![Page 1: PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA … · 4 12/05/2017 Implementation of PIDA crosscutting issues (1) •Capacity enhancement, coordination and communication Support](https://reader034.vdocuments.site/reader034/viewer/2022052002/60158c6eebde856ea71e6ecf/html5/thumbnails/1.jpg)
PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) ICT
COMPONENT -PROGRESS REPORT ICT SECTOR
![Page 2: PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA … · 4 12/05/2017 Implementation of PIDA crosscutting issues (1) •Capacity enhancement, coordination and communication Support](https://reader034.vdocuments.site/reader034/viewer/2022052002/60158c6eebde856ea71e6ecf/html5/thumbnails/2.jpg)
212/05/2017
OUTLINE
• Overview of the Programme;• Implementation of crosscutting issues;• Bottlenecks for PIDA implementation; • PIDA-PAP implementation on the ground: • Conclusion
![Page 3: PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA … · 4 12/05/2017 Implementation of PIDA crosscutting issues (1) •Capacity enhancement, coordination and communication Support](https://reader034.vdocuments.site/reader034/viewer/2022052002/60158c6eebde856ea71e6ecf/html5/thumbnails/3.jpg)
312/05/2017
Overview of PIDA
• PIDA Priority Action Plan, phase 1 (PIDA-PAP),➢ Up to2020, ➢ 51 programmes and projects decomposed into 433 actionable
projects covering transport, energy, information and communication technology (ICT) and trans-boundary water sectors
➢ Cost of delivering the PAP-1 from 2012 through 2020: $68 billion➢ Energy and transport projects and programmes represent around
95% of the total cost, demonstrating the critical need for transformative investments in these sectors to support African trade, promote growth and create jobs.
• Capital cost of PIDA’s long-term implementation• through 2040 estimated at more than $360 billion.
Energy$40.3
Transport
$25.4
Water$1.7
ICT$0.5
BY SECTORUS$ BILLIONS
Energy Transport Water ICT
![Page 4: PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA … · 4 12/05/2017 Implementation of PIDA crosscutting issues (1) •Capacity enhancement, coordination and communication Support](https://reader034.vdocuments.site/reader034/viewer/2022052002/60158c6eebde856ea71e6ecf/html5/thumbnails/4.jpg)
412/05/2017
Implementation of PIDA crosscutting issues (1)
• Capacity enhancement, coordination and communication ➢ Support (GIZ and the AfDB) towards strengthening stakeholders capacities in
M&E, reporting, information, communication and marketing and projects preparation
➢ Development of communication strategy and an action plan and establishment of a Virtual PIDA Information Centre (VPIC)
• Mobilizing resources to accelerate PIDA-PAP delivery➢ Dakar financing summit;➢ Adoption of the principle of continent’s public and private sectors
contribution to the financing
![Page 5: PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA … · 4 12/05/2017 Implementation of PIDA crosscutting issues (1) •Capacity enhancement, coordination and communication Support](https://reader034.vdocuments.site/reader034/viewer/2022052002/60158c6eebde856ea71e6ecf/html5/thumbnails/5.jpg)
512/05/2017
Implementation of PIDA crosscutting issues (2)
• Identification of implementation bottlenecks: ➢ Lack of capacity for project preparation; ➢ Lack of funding for project preparation; ➢ Lack of project financing; and ➢ Lack of involvement of the private sector.
• Setting up of PIDA Service Delivery Mechanism (SDM) and the NEPAD Infrastructure Project Preparation Fund (IPPF): to address the lack of capacity for early stage project preparation at the national and regional levels;
![Page 6: PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA … · 4 12/05/2017 Implementation of PIDA crosscutting issues (1) •Capacity enhancement, coordination and communication Support](https://reader034.vdocuments.site/reader034/viewer/2022052002/60158c6eebde856ea71e6ecf/html5/thumbnails/6.jpg)
612/05/2017
PIDA-PAP implementation on the ground (1)
• ICT PIDA PAP 1 Enabling environment: conducive environment for infrastructure development notably contribution of private sector. Implemented or ongoing implementation cover:
➢ Spectrum Policy: Develop guidelines on the harmonized use of the Digital Dividend;
➢ Access to digital dividend under negotiation• ICT PIDA PAP 2Terrestrial Connectivity: ensure each country connection by at
least two broadband infrastructure and ensure the access to submarine cable to all landlocked countries. This covers:
➢ Optic fibre Project from Algeria to Nigeria via Niger;➢ Multinational Niger-Chad Trans Saharan backbone –study supported by AfDB;➢ Central African fiber optic projects linking Member states
![Page 7: PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA … · 4 12/05/2017 Implementation of PIDA crosscutting issues (1) •Capacity enhancement, coordination and communication Support](https://reader034.vdocuments.site/reader034/viewer/2022052002/60158c6eebde856ea71e6ecf/html5/thumbnails/7.jpg)
712/05/2017
CONCLUSION/RECOMMENDATIONS
• PIDA is a sensible framework; making it functional requires significant capital commitment, greater coordination amongst key political actors, and engagement of the private sector.
• Lack of bankable projects remains a key bottleneck of PIDA.
• Need to speed up the implementation of the EU-Africa project of Accessing Digital Dividend in Africa for (i) increased broadband penetration, (ii) conducive legal and regulatory environment in
![Page 8: PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA … · 4 12/05/2017 Implementation of PIDA crosscutting issues (1) •Capacity enhancement, coordination and communication Support](https://reader034.vdocuments.site/reader034/viewer/2022052002/60158c6eebde856ea71e6ecf/html5/thumbnails/8.jpg)
Thank youMerciشكرا