Pesticide Intermediates in Existing
Unit.
Identification of the project proponent
The company is managed by Directors. Name of the directors are given below:
Sr
No.
Name of Directors Designation Address
1 Mr. Anand M Shetty Director 1801, Odyssey – 1, 18th
Floor,
Hiranandani Gardens, A.S. Marg,
Powai, Mumbai– 400 076
2 Mrs. Shashirekha A
Shetty
Director 1801, Odyssey – 1, 18th
Floor,
Hiranandani Gardens, A.S. Marg,
Powai, Mumbai– 400 076
3 Mr. Pravir A Shetty Director 1801, Odyssey – 1, 18th
Floor,
Hiranandani Gardens, A.S. Marg,
Powai, Mumbai– 400 076
4 Mr. Adish A Shetty Director 1801, Odyssey – 1, 18th
Floor,
Hiranandani Gardens, A.S. Marg,
Powai, Mumbai– 400 076
2.2 Brief description of nature of the Project
The proposed expansion project involves the production of Organic Specialty Chemicals &
Pesticide Intermediates which falls under item no 5(f) - synthetic organic chemicals & 5(b) –
Pesticide Intermediates as per the EIA notification, Sept. 14, 2006 (as amended time to
time), Since The project is located in Dahej-I, GIDC and due to pesticide intermediates, it is
to be treated as Category 'A', and needs to obtain the prior Environmental Clearance from
MoEFCC, New Delhi.
10
2.3 Need for the project and its importance to the country and or region
The products are widely used in pesticide industries, pharma industries and construction
chemicals. The proposed products range having good demand in the Market & as per
market survey by the company there is a less supply of the products against its demand, to
overcome this shortage & to bridge demand-supply gap, the company proposed to have this
expansion.
2.4 Demand-Supply Gap
Based on our informal survey of the market with our current customers and various
traders, we have found that there is a big potential for the range of the products we are
planning. These products will be an addition to the current range of our products.
2.5 Imports vs. Indigenous production
Based on the current cost of indigenous raw materials, it will make us very competitive
against imported finished products and we will be able to increase the export of our
finished products.
2.6 Export possibility
As per market survey by the company, these proposed products are having a domestic as
well as export market due to its application in various types of pesticide industries, pharma
industries and construction chemicals.
2.7 Domestic/Export Markets
According to our principal customer, there is very good possibility of export of the products.
2.8 Employment Generation (Direct and Indirect) due to project.
Employment would be as per prevailing norms of state government for skilled and unskilled
people for the proposed expansion project.
11
3.0 Project Description
3.1 Type of Project including interlinked and interdependent projects, if any.
Proposed expansion of Organic Specialty Chemicals and addition of Pesticide Intermediates
in Existing Unit. Category: 'A'-5(f) & 5(b).
3.2 Location (map showing general location, specific location and project boundary &
project site layout) with coordinates.
Map showing general location
12
Project Site:
13
Plant Layout
14
3.3 Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Major factors involved in the selection of site are listed below:
• Site is very well connected by road
• Proximity to Raw Material suppliers
• Availability of sufficient land free from cultivation
• Availability of power evacuation facilities
• Availability of abundant water for industrial use
• Availability of Port, common MEE, common TSDF & CETP
Modern infrastructure support and amenities at par with industrial estates in other global
markets, including:
� Efficient transport facilities within the industrial estate.
� Environment-friendly zone.
� Uninterrupted power supply.
3.4 Size or Magnitude of Operation
Please refer section 1.2 of PFR.
3.5 Project Description with process details (a schematic diagram/flow chart showing the
project layout, components of the project etc. should be given)
Please refer Annexure-III in Form-I.
3.6 Raw material required along with estimated quantity, likely source, marketing area of
final products. Mode of transport of raw materials and finished products.
Please refer Annexure-II in Form-I.
3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined.
There will not be resource optimization/recycling and reuse envisaged in the proposed
expansion project.
15
3.8 Availability of water its source, energy/power requirement and source should be
given.
Water Source
After proposed expansion, quantity of water consumption will be 655 KL/Day. The entire
water requirement will be met through GIDC Water Supply.
Power & Fuel Requirement
Power requirement:
Existing:
Power requirement= 1300 KVA from DGVCL and D.G.Set= 125 KVA
After Proposed Expansion:
Power requirement= 4500 KVA from DGVCL and D.G.Set= 1500 KVA
FUEL REQUIREMENT
EXISTING
Sr.
No.
Fuel Requirement
1. Coal 100 MT/Day
2. HSD 12 Lit/Hr
AFTER PROPOSED EXPANSION
1. Coal 200 MT/Day
2. HSD 35 Lit/Hr
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal.
• After Proposed Expansion, fresh water requirement will be met through GIDC, Vapi.
Total water requirement after proposed expansion will 655 m3/day (Fresh= 526 m
3/day +
Recycle= 129 m3/day). Total wastewater generation after proposed expansion will be
193 m3/day. The Low COD effluent (50 m
3/day) shall be treated in proposed effluent
treatment plant consisting of primary treatment and secondary treatment & dispose it to
GIDC Drain.
16
• The High COD & High TDS-effluent (138 m3/day) shall be treated in proposed effluent
treatment plant consisting of primary treatment, MEE and Secondary & Tertiary
Treatment & send it to plant for reuse purpose.
• Domestic Effluent (17 m3/day) is disposed through septic tank & soak pit.
3.10 Schematic representations of the feasibility drawing which give information of EIA
purpose.
RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT
MARKET ASSESSMENT
FINANCIAL REPORT
PROJECT REPORT
INTRODUCTION
MONITORING OF AIR, WATER & SOIL QUALITY & NOISE
LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS
& BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH
LOCALS
BASELINE
ENVIRONMENTAL
STATUS
ENVIRONMENTAL INFORMATION CENTRE
CENTRAL GROUND WATER BOARD
GUJARAT POLLUTION CONTROL BOARD (GPCB)
PUBLIC HEALTH ENGINEERING DEPT.
AGRICULTURE DEPARTMENT
FOREST DEPARTMENT
IRRIGATION DEPARTMENT
EMPLOYMENT EXCHANGE
HEALTH CENTER
CENSUS DEPT.
INDIAN METEOROLOGICAL DEPT.
SOCIOECONOMIC
STATUS &
INFRASTRUCTURE
PROPOSED
EXPANSION PLANT
FACILITY DESCRIPTION
IMPACTS
METHODOLOGY OF
IMPACT
ASSESSMENT
IDENTIFICATION & ASSESSMENT OF IMPACTS
EVALUATION OF IMPACTS BY MATRIX METHOD
SOURCE OF INFORMATION OVERVIEW OF
E. I. A. STUDIES
ACTIVITIES
ENVIRONMENTAL
MANAGEMENT PLAN
DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR
POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT,
GREEN BELT DEVELOPMENT MONITORING PROGRAM
RISK ANALYSIS
STUDIES &
DISASTER
MANAGEMENT PLAN
SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY
DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. CONSEQUENCE ANALYSIS
PREPARATION OF DISASTER MANAGEMENT PLAN
17
4.0 Site Analysis
4.1 Connectivity
• Site is very well connected by road
• Availability of power evacuation facilities
• Availability of abundant water for industrial use
4.2 Land Form, Land Use and Land Ownership
18
4.3 Topography (along with map)
19
4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including
area under CRZ)), shortest distances from the periphery of the project to periphery of the
forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from
HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette
notification should be given.
CRZ Clearance is not applicable to our industry.
20
4.5 Existing Infrastructure
Major factors involved in the selection of site are listed below:
Site is very well connected by road
Proximity to Raw Material suppliers
Availability of sufficient land free form cultivation
Availability of power evacuation facilities
4.6 Soil Classification
It will be incorporated in EIA Studies.
4.7 Climatic data from secondary sources.
Primary source: Our own weather station & Secondary Source: Indian Meteorological
Department.
4.8 Social infrastructure available.
Depending on the growth of the company the required social infrastructure will be
provided.
21
5.0 Planning Brief
5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country
planning/Development authority classification.
Type of Industry: Proposed expansion of Organic Specialty Chemicals & addition of Pesticide
intermediates in Existing Unit.
5.2 Population Projection
It will be incorporated in EIA Studies.
5.3 Land use planning (breakup along with green belt etc.)
Total Plot Area: 1,71,579 m2
5.4 Assessment of Infrastructure Demand (Physical & Social)
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed expansion project.
• Social Welfare
• Cordial relation with the industry shall be established and representation shall be made
to villagers for help for creation of facilities related to health, education, etc.
5.5 Amenities/Facilities
It will be incorporated in EIA Studies.
22
6.0 Proposed Infrastructure
6.1 Industrial Area (Processing Area)
Processing Area (Processing Zone, ETP Area and Utility Area): 26000 m2
6.2 Residential Area (Non Processing Area)
Non Processing Area (Green belt, Raw material storage area, finished storage area and open
area): 145579 m2
6.3 Green Belt
M/s. Organic Industries Pvt. Ltd. has developed an effective green belt within the factory
and on periphery of the factory. In addition to this, majority of the vacant land is planted
with trees, shrubs and grasses.
6.4 Social Infrastructure
Depending on the growth of the company the required social infrastructure will be
provided.
6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc)
Major factors involved in the selection of site are listed below:
• Site is very well connected by road
• Proximity to Raw Material suppliers
• Availability of sufficient land free from cultivation
• Availability of power evacuation facilities
• Availability of abundant water for industrial use
6.6 Drinking water Management (Source & Supply of water)
Water requirement will meet through GIDC Water Supply.
23
6.7 Sewerage System
Sewage pipes are laid in entire company for the removal and disposal of mainly non-
harmful liquid wastes from the offices, canteen and domestic waste coming from different
sections. These liquid wastes are treated and disposed of by septic tank & soak pit.
6.8 Solid Waste Management
Details of Hazardous Waste Generation & Disposal
Please refer Topic No. 1.7 of PFR.
6.9 Power Requirement & Supply/Source
Power requirement:
Existing:
Power requirement= 1300 KVA from DGVCL and D.G.Set= 125 KVA
After Proposed Expansion:
Power requirement= 2800 KVA from DGVCL and D.G.Set= 1500 KVA
Fuel Requirement
EXISTING
Sr.
No.
Fuel Requirement
1. Coal 100 MT/Day
2. HSD 12 Lit/Hr
AFTER PROPOSED EXPANSION
1. Coal 200 MT/Day
2. HSD 35 Lit/Hr
24
7.0 Rehabilitation and Resettlement (R & R) Plan
7.1 Policy to be adopted (central/state) in respect of the project affected including home
oustees, land ouatees and landless laborers (a brief outline to be given)
There is no habitation on the proposed expansion project area and it is within existing
industry, so that R & R policy is not applicable to this project.
There shall be no displacement of any population in the project area. Any major activity that
may lead to resettlement of the people is considered as permanent impact. Hence, there is
no permanent impact on this account. The increasing industrial activity will boost the
commercial and economical status of the locality up to some extent.
8. Project Schedule & Cost Estimates
8.1 Likely date of start of construction and likely date of completion (Time schedule for
the project to be given).
We hereby state that the existing plant is operating as per present CC&A and will seek
revised CC&A only after obtaining the environmental clearance & CTE as per this
application.
Project can be implemented in 8 months after obtaining EC & CTE.
8.2 Estimated Project cost along with analysis in terms of economic viability of the
project.
Total costs of the project will Rs. 12.95 Crore (Proposed Expansion). Capital cost of air &
water pollution control system and environmental monitoring equipments will be Rs. 2.5
Crore (Proposed Expansion).
25
9. Analysis of Proposal (Final Recommendations)
9.1 Financial and social benefits with special emphasis on the benefit to be local people
including tribal population, if any, in the area.
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed project.
• Social Welfare shall be done.
• Cordial relation with the industry shall be established and representation shall be made