II Company ProfileCompany Profile
Organization StructureOrganization Structure11
International AllianceInternational Alliance22
Our CustomersOur Customers33
AdvantageAdvantage44
HistoryHistory55
Company structureCompany structure
CEO
Planning Consulting
(Strategies,Visioning,Planning)
(Technology, Venture management)
CustomerSupport
Development
HumanResources
Consulting Education & Training
Finance Sales &Marketing
Operation
Development A
Development B
DevelopmentC
Sales &Marketing A
Sales &Marketing C
Sales &Marketing B
CAD&SOFT Co., LTD.CAD&SOFT Co., LTD.
JapanJapan
NTTDataNTTData
SRASRA
MISMIS
ChinaChina
Liaohe DigitalLiaohe Digital
Liaoning Liaoning NEWHELPNEWHELP
IndiaIndia
E-TechE-Tech
PhilippinesPhilippines
APTechAPTech
CanadaCanada
SCSC
SpainSpain
JP VALJP VAL
VietnamVietnam
VinashingVinashing
TinymoduleTinymodule
International AlliancesInternational AlliancesInternational AlliancesInternational Alliances
Our customersOur customersOur customersOur customers
Our Customer
Some of our more recognized customers include:Some of our more recognized customers include:
AdvantagesAdvantages
Korea
ADVANTAGES OF THE ALLIANCE WITH CAD & SOFT
Cad & Soft/JP ValPossibility to access to the
design tool Ship Constructor with special price
Indirect support from Korea government trough Cad & Soft for alliances in future projects.
A TFT in country of origin and Korea. If necessary support of consultants from Spain, China or Japan experts in the ship industry.
Opportunity to access to future IT products developed in Korea for the relevant industry
Cad & Soft/JP Val
Know how the ship industry.Experience in projects with
main vendors of big ship yards in Korea.
Projects with Hyndai Heavy Industry
(Sub vendor: Lee young Shinhan hochang).
Benchmark with Korea/China and Vietnam.
Personalized support with consultants of Cad & Soft and partners in Asia and other regions
Certificates and recognitions Certificates and recognitions
Small & Medium Business
Administration
Military Manpower
Administration
DNV
Small & Medium Business
Administration
Microsoft
Microsoft
Small & Medium Business
Administration
Organization
Certified as Venture Business
(Registration No.99123471-387)
Designated as Industrial Military Manpower Company in 2001
Norway DNV ISO-9001 a note of Authentication Acquisition
Selection of Business Support of ERP Consulting
In Small & Medium Enterprises
Contract of Microsoft Certified Partner
Contract of proERP vs MS-SQL Runtime
Selection of Support Company in 10 thousands IT Business
(High Class ERP, Basic ERP)
1999.12.15
2000.12.07
2001.01.05
04.02
04.10
04.15
04.28
contentsDate
DateDate OrganizationOrganization contentscontents
2001.10.232001.10.23
10.2310.23
12.1712.17
12.2112.21
2002.05.132002.05.13
05.3105.31
2003.11.102003.11.10
12.2412.24
2004.04.252004.04.25
Korea Industrial ComplexKorea Industrial Complex
CorporationCorporation
Small & Medium Business Small & Medium Business
AdministrationAdministration
Ministry of Information & Ministry of Information &
CommunicationCommunication
Ministry of Commerce, Industry Ministry of Commerce, Industry
and Energyand Energy
Korea Information Management Korea Information Management Institution for Small & Medium Institution for Small & Medium
EnterprisesEnterprises
INTERNATIONAL QUALITY INTERNATIONAL QUALITY SYSTEM PTY. LTD.SYSTEM PTY. LTD.
Busan Business Support CenterBusan Business Support Center
Daily Economy NewspaperDaily Economy Newspaper
Selection of Solution Company in Intelligence SupportSelection of Solution Company in Intelligence Support
Selection of ERP Consulting Support Company Selection of ERP Consulting Support Company
in Small & Medium Enterprisesin Small & Medium Enterprises
Selection of Perspective Minor Enterprises (2002~2004) Selection of Perspective Minor Enterprises (2002~2004)
Selection of 1Selection of 1stst Template Developer (Shipbuilder Section) Template Developer (Shipbuilder Section)
Selection of Intelligence Consulting Business in Local Small Selection of Intelligence Consulting Business in Local Small
& Medium Enterprises (Busna.Ulsna IT Consulting Group)& Medium Enterprises (Busna.Ulsna IT Consulting Group)
Selection of Production Intelligence in Small & Medium Selection of Production Intelligence in Small & Medium EnterprisesEnterprises
ISO 9001:2000 / KS A 9001:2001ISO 9001:2000 / KS A 9001:2001
Recommended Excellent 2003 S/W : proERPRecommended Excellent 2003 S/W : proERP
Awarded “Venture Administration Gold”Awarded “Venture Administration Gold”
Certificates and Certificates and recognitions recognitions
Certificates and Certificates and recognitions recognitions
DateDate OrganizationOrganization contentscontents
2004. 042004. 04
2005.022005.02
20052005
2006.062006.06
2006.092006.09
2006.092006.09
2006.122006.12
2007. 012007. 01
2007.012007.01
2007.022007.02
2007.042007.04
Small & Medium Business
Small & Medium Business
(Busan & Ulsan)
TOC Solution
IT Venture Growth Support
Technology Development
BORIM
DONG-NAM
ATEC
NEDTEC
ShipConstructor
ASPROVA
MITEC
Manufacture Company IT Research Manufacture Company IT Research
““Development of Mita Middleware System”Development of Mita Middleware System”
Development of data mining Module for ERP systemDevelopment of data mining Module for ERP system
Development of TOCDevelopment of TOC
Oversea Marketing of proERPOversea Marketing of proERP
Interface Development of proERP & ShipconstructorInterface Development of proERP & Shipconstructor
Consulting in BORIM CompanyConsulting in BORIM Company
proERP Consulting in Dong-Nam ENG proERP Consulting in Dong-Nam ENG
proERP Consulting in ATECproERP Consulting in ATEC
proERP Consulting in NEDTECproERP Consulting in NEDTEC
Agreement of ShipConstructor Agreement of ShipConstructor
Agreement of ASPROVAAgreement of ASPROVA
proERP Consulting in MITECproERP Consulting in MITEC
Certificates and Certificates and recognitions recognitions
Certificates and Certificates and recognitions recognitions
Function ChartFunction Chart11
ProERP ConceptProERP Concept22
Application IndustriesApplication Industries33
BenefitsBenefits44
IIIIproERP IntroductionproERP Introduction
ImplementationImplementation55
Function chartFunction chartFunction chartFunction chart
FunctionsFunctions
Standard dataStandard data Basic data management, integrated code management, standard BOM management, Basic data management, integrated code management, standard BOM management,
standard process management, process system management, design event standard process management, process system management, design event
managementmanagement
Sale and distributionSale and distribution Order processing management, estimate management, customer management, sale& Order processing management, estimate management, customer management, sale&
bill collecting management, supply management, sale and distribution status bill collecting management, supply management, sale and distribution status
managementmanagement
Production planningProduction planning Contract management, operation management, load leveling management, contract, Contract management, operation management, load leveling management, contract,
equipment management, performance management, production status managementequipment management, performance management, production status management
Design planningDesign planning BOM management, drawing plan, material selection planning, MP planning, POR BOM management, drawing plan, material selection planning, MP planning, POR
planning, drawing performance planning, design status managementplanning, drawing performance planning, design status management
Material managementMaterial management Purchase & storing management, delivery management, surplus /remaining material Purchase & storing management, delivery management, surplus /remaining material
management, exporting management, steel material/outsourced product management, management, exporting management, steel material/outsourced product management,
purchase time management, undone order processing/storing management, material purchase time management, undone order processing/storing management, material
raw cost management, raw cost control, material status managementraw cost management, raw cost control, material status management
The cost controlThe cost control Executive budget planning, standard cost management, the cost control, the cost Executive budget planning, standard cost management, the cost control, the cost
account management, the cost weight control, exchange rate management, executive account management, the cost weight control, exchange rate management, executive
budget item planning, currency code management, the actual cost management, the budget item planning, currency code management, the actual cost management, the
project cost management project cost management
Accounting managementAccounting management Voucher, register, financial statement, surtax, budget, fund, fixed asset and automatic Voucher, register, financial statement, surtax, budget, fund, fixed asset and automatic
fill-in managementfill-in management
Human resource Human resource managementmanagement
Human resource management, payment management, year-end adjustment, retirement Human resource management, payment management, year-end adjustment, retirement
adjustment, diligence & indolence, partners, human resource status managementadjustment, diligence & indolence, partners, human resource status management
Management informationManagement information Standard information management, order processing, project planning, cause Standard information management, order processing, project planning, cause
assessment, integrated administration, business data showingsassessment, integrated administration, business data showings
Management in common Management in common partpart
Bulletin, business card, bookmark (favorite), customized security set, security set Bulletin, business card, bookmark (favorite), customized security set, security set
customized for different window system, version managercustomized for different window system, version manager
OBS : (Organization Breakdown Structure)OBS : (Organization Breakdown Structure) OBS rearranges the entire structure to center on OBS rearranges the entire structure to center on business operation and conveys the data business operation and conveys the data easily.easily.
proERP ConceptproERP Concept
CBSCBS
WBSWBS
PBSPBS
OBSOBS
PMPM
M/S SCH’M/S SCH’
proERP is consisted of 4-detailed concept, in order to provide a proERP is consisted of 4-detailed concept, in order to provide a
systematic process environment.systematic process environment.
WBS : (Work Breakdown Structure)WBS : (Work Breakdown Structure)it proceeds in top-down method grouping every it proceeds in top-down method grouping every activity in order to conduct assigned projects activity in order to conduct assigned projects systematically. systematically.
PBS : (Product Breakdown Structure)PBS : (Product Breakdown Structure) it develops the products of assigned project step-it develops the products of assigned project step-by-step by-step basis to facilitate easy production and system basis to facilitate easy production and system manager.manager.
CBS : (Cost Breakdown Structure)CBS : (Cost Breakdown Structure)it proceeds in top-down method by grouping every it proceeds in top-down method by grouping every account and manufacturing cost system.account and manufacturing cost system.
proERP conceptproERP conceptproERP conceptproERP concept
ApplicationsApplications
ShipShip
Steel Structure
Electricity
Distribution Equipment
Transportation, Load Equipment
Building Industry
Chemistry, Cement, Facilities
EngineeringField
proERP LT
OthersOthers
Advantages Advantages Advantages Advantages
KoreaKorea
ADVANTAGES OF WORKING ADVANTAGES OF WORKING WITH proERPWITH proERP
proERPproERP
• Connection with an ICS (Intelligent Connection with an ICS (Intelligent consulting system) to decrease consulting system) to decrease
installation time.installation time.• Detail BOM management in levels.Detail BOM management in levels.
• Reduce Inventorys. (steel plate, Reduce Inventorys. (steel plate, profile)profile)
proERPproERP
Focus on project management Focus on project management (Different to other ERP systems)(Different to other ERP systems)
Access to the Know how of the Access to the Know how of the industry in Korea (Processes, pn industry in Korea (Processes, pn standards, procedures, codes, standards, procedures, codes, drawings, styles…etc)drawings, styles…etc)
Multilingual program.Multilingual program. Easy and simple interface.Easy and simple interface. More efficient that MRP systemMore efficient that MRP system
Connection with an ICS (IntelligentConnection with an ICS (Intelligent consulting system) to decrease consulting system) to decrease installation time.installation time. Detail BOM management in levels.Detail BOM management in levels. Reduce Inventories. (steel plate,Reduce Inventories. (steel plate, profile)profile)
Implementaciones (1)Implementaciones (1)
Date Contents of Received an Order
1999-09
1999-10
1999-11
1999-12
2000-01
2000-04
2000-07
2000-10
2000-11
2001-05
2001-06
Contract of proERP Installation with IL Jin End Co., Ltd
Contract of proERP Installation with Yu Sung Industry Co., Ltd
Contract of proERP Installation with Kyun Jin Industry Co., Ltd
Contract of proERP Installation with Sam Woo Industry Co., Ltd
Contract of proERP Installation with ACE Engineering
Contract of proERP Installation with 71 Sam Sung Heavy Industry Cooperation
Enterprises (Human Resource , Payment/Accounting)
Contract of proERP Installation with Yient Co., Ltd
Contract of proERP Installation
with 3 Hyun Dae Heavy Industry Cooperation Enterprises
Contract of proERP Installation with 51 Dae Woo Shipbuilder Industry Cooperation
Enterprises (Human Resource, Payment/Accounting)
Contract of proERP Installation with 7 Dae Woo Shipbuilder Industry
(Human Resource, Payment/Accounting)
Contract of proERP Installation with Se Gi High Tech Co., Ltd
Implementaciones (2)Implementaciones (2)
Date Contents
2001-07
2001-08
2002-03
2002-03
2002-03
2002-06
2003-02
2003-03
2003-04
2003-04
Contract of proERP Installation with Sun Bo Industry Co., Ltd
Contract of proERP Installation with Dae Kyung Techons Co., Ltd
Contract of proERP Installation with Saracom Co., Ltd
Contract of proERP Installation with Se Jin Technology Industry Co., Ltd
Contract of proERP Installation with Darin Co., Ltd
Contract of production Intelligence System Installation with Yient Co., Ltd
(APS / Yard Area system Development)
Contract of proERP Installation with Sung Jin Giotech Co., Ltd
Contract of proERP Installation with PH Korea Co., Ltd
Contract of proERP Installation with Sin Dong Industry
Contract of proERP Installation with Mesco Co., Ltd
Implementaciones (3)Implementaciones (3)
Date Contents
2003-06
2003-06
2003-10
2003-12
2004-04
2004-04
2004-08
2005-03
2005-04
2006-08
2006-09
2006-12
2007-01
2007-01
2007-06
2007-07
Contract of S/W MA with Lee-Young Instrument Co., Ltd
Contract of proERP with Kangeto Co., Ltd
Contract of proERP with WIN Co., Ltd
Contract of proERP with New Fly Tech
Contract of Production Info. Business with Dong-Kug Neha Co., Ltd
(Spot Accomplishment D/B Management, POP System)
Contract of Info. Consulting Business with 2 Companies
(IL-Jin End Co., Ltd, Jin-Yang Pump Co., Ltd)
Contract of proERP with SungWon Eletronics Co., Ltd.
Contract of proERP with ChangSin Co.,Ltd.
Contract of proERP with JinYeong HwaSung Co.,Ltd.
Contract of proERP with ScanaKorea Hidroric Co.,Ltd.
Contract of proERP with 22 Companies in the Borim Building
Contract of proERP with DongNam ENG Co.,Ltd.
Contract of proERP with Artec Co.,Ltd.
Contract of proERP with NedTec Co., Ltd.
Contract of proERP with YouIl Food Co., Ltd
Contract of proERP with CMG Techwin Co., Ltd
Block Building1
Erection2
Launches3
Sea Trials4
IIIShipbuilding Process
DesignDesign11
Cutting and FormingCutting and Forming22
Pre-FabricationPre-Fabrication33
Paint WorkPaint Work44
AssemblyAssembly55
Block BuildingBlock BuildingBlock BuildingBlock Building
DesignDesign
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
3D Structure
View of the Structure In block design wire frame
3D Structure
View of the Structure In block design wire frame
DesignDesign
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
3D Solid Structure
View of texture of structure
3D Solid Structure
View of texture of structure
DesignDesign
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
3D Block on the Stocks
View with mountableelements ( auxiliary engines, fuel service pumps, ventilation conduits, compressed air system and oil services piping, lubrication and compressed air).
3D Block on the Stocks
View with mountableelements ( auxiliary engines, fuel service pumps, ventilation conduits, compressed air system and oil services piping, lubrication and compressed air).
Cutting and FormingCutting and Forming
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Plasma Cutting
Cutting by electric plasma connected to the CAD-CAM systems.
Plasma Cutting
Cutting by electric plasma connected to the CAD-CAM systems.
Cutting and FormingCutting and Forming
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Sub-assemblies
Automatic welding systems at sub-assembly stages of manufacture.
Sub-assemblies
Automatic welding systems at sub-assembly stages of manufacture.
Cutting and FormingCutting and Forming
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Panel Line Production
Fully automated panel fitting and welding line.
Panel Line Production
Fully automated panel fitting and welding line.
Cutting and FormingCutting and Forming
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Line Heating
Machine plate forming technique.
Line Heating
Machine plate forming technique.
Pre-FabricationPre-Fabrication
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Laser Dimensional Control
Dimensional check systems for units, applying laser and ultraviolet ray monitoring techniques, to guarantee excellent results in block couplings and in the forms of the vessel.
Laser Dimensional Control
Dimensional check systems for units, applying laser and ultraviolet ray monitoring techniques, to guarantee excellent results in block couplings and in the forms of the vessel.
Pre-FabricationPre-Fabrication
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Outfitting Integration
Integration of the outfitting starts in the initial stages of block manufacture.
Outfitting Integration
Integration of the outfitting starts in the initial stages of block manufacture.
Pre-FabricationPre-Fabrication
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Lugging Semi-blocks
Semi-blocks with their outfitting are lugged to form the fitting unit on the stocks, to optimize the use of means and time.
Lugging Semi-blocks
Semi-blocks with their outfitting are lugged to form the fitting unit on the stocks, to optimize the use of means and time.
PaintworkPaintwork
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
PaintingPainting
Painting the Blocks Painting the Blocks prior to mounting on prior to mounting on the stocks allows for the stocks allows for considerable considerable improvements in improvements in quality and reducing quality and reducing delivery periods.delivery periods.
PaintingPainting
Painting the Blocks Painting the Blocks prior to mounting on prior to mounting on the stocks allows for the stocks allows for considerable considerable improvements in improvements in quality and reducing quality and reducing delivery periods.delivery periods.
AssemblyAssembly
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
ErectionErection
Applying high Applying high performance, semi-performance, semi-automatic welding automatic welding processes with processes with tubular and tubular and automatic wires, by automatic wires, by submerged arc.submerged arc.
ErectionErection
Applying high Applying high performance, semi-performance, semi-automatic welding automatic welding processes with processes with tubular and tubular and automatic wires, by automatic wires, by submerged arc.submerged arc.
AssemblyAssembly
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Final situation of the Final situation of the Block on the StocksBlock on the Stocks
The dimensional The dimensional statistics control statistics control methods applied to methods applied to fitting blocks on the fitting blocks on the stocks ensures stocks ensures precision vessel precision vessel structures.structures.
Final situation of the Final situation of the Block on the StocksBlock on the Stocks
The dimensional The dimensional statistics control statistics control methods applied to methods applied to fitting blocks on the fitting blocks on the stocks ensures stocks ensures precision vessel precision vessel structures.structures.
ErectionErection
Block BuildingBlock BuildingBlock BuildingBlock Building
LaunchesLaunchesLaunchesLaunches
ErectionErectionErectionErection
LaunchesLaunches
ErectionErectionErectionErection
Sea TrialsSea TrialsSea TrialsSea Trials
LaunchesLaunchesLaunchesLaunches
Sea TrialsSea Trials
LaunchesLaunchesLaunchesLaunches
Sea TrialsSea TrialsSea TrialsSea Trials
Block BuildingBlock Building11
ErectionErection22
LaunchesLaunches33
Sea TrialsSea Trials44
IVIVproERP to ShipbuildingproERP to Shipbuilding
Design ( proERP vs Shipbuilding )Design ( proERP vs Shipbuilding )
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
Block Building
1. DESIGN
2. CUTTING AND FORMING
3. PRE-FABRICATION
4. PAINTWORK
5. ASSEMBLY
proERP( Design )ShipConstructor Interface
-. Design Information ( D/B )-. Design BOM ( 3D CAD D/B)-. CAD D/B -> proERP D/B-. Parts List
proERP( Design )ShipConstructor Interface
-. Design Information ( D/B )-. Design BOM ( 3D CAD D/B)-. CAD D/B -> proERP D/B-. Parts List
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
proERP ( Design )proERP ( Design )
-.Design M/S -.Design M/S ScheduleSchedule-.Drawing Schedule -.Drawing Schedule -.Bill Of Material -.Bill Of Material (BOM)(BOM)-.POR-.POR-.Parts List-.Parts List
proERP ( Material )proERP ( Material )
-.Purchase Order -.Purchase Order ( PO )( PO )-.In/Out -.In/Out ManagementManagement-.Inventory-.Inventory
proERP ( Design )proERP ( Design )
-.Design M/S -.Design M/S ScheduleSchedule-.Drawing Schedule -.Drawing Schedule -.Bill Of Material -.Bill Of Material (BOM)(BOM)-.POR-.POR-.Parts List-.Parts List
proERP ( Material )proERP ( Material )
-.Purchase Order -.Purchase Order ( PO )( PO )-.In/Out -.In/Out ManagementManagement-.Inventory-.Inventory
Design ( proERP vs Shipbuilding )Design ( proERP vs Shipbuilding )
Cutting and Forming ( proERP vs Shipbuilding )Cutting and Forming ( proERP vs Shipbuilding )Cutting and Forming ( proERP vs Shipbuilding )Cutting and Forming ( proERP vs Shipbuilding )
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
proERP proERP ( Manufacture )( Manufacture )
-.Process Plan-.Process Plan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Parts List-.Parts List
proERP proERP ( Manufacture )( Manufacture )
-.Process Plan-.Process Plan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Parts List-.Parts List
Pre-Fabrication ( proERP vs Shipbuilding )Pre-Fabrication ( proERP vs Shipbuilding )
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
proERP proERP ( Manufacture )( Manufacture )
-.Fabrication Plan-.Fabrication Plan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Buget Control-.Buget Control
proERP proERP ( Manufacture )( Manufacture )
-.Fabrication Plan-.Fabrication Plan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Buget Control-.Buget Control
Paintwork ( proERP vs Shipbuilding )Paintwork ( proERP vs Shipbuilding )
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
proERP proERP ( Manufacture )( Manufacture )
-.Paintwork Plan-.Paintwork Plan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Buget Control-.Buget Control
proERP proERP ( Manufacture )( Manufacture )
-.Paintwork Plan-.Paintwork Plan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Buget Control-.Buget Control
Assembly ( proERP vs Shipbuilding )Assembly ( proERP vs Shipbuilding )
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
Block BuildingBlock Building
1. DESIGN1. DESIGN
2. CUTTING AND FORMING2. CUTTING AND FORMING
3. PRE-FABRICATION3. PRE-FABRICATION
4. PAINTWORK4. PAINTWORK
5. ASSEMBLY5. ASSEMBLY
proERP proERP ( Manufacture )( Manufacture )
-.Assembly Plan-.Assembly Plan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Budget Control-.Budget Control
proERP proERP ( Manufacture )( Manufacture )
-.Assembly Plan-.Assembly Plan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Budget Control-.Budget Control
Erection/Launches/Sea Trials( proERP vs Shipbuilding )
Erection/Launches/Sea Trials( proERP vs Shipbuilding )
LaunchesLaunchesLaunchesLaunches
proERP proERP ( Manufacture )( Manufacture )
-.Main Assembly -.Main Assembly PlanPlan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Budget Control-.Budget Control-.Slip Interface-.Slip Interface
proERP proERP ( Manufacture )( Manufacture )
-.Main Assembly -.Main Assembly PlanPlan-.Work Order-.Work Order-.Work Order Result-.Work Order Result-.Daily Report-.Daily Report-.Work Process Plan -.Work Process Plan vsvs ActualActual-.Budget Control-.Budget Control-.Slip Interface-.Slip Interface
ErectionErectionErectionErection
Sea TrialsSea TrialsSea TrialsSea Trials
ConclusionsConclusions
• The use of proERP give benefits in Planning, Administration and Control of the shipyards.
• An interface with a 3D system as SC allows an efficient use of resources and transfer of information.
• Allows the use of a single database for different projects.• Optimize time of the PM, design team and overheads.• The system manage multi-projects and reliable budgets. • proERP gives you a precise planning of the project costs• Offers a proper administration of schedules• Diversification and access to future technological
developments in Korea.
Improve use of resources (Funds, time and capital resources) sing 3D and proERP under the same system interfaced.
Be more practical and efficient in the planning and development of projects
ConclusionsConclusions
Design + Planning + AdministrationDesign + Planning + Administration
EISEISAdmin Dpt.
3D CAD3D CADEngieering
proERPproERPCAD&SOFT
Pilot ProjectPilot ProjectShipYard
EngineeringEngineering3D Modeling3D Modeling
SystemSystemManagementManagement
IntegratedIntegratedServiceService
SuccessSuccessDeliveryDelivery
Q & AQ & A
Q & A
InformationInformation
Thank you
• Company Web Site : Company Web Site : http://www.cad.co.kr• proERP Web Site : proERP Web Site : http://www.proERP.com• E-mail : E-mail : [email protected]• Telephone : +82 - 51 - 803 - 5462~ 4Telephone : +82 - 51 - 803 - 5462~ 4• Fax : +82 - 51 – 803 - 5465Fax : +82 - 51 – 803 - 5465