PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
1 PP Belchatow 9 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)
Poland Babcock Borsig Steinmüller GmbH, Germany 2015
2 PP Belchatow 10 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)
Poland Babcock Borsig Steinmüller GmbH, Germany 2015
3 PP Govora fabrication of burners Romania Babcock Borsig Steinmüller GmbH, Germany 2015
4 Dong Energy fabrication of steel structures Germany Bilfinger MCE Aschersleben GmbH, Germany 2015
5 Werk Dillenburg fabrication of superheater Germany Weiss Kessel-, Anlagen- und Maschinenbau GmbH, Germany
2014
6 PP Nordhorn fabrication of superheater Germany Bilfinger Rosink GmbH, Germany 2014
7 Werk Aschersleben fabrication of tank Germany Bilfinger MCE Aschersleben GmbH, Germany 2014
8 PP Turow fabrication and delivery of steel structure Poland Bilfinger Infrastructure S.A., Poland 2014
9 PP Nikola Tesla - Obrenovac fabrication and delivery of burners Serbia Babcock Borsig Steinmüller GmbH, Germany 2014
10 PP Jänschwalde fabrication of ducts Germany Babcock Borsig Steinmüller GmbH, Germany 2014
11 PP Turow fabrication and delivery of system for purifying flue gases (ducts, shielding, steel structures)
Poland Babcock Noell GmbH, Germany 2014
12 PP Belchatow 12 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)
Poland Babcock Borsig Steinmüller GmbH, Germany 2013 - 2014
13 PP Belchatow 11 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)
Poland Babcock Borsig Steinmüller GmbH, Germany 2013
14 PP Bitola fabrication of burners Macedonia Babcock Borsig Steinmüller GmbH, Germany 2013
15 CF Allmendingen Schwenk fabrication of steel structure Germany ThyssenKrupp Resource Technologies GmbH, Germany
2013
Page 2 / 2
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
16 PP Sabiya fabrication of burners Kuwait Babcock Borsig Steinmüller GmbH, Germany 2013
17 PP GKM Mannheim fabrication of the wet ash treatment plant part Germany Babcock Borsig Steinmüller GmbH, Germany 2013
18 PP Bitola fabrication of burners and kipprost module Macedonia Babcock Borsig Steinmüller GmbH, Germany 2012
19 PP Belchatow 8 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)
Poland Babcock Borsig Steinmüller GmbH, Germany 2012
20 PP Belchatow 7 fabrication of firing system (mills, burners, ducts, classifiers, diffusers)
Poland Babcock Borsig Steinmüller GmbH, Germany 2011 - 2012
21 PP Amer 9 fabrication of classifier upper part The
Netherlands Babcock Borsig Steinmüller GmbH, Germany 2011
22 Cordemais 3 fabrication of air ducts France Babcock Borsig Service GmbH, Germany 2011
23 PP Belchatow 6 fabrication of firing system components Poland Babcock Borsig Service GmbH, Germany 2010
24 Basell Wesseling fabrication of steel structure and air ducts Germany Babcock Borsig Service GmbH, Germany 2010
25 PP Rodenhuize 4 fabrication of ducts Belgium Babcock Borsig Service GmbH, Germany 2010
26 PP Belchatow 5 fabrication of firing system components Poland STEINMÜLLER Instandsetzung Kraftwerke GmbH, Germany
2010
27 PP Belchatow 4 fabrication of firing system components Poland STEINMÜLLER Instandsetzung Kraftwerke GmbH, Germany
2009
28 PP BOA 1, Niederaussem fabrication of ducts for E-filter Germany Rothemühle, Germany 2002
90 years since 1926
References – Bridges
PROJECT
WORK DETAILS
COUNTRY EMPLOYER YEAR Description
Length (m)
Spans (m)
Weight (t)
1 Licanka Bridge fabrication of bridge steel structure
72 2x36 220 Croatia Hrvatske zeljeznice d.d., Croatia
2013
2 Tunnel Sveti Ilija erection of bridge steel structure for remedy of cavities inside the tunnel
1x20,4 + 2x27,4 210 Croatia Hidroelektra Niskogradnja d.d., Croatia
2012
3 Bosut Bridge new bridge construction 67 65 390 Croatia Swietelsky d.o.o., Croatia 2010
- 2011
4 Zdrelac Bridge on the road D110 over sea strait Zdrelac between islands Ugljan and Pasman
reconstruction 67.9 66.9 360 Croatia Konstruktor inzenjering Split d.d., Croatia
2008
5 Zrinski Bridge over River Mura on Motorway between Letenya and Goricani
new bridge construction 216 36+3x48+36 1267 Croatia and
Hungary
Hrvatske autoceste d.o.o., Croatia, Croatia and Nemzeti Infrastruktura Fejleszto, Hungary
2007 -
2008
6 Crna Rijeka Bridge on Motorway Zagreb-Split-Dubrovnik, Section Ploce 1 - Luka Ploce
new bridge construction 328 2x24+8x35 1039 Croatia Hrvatske autoceste d.o.o., Croatia
2007 -
2008
7 Road overpass Josava at Osijek - Dakovo Section of Beli Manastir - Osijek - Svilaj - Ploce Motorway
overpass construction 253 36+4x45+36 1581 Croatia Hrvatske autoceste d.o.o., Croatia
2007
8 Road overpass Hrastinka at Osijek - Dakovo Section of Beli Manastir - Osijek - Svilaj - Ploce Motorway
overpass construction 163 36+2x45+36 1022 Croatia Hrvatske autoceste d.o.o., Croatia
2007
9 Road overpass Topolina at Osijek - Dakovo Section of Beli Manastir - Osijek - Svilaj - Ploce Motorway
overpass construction 118 36+45+36 738 Croatia Hrvatske autoceste d.o.o., Croatia
2007
10 Road overpass over the Zagreb - Vinkovci railway, in km 76+942,86 at Beli Manastir -
overpass construction 656 L=35,5+13x45+35,5 4000 Croatia Hrvatske autoceste d.o.o., Croatia
2006
Page 2 / 4
90 years since 1926
PROJECT
WORK DETAILS
COUNTRY EMPLOYER YEAR Description
Length (m)
Spans (m)
Weight (t)
Osijek - Svilaj - Ploce Motorway, Section Dakovo - Sredanci
11 Road bridge over River Drava at the Osijek bypass road
new bridge construction 270 L=80+110+80 1341 Croatia Hrvatske ceste d.o.o., Croatia
2006
12 Road bridge over River Spacva near Lipovac new bridge construction 94 L=1x94 456 Croatia Hrvatske ceste d.o.o., Croatia
2006
13 Road overpass at Kosnica crossing at Zagreb - Lipovac Motorway, Section Jankomir - Ivanja Reka
steel structure fabrication 116 L=26+32+32+26 665 Croatia Viadukt d.d., Croatia 2006
14 Road bridge over River Mura at Sv. Martin - Hotize Public Road
new bridge construction 105 L=31,5+42+31,5 120 Croatia Hrvatske ceste d.o.o., Croatia
2005
15 Road bridge over River Sava near Zapresic new bridge construction 200 L=50+100+50 1130 Croatia Viadukt d.d., Croatia 2005
16 Gacka Bridge on Motorway Zagreb - Split, Section Zuta Lokva - Licko Lešce
new bridge construction 452 L=55+90+55+5x44+32 4646 Croatia Hrvatske autoceste d.o.o., Croatia
2004
17 Road bridge over River Bosut in Nijemci reconstruction 63 L=31,5+31,5 78 Croatia Hrvatske ceste d.o.o., Croatia
2004
18 Maslenica Bridge over Novsko Zdrilo at D8 Public Road
renewal of the destroyed bridge
314 steel arc L=155 1537 Croatia Hrvatske ceste d.o.o., Croatia
2004
19 Road bridge over River Sava in Jasenovac reconstruction 236 L=60,5+120+55,5 1240 Croatia Hrvatske ceste d.o.o., Croatia I EU
2004
20 Road bridge over River Krka at Skradin - Sibenik Section of Adriatic Motorway
new bridge construction 352 L=2x32+204+32+28+24 1690 Croatia Konstruktor inzenjering d.d., Croatia
2004
21 Al-Lezhe road bridge new bridge construction 60 L=30x30 165 Albania Cordioli&CS S.p.A, Italy 2003
22 Al-Dures-Dajlani road bridge new bridge construction 400 knot 1100 Albania Cordioli&CS S.p.A, Italy 2002
23 Al-Lezhe-Mat road bridge new bridge construction 630 L=18x35 1050 Albania Cordioli&CS S.p.A, Italy 2002
24 Al-Lezhe-Drin road bridge new bridge construction 240 L=5x32+49+31 420 Albania Cordioli&CS S.p.A, Italy 2002
Page 3 / 4
90 years since 1926
PROJECT
WORK DETAILS
COUNTRY EMPLOYER YEAR Description
Length (m)
Spans (m)
Weight (t)
25 Ilok Bridge - River Dunav in km 336+500 steel structure and electrical installation improvement
15 L=1x15 9.5 Croatia Hrvatske ceste d.o.o., Croatia
2002
26 Road bridge over River Glina in Glina bridge renewal 42.5 L=1x42,5 119 Croatia Hrvatske ceste d.o.o., Croatia
2002
27 Road bridge over River Orasnica in Knin reconstruction 10.5 L=1x10,5 17 Croatia Hrvatske ceste d.o.o., Croatia
2002
28 Al-Dures-Erzenit road bridge new bridge construction 100 L=33+33+33 245 Albania Cordioli&CS S.p.A, Italy 2001
29 Al-Dures-Flake road bridge new bridge construction 30 L=30 40 Albania Cordioli&CS S.p.A, Italy 2001
30 Al-Dures-Rinyja road bridge new bridge construction 30 L=30 36 Albania Cordioli&CS S.p.A, Italy 2001
31 Al-Dures-Schorzet road bridge new bridge construction 40 L=40 80 Albania Cordioli&CS S.p.A, Italy 2001
32 Road&railway bridge over River Sava - Slavonski Samac - Bosanski Samac
reconstruction 198 L=55+88+55 1450 Croatia EU 2001
33 Road bridge over River Sava - Slavonski Brod - Bosanski Brod
reconstruction 227 L =71+79+71 439 Croatia Parsons Corporation, USA 2001
34 Al-Dures-Overpas road bridge new bridge construction 80 L=33 160 Albania Cordioli&CS S.p.A, Italy 2000
35 Road bridge over River Drava in Belisce new bridge construction 192 L=90+90 920 Croatia Duro Dakovic Inzenjering d.d., Croatia
2000
36 Strmen road bridge reconstruction 61 L=4x15,25 9 Croatia Hrvatske ceste d.o.o., Croatia
2000
37 Road bridge over River Sava - Stara Gradiska
reconstruction 494 L=71+ +71 196 Croatia Duro Dakovic Inzenjering d.d., Croatia
1999
38 Zupanja/Orasje road bridge over River Sava reconstruction 304 L=85+134+85 1130 Croatia Hrvatske ceste d.o.o., Croatia - PID BIH
1999
39 Road bridge over River Kupa near Brest new bridge construction 123.4 L=61,7+61,7 450 Croatia Hrvatske ceste d.o.o., Croatia
1998
Page 4 / 4
90 years since 1926
PROJECT
WORK DETAILS
COUNTRY EMPLOYER YEAR Description
Length (m)
Spans (m)
Weight (t)
40 Loskun railway bridge new bridge construction
70 L=1x70 260 Croatia Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ) GmbH
1997
90 years since 1926
References – Industrial Plants
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
1 Großmehring trunk recovery Germany Bilfinger FRB GmbH, Germany 2014
2 Paper mill Hoya boiler overhaul Germany Standardkessel Baumgarte Service GmbH, Germany
2014
3 BVA Hagen Kabel boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany
2014
4 Cement Factory Peru kiln overhaul Germany ThyssenKrupp Industrial Solutions GmbH, Germany
2014
5 Cement Factory Sv. Juraj replacement of rotary kiln parts Croatia Cemex, Croatia 2014
6 Paper mill Natron - Hayat, Maglaj rotary kiln overhaul Bosnia and
Herzegovina Natron-Hayat d.o.o. Maglaj, Bosnia and Herzegovina
2014
7 Cement Factory Koromacno annual maintenance Croatia Holcim (Croatia) d.o.o., Croatia 2014
8 ITV-Murexin delivery and installation of two silos Croatia ITV RASŠA 2013
9 Pharmaceutical manufacturing plant Savski Marof
reconstruction of the synthesis plant Croatia Pliva Croatia d.o.o., Croatia 2013
10 Schwenk E. Zementwerk KG, Werk Allmendingen
installation of a cement line Germany ThyssenKrupp Resource Technologies GmbH, Germany
2013
11 Cement Factory Koromacno annual maintenance and overhaul of clinker and cement production line Croatia Holcim (Croatia) d.o.o., Croatia 2013
12 Cement Factory Nasicecement replacement of rotary kiln shell, support roller and girth gear Croatia Nasicecement d.d., Croatia 2012
13 Cellulose Factory Natron - Hayat, Maglaj rotary kiln overhaul Bosnia and
Herzegovina Natron-Hayat d.o.o. Maglaj, Bosnia and Herzegovina
2011
14 Cement Factory Lukavac cement grinder overhaul Bosnia and
Herzegovina Fabrika cementa Lukavac d.d., Bosnia and Herzegovina
2011
15 Cement Factory Nasicecement mechanical equipment overhaul Croatia Nasicecement d.d., Croatia 2011
16 Cement Factory Koromacno annual overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2011
Page 2 / 4
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
17 Cheese Factory Zdenka Veliki Zdenci reconstruction of food plant Croatia Zdenka d.o.o., Croatia 2011
18 Cement Factory Koromacno winter overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2010
19 KAKANJ Cement Factory replacement of cement grinder B Bosnia and
Herzegovina Tvornica cementa Kakanj d.d., Bosnia and Herzegovina
2010
20 KAKANJ Cement Factory replacement of raw material grinder Bosnia and
Herzegovina Tvornica cementa Kakanj d.d., Bosnia and Herzegovina
2010
21 Cement Factory Koromacno winter overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2009
22 KAKANJ Cement Factory replacement of cement grinder B Bosnia and
Herzegovina Tvornica cementa Kakanj d.d., Bosnia and Herzegovina
2009
23 Cement Factory Koromacno winter overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2008
24 ISTRACEMENT Cement Factory fabrication and assembly of new clinker production line Croatia Istra cement d.o.o., Croatia 2008
25 Duna - Dráva Cement reconstruction of line 2 in Beremend Cement factory Hungary Polysius AG, Germany 2008
26 VIRO Sugar Factory reconstruction of sugar factory Croatia VIRO Tvornica secera d.d., Croatia
2008
27 Cement Factory Koromacno fabrication and assembly of hot gas ducts; winter overhaul Croatia Holcim (Croatia) d.o.o., Croatia 2007
28 CHEKKA Cement Factory capacity enlargement of clinker production line Lebanon Cimentarie Nationale SAL, Lebanon
2007
29 Cement Factory Nasicecement winter overhaul Croatia Nasicecement d.d., Croatia 2006
- 2007
30 KOROMACNO Cement Factory partial replacement of rotary kiln and heat exchangers; reconstruction of cement packing line; construction of waste consumption plant; regular annual overhauls
Croatia Holcim (Croatia) d.o.o., Croatia 2005
- 2007
31 KANDIT PREMIJER OSIJEK Sugar Factory
regular annual overhauls Croatia Kandit - Premijer d.o.o., Croatia 2005
- 2007
32 NASICECEMENT Cement Factory erection of new MC3 cement grinding plant; cement works overhauls Croatia Nasicecement d.d., Croatia 2005
- 2007
Page 3 / 4
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
33 OSIJEK Brewery regular annual overhauls Croatia Pivovara d.d. Osijek, Croatia 2005
- 2007
34 Istrian Lime Factory construction of new factory for mortar, glue and additives Croatia Istarska tvornica vapna d.o.o., Croatia
2006
35 DALMACIJACEMENT (Sv. Juraj CF, Sv. Kajo CF, 10. kolovoz Solin CF)
regular annual overhauls Croatia Dalmacijacement d.d., Croatia 2005
- 2006
36 UMAG Cement Factory dismantling of cement grinding plant Croatia Holcim (Croatia) d.o.o., Croatia 2005
37 DALMACIJACEMENT (Sv.Juraj CF) overhaul and reconstruction of raw material grinding plant; mechanical and electrical equipment installation for raw material grinder - 650 t/h capacity
Croatia Dalmacijacement d.d., Croatia 2004
38 LES CIMENTS DE JBEL OUST (Chergakom)
erection of equipment and steel structure for new coal grinding unit Tunisia Polysius AG, France 2004
39 KAKANJ Cement Factory rotary kiln casing partial replacement Bosnia and
Herzegovina Tvornica cementa Kakanj d.d., Bosnia and Herzegovina
2003 -
2004
40 DALMACIJACEMENT Cement Factories regular annual overhauls Croatia Dalmacijacement d.d., Croatia 1998
- 2004
41 ISTRACEMENT Cement Factory reconstruction of coal grinding plant Croatia Istra cement d.o.o., Croatia 2003
42 NASICECEMENT Cement Factory erection of equipment for coal grinding plant, equipment and structures for clinker production line - capacity enlargement
Croatia Nasicecement d.d., Croatia 2002
- 2003
43 SOCIETE des CIMENTS d'ENFIDA construction of new clinker production line Tunisia Polysius AG, France 2002
- 2003
44 LES CIMENTS DE JEBEL OUST Cement Factory
erection of mechanical equipment and steel structure Tunisia Polysius AG, France 2001
- 2002
45 CHEKKA Cement Factory mechanical & electrical erection of new clinker line and installation of equipment for diesel power plant 2x7.5 MW
Lebanon Cimentarie Nationale SAL, Lebanon
1998
Page 4 / 4
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
46 KOROMACNO Cement Factory reconstruction of heat exchangers, clinker transport and erection of steel structure
Croatia Holcim (Croatia) d.o.o., Croatia 1998
47 NASICECEMENT Cement Factory reconstruction of rotary kiln, heat exchangers, electrical filters; erection of steel structure and regular annual overhaul
Croatia Nasicecement d.d., Croatia 1998
48 DYCKERHOFF AG, LENGERICH Cement Factory
erection of steel structure Germany Polysius AG, Germany 1998
49 MILKE GESEKE Cement Factory erection of steel structure, equipment and fire-durable refractory Germany Polysius AG, Germany 1997
- 1998
50 LAEGERDORF Cement Factory erection of steel structure, equipment and Dopol tower refractory, kiln and cooler for clinker
Germany Polysius AG, Germany 1997
90 years since 1926
References – Petrochemical Plants
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
1 Rijeka Oil Refinery engineering services, material supply, piping and equipment erection in order to increase energy efficiency
Croatia INA d.d., Croatia 2013
2 Rijeka Oil Refinery fabrication and replacement of Riser regenerator on FCC plant Croatia INA d.d., Croatia 2013
3 Rijeka Oil Refinery fabrication and replacement of expansion joint and pipeline 36" and 66" on FCC plant
Croatia INA d.d., Croatia 2013
4 Rijeka Oil Refinery G4 boiler overhaul Croatia STSI d.o.o., Croatia 2013
5 Rijeka Oil Refinery G5 boiler overhaul Croatia STSI d.o.o., Croatia 2013
6 Rijeka Oil Refinery erection of sweet wac plant (desulphurization plant) Croatia INA d.d., Croatia 2013
7 Oil tank JANAF Zitnjak erection of 2 oil tanks (2 x 20.000 m3) Croatia Monting d.o.o., Croatia 2013
8 Oil tank JANAF Omisalj erection of an oil tank (80.000 m3) and connecting pipelines Croatia Duro Dakovic Inzenjering d.d., Croatia 2013
9 Sisak Oil Refinery erection of waste water treatment plant Croatia INA d.d., Croatia 2013
10 Kutina Petrochemical Plant
overhaul of ammonia and urea fabrication units Croatia Petrokemija d.d. Tvornica gnojiva Kutina, Croatia
2012
11 Sisak Oil Refinery dismantling and assembly of piping Croatia STSI d.o.o., Croatia 2011
12 Rijeka Oil Refinery - Urinj
assembly of high and low pressure piping in Hydrocracker Complex Croatia CB&I Lummus s.r.o., Czech Republic 2010
13 Kutina Petrochemical Plant
regular yearly overhaul Croatia Petrokemija d.d. Tvornica gnojiva Kutina, Croatia
2008, 2009
14 Rijeka Oil Refinery reconstruction of Topping unit 3 Croatia STSI d.o.o., Croatia 2008
15 Sisak Oil Refinery boiler pressure part overhaul Croatia STSI d.o.o., Croatia 2008
16 Sisak Oil Refinery assembly of stationary equipment in sulphur plant Croatia INA d.d., Croatia 2007
17 Rijeka Oil Refinery assembly of vacuum distillation unit Croatia STSI d.o.o., Croatia 2007
18 Sisak Oil Refinery replacement of equipment and R 5301 reactor Croatia STSI d.o.o., Croatia 2007
Page 2 / 3
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
19 Sisak Oil Refinery assembly of gas generator Croatia STSI d.o.o., Croatia 2007
20 Sisak Oil Refinery FCC splitter reconstruction Croatia STSI d.o.o., Croatia 2007
21 Kutina Petrochemical Plant
plant overhaul and yearly maintenance Croatia Petrokemija d.d. Tvornica gnojiva Kutina, Croatia
2007
22 Kutina Petrochemical Plant
construction of new soot silo; boiler unit chimney replacement; maintenance; regular annual overhauls
Croatia Petrokemija d.d. Tvornica gnojiva Kutina, Croatia
2005 - 2007
23 Rijeka Oil Refinery - Urinj
313 - F3 heater unit overhaul Croatia INA d.d. Zagreb, Croatia 2006
24 Rijeka Oil Refinery - Urinj
312 - F1 heater unit overhaul Croatia STSI d.o.o., Croatia 2006
25 Rijeka Oil Refinery - Urinj
FCC plant overhaul, reactor replacement Croatia STSI d.o.o., Croatia 2006
26 Rijeka Oil Refinery - Urinj
331 SA-018 80 000 m3 tank reworks Croatia STSI d.o.o., Croatia 2006
27 Sisak Oil Refinery T6101 column piping reconstruction Croatia INA d.d. Zagreb, Croatia 2005
28 Rijeka Oil Refinery - Urinj
vacuum distillation reconstruction Croatia INA d.d. Zagreb, Croatia 2005
29 Rijeka Oil Refinery - Urinj
blow-down piping replacement Croatia STSI d.o.o., Croatia 2005
30 Rijeka Oil Refinery - Mlaka
G-002 boiler overhaul Croatia INA d.d. Zagreb, Croatia 2003
31 Rijeka Oil Refinery - Urinj
16C-1;318C-101 column disassembly/erection Croatia INA d.d. Zagreb, Croatia 2003
32 Bayernoil Refinery piping erection Germany KA-Muenchen GmbH, Germany 2003
33 Rijeka Oil Refinery HDS plant overhaul Croatia INA d.d. Zagreb, Croatia 2002
34 Sisak Oil Refinery FCC plant overhaul Croatia INA d.d. Zagreb, Croatia 2001
35 Kutina Petrochemical Plant
ammonium plant overhaul Croatia Petrokemija d.d., Croatia 2001
Page 3 / 3
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
36 Leuna Werke Oil Refinery
piping erection Germany Sarens GmbH, Germany 2001
37 Cepin Oil Factory equipment and piping erection Croatia KA-Muenchen GmbH, Germany 2000
38 Belisce d.d. equipment and piping erection Croatia Belisce d.d., Croatia 1999
39 PLIVA - Savski Marof equipment and piping erection Croatia INA d.d. Zagreb, Croatia 1998
40 Rijeka Oil Refinery overhaul of boilers G-4, G-5 Croatia Pliva d.d., Croatia 1998
41 Rijeka Oil Refinery platforming II overhaul Croatia INA d.d. Zagreb, Croatia 1997
90 years since 1926
References – Power Plants
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
1 PP Belchatow 10 dismantling and assembly (mills, burners, ducts) Poland Babcock Borsig Steinmüller GmbH, Germany 2015
2 PP Belchatow 9 dismantling and assembly (mills, burners, ducts) Poland Babcock Borsig Steinmüller GmbH, Germany 2015
3 PP Skaerbaek assembly of two biomass boilers Denmark Babcock Wilcox Volund, Denmark 2015
4 PP Skaerbaek assembly of two bag filters Denmark Envirotherm GmbH, Germany 2015
5 PP Dalkia Lodz dismantling and assembly of two boilers Poland Babcock Borsig Steinmüller GmbH, Germany 2014
6 PP Pöls dismantling and assembly of the boiler Austria Andritz Energy & Environment AG 2014
7 PP Wilton boiler assembly UK CNIM, France 2014
8 PP Amager boiler assembly Denmark DD TEP d.o.o., Croatia 2014
9 PP Weener boiler overhaul Germany Standardkessel Baumgarte Service GmbH, Germany
2014
10 PP Boxberg boiler overhaul Germany Babcock Noell GmbH, Germany 2014
11 PP Boxberg boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Zweigniederlassung Peitz, Germany
2014
12 PP Stuttgart-Münster boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
13 PP Altbach boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
14 PP Fenne boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
15 PP München-Nord boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
16 PP Farge boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
17 PP Weiher boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
18 PP Offenbach boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
19 PP Lippendorf boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Zweigniederlassung Peitz, Germany
2014
Page 2 / 9
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
20 PP Dortmund boiler overhaul Germany Standardkessel Baumgarte Service GmbH, Germany
2014
21 PP Niederaußem piping erection Germany Kraftanlagen München GmbH, Niederlassung Essen, Germany
2014
22 PP Offenbach burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
23 PP München-Nord burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
24 PP Fenne burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
25 GuD Lausward piping erection Germany Babcock Borsig Steinmüller GmbH, Germany 2014
26 PP Zolling expansion joint overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
27 PP Jänschwalde burner overhaul Germany Babcock Borsig Steinmüller GmbH, Zweigniederlassung Peitz, Germany
2014
28 PP Minden boiler overhaul Germany Balcke-Dürr GmbH, Germany 2014
29 PP Freistett boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
30 PP Karlsruhe boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
31 PP Staudinger boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
32 PP Offenbach burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2014
33 PP Belchatow 12 firing system replacement, recovery of fresh air ducts and waste gases
Poland Babcock Borsig Steinmüller GmbH, Germany 2014
34 PP Belchatow 11 firing system replacement, recovery of fresh air ducts and waste gases
Poland Babcock Borsig Steinmüller GmbH, Germany 2014
35 NPP Krsko repair and replacement of valves and secondary equipment
Slovenia NEK d.o.o., Slovenia 2013
36 PP Rijeka replacement of high-pressure headers and coolers Croatia DD TEP d.o.o., Croatia 2013
37 PP Prunerov erection of 2 boilers and pressure piping systems Czech
Republic Metrostav a.s., Czech Republic 2013
38 PP Plomin 1 boiler pressure parts overhaul Croatia HEP d.d., Croatia 2013
Page 3 / 9
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
39 PP Belisce d.d. erection of boilers Croatia RH -TECH. GmbH, Austria 2013
40 CHP Lichterfelde piping erection Germany Steelcon A/S, Denmark 2013
41 PP Mannheim installation of ash removal Germany STAG AG, Switzerland 2013
42 Energieversorgung Offenbach boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013
43 PP Jänschwalde boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Subsidiary Peitz, Germany
2013
44 PP Staudinger burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013
45 Steel factory Salzgitter Flachstahl boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013
46 PP Lippendorf boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Subsidiary Peitz, Germany
2013
47 PP Voerde burner overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013
48 CHP Lichterfelde erection of 3 boilers Germany Babcock Borsig Steinmüller CZ s.r.o, Czech Republic
2013
49 PP Frimmersdorf boiler reconstruction Germany Babcock Borsig Steinmüller GmbH, Germany 2013
50 PP Weener Energie boiler overhaul Germany Standardkessel Baumgarte Service GmbH, Germany
2013
51 SWE Energie Erfurt, gas - steam plant piping erection Germany Kraftanlagen München GmbH, Germany 2013
52 PP Stuttgart-Münster boiler overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2013
53 PP Datteln boiler overhaul Germany Hitachi Power Europe GmbH, Germany 2012
54 PP Kladno K7 Phase II piping erection Czech
Republic Kraftanlagen München GmbH, Germany
2012 - 2013
55 PP Walsum unit 10, boiler reconstruction Germany Babcock Borsig Steinmüller GmbH, Germany 2012 - 2013
56 PP Belchatow 8 fabrication, dismantling and assembly of firing system (mills, burners, ducts, classifiers, diffusers)
Poland Babcock Borsig Steinmüller GmbH, Germany 2012
57 PP Shell Wesseling ESP assembly Germany Hamon Environmental GmbH, Germany 2012
Page 4 / 9
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
58 PP Wuppertal dismantling and erection of boiler steel structure Germany Fisia Babcock Environment GmbH, Germany 2012
59 PP Wedel dismantling and assembly of air ducts Germany Balcke Duerr GmbH, Germay 2012
60 PP Duisburg dismantling and assembly of boiler preheating unit Germany Babcock Borsig Steinmüller GmbH, Germany 2012
61 PP Rijeka replacement of PP 2 and MPP 2 Croatia DD TEP d.o.o., Croatia 2012
62 PP Plomin 1 replacement of header K 90 and joining pipes Croatia HEP d.d., Croatia 2012
63 PP Plomin 2 overhaul, replacement of pipes in boiler pressure part, replacement of balls and plates in mills
Croatia HEP d.d., Croatia 2012
64 NPP Krsko repair and replacement of valves and secondary equipment
Slovenia NEK d.o.o., Slovenia 2012
65 PP Belchatow 7 fabrication, dismantling and assembly of firing system (mills, burners, ducts, classifiers, diffusers)
Poland Babcock Borsig Steinmüller GmbH, Germany 2011 - 2012
66 PP Medupi 6 supervision of boiler pressure parts assembly South Africa Steinmüller Africa, South Africa 2011 - 2012
67 TE Rijeka fabrication, dismantling and assembly of stack steel shell Croatia HEP d.d., Croatia 2011 - 2012
68 PP Mannheim assembly of ESP and REA Germany Fisia Babcock Environment GmbH, Germany 2011 - 2012
69 Shell Wesseling assembly of boiler, ducts, equipment and piping Germany Standardkessel GmbH, Germany 2011 - 2012
70 PP Westfalen unit D/E, erection of boiler internal piping Germany BHR Hochdruck - Rohrleitungsbau GmbH, Germany
2011 - 2013
71 Zagreb TPP recovery of Block K, utilizators No. 1 and 2, HP - superheater and LP - vaporizer
Croatia HEP d.d., Croatia 2011
72 BelisCe d.d. (PP) installation of reinforcement Croatia BelisCe d.d., Croatia 2011
73 HEP Toplinarstvo, Osijek boiler repair Croatia HEP d.d., Croatia 2011
74 PP Rijeka disassembly and erection of components and piping Croatia DAR d.o.o., Croatia 2011
75 VA Stahl Linz II boiler erection Austria J. Christof GmbH, Austria 2011
Page 5 / 9
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
76 PP Kladno K7 piping erection Czech
Republic Kraftanlagen München GmbH, Germany 2011
77 PP Niederausem dismantling and assembly of boiler walls and preheater part
Germany Babcock Borsig Steinmüller GmbH, Germany 2011
78 PP Offenbach boiler pressure parts overhaul Germany Babcock Borsig Steinmüller GmbH, Germany 2011
79 PP Stuttgart Münster boiler overhaul, boiler grid revision Germany Babcock Borsig Steinmüller GmbH, Germany 2011
80 PP München disassembly and assembly of burner Germany Babcock Borsig Steinmüller GmbH, Germany 2011
81 IHKW Andernach boiler pressure parts overhaul Germany Oschatz GmbH, Germany 2011
82 Herten boiler pressure parts overhaul Germany E.ON Anlagenservice GmbH, Germany 2011
83 PP Altbach boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2011
84 MiRO Karlsruhe revision of electrostatic precipitators Germany Babcock Borsig Service GmbH, Germany 2011
85 PP Farge boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2011
86 TPP Hannover boiler and piping overhaul Germany BHR Hochdruck - Rohrleitungsbau GmbH, Germany
2011
87 PP Zolling disassembly and assembly of ducts, boiler and burner overhaul
Germany Babcock Borsig Steinmüller GmbH, Germany 2011
88 Praxair Hürth erection of housing for production of technical gases Germany BHR Hochdruck - Rohrleitungsbau GmbH, Germany
2011
89 PP Moorburg assembly of electrostatic precipitators Germany Fisia Babcock Environment GmbH, Germany 2011
90 SPP Lünen erection of feed water piping Germany BHR Hochdruck - Rohrleitungsbau GmbH, Germany
2010 - 2011
91 GDF Suez PP Wilhelmshaven piping erection - auxiliary systems Germany Kraftanlagen München GmbH, Germany 2010 - 2011
92 TE Frimmersdorf boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010
93 SW München- HKW Nord boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010
94 EnBW Stuttgart Münster boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010
Page 6 / 9
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
95 TE Mannheim boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010
96 SW Duisburg boiler pressure parts overhaul Germany Babcock Borsig Service GmbH, Germany 2010
97 PP Neurath, BoA 2/3 ducts preassembly Germany Hitachi Power Europe GmbH / Alstom, Germany
2010
98 PP Datteln, blok 4 erection of a boiler unit, internal piping and coal grinders Germany Hitachi Power Europe GmbH, Germany 2010
99 PP Belchatów 5 & 6 erection of equipment, ducts and piping Poland Babcock Borsig Service GmbH, Germany 2010
100 GSPP Braunschweig , PP Mitte piping erection Germany BHR Hochdruck- Rohrleitungsbau GmbH, Germany
2010
101 Kandit Premijer Osijek Sugar Factory revision of boiler units Croatia Kandit - Premijer d.o.o., Croatia 2010
102 NPP Krsko annual overhaul Slovenia NEK d.o.o., Slovenia 2010
103 PP Belchatów 5 fabrication and assembly of new boiler unit firing system Poland Steinmüller Instandsetzung Kraftwerke GmbH, Germany
2010
104 PP Voerde dismantling of old and assembly of new coal dust ducts Germany Babcock Borsig Service GmbH, Germany 2009
105 Kandit Premijer Osijek Sugar Factory revision of boiler units Croatia Kandit - Premijer d.o.o., Croatia 2009
106 NPP Krsko annual overhaul Slovenia NEK d.o.o., Slovenia 2009
107 Mecklenburger Kartofelveredelung GmbH Hagenow
boiler plant erection Germany Oschatz GmbH, Germany 2009
108 Marica-Iztok 3 flue ducts assembly Bulgaria AE&E CZ s.r.o., Czech Republic 2009
109 PP Neurath, BoA 2/3 assembly of fuel gas cleaning unit Germany Austrian Energy & Environment AG & Co KG, Austria
2009
110 PP Neurath, BoA 2/3 assembly of piping system LAB Germany Babcock Borsig Service GmbH, Germany 2009
111 PP Neurath, BoA 2/3 assembly of electrostatic precipitators Germany Fisia Babcock Environment GmbH, Germany 2009
112 PP Neurath, BoA 2/3 assembly of auxiliary piping system Germany Kraftanlagen München GmbH, Germany 2009
113 PP Belchatów 4 fabrication and assembly of new boiler unit firing system Poland Steinmüller Instandsetzung Kraftwerke GmbH, Germany
2009
Page 7 / 9
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
114 NPP Krsko secondary valves and secondary equipment overhaul Slovenia NEK d.o.o., Slovenia 2009
115 TPP Zagreb L boiler assembly Croatia DD TEP d.o.o., Croatia 2008
116 PP Rijeka replacement of steam line Croatia DD TEP d.o.o., Croatia 2008
117 BelisCe d.d. (PP) replacement of K4 boiler drum Croatia DD TEP d.o.o., Croatia 2008
118 RZZ Herten 2 erection of 2 boiler plants Germany Fisia Babcock Environment GmbH, Germany 2008
119 PP Plomin 1 boiler pressure parts overhaul Croatia HEP d.d., Croatia 2008
120 PP Neurath, BoA 2/3 preassembly of air and flue ducts boiler F, G Germany Logicom GmbH, Germany 2008
121 IHKW Andernach boiler plant erection Germany Oschatz GmbH, Germany 2008
122 PP Voerde erection of REA plant, blocks A&B Germany Austrian Energy&Environment AG, Austria 2007
123 PP Weisweiler dismantling and assembly of steam piping Germany e.o.n. Anlagen Service , Germany 2007
124 Gas- und Dampfturbinenkraftwerk Hamm-Uentrop
erection of 2 boiler plants Germany Ansaldo Caldaie S.p.A., Italy 2007
125 Cemex OstZement GmbH, Rüdersdorf boiler plant erection and REA Germany Fisia Babcock Environment GmbH, Germany 2007
126 PP Plomin 1 i 2 boiler pressure parts overhaul Croatia HEP d.d., Croatia 2007
127 PP Plomin 2 pipe conveyor reconstruction Croatia HEP d.d., Croatia 2007
128 PP Plomin 1 superheater reconstruction Croatia HEP d.d., Croatia 2007
129 Elektromark, Cuno-Heizkraftwerk Herdecke
piping erection Germany Kraftanlagen München GmbH, Germany 2007
130 NPP Olkiluoto prefabrication and erection of piping in Block 3 of the nuclear power plant
Finland Kraftanlagen München GmbH, Germany 2007
131 NPP Krsko valves and secondary piping overhaul Slovenia NEK d.o.o., Slovenia 2007
132 Thermische Verwertungsanlage Schwarza, Rudolstadt
boiler plant erection Germany Oschatz GmbH, Germany 2007
133 Weig Karton GmbH & Co. KG, Mayen boiler plant erection Germany Oschatz GmbH, Germany 2007
Page 8 / 9
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
134 PP Münster, Stuttgart erection of 2 boiler plants Germany ALSTOM Power Conversion GmbH, Germany 2006
135 Karsto Gas Refinery HRSG boiler erection Norway Balcke Duerr Austria, Austria 2006
136 Zagreb TPP HRSG boiler erection Croatia HEP d.d., Croatia 2006
137 Osijek TPP chemical water treatment Croatia HEP d.d., Croatia 2006
138 TRABA - Germania, Hannover – Lahe erection of 2 boiler plants Germany ALSTOM Power Boiler GmbH, Germany 2005
139 BOTNIA, Kaskinen Paper Factory boiler overhaul Finland Atlantic Project Company Ltd., Ireland 2005
140 INA, Sisak Oil Rafinery ECO package replacement Croatia INA d.d., Croatia 2005
141 VA Stahl, Linz erection of boiler unit Austria J. Christof GmbH, Austria 2005
142 OMV - Schwechat Oil Refinery piping erection Austria J. Christof GmbH, Austria 2005
143 VA Stahl, Linz B-06 boiler plant overhaul Austria J. Christof GmbH, Austria 2005
144 Krsko NPP secondary piping replacement; regular annual overhauls Slovenia NUMIP d.o.o., Slovenia 2005
145 SARPSBORG Paper Factory new boiler plant erection Norway AE & E AG, Austria 2004
146 TARBERT PP - Block 4 erection of boiler pressure components Ireland Atlantic Project Company Ltd., Ireland 2004
147 VA Stahl, Linz erection of boiler unit Austria J. Christof GmbH, Austria 2004
148 Köln - Niehl TPP erection of boiler and connected lines Germany MCE VOEST Berlin GmbH, Germany 2004
149 München TPP South erection of 2 boiler plants Germany MCE vom hagen GmbH, Germany 2004
150 Niederaußem PP erection of 2 REA plants, block 1000 MW Germany Babcock Borsig Power GmbH, Germany 2003
151 TARBERT PP - Block 3 erection of boiler pressure components Ireland Atlantic Project Company Ltd., Ireland 2003
152 Hamborn TPP boiler plant erection Germany BBP Energy GmbH, Germany 2003
153 Köln PP erection of plant for smoke gasses filtering Germany BBP Environment GmbH, Germany 2003
154 Poolbeg PP erection of boiler pressure components Ireland AE Industrieservice GmbH, Austria 2002
155 BROBEKK Incineration Plant revision of boiler unit Norway Babcock Environment GmbH, Germany 2002
Page 9 / 9
90 years since 1926
PROJECT WORK DESCRIPTION COUNTRY EMPLOYER YEAR
156 KLEMETSTRUD Incineration Plant revision of boiler unit Norway Babcock Environment GmbH, Germany 2001
157 Huettenwerk Kayser AG revision of boiler unit Germany Oschatz GmbH, Germany 2001
158 Niederaußem PP boiler plant erection Germany RWE AG Essen, Germany 2001
159 Niederaußem PP piping erection Germany Kraftanlagen München GmbH, Germany 2001
160 Plomin II PP boiler plant erection Croatia Austrian Energy&Environment AG, Austria 2000
161 Westfield PP / Fife biomass fuelled boiler plant erection (HRSG) Scotland Austrian Energy &Env.AG, Austria 1999
162 Zagreb TPP & HRSG (West) boiler plant erection Croatia Austrian Energy&Environment AG, Austria 1999
163 Westfield PP / Fife biomass fuelled boiler plant erection (HRSG) Scotland Nem Schelde, Netherland 1999
164 Zagreb TPP & HRSG (East) boiler plant erection Croatia Parsons Co., USA 1999
165 RWE, Neurath PP reworks and revision of boiler unit Germany EVT Energie und Verfahrenstechnik GmbH, Germany
1997
166 Friedrich und Karl Bay GmbH & Co. KG boiler plant erection Germany Friedrich und Karl Bay GmbH & Co. KG, Germany
1997
167 VWK, Wolfsburg PP North/South dismantling and erection of burning system Germany Kuettner GmbH & Co. KG, Germany 1997
168 Heyden PP plant for smoke gasses filtering Germany Saarberg Hoelter Umwelttechnik GmbH, Germany