![Page 1: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/1.jpg)
Proiect - Qua rterlv Progress Report
Promote/s Name Casa Grande Civil Engineering Private LimitedProject Name Casagrand BellissimoProject Registration No TN/01/Buildin sloo28l2ot7Quarter Ending September 23,zOLg
B. Construction
S.No Description Nos. Total Area
- (sq.m)
Plots/Flats Booked size wise(As given in Carpet AreaStatement while registering)
2!9.24937 501.311
3952.069
96s 1.802
2 Parking Lots
339
UDS Registered in Sq.m.
35 t89L.17
S.No Description Block/Tower No. Status
Door Shutter fixing, Painting & Cp sanfixing work is in resS
B Door Shutter fixing, Pajnting & Cp sanfixing work is in progress
ary
C Final Coat painting is in progress, Hanover is in Progress
tng
DFalse ceiling, Door Shutter fixing, pain
CP sanitary fixing & Terrace tile layingis in progress
ng,
ork
EFalse ceiling, Door Shutter fixing, paintCP sanitary fixing work is in progress
ng&
L Stage of construcUon ofeach Block/Tower, Floorwise
FTile laying, Window fixing & paintingis in progress
rk
./../ t'i
II
I5
A. Sales
4
2367 6.7
2BHK 641)
3BH K 156
4BH K 43
L.
40683.
![Page 2: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/2.jpg)
ress
1g isj
Marble & Tile laying, Window fixing &Painting work is in progress
lnternal Plumbing, WaterproofingCompleted & Tile laying work is in p
Block work, lnternal Plastering, plumbiin Progress, Water proofing Complete
2 Status of commonAmenities for eachBlock/Tower, ltem wise Club House Stilt floor roofslab is in
C. Details of Clearances
1-. Completion Certificate No. NA2. Annual Audit Report of Special Account in Form 7 Enclosed
D. Latest Photo with Date (Atleast from 2 angles) - Enclosed in CD
For CASA G CIVIL
U
PVI LTD
d tories
G
J
![Page 3: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/3.jpg)
BLOCK – A PAINTING WORK, FALSE CEILING, SWITCH PLATE, KITCHEN COUNTER, FINISHING WORK IN PROGRESS.
![Page 4: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/4.jpg)
BLOCK – A
![Page 5: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/5.jpg)
BLOCK – B FINISHING WORK IN PROGRESS
![Page 6: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/6.jpg)
BLOCK – B
![Page 7: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/7.jpg)
BLOCK – C FINISHING AND QC SNAG WORK IN PROGRESS
![Page 8: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/8.jpg)
BLOCK – C
![Page 9: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/9.jpg)
BLOCK – D 3RD FLOORPAINTING AND KITCHEN GRANITE LAYING, DOOR SHUTTER, COUNTER TOP WASH BASIN, WIRING, SWITCH PLATE GRANITE WORK
IN PROGRESS
![Page 10: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/10.jpg)
BLOCK – D
![Page 11: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/11.jpg)
BLOCK – E INTERNAL PAINTING,SWITCH PLAT WORK,KITCHEN PLATFORM, IN PROGRESS
![Page 12: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/12.jpg)
BLOCK – E
![Page 13: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/13.jpg)
BLOCK – F 4TH FLOOR TILE, WALL PUTTY, EXTERNAL PAINTING, UPVC WINDOW WORK IN PROGRESS, WATER PROOFING, WINDOW GRILL
![Page 14: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/14.jpg)
BLOCK – F
![Page 15: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/15.jpg)
BLOCK – G PLUMBING WORK , WATER PROOFING, WALL&FLOOR TILES, MARBLE FLOORING, EXTERNAL PAINTING WORK, GRILL FIXING
IN PROGRESS
![Page 16: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/16.jpg)
BLOCK – G
![Page 17: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/17.jpg)
BLOCK – H PLUMBING WORK,WATERPROOFING,WALL PUTTY TILING,EXTERNAL PAINTING IN PROGRESS
![Page 18: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/18.jpg)
BLOCK – H
![Page 19: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/19.jpg)
BLOCK – J 4th FLOOR BLOCK WORK,2ND FLOOR PLASTERING WORK, EXTERNAL PLASTERING,1ST FLOOR WALL PUTTY WORK
IN PROGRESS
![Page 20: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/20.jpg)
CLUB HOUSE ROOF SHUTTERING &BARBENDING CONCRETE WORK
![Page 21: Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private](https://reader033.vdocuments.site/reader033/viewer/2022041416/5e1ba8652bc74f2a711ba94c/html5/thumbnails/21.jpg)
DRAIN & ELECTRICAL TRENCH WORK,CHAMBER ,STILT FLOOR PCC WORK IN, PLUMBING CHAMBER, STILT CEILING GVP WORK, LIFT ELECTRICAL, PROGRESS
TRENCH A to D
EXTERNAL WORK