production schedule

1
Production Schedule Names: Aran, Kirtan GOKULAN Production: h h her Inside Sores er Inside Sores er Inside Sores er Inside Sores Day and Date Shots Location People Required Props/Costumes and Equipment 14/03/12 1 - 16 Bedroom 1 (Molly’s), Bedroom 2 (Dad’s) Molly Make-up. Fake scar kit. Jumper. Condom. Radio. Bedroom facilities. 16/03/12 17 - 22 Bedroom 1, Bedroom 2, Upstairs corridor, Staircase, By the front door Molly, Father Make-up. Jumper. Fake scar kit make up. Bedroom facilities. 19/03/12 23 - 27 By the front door, Upstairs corridor, Bedroom 1, Staircase, Street Molly, Father Shoes. Bedroom facilities.

Upload: aran-knowles

Post on 30-Mar-2016

213 views

Category:

Documents


1 download

DESCRIPTION

ooidsgnjngvflksninglknlnfsaoilrtnlkrg

TRANSCRIPT

Page 1: production schedule

Production Schedule

Names: Aran, Kirtan GOKULAN Production: hhhher Inside Soreser Inside Soreser Inside Soreser Inside Sores

Day and

Date

Shots Location People Required Props/Costumes and

Equipment 14/03/12

1 - 16 Bedroom 1

(Molly’s), Bedroom 2

(Dad’s)

Molly Make-up. Fake scar kit. Jumper. Condom. Radio.

Bedroom facilities.

16/03/12

17 - 22 Bedroom 1, Bedroom 2,

Upstairs corridor,

Staircase, By the front door

Molly, Father Make-up. Jumper. Fake scar kit make up. Bedroom

facilities.

19/03/12

23 - 27 By the front door, Upstairs

corridor, Bedroom 1, Staircase,

Street

Molly, Father Shoes. Bedroom facilities.