Page 1: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

90 years since 1926

PROJECT

REFERENCES

Page 2: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

90 years since 1926

References – Fabrication

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

1 PP Belchatow 9 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)

Poland Babcock Borsig Steinmüller GmbH, Germany 2015

2 PP Belchatow 10 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)

Poland Babcock Borsig Steinmüller GmbH, Germany 2015

3 PP Govora fabrication of burners Romania Babcock Borsig Steinmüller GmbH, Germany 2015

4 Dong Energy fabrication of steel structures Germany Bilfinger MCE Aschersleben GmbH, Germany 2015

5 Werk Dillenburg fabrication of superheater Germany Weiss Kessel-, Anlagen- und Maschinenbau GmbH, Germany

2014

6 PP Nordhorn fabrication of superheater Germany Bilfinger Rosink GmbH, Germany 2014

7 Werk Aschersleben fabrication of tank Germany Bilfinger MCE Aschersleben GmbH, Germany 2014

8 PP Turow fabrication and delivery of steel structure Poland Bilfinger Infrastructure S.A., Poland 2014

9 PP Nikola Tesla - Obrenovac fabrication and delivery of burners Serbia Babcock Borsig Steinmüller GmbH, Germany 2014

10 PP Jänschwalde fabrication of ducts Germany Babcock Borsig Steinmüller GmbH, Germany 2014

11 PP Turow fabrication and delivery of system for purifying flue gases (ducts, shielding, steel structures)

Poland Babcock Noell GmbH, Germany 2014

12 PP Belchatow 12 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)

Poland Babcock Borsig Steinmüller GmbH, Germany 2013 - 2014

13 PP Belchatow 11 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)

Poland Babcock Borsig Steinmüller GmbH, Germany 2013

14 PP Bitola fabrication of burners Macedonia Babcock Borsig Steinmüller GmbH, Germany 2013

15 CF Allmendingen Schwenk fabrication of steel structure Germany ThyssenKrupp Resource Technologies GmbH, Germany

2013

Page 3: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 2 / 2

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

16 PP Sabiya fabrication of burners Kuwait Babcock Borsig Steinmüller GmbH, Germany 2013

17 PP GKM Mannheim fabrication of the wet ash treatment plant part Germany Babcock Borsig Steinmüller GmbH, Germany 2013

18 PP Bitola fabrication of burners and kipprost module Macedonia Babcock Borsig Steinmüller GmbH, Germany 2012

19 PP Belchatow 8 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)

Poland Babcock Borsig Steinmüller GmbH, Germany 2012

20 PP Belchatow 7 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)

Poland Babcock Borsig Steinmüller GmbH, Germany 2011 - 2012

21 PP Amer 9 fabrication of classifier upper part The

Netherlands Babcock Borsig Steinmüller GmbH, Germany 2011

22 Cordemais 3 fabrication of air ducts France Babcock Borsig Service GmbH, Germany 2011

23 PP Belchatow 6 fabrication of firing system components Poland Babcock Borsig Service GmbH, Germany 2010

24 Basell Wesseling fabrication of steel structure and air ducts Germany Babcock Borsig Service GmbH, Germany 2010

25 PP Rodenhuize 4 fabrication of ducts Belgium Babcock Borsig Service GmbH, Germany 2010

26 PP Belchatow 5 fabrication of firing system components Poland STEINMÜLLER Instandsetzung Kraftwerke GmbH, Germany

2010

27 PP Belchatow 4 fabrication of firing system components Poland STEINMÜLLER Instandsetzung Kraftwerke GmbH, Germany

2009

28 PP BOA 1, Niederaussem fabrication of ducts for E-filter Germany Rothemühle, Germany 2002

Page 4: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

90 years since 1926

References – Bridges

PROJECT

WORK DETAILS

COUNTRY EMPLOYER YEAR Description

Length (m)

Spans (m)

Weight (t)

1 Licanka Bridge fabrication of bridge steel structure

72 2x36 220 Croatia Hrvatske zeljeznice d.d., Croatia

2013

2 Tunnel Sveti Ilija erection of bridge steel structure for remedy of cavities inside the tunnel

1x20,4 + 2x27,4 210 Croatia Hidroelektra Niskogradnja d.d., Croatia

2012

3 Bosut Bridge new bridge construction 67 65 390 Croatia Swietelsky d.o.o., Croatia 2010

- 2011

4 Zdrelac Bridge on the road D110 over sea strait Zdrelac between islands Ugljan and Pasman

reconstruction 67.9 66.9 360 Croatia Konstruktor inzenjering Split d.d., Croatia

2008

5 Zrinski Bridge over River Mura on Motorway between Letenya and Goricani

new bridge construction 216 36+3x48+36 1267 Croatia and

Hungary

Hrvatske autoceste d.o.o., Croatia, Croatia and Nemzeti Infrastruktura Fejleszto, Hungary

2007 -

2008

6 Crna Rijeka Bridge on Motorway Zagreb-Split-Dubrovnik, Section Ploce 1 - Luka Ploce

new bridge construction 328 2x24+8x35 1039 Croatia Hrvatske autoceste d.o.o., Croatia

2007 -

2008

7 Road overpass Josava at Osijek - Dakovo Section of Beli Manastir - Osijek - Svilaj - Ploce Motorway

overpass construction 253 36+4x45+36 1581 Croatia Hrvatske autoceste d.o.o., Croatia

2007

8 Road overpass Hrastinka at Osijek - Dakovo Section of Beli Manastir - Osijek - Svilaj - Ploce Motorway

overpass construction 163 36+2x45+36 1022 Croatia Hrvatske autoceste d.o.o., Croatia

2007

9 Road overpass Topolina at Osijek - Dakovo Section of Beli Manastir - Osijek - Svilaj - Ploce Motorway

overpass construction 118 36+45+36 738 Croatia Hrvatske autoceste d.o.o., Croatia

2007

10 Road overpass over the Zagreb - Vinkovci railway, in km 76+942,86 at Beli Manastir -

overpass construction 656 L=35,5+13x45+35,5 4000 Croatia Hrvatske autoceste d.o.o., Croatia

2006

Page 5: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 2 / 4

90 years since 1926

PROJECT

WORK DETAILS

COUNTRY EMPLOYER YEAR Description

Length (m)

Spans (m)

Weight (t)

Osijek - Svilaj - Ploce Motorway, Section Dakovo - Sredanci

11 Road bridge over River Drava at the Osijek bypass road

new bridge construction 270 L=80+110+80 1341 Croatia Hrvatske ceste d.o.o., Croatia

2006

12 Road bridge over River Spacva near Lipovac new bridge construction 94 L=1x94 456 Croatia Hrvatske ceste d.o.o., Croatia

2006

13 Road overpass at Kosnica crossing at Zagreb - Lipovac Motorway, Section Jankomir - Ivanja Reka

steel structure fabrication 116 L=26+32+32+26 665 Croatia Viadukt d.d., Croatia 2006

14 Road bridge over River Mura at Sv. Martin - Hotize Public Road

new bridge construction 105 L=31,5+42+31,5 120 Croatia Hrvatske ceste d.o.o., Croatia

2005

15 Road bridge over River Sava near Zapresic new bridge construction 200 L=50+100+50 1130 Croatia Viadukt d.d., Croatia 2005

16 Gacka Bridge on Motorway Zagreb - Split, Section Zuta Lokva - Licko Lešce

new bridge construction 452 L=55+90+55+5x44+32 4646 Croatia Hrvatske autoceste d.o.o., Croatia

2004

17 Road bridge over River Bosut in Nijemci reconstruction 63 L=31,5+31,5 78 Croatia Hrvatske ceste d.o.o., Croatia

2004

18 Maslenica Bridge over Novsko Zdrilo at D8 Public Road

renewal of the destroyed bridge

314 steel arc L=155 1537 Croatia Hrvatske ceste d.o.o., Croatia

2004

19 Road bridge over River Sava in Jasenovac reconstruction 236 L=60,5+120+55,5 1240 Croatia Hrvatske ceste d.o.o., Croatia I EU

2004

20 Road bridge over River Krka at Skradin - Sibenik Section of Adriatic Motorway

new bridge construction 352 L=2x32+204+32+28+24 1690 Croatia Konstruktor inzenjering d.d., Croatia

2004

21 Al-Lezhe road bridge new bridge construction 60 L=30x30 165 Albania Cordioli&CS S.p.A, Italy 2003

22 Al-Dures-Dajlani road bridge new bridge construction 400 knot 1100 Albania Cordioli&CS S.p.A, Italy 2002

23 Al-Lezhe-Mat road bridge new bridge construction 630 L=18x35 1050 Albania Cordioli&CS S.p.A, Italy 2002

24 Al-Lezhe-Drin road bridge new bridge construction 240 L=5x32+49+31 420 Albania Cordioli&CS S.p.A, Italy 2002

Page 6: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 3 / 4

90 years since 1926

PROJECT

WORK DETAILS

COUNTRY EMPLOYER YEAR Description

Length (m)

Spans (m)

Weight (t)

25 Ilok Bridge - River Dunav in km 336+500 steel structure and electrical installation improvement

15 L=1x15 9.5 Croatia Hrvatske ceste d.o.o., Croatia

2002

26 Road bridge over River Glina in Glina bridge renewal 42.5 L=1x42,5 119 Croatia Hrvatske ceste d.o.o., Croatia

2002

27 Road bridge over River Orasnica in Knin reconstruction 10.5 L=1x10,5 17 Croatia Hrvatske ceste d.o.o., Croatia

2002

28 Al-Dures-Erzenit road bridge new bridge construction 100 L=33+33+33 245 Albania Cordioli&CS S.p.A, Italy 2001

29 Al-Dures-Flake road bridge new bridge construction 30 L=30 40 Albania Cordioli&CS S.p.A, Italy 2001

30 Al-Dures-Rinyja road bridge new bridge construction 30 L=30 36 Albania Cordioli&CS S.p.A, Italy 2001

31 Al-Dures-Schorzet road bridge new bridge construction 40 L=40 80 Albania Cordioli&CS S.p.A, Italy 2001

32 Road&railway bridge over River Sava - Slavonski Samac - Bosanski Samac

reconstruction 198 L=55+88+55 1450 Croatia EU 2001

33 Road bridge over River Sava - Slavonski Brod - Bosanski Brod

reconstruction 227 L =71+79+71 439 Croatia Parsons Corporation, USA 2001

34 Al-Dures-Overpas road bridge new bridge construction 80 L=33 160 Albania Cordioli&CS S.p.A, Italy 2000

35 Road bridge over River Drava in Belisce new bridge construction 192 L=90+90 920 Croatia Duro Dakovic Inzenjering d.d., Croatia

2000

36 Strmen road bridge reconstruction 61 L=4x15,25 9 Croatia Hrvatske ceste d.o.o., Croatia

2000

37 Road bridge over River Sava - Stara Gradiska

reconstruction 494 L=71+ +71 196 Croatia Duro Dakovic Inzenjering d.d., Croatia

1999

38 Zupanja/Orasje road bridge over River Sava reconstruction 304 L=85+134+85 1130 Croatia Hrvatske ceste d.o.o., Croatia - PID BIH

1999

39 Road bridge over River Kupa near Brest new bridge construction 123.4 L=61,7+61,7 450 Croatia Hrvatske ceste d.o.o., Croatia

1998

Page 7: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 4 / 4

90 years since 1926

PROJECT

WORK DETAILS

COUNTRY EMPLOYER YEAR Description

Length (m)

Spans (m)

Weight (t)

40 Loskun railway bridge new bridge construction

70 L=1x70 260 Croatia Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ) GmbH

1997

Page 8: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

90 years since 1926

References – Industrial Plants

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

1 Großmehring trunk recovery Germany Bilfinger FRB GmbH, Germany 2014

2 Paper mill Hoya boiler overhaul Germany Standardkessel Baumgarte Service GmbH, Germany

2014

3 BVA Hagen Kabel boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany

2014

4 Cement Factory Peru kiln overhaul Germany ThyssenKrupp Industrial Solutions GmbH, Germany

2014

5 Cement Factory Sv. Juraj replacement of rotary kiln parts Croatia Cemex, Croatia 2014

6 Paper mill Natron - Hayat, Maglaj rotary kiln overhaul Bosnia and

Herzegovina Natron-Hayat d.o.o. Maglaj, Bosnia and Herzegovina

2014

7 Cement Factory Koromacno annual maintenance Croatia Holcim (Croatia) d.o.o., Croatia 2014

8 ITV-Murexin delivery and installation of two silos Croatia ITV RASŠA 2013

9 Pharmaceutical manufacturing plant Savski Marof

reconstruction of the synthesis plant Croatia Pliva Croatia d.o.o., Croatia 2013

10 Schwenk E. Zementwerk KG, Werk Allmendingen

installation of a cement line Germany ThyssenKrupp Resource Technologies GmbH, Germany

2013

11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013

12 Cement Factory Nasicecement replacement of rotary kiln shell, support roller and girth gear Croatia Nasicecement d.d., Croatia 2012

13 Cellulose Factory Natron - Hayat, Maglaj rotary kiln overhaul Bosnia and

Herzegovina Natron-Hayat d.o.o. Maglaj, Bosnia and Herzegovina

2011

14 Cement Factory Lukavac cement grinder overhaul Bosnia and

Herzegovina Fabrika cementa Lukavac d.d., Bosnia and Herzegovina

2011

15 Cement Factory Nasicecement mechanical equipment overhaul Croatia Nasicecement d.d., Croatia 2011

16 Cement Factory Koromacno annual overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2011

Page 9: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 2 / 4

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

17 Cheese Factory Zdenka Veliki Zdenci reconstruction of food plant Croatia Zdenka d.o.o., Croatia 2011

18 Cement Factory Koromacno winter overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2010

19 KAKANJ Cement Factory replacement of cement grinder B Bosnia and

Herzegovina Tvornica cementa Kakanj d.d., Bosnia and Herzegovina

2010

20 KAKANJ Cement Factory replacement of raw material grinder Bosnia and

Herzegovina Tvornica cementa Kakanj d.d., Bosnia and Herzegovina

2010

21 Cement Factory Koromacno winter overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2009

22 KAKANJ Cement Factory replacement of cement grinder B Bosnia and

Herzegovina Tvornica cementa Kakanj d.d., Bosnia and Herzegovina

2009

23 Cement Factory Koromacno winter overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2008

24 ISTRACEMENT Cement Factory fabrication and assembly of new clinker production line Croatia Istra cement d.o.o., Croatia 2008

25 Duna - Dráva Cement reconstruction of line 2 in Beremend Cement factory Hungary Polysius AG, Germany 2008

26 VIRO Sugar Factory reconstruction of sugar factory Croatia VIRO Tvornica secera d.d., Croatia

2008

27 Cement Factory Koromacno fabrication and assembly of hot gas ducts; winter overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2007

28 CHEKKA Cement Factory capacity enlargement of clinker production line Lebanon Cimentarie Nationale SAL, Lebanon

2007

29 Cement Factory Nasicecement winter overhaul Croatia Nasicecement d.d., Croatia 2006

- 2007

30 KOROMACNO Cement Factory partial replacement of rotary kiln and heat exchangers; reconstruction of cement packing line; construction of waste consumption plant; regular annual overhauls

Croatia Holcim (Croatia) d.o.o., Croatia 2005

- 2007

31 KANDIT PREMIJER OSIJEK Sugar Factory

regular annual overhauls Croatia Kandit - Premijer d.o.o., Croatia 2005

- 2007

32 NASICECEMENT Cement Factory erection of new MC3 cement grinding plant; cement works overhauls Croatia Nasicecement d.d., Croatia 2005

- 2007

Page 10: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 3 / 4

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

33 OSIJEK Brewery regular annual overhauls Croatia Pivovara d.d. Osijek, Croatia 2005

- 2007

34 Istrian Lime Factory construction of new factory for mortar, glue and additives Croatia Istarska tvornica vapna d.o.o., Croatia

2006

35 DALMACIJACEMENT (Sv. Juraj CF, Sv. Kajo CF, 10. kolovoz Solin CF)

regular annual overhauls Croatia Dalmacijacement d.d., Croatia 2005

- 2006

36 UMAG Cement Factory dismantling of cement grinding plant Croatia Holcim (Croatia) d.o.o., Croatia 2005

37 DALMACIJACEMENT (Sv.Juraj CF) overhaul and reconstruction of raw material grinding plant; mechanical and electrical equipment installation for raw material grinder - 650 t/h capacity

Croatia Dalmacijacement d.d., Croatia 2004

38 LES CIMENTS DE JBEL OUST (Chergakom)

erection of equipment and steel structure for new coal grinding unit Tunisia Polysius AG, France 2004

39 KAKANJ Cement Factory rotary kiln casing partial replacement Bosnia and

Herzegovina Tvornica cementa Kakanj d.d., Bosnia and Herzegovina

2003 -

2004

40 DALMACIJACEMENT Cement Factories regular annual overhauls Croatia Dalmacijacement d.d., Croatia 1998

- 2004

41 ISTRACEMENT Cement Factory reconstruction of coal grinding plant Croatia Istra cement d.o.o., Croatia 2003

42 NASICECEMENT Cement Factory erection of equipment for coal grinding plant, equipment and structures for clinker production line - capacity enlargement

Croatia Nasicecement d.d., Croatia 2002

- 2003

43 SOCIETE des CIMENTS d'ENFIDA construction of new clinker production line Tunisia Polysius AG, France 2002

- 2003

44 LES CIMENTS DE JEBEL OUST Cement Factory

erection of mechanical equipment and steel structure Tunisia Polysius AG, France 2001

- 2002

45 CHEKKA Cement Factory mechanical & electrical erection of new clinker line and installation of equipment for diesel power plant 2x7.5 MW

Lebanon Cimentarie Nationale SAL, Lebanon

1998

Page 11: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 4 / 4

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

46 KOROMACNO Cement Factory reconstruction of heat exchangers, clinker transport and erection of steel structure

Croatia Holcim (Croatia) d.o.o., Croatia 1998

47 NASICECEMENT Cement Factory reconstruction of rotary kiln, heat exchangers, electrical filters; erection of steel structure and regular annual overhaul

Croatia Nasicecement d.d., Croatia 1998

48 DYCKERHOFF AG, LENGERICH Cement Factory

erection of steel structure Germany Polysius AG, Germany 1998

49 MILKE GESEKE Cement Factory erection of steel structure, equipment and fire-durable refractory Germany Polysius AG, Germany 1997

- 1998

50 LAEGERDORF Cement Factory erection of steel structure, equipment and Dopol tower refractory, kiln and cooler for clinker

Germany Polysius AG, Germany 1997

Page 12: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

90 years since 1926

References – Petrochemical Plants

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

1 Rijeka Oil Refinery engineering services, material supply, piping and equipment erection in order to increase energy efficiency

Croatia INA d.d., Croatia 2013

2 Rijeka Oil Refinery fabrication and replacement of Riser regenerator on FCC plant Croatia INA d.d., Croatia 2013

3 Rijeka Oil Refinery fabrication and replacement of expansion joint and pipeline 36" and 66" on FCC plant

Croatia INA d.d., Croatia 2013

4 Rijeka Oil Refinery G4 boiler overhaul Croatia STSI d.o.o., Croatia 2013

5 Rijeka Oil Refinery G5 boiler overhaul Croatia STSI d.o.o., Croatia 2013

6 Rijeka Oil Refinery erection of sweet wac plant (desulphurization plant) Croatia INA d.d., Croatia 2013

7 Oil tank JANAF Zitnjak erection of 2 oil tanks (2 x 20.000 m3) Croatia Monting d.o.o., Croatia 2013

8 Oil tank JANAF Omisalj erection of an oil tank (80.000 m3) and connecting pipelines Croatia Duro Dakovic Inzenjering d.d., Croatia 2013

9 Sisak Oil Refinery erection of waste water treatment plant Croatia INA d.d., Croatia 2013

10 Kutina Petrochemical Plant

overhaul of ammonia and urea fabrication units Croatia Petrokemija d.d. Tvornica gnojiva Kutina, Croatia

2012

11 Sisak Oil Refinery dismantling and assembly of piping Croatia STSI d.o.o., Croatia 2011

12 Rijeka Oil Refinery - Urinj

assembly of high and low pressure piping in Hydrocracker Complex Croatia CB&I Lummus s.r.o., Czech Republic 2010

13 Kutina Petrochemical Plant

regular yearly overhaul Croatia Petrokemija d.d. Tvornica gnojiva Kutina, Croatia

2008, 2009

14 Rijeka Oil Refinery reconstruction of Topping unit 3 Croatia STSI d.o.o., Croatia 2008

15 Sisak Oil Refinery boiler pressure part overhaul Croatia STSI d.o.o., Croatia 2008

16 Sisak Oil Refinery assembly of stationary equipment in sulphur plant Croatia INA d.d., Croatia 2007

17 Rijeka Oil Refinery assembly of vacuum distillation unit Croatia STSI d.o.o., Croatia 2007

18 Sisak Oil Refinery replacement of equipment and R 5301 reactor Croatia STSI d.o.o., Croatia 2007

Page 13: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 2 / 3

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

19 Sisak Oil Refinery assembly of gas generator Croatia STSI d.o.o., Croatia 2007

20 Sisak Oil Refinery FCC splitter reconstruction Croatia STSI d.o.o., Croatia 2007

21 Kutina Petrochemical Plant

plant overhaul and yearly maintenance Croatia Petrokemija d.d. Tvornica gnojiva Kutina, Croatia

2007

22 Kutina Petrochemical Plant

construction of new soot silo; boiler unit chimney replacement; maintenance; regular annual overhauls

Croatia Petrokemija d.d. Tvornica gnojiva Kutina, Croatia

2005 - 2007

23 Rijeka Oil Refinery - Urinj

313 - F3 heater unit overhaul Croatia INA d.d. Zagreb, Croatia 2006

24 Rijeka Oil Refinery - Urinj

312 - F1 heater unit overhaul Croatia STSI d.o.o., Croatia 2006

25 Rijeka Oil Refinery - Urinj

FCC plant overhaul, reactor replacement Croatia STSI d.o.o., Croatia 2006

26 Rijeka Oil Refinery - Urinj

331 SA-018 80 000 m3 tank reworks Croatia STSI d.o.o., Croatia 2006

27 Sisak Oil Refinery T6101 column piping reconstruction Croatia INA d.d. Zagreb, Croatia 2005

28 Rijeka Oil Refinery - Urinj

vacuum distillation reconstruction Croatia INA d.d. Zagreb, Croatia 2005

29 Rijeka Oil Refinery - Urinj

blow-down piping replacement Croatia STSI d.o.o., Croatia 2005

30 Rijeka Oil Refinery - Mlaka

G-002 boiler overhaul Croatia INA d.d. Zagreb, Croatia 2003

31 Rijeka Oil Refinery - Urinj

16C-1;318C-101 column disassembly/erection Croatia INA d.d. Zagreb, Croatia 2003

32 Bayernoil Refinery piping erection Germany KA-Muenchen GmbH, Germany 2003

33 Rijeka Oil Refinery HDS plant overhaul Croatia INA d.d. Zagreb, Croatia 2002

34 Sisak Oil Refinery FCC plant overhaul Croatia INA d.d. Zagreb, Croatia 2001

35 Kutina Petrochemical Plant

ammonium plant overhaul Croatia Petrokemija d.d., Croatia 2001

Page 14: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 3 / 3

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

36 Leuna Werke Oil Refinery

piping erection Germany Sarens GmbH, Germany 2001

37 Cepin Oil Factory equipment and piping erection Croatia KA-Muenchen GmbH, Germany 2000

38 Belisce d.d. equipment and piping erection Croatia Belisce d.d., Croatia 1999

39 PLIVA - Savski Marof equipment and piping erection Croatia INA d.d. Zagreb, Croatia 1998

40 Rijeka Oil Refinery overhaul of boilers G-4, G-5 Croatia Pliva d.d., Croatia 1998

41 Rijeka Oil Refinery platforming II overhaul Croatia INA d.d. Zagreb, Croatia 1997

Page 15: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

90 years since 1926

References – Power Plants

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

1 PP Belchatow 10 dismantling and assembly (mills, burners, ducts) Poland Babcock Borsig Steinmüller GmbH, Germany 2015

2 PP Belchatow 9 dismantling and assembly (mills, burners, ducts) Poland Babcock Borsig Steinmüller GmbH, Germany 2015

3 PP Skaerbaek assembly of two biomass boilers Denmark Babcock Wilcox Volund, Denmark 2015

4 PP Skaerbaek assembly of two bag filters Denmark Envirotherm GmbH, Germany 2015

5 PP Dalkia Lodz dismantling and assembly of two boilers Poland Babcock Borsig Steinmüller GmbH, Germany 2014

6 PP Pöls dismantling and assembly of the boiler Austria Andritz Energy & Environment AG 2014

7 PP Wilton boiler assembly UK CNIM, France 2014

8 PP Amager boiler assembly Denmark DD TEP d.o.o., Croatia 2014

9 PP Weener boiler overhaul Germany Standardkessel Baumgarte Service GmbH, Germany

2014

10 PP Boxberg boiler overhaul Germany Babcock Noell GmbH, Germany 2014

11 PP Boxberg boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Zweigniederlassung Peitz, Germany

2014

12 PP Stuttgart-Münster boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

13 PP Altbach boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

14 PP Fenne boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

15 PP München-Nord boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

16 PP Farge boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

17 PP Weiher boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

18 PP Offenbach boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

19 PP Lippendorf boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Zweigniederlassung Peitz, Germany

2014

Page 16: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 2 / 9

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

20 PP Dortmund boiler overhaul Germany Standardkessel Baumgarte Service GmbH, Germany

2014

21 PP Niederaußem piping erection Germany Kraftanlagen München GmbH, Niederlassung Essen, Germany

2014

22 PP Offenbach burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

23 PP München-Nord burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

24 PP Fenne burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

25 GuD Lausward piping erection Germany Babcock Borsig Steinmüller GmbH, Germany 2014

26 PP Zolling expansion joint overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

27 PP Jänschwalde burner overhaul Germany Babcock Borsig Steinmüller GmbH, Zweigniederlassung Peitz, Germany

2014

28 PP Minden boiler overhaul Germany Balcke-Dürr GmbH, Germany 2014

29 PP Freistett boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

30 PP Karlsruhe boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

31 PP Staudinger boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

32 PP Offenbach burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014

33 PP Belchatow 12 firing system replacement, recovery of fresh air ducts and waste gases

Poland Babcock Borsig Steinmüller GmbH, Germany 2014

34 PP Belchatow 11 firing system replacement, recovery of fresh air ducts and waste gases

Poland Babcock Borsig Steinmüller GmbH, Germany 2014

35 NPP Krsko repair and replacement of valves and secondary equipment

Slovenia NEK d.o.o., Slovenia 2013

36 PP Rijeka replacement of high-pressure headers and coolers Croatia DD TEP d.o.o., Croatia 2013

37 PP Prunerov erection of 2 boilers and pressure piping systems Czech

Republic Metrostav a.s., Czech Republic 2013

38 PP Plomin 1 boiler pressure parts overhaul Croatia HEP d.d., Croatia 2013

Page 17: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 3 / 9

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

39 PP Belisce d.d. erection of boilers Croatia RH -TECH. GmbH, Austria 2013

40 CHP Lichterfelde piping erection Germany Steelcon A/S, Denmark 2013

41 PP Mannheim installation of ash removal Germany STAG AG, Switzerland 2013

42 Energieversorgung Offenbach boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013

43 PP Jänschwalde boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Subsidiary Peitz, Germany

2013

44 PP Staudinger burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013

45 Steel factory Salzgitter Flachstahl boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013

46 PP Lippendorf boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Subsidiary Peitz, Germany

2013

47 PP Voerde burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013

48 CHP Lichterfelde erection of 3 boilers Germany Babcock Borsig Steinmüller CZ s.r.o, Czech Republic

2013

49 PP Frimmersdorf boiler reconstruction Germany Babcock Borsig Steinmüller GmbH, Germany 2013

50 PP Weener Energie boiler overhaul Germany Standardkessel Baumgarte Service GmbH, Germany

2013

51 SWE Energie Erfurt, gas - steam plant piping erection Germany Kraftanlagen München GmbH, Germany 2013

52 PP Stuttgart-Münster boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013

53 PP Datteln boiler overhaul Germany Hitachi Power Europe GmbH, Germany 2012

54 PP Kladno K7 Phase II piping erection Czech

Republic Kraftanlagen München GmbH, Germany

2012 - 2013

55 PP Walsum unit 10, boiler reconstruction Germany Babcock Borsig Steinmüller GmbH, Germany 2012 - 2013

56 PP Belchatow 8 fabrication, dismantling and assembly of firing system (mills, burners, ducts, classifiers, diffusers)

Poland Babcock Borsig Steinmüller GmbH, Germany 2012

57 PP Shell Wesseling ESP assembly Germany Hamon Environmental GmbH, Germany 2012

Page 18: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 4 / 9

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

58 PP Wuppertal dismantling and erection of boiler steel structure Germany Fisia Babcock Environment GmbH, Germany 2012

59 PP Wedel dismantling and assembly of air ducts Germany Balcke Duerr GmbH, Germay 2012

60 PP Duisburg dismantling and assembly of boiler preheating unit Germany Babcock Borsig Steinmüller GmbH, Germany 2012

61 PP Rijeka replacement of PP 2 and MPP 2 Croatia DD TEP d.o.o., Croatia 2012

62 PP Plomin 1 replacement of header K 90 and joining pipes Croatia HEP d.d., Croatia 2012

63 PP Plomin 2 overhaul, replacement of pipes in boiler pressure part, replacement of balls and plates in mills

Croatia HEP d.d., Croatia 2012

64 NPP Krsko repair and replacement of valves and secondary equipment

Slovenia NEK d.o.o., Slovenia 2012

65 PP Belchatow 7 fabrication, dismantling and assembly of firing system (mills, burners, ducts, classifiers, diffusers)

Poland Babcock Borsig Steinmüller GmbH, Germany 2011 - 2012

66 PP Medupi 6 supervision of boiler pressure parts assembly South Africa Steinmüller Africa, South Africa 2011 - 2012

67 TE Rijeka fabrication, dismantling and assembly of stack steel shell Croatia HEP d.d., Croatia 2011 - 2012

68 PP Mannheim assembly of ESP and REA Germany Fisia Babcock Environment GmbH, Germany 2011 - 2012

69 Shell Wesseling assembly of boiler, ducts, equipment and piping Germany Standardkessel GmbH, Germany 2011 - 2012

70 PP Westfalen unit D/E, erection of boiler internal piping Germany BHR Hochdruck - Rohrleitungsbau GmbH, Germany

2011 - 2013

71 Zagreb TPP recovery of Block K, utilizators No. 1 and 2, HP - superheater and LP - vaporizer

Croatia HEP d.d., Croatia 2011

72 BelisCe d.d. (PP) installation of reinforcement Croatia BelisCe d.d., Croatia 2011

73 HEP Toplinarstvo, Osijek boiler repair Croatia HEP d.d., Croatia 2011

74 PP Rijeka disassembly and erection of components and piping Croatia DAR d.o.o., Croatia 2011

75 VA Stahl Linz II boiler erection Austria J. Christof GmbH, Austria 2011

Page 19: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 5 / 9

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

76 PP Kladno K7 piping erection Czech

Republic Kraftanlagen München GmbH, Germany 2011

77 PP Niederausem dismantling and assembly of boiler walls and preheater part

Germany Babcock Borsig Steinmüller GmbH, Germany 2011

78 PP Offenbach boiler pressure parts overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2011

79 PP Stuttgart Münster boiler overhaul, boiler grid revision Germany Babcock Borsig Steinmüller GmbH, Germany 2011

80 PP München disassembly and assembly of burner Germany Babcock Borsig Steinmüller GmbH, Germany 2011

81 IHKW Andernach boiler pressure parts overhaul Germany Oschatz GmbH, Germany 2011

82 Herten boiler pressure parts overhaul Germany E.ON Anlagenservice GmbH, Germany 2011

83 PP Altbach boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2011

84 MiRO Karlsruhe revision of electrostatic precipitators Germany Babcock Borsig Service GmbH, Germany 2011

85 PP Farge boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2011

86 TPP Hannover boiler and piping overhaul Germany BHR Hochdruck - Rohrleitungsbau GmbH, Germany

2011

87 PP Zolling disassembly and assembly of ducts, boiler and burner overhaul

Germany Babcock Borsig Steinmüller GmbH, Germany 2011

88 Praxair Hürth erection of housing for production of technical gases Germany BHR Hochdruck - Rohrleitungsbau GmbH, Germany

2011

89 PP Moorburg assembly of electrostatic precipitators Germany Fisia Babcock Environment GmbH, Germany 2011

90 SPP Lünen erection of feed water piping Germany BHR Hochdruck - Rohrleitungsbau GmbH, Germany

2010 - 2011

91 GDF Suez PP Wilhelmshaven piping erection - auxiliary systems Germany Kraftanlagen München GmbH, Germany 2010 - 2011

92 TE Frimmersdorf boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010

93 SW München- HKW Nord boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010

94 EnBW Stuttgart Münster boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010

Page 20: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 6 / 9

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

95 TE Mannheim boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010

96 SW Duisburg boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010

97 PP Neurath, BoA 2/3 ducts preassembly Germany Hitachi Power Europe GmbH / Alstom, Germany

2010

98 PP Datteln, blok 4 erection of a boiler unit, internal piping and coal grinders Germany Hitachi Power Europe GmbH, Germany 2010

99 PP Belchatów 5 & 6 erection of equipment, ducts and piping Poland Babcock Borsig Service GmbH, Germany 2010

100 GSPP Braunschweig , PP Mitte piping erection Germany BHR Hochdruck- Rohrleitungsbau GmbH, Germany

2010

101 Kandit Premijer Osijek Sugar Factory revision of boiler units Croatia Kandit - Premijer d.o.o., Croatia 2010

102 NPP Krsko annual overhaul Slovenia NEK d.o.o., Slovenia 2010

103 PP Belchatów 5 fabrication and assembly of new boiler unit firing system Poland Steinmüller Instandsetzung Kraftwerke GmbH, Germany

2010

104 PP Voerde dismantling of old and assembly of new coal dust ducts Germany Babcock Borsig Service GmbH, Germany 2009

105 Kandit Premijer Osijek Sugar Factory revision of boiler units Croatia Kandit - Premijer d.o.o., Croatia 2009

106 NPP Krsko annual overhaul Slovenia NEK d.o.o., Slovenia 2009

107 Mecklenburger Kartofelveredelung GmbH Hagenow

boiler plant erection Germany Oschatz GmbH, Germany 2009

108 Marica-Iztok 3 flue ducts assembly Bulgaria AE&E CZ s.r.o., Czech Republic 2009

109 PP Neurath, BoA 2/3 assembly of fuel gas cleaning unit Germany Austrian Energy & Environment AG & Co KG, Austria

2009

110 PP Neurath, BoA 2/3 assembly of piping system LAB Germany Babcock Borsig Service GmbH, Germany 2009

111 PP Neurath, BoA 2/3 assembly of electrostatic precipitators Germany Fisia Babcock Environment GmbH, Germany 2009

112 PP Neurath, BoA 2/3 assembly of auxiliary piping system Germany Kraftanlagen München GmbH, Germany 2009

113 PP Belchatów 4 fabrication and assembly of new boiler unit firing system Poland Steinmüller Instandsetzung Kraftwerke GmbH, Germany

2009

Page 21: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 7 / 9

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

114 NPP Krsko secondary valves and secondary equipment overhaul Slovenia NEK d.o.o., Slovenia 2009

115 TPP Zagreb L boiler assembly Croatia DD TEP d.o.o., Croatia 2008

116 PP Rijeka replacement of steam line Croatia DD TEP d.o.o., Croatia 2008

117 BelisCe d.d. (PP) replacement of K4 boiler drum Croatia DD TEP d.o.o., Croatia 2008

118 RZZ Herten 2 erection of 2 boiler plants Germany Fisia Babcock Environment GmbH, Germany 2008

119 PP Plomin 1 boiler pressure parts overhaul Croatia HEP d.d., Croatia 2008

120 PP Neurath, BoA 2/3 preassembly of air and flue ducts boiler F, G Germany Logicom GmbH, Germany 2008

121 IHKW Andernach boiler plant erection Germany Oschatz GmbH, Germany 2008

122 PP Voerde erection of REA plant, blocks A&B Germany Austrian Energy&Environment AG, Austria 2007

123 PP Weisweiler dismantling and assembly of steam piping Germany e.o.n. Anlagen Service , Germany 2007

124 Gas- und Dampfturbinenkraftwerk Hamm-Uentrop

erection of 2 boiler plants Germany Ansaldo Caldaie S.p.A., Italy 2007

125 Cemex OstZement GmbH, Rüdersdorf boiler plant erection and REA Germany Fisia Babcock Environment GmbH, Germany 2007

126 PP Plomin 1 i 2 boiler pressure parts overhaul Croatia HEP d.d., Croatia 2007

127 PP Plomin 2 pipe conveyor reconstruction Croatia HEP d.d., Croatia 2007

128 PP Plomin 1 superheater reconstruction Croatia HEP d.d., Croatia 2007

129 Elektromark, Cuno-Heizkraftwerk Herdecke

piping erection Germany Kraftanlagen München GmbH, Germany 2007

130 NPP Olkiluoto prefabrication and erection of piping in Block 3 of the nuclear power plant

Finland Kraftanlagen München GmbH, Germany 2007

131 NPP Krsko valves and secondary piping overhaul Slovenia NEK d.o.o., Slovenia 2007

132 Thermische Verwertungsanlage Schwarza, Rudolstadt

boiler plant erection Germany Oschatz GmbH, Germany 2007

133 Weig Karton GmbH & Co. KG, Mayen boiler plant erection Germany Oschatz GmbH, Germany 2007

Page 22: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 8 / 9

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

134 PP Münster, Stuttgart erection of 2 boiler plants Germany ALSTOM Power Conversion GmbH, Germany 2006

135 Karsto Gas Refinery HRSG boiler erection Norway Balcke Duerr Austria, Austria 2006

136 Zagreb TPP HRSG boiler erection Croatia HEP d.d., Croatia 2006

137 Osijek TPP chemical water treatment Croatia HEP d.d., Croatia 2006

138 TRABA - Germania, Hannover – Lahe erection of 2 boiler plants Germany ALSTOM Power Boiler GmbH, Germany 2005

139 BOTNIA, Kaskinen Paper Factory boiler overhaul Finland Atlantic Project Company Ltd., Ireland 2005

140 INA, Sisak Oil Rafinery ECO package replacement Croatia INA d.d., Croatia 2005

141 VA Stahl, Linz erection of boiler unit Austria J. Christof GmbH, Austria 2005

142 OMV - Schwechat Oil Refinery piping erection Austria J. Christof GmbH, Austria 2005

143 VA Stahl, Linz B-06 boiler plant overhaul Austria J. Christof GmbH, Austria 2005

144 Krsko NPP secondary piping replacement; regular annual overhauls Slovenia NUMIP d.o.o., Slovenia 2005

145 SARPSBORG Paper Factory new boiler plant erection Norway AE & E AG, Austria 2004

146 TARBERT PP - Block 4 erection of boiler pressure components Ireland Atlantic Project Company Ltd., Ireland 2004

147 VA Stahl, Linz erection of boiler unit Austria J. Christof GmbH, Austria 2004

148 Köln - Niehl TPP erection of boiler and connected lines Germany MCE VOEST Berlin GmbH, Germany 2004

149 München TPP South erection of 2 boiler plants Germany MCE vom hagen GmbH, Germany 2004

150 Niederaußem PP erection of 2 REA plants, block 1000 MW Germany Babcock Borsig Power GmbH, Germany 2003

151 TARBERT PP - Block 3 erection of boiler pressure components Ireland Atlantic Project Company Ltd., Ireland 2003

152 Hamborn TPP boiler plant erection Germany BBP Energy GmbH, Germany 2003

153 Köln PP erection of plant for smoke gasses filtering Germany BBP Environment GmbH, Germany 2003

154 Poolbeg PP erection of boiler pressure components Ireland AE Industrieservice GmbH, Austria 2002

155 BROBEKK Incineration Plant revision of boiler unit Norway Babcock Environment GmbH, Germany 2002

Page 23: PROJECT REFERENCES2013 11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013 12 Cement Factory

Page 9 / 9

90 years since 1926

PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR

156 KLEMETSTRUD Incineration Plant revision of boiler unit Norway Babcock Environment GmbH, Germany 2001

157 Huettenwerk Kayser AG revision of boiler unit Germany Oschatz GmbH, Germany 2001

158 Niederaußem PP boiler plant erection Germany RWE AG Essen, Germany 2001

159 Niederaußem PP piping erection Germany Kraftanlagen München GmbH, Germany 2001

160 Plomin II PP boiler plant erection Croatia Austrian Energy&Environment AG, Austria 2000

161 Westfield PP / Fife biomass fuelled boiler plant erection (HRSG) Scotland Austrian Energy &Env.AG, Austria 1999

162 Zagreb TPP & HRSG (West) boiler plant erection Croatia Austrian Energy&Environment AG, Austria 1999

163 Westfield PP / Fife biomass fuelled boiler plant erection (HRSG) Scotland Nem Schelde, Netherland 1999

164 Zagreb TPP & HRSG (East) boiler plant erection Croatia Parsons Co., USA 1999

165 RWE, Neurath PP reworks and revision of boiler unit Germany EVT Energie und Verfahrenstechnik GmbH, Germany

1997

166 Friedrich und Karl Bay GmbH & Co. KG boiler plant erection Germany Friedrich und Karl Bay GmbH & Co. KG, Germany

1997

167 VWK, Wolfsburg PP North/South dismantling and erection of burning system Germany Kuettner GmbH & Co. KG, Germany 1997

168 Heyden PP plant for smoke gasses filtering Germany Saarberg Hoelter Umwelttechnik GmbH, Germany

1997