production schedule
DESCRIPTION
ooidsgnjngvflksninglknlnfsaoilrtnlkrgTRANSCRIPT
Production Schedule
Names: Aran, Kirtan GOKULAN Production: hhhher Inside Soreser Inside Soreser Inside Soreser Inside Sores
Day and
Date
Shots Location People Required Props/Costumes and
Equipment 14/03/12
1 - 16 Bedroom 1
(Molly’s), Bedroom 2
(Dad’s)
Molly Make-up. Fake scar kit. Jumper. Condom. Radio.
Bedroom facilities.
16/03/12
17 - 22 Bedroom 1, Bedroom 2,
Upstairs corridor,
Staircase, By the front door
Molly, Father Make-up. Jumper. Fake scar kit make up. Bedroom
facilities.
19/03/12
23 - 27 By the front door, Upstairs
corridor, Bedroom 1, Staircase,
Street
Molly, Father Shoes. Bedroom facilities.