project all

12
ID EWO# Issued Category Project Name 4 22899 1106201 New Link 7 22791 22052013 New Link 8 22789 22052013 Internal 31 22802 24052013 New Link 71 22880 19062013 Migration 78 22734 10052013 Internal EWO New Link SR7 Graha 9 - SR7 Cyber Leased Line 10 Gbps 79 22728 08052013 87 22750 14052013 Internal 94 22349 05032013 Dismantle 106 22348 05032013 Dismantle EWO New Link PT.Sampoerna Telekomunikasi Indonesia (STI) Link Graha Mobisel - Wisma BCA Mataram Valdo Leased Line 3 Mbps SO_4462 CID_1004MM00005753IFORTE EWO New Link SMART PABX SDC BII - Wisma Biliton Lantai 4 Via FO MTI PABX 1 E1 , CID:1001MM00005373. EWO INTERNAL - Upgrade Trunking IP Core Section Graha - Lampung Internal 2 STM -1 EWO New Link MQM QQ Katsuyama Finetech Indonesia, Deltamas Supernet Mix 1 Mbps SO_4408 CID_2035SM00005379 Telkomsel, PT EWO Migration POI Telkomsel TBS to POI XL Jakarta Cibitung Via Moratel Local Loop 33 E1 Re- Engineering EWO Reengineering Link IIX For Smartfren, Cyber APJII - Smartfren BSD Leased Line Leased Line 1 Gbps SO_ CID_ EWO Moratelindo - Internal New Tunneling from 1678 Purwokerto to 1660 Purwokerto Internal STM-64 EWO Dismantle Link STIS - BPS Internet IX 10 Mbps + IIX 100 Mbps SO Awal 1295 SO Dismantle 1555 EWO Dismantle Link Badan Pusat Statistik (Kantor Pusat) IP Transit IX 40 Mbps and IIX 100 Mbps SO Awal 1294 SO Dismantle 1554

Upload: tomsamcong

Post on 03-Jan-2016

179 views

Category:

Documents


2 download

DESCRIPTION

report by gusti 1 juli 2013

TRANSCRIPT

Page 1: Project All

ID EWO# Issued Category Project Name Priority4 22899 1106201 New Link (2) Normal

7 22791 22052013 New Link (2) Normal

8 22789 22052013 Internal (2) Normal

31 22802 24052013 New Link (2) Normal

71 22880 19062013 Migration (2) Normal

78 22734 10052013 Internal EWO New Link SR7 Graha 9 - SR7 Cyber Leased Line 10 Gbps (2) Normal

79 22728 08052013 Re-Engineering (2) Normal

87 22750 14052013 Internal (2) Normal

94 22349 05032013 Dismantle (2) Normal

106 22348 05032013 Dismantle (2) Normal

EWO New Link PT.Sampoerna Telekomunikasi Indonesia (STI) Link Graha Mobisel - Wisma BCA Mataram Valdo Leased Line 3 Mbps SO_4462 CID_1004MM00005753IFORTE

EWO New Link SMART PABX SDC BII - Wisma Biliton Lantai 4 Via FO MTI PABX 1 E1 , CID:1001MM00005373.

EWO INTERNAL - Upgrade Trunking IP Core Section Graha - Lampung Internal 2 STM -1

EWO New Link MQM QQ Katsuyama Finetech Indonesia, Deltamas Supernet Mix 1 Mbps SO_4408 CID_2035SM00005379

Telkomsel, PT EWO Migration POI Telkomsel TBS to POI XL Jakarta Cibitung Via Moratel Local Loop 33 E1

EWO Reengineering Link IIX For Smartfren, Cyber APJII - Smartfren BSD Leased Line Leased Line 1 Gbps SO_ CID_

EWO Moratelindo - Internal New Tunneling from 1678 Purwokerto to 1660 Purwokerto Internal STM-64

EWO Dismantle Link STIS - BPS Internet IX 10 Mbps + IIX 100 Mbps SO Awal 1295 SO Dismantle 1555

EWO Dismantle Link Badan Pusat Statistik (Kantor Pusat) IP Transit IX 40 Mbps and IIX 100 Mbps SO Awal 1294 SO Dismantle 1554

Page 2: Project All

108 22530 01042013 New Link (2) Normal

117 22884 07062013 Survey (2) Normal

588 22253 20022013 EWO New Trunk ALU SAS M 7210 CYB to ALU SAS M 7210 SMG (2) Normal

590 22407 14032013 Internal EWO Moratelindo - Internal Optimalisation idle Equipment Internal 2 Item (2) Normal

594 22061 15012013 Internal (2) Normal

595 22198 13022013 Internal EWO Moratelindo - Internal Optimalization idle Equipment (2) Normal

599 22595 16042013 Upgrade (2) Normal

603 22376 10032013 New Link (2) Normal

615 22062 11012013 New Link EWO New Link PT.Jala Lintas Media (JLM) Link Permata Kuningan - Cyber APJII (2) Normal

620 22796 24052013 Trial EWO New Link (Trial) Cyber CSF, PT SO 35 (2) Normal

EWO New Link CNOOC SES Ltd, Pabelokan Island Supernet GBO IX 2 Mbps IIX 2 Mbps Via XL SO 4095 CID 6996SM00005159

Triple EWO: 22884, 22885, 22886: 22884-07062013 EWO Survey jalur FO Plaza BII_Tower 3 lt 8; 22885-07062013 EWO Survey jalur FO Plaza BII_Tower 2 lt 20; 22886-07062013 EWO Survey jalur FO Plaza BII_Tower 2 lt 29

EWO Moratelindo- Internal Monitoring Progress insert Card STM-16 for Metro E Fo Node

EWO Upgrade PT.Ambhara Duta Shanti Link Cyber APJII - PGS Solo Leased Line From 10 Mbps to 100 Mbps SO_4146 CID_6604MM00004412

New Link BERCA HARDAYAPERKASA MTI BPD Semarang-MTI Cyber APJII Leased Line 3 Mbps SO_3995

Page 3: Project All

PIC Region Location A Location B StatusDharma, M. Suryadharma Y. Jakarta Wisma BCA Matraman (1) Not Started

Supri, M. Supriyatna Jabodetabek SMART PABX SDC BII Wisma Biliton Lt.4 (1) Not Started

Dharma, M. Suryadharma Y. Jakarta-West Jakarta Lampung (1) Not Started

Dharma, M. Suryadharma Y. Jakarta Deltamas Graha 9 (1) Not Started

Dharma, M. Suryadharma Y. Jakarta Telkomsel TBS XL Jakarta Cibitung (1) Not Started

Dharma, M. Suryadharma Y. Jakarta CSF, Cyber Graha 9 (2) In Progress

Dharma, M. Suryadharma Y. Jakarta MTI NOC BSD (2) In Progress

Dharma, M. Suryadharma Y. East 1678 Pwkt 1660 Pwkt (2) In Progress

Dharma, M. Suryadharma Y. Jakarta - - (2) In Progress

Dharma, M. Suryadharma Y. Jakarta BPS Pusat - (2) In Progress

PT.Sampoerna Telekomunikasi Indonesia (STI), Graha Mobisel Jakarta

MTI CYBER CDC LT.5, MTI CYBER APJII LT.1

Page 4: Project All

Dharma, M. Suryadharma Y. Jakarta CNOOC, Pabelokan Island (2) In Progress

Dharma, M. Suryadharma Y. Jakarta (2) In Progress

Dharma, M. Suryadharma Y. Jakarta MTI-BPD SMG MTI-CYBER (4) Deferred

Dharma, M. Suryadharma Y. Jakarta Graha 9 - (4) Deferred

Dharma, M. Suryadharma Y. Jakarta BII, BSD,Cyber, Grh9, Depok, Bogor (4) Deferred

Dharma, M. Suryadharma Y. Jakarta GRAHA 9 - (4) Deferred

Dharma, M. Suryadharma Y. East Cyber APJII Lt.1 PGS Solo (5) Waiting On

Dharma, M. Suryadharma Y. Jakarta-East Cyber APJII Lt.1 BPD Semarang Lt.2 (5) Waiting On

Dharma, M. Suryadharma Y. Jakarta Cyber APJII Lt.1 Permata Kuningan (6) Roll Back

Dharma, M. Suryadharma Y. Jakarta Cyber CSF (6) Roll Back

BII, BSD,Cyber, Grh9, Depok, Bogor

Page 5: Project All

Received Date Start Date End Date Completed Date SO SPK BAA No BAA Date11/Jun/2013 11-Jun-2013 01-Jul-2013 4462

22/May/2013 22-May-2013 4403 048

22/May/2013 22-May-2013 24-May-2013

24/May/2013 27-May-2013 31-May-2013 4408

20/Jun/2013 20-Jun-2013 25-Jun-2013

10/May/2013 13-May-2013 17-May-2013

08/May/2013 08-May-2013

15/May/2013 17-May-2013 17-May-2013

05/Mar/2013 05-Mar-2013 05-Mar-2013

05/Mar/2013 05-Mar-2013 05-Mar-2013

Page 6: Project All

02/Apr/2013 02-Apr-2013 08-Apr-2013 4095

07/Jun/2013 10-Jun-2013 14-Jun-2013

20/Feb/2013 20-Feb-2013 25-Feb-2013

14/Mar/2013 14-Mar-2013 15-Mar-2013

15/Jan/2013 15-Jan-2013 16-Jan-2013

13/Feb/2013 13-Feb-2013 20-Feb-2013

17/Apr/2013 17-Apr-2013 17-Apr-2013 4146

11/Mar/2013 11-Mar-2013 13-Mar-2013 139

11/Jan/2013 11-Jan-2013 30-Jan-2013 033

24/May/2013 24-May-2013 24-May-2013 30/May/2013

Page 7: Project All

BAA Status Customer Marketing Contact Design Engineer Network XC(1) Open Jerry, Jermias Lazarus Amrih, Amrih Sulanjati

Ane, Diane Derlin Faisal S., Faisal Syafyar

(4) No BAA Ranu, Ranuyoga

(1) Open Yohana, Yohana Oktorin Asep, Asep Purwadi

(1) Open Dedy, Dedy Kurniawan Faisal S., Faisal Syafyar

(4) No BAA Dwi, Dwi Putranto

Ane, Diane Derlin Rio, Rio Prakoso

(4) No BAA Dicky, Dicky Sahbani

(4) No BAA -

(4) No BAA -

Page 8: Project All

(1) Open Melanie, Melanie Ghandika Rio, Rio Prakoso

(4) No BAA Daris, Daris Salam

(1) Open HerryR

(1) Open FOC JABODETABEK

(4) No BAA Pak Ade Infonet

(4) No BAA foc reg & NOC

(1) Open Yudi, Yudi Imanuel Amrih, Amrih Sulanjati

(1) Open Yudhi

(1) Open Victor Irianto

(4) No BAA Firman P., Firman Prasetya Rio, Rio Prakoso

Page 9: Project All

Project Coordinator SO Executor Notes11 Jun 2013: EWO Released.13 Jun 2013: Info by Dharma: "Updated Info :Sudah kita koordinasikan ke 3 party. Adapun point2nya sbb :1. Akan di lakukan penarikan malam ini ke BCA.2. Besok jika akan melakukan penarikan ke gedung BCAnya. Mereka butuh suppor1 Juli 2013 : By JerrySaat ini lagi di lakukan proses pembuatan izin sambil menunggu topologi pemasangan ceria seperti apa itu yg di tanyakan pihak BCA kepada kita..karena ini ada hubungannya dengan system security Wisma BCA

23May 2013: EWO Released.26 Juni 2013 : Pengajuan Ijin oleh Project dan Presales28 Juni 2013 : di email mba rita mau mengasih ijinnya dalam bentuk PDF, tetapi kami belum menerimanya

22 May 2013: EWO Released.FOC, only monitoring and for information FOC Jabodetabek and Lampung Team, for your information, the physical connection :Graha 9Allocation XDM 1000.16 Graha di Sl i8-P10 VC4#3,4 LampungAllocation XDM 1000.4 BDL SLi2-P9-VC

27 May 2013: EWO Released.RFS: May 31, 2013.FOC Team, only for information, due to last mile provided by MQM.12 Juni 2013 : Ewo done by arfan

20 Jun 2013: EWO Released. CID:1216IT00001910, 1216IT00001911, 1216IT00001912, 1216IT00001913, 1216IT00001914, 1216IT00001915, 1216IT00001916, 1216IT00001917, 1216IT00001918, 1216IT00001919, 1216IT00001920, 1216IT00001921, 1216IT00001922, 1216IT0000192325 Juni 2013 : Ewo Done by FOC Jabo

10 May 2013: EWO Released.16 May 2013: Febri Update:"APJI to CDC OTB core 96 T-line core 49,50 ><49,50OTB Core 96 T-line core 49,50<>5/1/2APJI to CSF MMR core 29,30><29,30CSF MMR to PSS core 29,30 ><slot 13 c4Graha 9 PSS to SR 7 slot 14 c4 >< 5/1/21 Mei 2013 : Ewo Done by helmiSetelah dilakukan pengecekan core kembali di sisi cyber CSF <>APJII ternyata untuk core 30 putus(loss),maka cyber CSF to APJII telah diganti core yang sebelumnya 29 dan 30 menjadi 41 dan 42

8 May 2013: EWO Released.Execution this EWO on May 8, 2013 at 7:00 PM1 Juli 2013 : Mohon Ewo Cancel by Admin. Karena belum pernah di release ke FOC Jabo. Dan ewo tersebut diganti dengan Ewo 22890.

17 May 2013: EWO Released. 22 May 2013: Mohon di follow ke temen2 yang di jabar, karena area tersebut bukan area jateng. (Info from Jateng region)

5 Mar 2013: EWO received. Link already disable by NOC IP Core (Arfan). Permit process to dismantle hardware @ customer site by Mba Mirna (Project). Dismantle Radio 2 side of BPS.

5 Mar 2013: EWO received. Link already disable by NOC IP Core (Arfan). Permit process to dismantle hardware @ customer site by Mba Mirna/Mba Angganeta (Project). Dismantle Radio 2 side of BPS (Center Office).

Page 10: Project All

Angganeta, Angganeta

Angganeta, Angganeta

28 Januari 2013: EWO diterima. 31 Jan 2013: EWO cancel, info Pak Rony AM by email.

2 Apr 2013: EWO Received.5 Apr 2013; All already preparedLast Status Waiting On. Equipment not Ready (firewall).3 Jun 2013:Waiting XL Link19 Jun 2013: Info by Teguh Presale : "Untuk kebutuhan CNOOC Pabelokan, Interkoneksi XL <> MTI di Cyber sudah don

10 Jun 2013: EWO Released.Info by Agoeng (Presale): "Implementasi EWO ini apakah dibarengi dengan implementasi ewo no 22859-04062013 (Survey Jalur Dan Panjang Kabel Dari POP MTI Ke customer ISAT di Lt.30 BII Tower 2.xlsx)."13 juni 2013 : Ewo di hold sampai ada kejelasan PIC Customer dan BM nya

21 Februari 2013 : EWO diterima. Material in progress. 6 Mar 2013: Untuk EWO ini belum bisa dilanjut dikarenakan ada kendala pada konfigurasi ISA card di 1660 SMG & 1660 CYB, ISA card belum terintegrasi di NMS yang baru. Kami tidak bisa melakukan konfigur9 May 2013 : Take Over ISA oleh team ALU sampai saat ini belum berhasil dilakukan, untuk sementara activity ini di pending sampai ada kabar dari Team ALU26 Juni 2013 : Take over ISA oleh team ALU berhasil untuk di Yogya, Dharmala, Cyber dan Bandung tinggal Semarang Cyber(1660.2) belum berhasil. menunggu dari team ALU.

14 Mar 2013: EWO diterima.This EWO Refer to EWO 22198-1302201319 Mar 13> Material ALU 1642 dan BG30 n patchcord masih dicari o/ INFRADeffered: waiting Material

15 Januari 2013 : EWO diterima. 28 Januari 2013 : di HOLD Karena new card yang akan diinsert (SIO64B) berbeda dengan card existing (SIO64) dan tidak support untuk NVM versi lama, sehingga diperlukan upgrade NVM di existing XDM-1000. Saat ini masih dalam k

13 Februari 2013 : EWO diterima Equipment already installed @ Graha 9 Data Center, software in progressThis EWO Refer to EWO 22198-1302201319 Mar 13: Material ALU 1642 dan BG30 n patchcord masih dicari o/ INFRAWaiting On: Material.15 Feb 13 : Erwin EN

17 Apr 2013: EWO Received.FOC - Field Operation Center 1. Please coordination with PIC Customer to reconnect UTP cable from customer equipment to SW DCN Cyber APJII (10.200.0.106) port Eth0/0/502. Please coordination with PIC Customer to r

11 Mar 2013: EWO Received.16 Mar 2013: Status Waiting On.Info Rony (AM): Untuk link ini masih menunggu tanggal konfirmasi dari pelanggan untuk instalasi BPD Semarang.

24 May 2013: EWO Released.TRIAL PERIOD : May 24, 2013 until May 30, 2013For hardware connection: laying cable and connect to port will be process by PIC CSF Raditya Wibisono (021-5727777 / 08111802831) as inform by Mas Firman P.Dear FOC Jabo Team, th30 May 2013 :ewo di roll back