production schedule
TRANSCRIPT
Date of lesson/ filming day
What shots/scenes are being filmed
Where will filming take place
What crew and cast are needed
What props and costumes are needed
What equipment is needed
Wednesday 7th January after school
Shot 10-11 In the Forest The Actors (Sophie and Chester) and the camera
Casual costume dress
Camera, Tripod
Friday 9th January school time
Shot 16-19 In the bedroom Sophie, and camera
Bed and bedroom equipment, pyjamas
Camera, Tripod, Fake blood
Saturday 10th January out of school time
Shots 12-15 Kitchen and Front Garden
The Actors (Sophie and Chester) and the camera
knife and food for cooking, pyjama and casual dress
Camera and Tripod
Monday 12th January After school
Shots 6-9 Back Garden and Lounge
The Actors (Sophie and Chester) and the camera
Garden Tools, Lounge Equipment, Bowl of popcorn
Camera and Tripod
Saturday 17th January out of school time
Shots 1-5 Bournemouth Beach
The Actors (Sophie and Chester) and the camera
Winter wear costume.
Camera and Tripod
Monday 19th January
Voice Over Classroom at school
Sophie is needed Voice recorder
Date of lesson/ editing day
What shots/scenes are being edited
Wednesday 21st January in school time
I will be editing shot 1 where they are walking up the promenade and shots 2-3 where they are on the beach
Thursday 22nd January in school time
I will be editing shots 4-5 where they are on the beach
Wednesday 28th January in school time
I will be editing shots 6-8 from the lounge
Thursday 29th January in school time
I will be editing shots 9-11 where they are in the forest and in the back garden
Wednesday 4th February in school time
I will be editing shots 12-15 where they are in the kitchen and in the front garden
Thursday 5th February in school time
I will be editing shots 16-19 where Sophie is in the bedroom
Wednesday 11th February in school time
I will be adding the voice over and the music
Thursday 12th February in school time
I will be making sure that everything works well and runs smoothly and I will add the credits.