production planning - media.logiciel-supply...

2
SUPPLY CHAIN PLANNING SOLUTIONS For every Supply Chain challenge, there is a FuturMaster answer FM Production Planning plans within multiple finite capacity constraints (factories, lines, shifts, resources, subcontractors). It plans at detailed and family levels and allows manual intervention in the creation of the Master Production Schedule (MPS) or Production Plan. Plan in detail for optimal manufacturing performance Take into account multiple overlapping constraints (lines, warehouses, shifts, materials, machines, resources) Combine planning know-how with advanced solvers to rapidly generate high quality plans that reflect reality Run alternative scenario simulations for Rough Cut Capacity Planning (RCCP) Drive the key performance measures Support overall S&OP process Multi-dimension analytical reports PRODUCTION PLANNING S&OP PRODUCTION PLANNING Advanced Promotion Management Distribution Planning Advanced Launch Management Demand Management Procurement Sales Planning & Budgeting Scheduling Calculate Realistic production plans Improve Your process flow and operations Your operating costs Plan With multiple finite capacity constraints Create Alternative scenario simulations The utilization of your production facilities Optimize Reduce

Upload: tranduong

Post on 04-Feb-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: PRODUCTION PLANNING - media.logiciel-supply …media.logiciel-supply-chain.com/...productionplanning_787917.pdf · FM Production Planning plans within multiple finite capacity constraints

SUPPLY CHAIN PLANNING SOLUTIONSFor every Supply Chain challenge, there is a FuturMaster answer

FM Production Planning plans within multiple finite capacity constraints (factories, lines, shifts, resources, subcontractors). It plans at detailed and family levels and allows manual intervention in the creation of the Master Production Schedule (MPS) or Production Plan.

Plan in detail for optimal manufacturing performance

Take into account multiple overlapping constraints (lines, warehouses, shifts, materials, machines, resources)

Combine planning know-how with advanced solvers to rapidly generate high quality plans that reflect reality

Run alternative scenario simulations for Rough Cut Capacity Planning (RCCP)

Drive the key performance measures

Support overall S&OP process

Multi-dimension analytical reports

PRODUCTION PLANNING

S&OP

PRODUCTION PLANNING

AdvancedPromotionManagement

Distribution Planning

Advanced Launch Management

DemandManagement

Procurement Sales Planning& Budgeting

Scheduling

Calculate

Realistic productionplans

Improve

Your process flow andoperations

Your operating costs

Plan

With multiple finitecapacity constraints

Create

Alternative scenariosimulations

The utilization of yourproduction facilities

Optimize

Reduce

Page 2: PRODUCTION PLANNING - media.logiciel-supply …media.logiciel-supply-chain.com/...productionplanning_787917.pdf · FM Production Planning plans within multiple finite capacity constraints

TYPICAL BENEFITS

20

Customer Satisfaction10 – 20% service level improvement

Optimize your stock25 – 60% decrease in inventory levels Reduction of obsolete and waste stock Reduced working capital requirements

Optimize your resources10 – 20% improvement of the use of Production capacitySetup / changeover time reduction

Reduce your costsProcurement, manufacturing and distribution

Master your supply chainStrengthen collaboration with customers and suppliersSynchronize operations

Increase your sales turnover & profit2 – 5% increase in revenue 5 – 10% reduction in costs

500 10,000 65

years of excellence

customers users countries

BEAUTY & LUXURY FOOD & BEVERAGE

INDUSTRIAL HEALTH CONSUMER GOODS TELECOM BANK

AEROSPACERETAIL & DISTRIBUTION FASHION

THEY TRUST US

FRANCE1 cours de l’ile Seguin - Immeuble Aurélium92100 Boulogne-Billancourt +33 (0)1 46 08 05 45

UNITED KINGDOM, Wakefield

+44 (0)1924 366356

SINGAPORE, Singapore

+ 65 62248239

CHINA, Beijing

+86 (0)10 8523 5800

BRAZIL, Sao Paulo

+55 (11) 986 02 02 92

wwww.futurmaster.com