Project by Falbygdens Energi AB

Energy storage Marknadsgatan Test and evaluation of energy storage

Energy storage connected to the wind power

Business models Energy Hub

Energy Storage Marknadsgatan

Energy Storage

Renewable electricity production

Electric cars

Visualization

The aim of the project was to test new technologies, visualize the power output from a energy storage and experiment with new business models. The goal was a pilot plant where Falbygdens Energi has the ability to test, evaluate the technology and benefits of a local energy storage.

The project was implemented between 2011-03-22 and 2012-09-30

Test and evaluation of Energy storage

•Functions tests •Applications test •Business models

The goal is to test and evaluate an existing energy storage plague spirit in a local power grid, and to evaluate the role of energy storage in the size of 100 kWh may have in the future regarding function, applications and possible business models. The project will continue to 2014-12-31.

Energy storage connected to the wind power

The goal of the study is that the report will serve as an instruction and as a basis for a technical specification and can be used for a possible purchase of an energy store.

The project was implemented between 2011-11-01 and 2012-09-30.

Business models Energy Hub

http://www.ferroamp.com/energyhub/benefits-for-consumers

The purpose of the study is to investigate and evaluate new business models for energihuben, solar cells and energy storage. The local energy store is located directly adjacent to the consumer's installation. The business model will be the basis for getting the product to market. The goal is to find the business model that ties together the various new benefits with the product, where all partners supplier / customer / utility companies is winner and an intermediate goal is to identify and quantify the various new benefits that are the product of electric utilities, consumers and the environment.

The project will continue to 2013-12-31.

The first battery storage in Sweden. Case studies, possibilities and outcomes.

Pia Borg

Project: Energy Storage Marknadsgatan

Energy Storage

Renewable electricity production

Electric cars

Visualization

Film

Battery Storage

• Active power 75 kW • Reactive power 100 kVar • Filter 50A • Energy 90 kWh

Single line diagram

• Battery modules • Converter • Step-up transformer • Monitoring system • Fire extinguishing System • Air conditioning • Measuring

Load profile

Daily cycling

Applications for energy storage in the low voltage network

•Peak shaving/load shifting •Reactive power compensation •Power quality improvement

Test program

•Capacity increase of substation due to load leveling •Voltage control by energy storage reactive power •Evaluation of reduction of losses 20/0,4 transformer •Evaluation of losses in energy storage system

• Capacity and round trip efficiency

• Battery degradation plus internal resistance and peak power capability

• Reliability of the energy storage

• Evaluation of ambient conditions in energy storage system

ELFORSK

www.elforsk.se/Rapporter/?rid=12_44_

• Dimensioning criteria • Regulatory framework • Business Models • Financial Calculation • Simulation Tools

Conclusions

• Peak shaving/load shifting, Reactive power compensation, Power quality improvement

• Provides additional wind power in the grid • Applications (Increased hosting capacity, reduced cost, peak