Project Details- (Riverbed Sand Mining Project) Sr. No. Details Particulars ABOUT THE PROPOSAL 1 Name of Lease Holder DEEPAKBHAI S PATEL 2 Location Address Sur.No.19, Vill: Dokalyani Muwadi, Tal: Lunawada, Dist: Mahisagar GUJARAT 3 Applicability of the CRZ Notification, 2011 NA 4 Lease Area (Hectares) 0.50.00 Hector 5 Co-ordinates of the lease area 23 0 05’55.1’’N 73 0 36’15.1’’E 23 0 05’53.53’’N 73 0 36’15.5’’E 23 0 05’52.5’’N 73 0 36’13.6’’E 23 0 05’54.2’’N 73 0 36’13.00’’E 6 Ownership of Land (Gove./Private Land) Government 7 Status of operation (New project or Existing project operating since 2008 New Project 8 Status of Lease (Lease no., date of issue, lease period, date of application for lease renewal, etc.) Approval of mining plan lease issued by the Collector office (Mining Department) Room No. 9 to 14, First Floor, Godhra on dated 09.05.2011 vide letter no. AGG/QAL/1607/2947, Mahisagar 9 Sand Reserve (MT) As per Technical Report 10 Rate of mining of mineral (MT/Month) 8000MT/Year ENVIRONMENT SETTINGS 11 If located within 10km, aerial distance of the lease area from the nearest: Name Distance (Km) i. National Park/Wildlife Sanctuary/Biosphere Reserve: NA ii. Reserve Forest/Protected Forest: NA iii. Human Habitation Village: Dokalyani Muwadi 1.15 iv. Railway Line: - - v. Road: Village Road 0.9 vi. Notified/Protected Archaeological sites: NA vii. Social infrastructures, e.g. school, hospital, historic/cultural/religious places, defense establishments, etc. : Community Health Centre Lunawada Religious Places: Local Temple, School 19 1.20 12 Width of riverbed (Meters) 80 13 Average depth of water at lease area (Meteres) 85 Mtr 14 Average thickness of sand deposit at lease area 3 Mtr. Max 15 Details of riparian vegetation, including endemic and endangered species of fauna, if any NA 16 Geo-Hydrology of the river flow (perennial, seasonal, etc.), Sediment transport characteristics/replenishment potential, etc. Seasonal Short time 17 Width and condition of access road (Kutcha/pucca) to the lease area: 5 Mt. Width and 600 Mt. long Kutcha Road

Upload: vuongque

Post on 29-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Details- (Riverbed Sand Mining Project)environmentclearance.nic.in/writereaddata/.../EC/Additional_Report/...to 14, First Floor, Godhra on dated 09.05.2011 vide ... (M T) As

Project Details- (Riverbed Sand Mining Project)Sr.No.

Details Particulars

ABOUT THE PROPOSAL1 Name of Lease Holder DEEPAKBHAI S PATEL2 Location Address Sur.No.19, Vill: Dokalyani Muwadi,Tal: Lunawada, Dist: MahisagarGUJARAT3 Applicability of the CRZ Notification,

2011NA

4 Lease Area (Hectares) 0.50.00 Hector5 Co-ordinates of the lease area 23005’55.1’’N 73036’15.1’’E

23005’53.53’’N 73036’15.5’’E23005’52.5’’N 73036’13.6’’E23005’54.2’’N 73036’13.00’’E

6 Ownership of Land (Gove./Private Land) Government7 Status of operation (New project or

Existing project operating since 2008New Project

8 Status of Lease (Lease no., date of issue,lease period, date of application for leaserenewal, etc.)

Approval of mining plan lease issued by theCollector office (Mining Department) Room No. 9to 14, First Floor, Godhra on dated 09.05.2011 videletter no. AGG/QAL/1607/2947, Mahisagar

9 Sand Reserve (MT) As per Technical Report10 Rate of mining of mineral (MT/Month) 8000MT/YearENVIRONMENT SETTINGS11 If located within 10km, aerial distance of

the lease area from the nearest:Name Distance

(Km)i. National Park/Wildlife

Sanctuary/Biosphere Reserve:NA

ii. Reserve Forest/Protected Forest: NAiii. Human Habitation Village: Dokalyani Muwadi 1.15

iv. Railway Line: - -v. Road: Village Road 0.9vi. Notified/Protected Archaeological

sites:NA

vii. Social infrastructures, e.g. school,hospital, historic/cultural/religiousplaces, defense establishments,etc. :

Community Health CentreLunawada

Religious Places: Local Temple,School

19

1.20

12 Width of riverbed (Meters) 8013 Average depth of water at lease area

(Meteres)85 Mtr

14 Average thickness of sand deposit at leasearea

3 Mtr. Max

15 Details of riparian vegetation, includingendemic and endangered species of fauna,if any

NA

16 Geo-Hydrology of the river flow(perennial, seasonal, etc.), Sedimenttransport characteristics/replenishmentpotential, etc.

Seasonal Short time

17 Width and condition of access road(Kutcha/pucca) to the lease area:

5 Mt. Width and 600 Mt. long Kutcha Road

Page 2: Project Details- (Riverbed Sand Mining Project)environmentclearance.nic.in/writereaddata/.../EC/Additional_Report/...to 14, First Floor, Godhra on dated 09.05.2011 vide ... (M T) As

DETAILS ON MINING/EXCAVATION ACTIVITIES18 Type of mining (Manual/Semi-

mechanized/mechanized)Type of mining :Semi-mechanized

19. Equipments to be used (Bulldozers,hydraulic excavators, loaders etc.)

JCB, Loader.

20. Minimum setback distance from river bank(Meters)

10 Mtr

21. Minimum buffer distance from bridgepiers/water intake wells/irrigation structure

500 Mtr

22. Minimum distance of stockpiles/vehicleloading place from the river bank

Mining will carried out in lease area. Thestockpiles/vehicle loading will be done in a such acontrolled manner that the nature of river does notdisturb. No artificial structure i.e. road or bund willbe created in lease area.

23. Maximum depth of sand removal (3 m orwater depth whichever is less)

3 Mtr

24. Man power requirement 0925. No. of working days in a year 180 Days26. Time of working hours in a day 8:00 to 17:00 (Total 8 Hours of working and one

hour of recess)Environmental management plan27. Measures proposed for protection of

environmental attributes like riverbed,riverbed vegetation, water, air, humanhealth, etc.

The precaution will be taken for nature of river bedand ensure that it would not be disturbed due tomining. No riverbed vegetation has been found inthe lease area. The depth of the mining will berestricted to 3 mtr. or water level, whichever is less.Domestic wastewater if generated will be disposedoff through soak pit/septic tank. Approach road &lease area will be water sprinkled regularly. Speedof vehicle entering in to the lease are will berestricted up to 20 kms/hrs. Overloaded vehicles wilbe covered with tarpaulin.

28. Details on transportation route & measuresproposed for control of fugitive emissionduring transportation

Approach road and lease area will be watersprinkled regularly. Speed of vehicle entering in tothe lease are will be restricted up to 20 kms/hrs.Overloaded vehicles will be covered with tarpaulin.

29. Details on transportation route area/ roadsides in at least 20% of lease area, numbers& types of species and budgetary outlay forthe same.

The green belt with tree plantation will be donesurrounding the available space of lease area andvillage.

30. Plan for restoration/reclamation The mine out area will be reclaimed through wastematerial i.e. coarse sand or gravel

Page 3: Project Details- (Riverbed Sand Mining Project)environmentclearance.nic.in/writereaddata/.../EC/Additional_Report/...to 14, First Floor, Godhra on dated 09.05.2011 vide ... (M T) As
Page 4: Project Details- (Riverbed Sand Mining Project)environmentclearance.nic.in/writereaddata/.../EC/Additional_Report/...to 14, First Floor, Godhra on dated 09.05.2011 vide ... (M T) As
Page 5: Project Details- (Riverbed Sand Mining Project)environmentclearance.nic.in/writereaddata/.../EC/Additional_Report/...to 14, First Floor, Godhra on dated 09.05.2011 vide ... (M T) As