PROJECTS INDIA PVT. LTD., COMPANY PROFILE Plot No. 51, 1 st Floor, Vittal Rao Nagar, Madhapur, Hyderabad – 500 081

Upload: vanthuan

Post on 04-Apr-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

PROJECTS INDIA PVT. LTD.,

COMPANY PROFILE

Plot No. 51, 1st Floor, Vittal Rao Nagar, Madhapur,Hyderabad – 500 081

Tel / Fax : 91-40-23117123 / 23115403Email : [email protected] : www.svsprojects.net

Page 2: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

INDEX

1. Index - 2

2. Introduction - 3

3. Works on Hand - 4

4. Works Executed - 6

5. Plant & Machinery - 8

6. Technical & Administration - 12

7. Organisation Chart - 14

8. More Happy Clients - 15

Page 3: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

PROFILE INTRODUCTION

We would like to introduce ourselves as one of the major reputed construction firms in the fields of Civil Project works, Earth works etc. We enjoy the confidence of our clientele in this sphere of quality and strict compliance of time schedule.

Our company was started in 1991, in the name of “S.V.L. Constructions” and took up major construction works in Vizag Steel Plant for a period. Subsequently the company was renamed as S.V.S. Constructions and under took civil construction works for M/S.H.S.C.L. Ltd.

Further we have classified our activities and included transportation also apart from regular construction activities. To reflect the present stature and nature of works being undertaken, the name of the company is changed to “S.V.S. Projects Pvt. Ltd”.

During our tenure for the past 20 successful years we have been associated within major constructions for “M/s. Myhome Industries Ltd(MAHA CEMENT)., M/s. Sagar Cements Ltd., M/s. Vijai Electricals Ltd, M/s. Andha Cements Ltd., M/s. Anjani Portland Cement Ltd., Keerthi Industries Ltd., Choramandal Cements Ltd., and Power Plants, World Bank aided projects such as Cancer Hospitals, Area Hospitals, Earth work EMBANKMENTS Revetments, Bridges, etc. We have also constructed prestigious Industrial constructions like Pre-heater up to a height of 120 mts, within 10 months at M/s. My home Cement Industries Ltd.

As the civil construction scenario has been changed to high-rise buildings, we also adapted to the changed environment and we have successfully completed My Home Vihanga’s project work - 20 Blocks of 2000 flats with in span of 20 months time with latest scaffolding (Aluminium Formwork). Also we are in completion stage of 2 Blocks of 20 floors 200 flats at Rainbow Vistas Phase 2 (Cybercity) – Hyderabad.

Projects are under progress (1 ) Shriram Greenfield Projects at – Bangalore - Wing A with 6 blocks of 19 floors each with 935 flats with each block 2 Basements and terrace, (2) Lansum Etania Developers LLP at Puppalaguda with 7 blocks of 20 floors each and club house of 7 floors(3) also associated with M/s. Jyothirmaye Properties Pvt. Ltd., for their Palm springs Projects-Guntur – 3 blocks 19 Floors construction.

We are happy to inform that another feather has been added to our cap, recently we have completed Telengana Government Chief Minister’s pet project of 2 bedroom row houses of 600 houses with all modern amenities at Erravalli village, Medak Dist. were completed with in short span of time and also inaugurated by none other than Sri Chandra Shekhar Rao – Chief Minister of Telengana State on 23rd December 2016.

Further we were awarded another Government Project at Gajwal for construction of 2 Bed Room row houses of 1200 flats

Page 4: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

We are also enclosing the list of our esteemed clients for whom we have completed the works within the time schedule, thereby saving the project cost. The enclosed list of clients and works would speak of our challenging abilities and performance.

We trust in quality construction and also completion of the works in time so that the client shall be able to avoid unnecessary expenditure in different forms that may occur due to delay in completion of work.

We are equipped with the latest equipments and highly efficient construction staff at all levels to show our end results with confidence.

Page 5: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

Works on HandExpect Amt of WorkWork ed date Balance ofWork Order work Order Start completedS.No. Name of the Contractee Order Nature of Work for Work to beNo. Value Rs. Date as on 31-08-Date comple completed2017tion

1 Iconica Constructions LOI Date: LOI Date: Construction of Green field project at Jun-15 May-18 3741.41 2058.5904.02.2015 04.02.2015 Bangalore 5,800.00

2 Penna Cement Industries ltdPCIL:DIR(T):SVS

01.04.2015 civil jobs for our Cement Terminal being Apr-15 Aug-17 794.73 355.27P:COCHIN setup at Cochin Port, Kerala state 1,150.00PORT:001:15-16

3 Lansum Etania Developers LLP Lansum Etania 06.07.2015 Construction of Residentional complex 5,130.00 Jul-15 Dec-17 2798.00 2332.00/SVS/Civil/28/2015-16

Lansum Etania Construction of Civil Structural &4 Lansum Properties LLP 06.07.2015 Masonary works of "Lansum Madhav Aug-15 Jan-17 195.00 55.48/SVS-3/2015-16 250.48towers"

5 My Home Industries Pvt Ltd MBMPL/TGU/PROJ/ 03.10.2015 Cement Grinding Unit Civil construction Oct-15 Aug-17 3321.36 3.64WO/013/2015-16 of Plant building 3325.00

6 My Home Industries Pvt LtdMHIPL/PPWH/2015

09-10-2015 Construction of Plant Buildings for Power Nov-15 Jun-17 922.96 177.04/MCW/001/WI4200 Plant 1,100.00000230/2015-167 Aqua Space Developers 4300003591 21-05-2016 Construction of Residentional complex 4653.00 May-16 Dec-18 2252.37 2400.63

8 Aqua Space Developers 4300003592 01-02-2016 Construction of Residentional complex 5374.00 Feb-16 Dec-18 977.37 4396.63

9 Aqua Space Developers 4300004377 05-08-2016 Construction of Residentional complex 4653.00 Aug-16 Dec-18 1058.51 3594.49

10 Aqua Space Developers 4300004091 27-05-2016 Construction of Residentional complex 1058.00 May-16 Dec-18 480.65 577.35

11 My Home Industries Pvt Ltd 4200000332 26-04-2016 Plant Internal Roads and Drains 604.00 Apr-16 Jun-17 603.83 0.17

12 Sandhya Hotels pvt ltd 12-05-2016 Construction of Hotel 100.00 May -16 Jul-17 100.00 36.00

PCIL:DIR(T):SVS Cement Terminal being setup at13 Penna Cement Industries ltd P:GOPALPUR 20-08-2016 875.00 Aug-16 Dec-17 339.91 535.09Gopalapur port, OrissaPORT:001:16-17PCIL:DIR(T):SVS Piling work for 0.5 MTPA Cement14 Penna Cement Industries ltd P:GOPALPUR 10-10-2016 400.00 Oct-16 Dec-17 298.46 101.54Terminal at Gopalapur port, OrissaPORT:002:16-17

15 Jyothrmaye Properties pvt ltd 02-11-2016 Construction of Residentional complex @ 2354.00 Nov-16 Jan-18 261.12 2092.88GunturPCIL:DIR(T):SVS Cement Terminal being setup at NSD,16 Penna Cement Industries ltd P:KOLKATA 06-04-2017 700.00 April-17 Mar 18 0 700.00Kolkata Port, West bengalPORT:001:17-18

PCIL:SVS:WO- Piling works for 0.5MTPA Cement17 Penna Cement Industries ltd PILES:KOLKATA: 06-04-17 400.00 April-17 Mar 18 0 400.00Terminal atNSD Kolkata, West Bengal002:17-18Total : 37926.48 18145.68 19780.80

Page 6: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

LIST OF WORKS EXECUTED

Work Order work Start Date / Amt ofS.No. Name of the Contractee Work Order No. Order Month of WorkDate DateValue Rs. completion Executed

1 My Home Constructions pvt 4300001597 25.02.2014 Feb-15 May-15 21.27ltd 25.13

2 My Home Constructions pvt 4300002225 25.02.2014 Feb-15 May-15 33.32ltd 967.68

3 My Home Constructions pvt 4300002111/1 14.11.2014 Nov-14 May-15 531.00ltd 555.41

4 My Home Constructions pvt 4300001469 06-01-2014 Nov-14 May-15 1984.38ltd 2,737.315 My Home Industries Pvt Ltd 4200000142 Jan-15 Mar-15 98.64

6 My Home Industries Pvt Ltd 4200000143 17-12-2014 31.57 Jan-15 Mar-15 29.45

7 My Home Industries Pvt Ltd 4200000145/1211 19-12-2014 7.00 Dec-14 Apr-15 5.29

8 My Home Industries Pvt Ltd 4200000146 20-12-2014 64.00 Dec-14 Jan-15 20.38

9 My Home Industries Pvt Ltd 4200000150 30-12-2014 11.40 Jan-15 Apr-15 8.01

10 My Home Industries Pvt Ltd 4200000153 02-01-2015 7.00 Jan-15 Apr-15 7.13

11 My Home Industries Pvt Ltd 4200000156 23-01-2015 11.00 Jan-15 Apr-15 9.30

12 My Home Industries Pvt Ltd 2500003292 17-02-2015 10.43 Mar-15 Mar-15 10.43

13 My Home Industries Pvt Ltd 4200000198 22.06.2015 14.98 Jun-15 Jul-15 12.20

14 My Home Industries Pvt Ltd 4200000199 22.06.2015 21.65 Jun-15 Jul-15 22.89

15 My Home Industries Pvt Ltd 4200000201 26.06.2015 21.79 Jun-15 Jul-15 21.28

16 My Home Industries Pvt Ltd 4200000210 24-07-2015 44.61 Jun-15 Jul-15 28.57

17 My Home Industries Pvt Ltd 4200000211 24-07-2015 19.20 Jun-15 Jul-15 20.67

18 My Home Industries Pvt Ltd 4200000219 31-08-2015 6.62 Jun-15 Jul-15 4.99

19 My Home Constructions pvt 4300002859 06-01-2014 616.05 Jan-14 Dec-16 413.00ltd

20 My Home Constructions pvt 4300002852 14.11.2014 931.8 Nov-14 Dec-16 912.00ltd

21 My Home Constructions pvt 4300002850 14.11.2014 673.67 Nov-14 Dec-16 652.57ltd

22 My Home Constructions pvt 430002851 19.02.2014 909.15 Feb-14 Dec-16 849.00ltd

23 Bhagyanagar Infra ProjectsBIPL/LOI/15-16

09.04.20151802.05

Apr-15 Apr-17 1802.05

27 Aurobindo Pharma Ltd 141606031 31-05-2016 804.00 May -16 Mar-17 804.00

Page 7: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

S.No. Name & Address of the Clients Architects Values Time of Year(Rs.in CompletionLacs)

1 Zuari Cement Ltd – Packing Plant 3315 18 Months 06/14 to 11/15Terminal at cochin

2 Zuari Cement Ltd – Grinding Unit at 4800 18montsh 01/14 to 06/15Solapur

3 Aurobind Pharma Ltd Pragathi Consultants 996 12 months 03/14 to 04/154 Vicat Sagar Cement Pvt Ltd - R.V. Consultancy 3780 18 Months 01/12 to 01/14

5 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14

3 My Home Industries Ltd - Grinding Unit My Home Consultancy 2558 18 Months 12/10 to 09/12at Mulakalapally

4 My Home Industries Ltd (CPP-2) My Home Consultancy 942 12 months 07/11 to 06/125 Sri Lalitha Cement Industries Ltd Design Tribe India Pvt 17 Months 05/10 to 09/11

Ltd 28856 Zuari Cements Ltd ( Itali cement Group) Design Tribe India Pvt 792 12 Months 09/10 to 09/11

Ltd7 My Home Industries Ltd - MCW – My Home Consultancy 1112 13 Months 04/10 to 04/11

Railway Siding & Track Linking works8 My Home Industries Ltd - Grinding Unit My Home Consultancy 1562 12 Months 12/09 to 11/10

at Mulakalapally9 My Home Industries Ltd - Mellacheruvu My Home Consultancy 1262 19 Months 10/09 to 05/11

Cement works10 Junagadh Power Projects Pvt. Ltd., Myhome Consultancy 636 13 Months 04/10 to 04/1111 Amreli Power Projects Pvt. Ltd., Myhome Consultancy 679 11 Months 12/09 to 10/1012 Bheema Cements Ltd., Aashritha Associates 278 7 Months 04/10 to 09/1013 Anjani Portland Cement Ltd., Siri Consultancy 1,738 13 Months 03/09 to 03/1014 My Home Industries Ltd - Grinding Unit My Home Consultancy 2,776 24 Months 12/07 to 11/09

at Mulakalapally15 Andhra Cements Ltd - Dachepalli, Holtec Consulting 3,617 26 Months 12/07 to 02/10

Guntur16 My Home Industries Ltd, Mellachevuru My Home Consultancy 255 5 Months 06/09 to 10/09

Cement Works17 Jayabheri Properties Pvt Ltd My Home Consultancy 282 18 Months 03/08 to 09/0918 Keerthi Industries Ltd R.V. Consultancy 770 12 Months 12/07 to 12/0819 Vijai Electricals Ltd., K.L.N. Gupta & Co 3,700 21 Months 04/06 to 12/07

20 My Home Constructions Pvt Ltd My Home Consultancy 321 9 Months 05/07 to 01/0821 Sagar Cements Ltd., Samskruthi Designers 1,350 12 Months 03/07 to 02/0822 My Home Industries Ltd - Unit III Ramesh Mantha-Arc. 3,000 12 Months 01/06 to 02/07

23 Metropolitan Transport MTP Railways 430 18 Months 07/05 to 12/06Project(Railways), Chennai

24 Jayabheri Properties Pvt. Ltd Hyderabad Ramesh Mantha-Arc. 135 12 Months 01/04 to 01/0525 Gland Pharma Limited Hyderabad 20 2 Months 04/03 to 05/0326 Visakha Central School Hyderabad. Ramesh Mantha-Arc. 225 18 Months 04/02 to 09/0327 Construction of Bridge Across AP- Panchayati Raj 104 8Months 8/01 to 3/02

KandiKalavaDabbakalava ,.P.R Kakinada,E.G. Dist

28 Improvement to River Godavari Flood AP Irrigation 190 12Months 99/2000Bank along PIP .E.G.Dist

Page 8: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

29 Govt. Area Hospital, Tuni, E.G.Dist. APHMHIDC 255 20Months 8/99 to 3/200130 Bridges Across Yeleru River Panchayet Raj 168 12Months 09/99 to 09/2k

Yelleswaram, E.G.Dist.31 Metropolitan Transport Project Indian Railways 261 24 Months 3/03 to 03/05

(Railways - Chennai)32 M/s. Sagar Cements Ltd Mattampally - Bhagavathi Associates 50 6Months 2002

Nalgonda –Dist33 M/s. Suvarna Cements Ltd Mellacheruvu Siri Consultants 46 6Months 2002

- Nalgonda – Dist34 Base Power Private Ltd Raichur - MN Dastur& Co., 100 --- 200235 Saro Power & Infrastructures (P) Ltd MN Dastur& Co., 125 -- 2002

Gudlaballuru - Mehaboob Nagar -Dist34 Sri Kalyani Agro Products & Ind. Ltd MN Dastur& Co., 154 5Months 11/01 to 03/02

TadepalliGudam - E.G. Dist35 M/s. Varam Power Projects (P) Ltd MN Dastur& Co., 169 7Months 12/2000 to

Chilakapalam, Srikakulam Dist. 06/0136 My Home Cement Industries Ltd Siri Consultancy 105 -- 04/02 to09/02

Mellacheruvu, Kodad. (Unit - II) Silos --- 45.00,Roads -- 30.00&Other Misc - 30.00

37 My Home Cement Industries Ltd Siri Consultancy 600 10months 04/01 to 3/02Mellacheru, Kodad .(Unit - II)

38 Smt. NandamuriBasavataraka Cancer & Ramesh Mantha -Arc. 292 24Months 09/98 to 09/2kResearch Centre, Hyd.

39 Devi Cements, Mellacheru, Kodada.(Unit Bhagavathi Associates 200 14Months 08/98 to 10/99- I )

40 Sri Sailam Left Bank Canal works Under APSEB ,Deverakondaa) Audit Tunnel APSEB 51 3Months 03/98 to 05/98b) Removal of Over Burden ,, 45 ,, 04/98 to 08/98c) Grading Works ,, 61 4Months 06/98 to 10/98d) Pump House Excavation ,, 51 3Months 08/98 to 11/98

41 Priyadarshini Cements Ltd Bhagawati Designs Pvt. 35 4 Months 08/97 to 09/97Ltd.

42 Devi Cements Ltd(Maha Cement) Siri Consultants 440 10 Months 05/96 to 03/9743 Veera Labs Ltd Chemn. Tech. 79 1 Year 1995 - 199644 Divis Labs Ltd Siri Consultants 180 9 Months 01/95 to 09/9545 Bhoopathi Cements Hull Mark 10 4 Months 5/94 to 9/9446 Vera Laboratories Ltd Hull Mark 30 4 months 1994 - 199547 Sri Simhadri Cements Ltd Hull Mark 25 4 Months 1993 - 199448 Sri Simhadri Cements Ltd Siri Consultants 70 6 Months 1992 - 199349 Gold Star Steel & Alloy Ltd, Hyderabad Siri Consultants 120 8 Months 1991 - 199250 Visakhapatnam Steel Project Russian Design &MN 40 1 year 1990-1991

Dastur, Calcutta

(The above Values are excluding cost of Cement & Steel)

Page 9: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

CONCRETING EQUIPMENT :

Putzmeister Separate Placing Boom(MX32) 2014 – 6 NoSchwing Stetter Separate Placing Booms (SPB35) 2014 - 2 NoZoomlion Separate Placing Boom (SPB35) 2015 - 2 NoTruck Mounted Concrete Pump with placing Boom 36 mtr 2015 - 1 No

Truck Mounted Concrete Pump with placing Boom 36 mtr 2008 - 1 No

Truck Mounted Concrete Pump with placing Boom 36 mtr 2010 - 1 No

Truck Mounted Concrete Pump with placing Boom 36 mtr 2015 - 1 No

Truck Mounted Concrete Pump with placing Boom 36 mtr 2016 - 2 NoConcrete Batching Plant 60 Cum 2016 -3 No Concrete Batching Plant 45 Cum 2016 - 1 No Concrete batching Plant 30& 25 Cum 2017 - 5 No

Transit Mixers 6 &7 Cum (2015,2016&2017)- 37 No

Page 10: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

LIFTING EQUIPMENT

Tower Cranes – 17 Nos (Height up to 110 mtr& Jib upto 50 mtr)

SANY SPC 250 Telescopic Truck Mounted Crane – 1No

Mobile Tower Crane 3625 & 2418T – 2 No

Mobile Crane 9 to 12 Ton - 2008 & 2009 – 8 NoPassenger Hoists(Rock &Pinion)- 2016 - 4 NoMaterial Hoists - 2017 - 3 NosTower Hoists Height Upto 100mtr - 6 No

Greaves Soil Compactor - 2013 - 1 No

Hyundai Excavator R220LC - 2016 - 1 NoHyundai R80 - 2013 - 1 NoTelcon Ex 70 Excavator - 2007 – 3 No

Telcon JD 315 V Backhoe Loader 2007/08/09&10-11 - 7 No

Page 11: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

Piling Equipment :Sany Make SR155c10 Piling Rig –2017 - 1 No

TRANSPORTATION :Tippers Ashok Leyland / AMW – 2013 – 14 Nos

Tippers Ashok Leyland – 2007 & 2008 – 10 No

Mining Tippers Ashok Leyland – 2008 – 5 No

Cement & Flyash Tankers Eicher – 2007 – 3 No

Eicher 25 MT Capacity - 2007 – 1 No

Eicher 7.0 MT Capacity – 2004 – 1 No

Eicher 5.0 MT Capacity -2016 - 4NoTractor & Trailors – All – 10 Nos

Tractor with Bull Loader & Dozer – 3 No

Double Cabin Bolero Camper – 10 No

Single Cabin Pickup - 2007 - 2 No

SCAFFOLDING MATERIAL

MS Pipe 6mtr length x 40 NB - 1.5 Lakh NosSteel Shuttering - 50,000m2

A.P. Units - 2000 SetCuplock Scaffolding - 50000 UnitsRAC &Sweivel Couplers - 2,00,000 NoH – Frame - 5000 No

Page 12: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

ALUNINIUM FOAM SHUTTERING (MYVAN) :Foam Shuttering & Accessories - 50,000 Sq.mtr

SLIPFORM SHUTTERINGYoke Legs - 1000 Nos

Console for Deck ISA40x40x6 - 1000 NosConsole supports angles - 1000 NosWall Clamps - 5000 NosWall Pipe 40NB - 4000 NosJ-Hooks (Small) - 2000 NosJ-Hooks (Big) - 2000 NosShutter Plates 1000mmx1000mm - 1000 NosJ-Hook Plates - 4000 Nos

HYDRAULIC EQUIPMENT3.O M.T. Hydraulic Jacks - 500 NosHose Pipe ½” x 1.50 mtr - 1000 NosT- Connections - 200 NosStraight Connections - 200 NosMain Valves - 100 NosControl Bushes - 1000 NosHydraulic Power Pack with 10HP - 6 NosMotorApproach Tower - 400 RmtDecking Platform Planks & Runners - 1000 Rmt(8”x2”x5’ & 2”x3”)

Page 13: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

OTHER Misc. MACHINARYStripp Bending Machine (Automatic) – 1 NoBar Cutting Machine - 42 NoBar Bending Machine - 37 NoVibrator – Electrical(Imported) - 15 NoVibrator – Electrical - 25 NoVibrator – Petrol - 25 NoVibrator Needles (40&60mm) - 200 NoWelding Machines - 25 NoGas Cutting Set - 15 NoWater Engines & Pumps - 15 No

SURVEYINGLevel Instruments - 9 NoTheodolite - 7 NoTotal Station - 5 No

Page 14: Profile.doc · Web viewR.V. Consultancy 3780 18 Months 01/12 to 01/14 2 Gulbarga Power Pvt Ltd - R.V. Consultancy 732 18 Months 11/12 to 03/14 3 My Home Industries Ltd - Grinding

TECHNICAL & ADMINISTRATIONSl.No PARTICULARS No's

1 CIVIL ENGINEERS

a) B. Tech 25

b) Diploma 75

2 SITE SUPERVISORS

a) Technical (ITI) 45

b) Non – Technical 30

3 Accountants 20

4 Receptionist Cum Computer Operator 8

5 Personal Officers 6

6 Laisioning 3

7 Electrical Foreman & In-charge 8

8 Mechanical Foreman & In-charge 8

9 Vehicle In-charge 8

10 Painters 3

11 Plumber 1

12 Safety Officers 35

13 Store Officer & Store Keeper 22

14 Drivers & Cleaners 75

15 Electrician 35

16 Mechanics 10

17 Batching plant Operators & Helpers 25

18 Tower Crane Operators & Helpers 60

19 Excavators, Hydra & Roller Operators & Helpers 6

20 Concrete Pump Operators 28

21 Vibrator Operators 40

22 Other Staff like Office Boy, Cook, Watchmen& Security 80

Total 656