  • Work Study & ProductivityTraining module on

  • What is Productivity ?

  • What is Productivity ?Productivity is defined as ratio of Output to Input.

    Labor Productivity

  • * Labor Productivity examples ?GDP of an economy in a country is $10 trillions and total labor hours invested during the year were 300 billion. So labor productivity is ration GDP output to Labor hours i.e. $10 trillions/300 Billion man-hours - $33 per Man-hour. Growth in this value can be interpreted as rising standards of living in a country.

    A company that processes fruits and vegetables is able to produce 400 cases of canned peaches in one half hour with four workers. What is the labor productivity?

    Labor productivity = Quality Produced / Labors Hours= 400 cases (4 workers x 1/2 hours / workers)= 200 cases per labor hour.

  • * Multifactor Productivity examples ?A wrapping paper company produced 2,000 rolls of paper one day. Standard price is $ 1/roll. Labor cost was $ 160, material cost was $ 50, and overhead was $ 320. Determine the multifactor productivity.

    Multifactor productivity = Quality produced at standard price/(Labor cost + Material cost + Overhead)

    = 2,000 rolls x $ 1/ ($160+ $ 50 + $320)= 3.77 rolls output per dollars

  • Productivity Improvement Approaches ?Increase output for the same given Input resources

    Decrease of input resources for the same output.

  • * Labor Productivity examples ?A bottle packaging line with 30 filling count of tablets, running at 80 bottles per minute has pack style of 6 Bottles per tray and there is no shrink wrapping involved is able to pack 24,000 bottles per shift. By application of time & motion studies manpower along the line was reduced from 22 to 18 calculate productivity gain per shift

    Labor productivity - old system = Bottles Packed / Labor Hours= 24000 Bottles/ (22 Workers X 8 hours)= 136.36 Bottles per Man hour.

    Labor productivity - New system = Bottles Packed / Labor Hours= 24000 Bottles/ (18 Workers X 8 hours)= 166.67 Bottles per Man hour.

    Productivity Gain =(166.67-136.36)/136.36 = 22.22%

  • * Labor Productivity examples ?A bottle packaging line with 30 filling count of tablets, running at 80 bottles per minute has pack style of 6 Bottles per tray and there is no shrink wrapping involved is able to pack 24,000 bottles per shift. By application of time & motion studies along the packing line it is found that same manpower of 18 can handle line at 90 Bottles per minute. Calculate productivity gain

    Labor productivity - old system = Bottles Packed / Labor Hours= 80X300 = 24000 Bottles/ (18 Workers X 8 hours)= 166.67 Bottles per Man hour.

    Labor productivity - New system = Bottles Packed / Labor Hours= 90X300 = 27000 Bottles/ (18 Workers X 8 hours)= 187.5 Bottles per Man hour.

    Productivity Gain = (187.5-166.67)/166.67 = 12.49%

  • * Labor Productivity Improvement along secondary packaging in Strip Packing Line Case StudySummary of study: Product : Alendronate 70mg.Batch Studied: JKJ0196AInput Strips Speed: 105 Strips/Minute (Varying)Assumption: Running Hours of Line: 7Total number of persons Engaged: 24Total number of Work Stations: 12Area: Secondary PackingDetailed -

  • Productivity Improvement Approaches ?With small increase/alteration in input resources, higher amount of increase in output.

  • * Productivity Improvement for higher increase in output with smaller increase in Input Collins Little Company has a staff of 4, each working 8 hours per day (for a payroll cost of $ 640/day) and overhead expenses of $ 400 / day. Collins processes and closes on 8 titles each day. The company recently purchased a computerized title search system that will allow the processing of 14 titles per day. Although the staff, their works hours, and pay will be same, the overheads expenses are now $ 800 per day.

    Labor productivity with the old system:= 8 titles per day/ 32 labor hours = 0.25 titles per hourLabor productivity with the new system:=14 titles per day/ 32 labor hours = 0.44 title per labor hoursMultifactor productivity with the old system:=8 titles per day / (640 + 400) = 0.0077 titles per dollarsMultifactor productivity with the new system:=14 titles per day / (640 + 800) = 0.0097 titles per dollars

  • Factors Affecting Productivity

    Beyond control of any employer

  • * Productivity Improvement for higher increase in output with smaller increase in Input A prime example of this is the 2011 flooding that occurred in Thailand. Because of the widespread flood damage throughout the country many computer companies have been forced to increase their prices on hard drives. Hard drives are a chief technology export from Thailand and American productivity in computer supply markets has suffered due to weather conditions occurring in a foreign country.Similarly, crop productivity suffered in the United States in 2011 in response to weather patterns. Heavy Midwest flooding followed by a period of drought caused many cash crops to suffer and produce lower than expected yields. This has had reverberations in other arenas of the economy because of the increased prices related to these crops.Ther

  • Factors Affecting Productivity

  • The Task of ManagementManagement may alter either internal or external factors for larger quantity, better quality or higher value products or services with the same input.

    Achieve better results by changing nature of inputs such as advanced technology, computers or by using alternative source of Raw material or energy

  • The Task of ManagementLand & BuildingsMaterialsPlants, Machines & Equipment'sEnergyHuman ResourcesManagementObtains facts,Plans,Directs,Controls,Motivates

    In order to Produce

    Products & Services

  • Work Study & ProductivityWhat Is Work Study

    It is systematic examination of methods of carrying out activities so as to effectively utilize input resources and set up standards of performance for activities being carried out

  • Relationship between Work Study & Productivity

    Work Study & Productivity:

  • Why work study is required ?

  • Work study approach ?

  • Techniques of Work studyWork study consists of following Two Major Techniques

    Method Study: Systematic recording and critical examination of existing ways of doing things in order to make improvements

  • Techniques of Work study

    Work measurement: Techniques developed to establish time required for qualified worker/person to carry out task at defined rate of working.

  • Relationship Method Study & Work measurement

  • Relationship Method Study & Work measurement

  • Work Study Basic Procedure

  • Work Study Basic ProcedureSelect: The job or process to be studied.

    Record: All facts and data about job or process.

    Examine: Critical examination of all recorded facts.

    Develop: The most economical method.

  • Work Study Basic ProcedureEvaluate: Quantity of work involved in improved method Standard time for it.

    Define: The new method and Standard time.

    Install: Training concern person & Standard Time

    Maintain: The new standard practice by monitoring the results and comparing it with original targets.

  • Method Study Steps

  • Selecting The Work To Be StudiedEconomical Consideration: Obvious choices under this consideration are as below

    Key profit generating, costly operations or processes with largest scrap or waste rates.

    Bottlenecks holding up operations downstream/ upstream or operations with high cycle times.

  • Selecting The Work To Be StudiedEconomical Consideration:Repetitive activities and activities with large amount of labor, longer run timesMaterial handling activities as it contributes to more than 25% of manufacturing costTasks with highest percentage of wage cost

    One of the easiest technique is to apply Pareto analysis, to identify key operations or key products.

  • Selecting The Work To Be StudiedTechnical Consideration: Management may want to acquire advanced technologies in its operations.

    Before actual investment in newer technologies method study should be carried out to point out actual need of the enterprise for technology investment.

    Method study acts as scouting operation before introduction of more advanced technology.

  • Selecting The Work To Be StudiedHuman Consideration: Operations causing dissatisfaction, causing excessive fatigue, operations with serious safety hazards, monotonous activities.

    Activities leading to unrest or bad feeling to the workers, then it should not be considered.

  • Record, Examine & DevelopRecording The Facts: To record all the facts related to existing Method. The most commonly used recording techniques are Charts & Diagrams

  • *Thank you

    *****