Production Planning and Control13TRANSCRIPT
3. Execution of Plans Hierarchical Planning Contd
PPC Class Notes-Chapter13. Execution of PlansHierarchical Planning ContdShop Floor ControlConventional Approach, Process LayoutSimilar machines are grouped into workcenters Use workorders to schedule the jobs through workcenters / departmentsSchedule machine and other workcentersDetermine start and completion times of ordersUpdate the schedulePPC Class Notes-Chapter13. Execution of PlansHierarchical Planning ContdShop Floor Control (Contd)Recent Trend, Manufacturing CellsSimilar parts are grouped into familiesCorresponding machine cells are formedUse production ratesUse schedules to control production (Family Sequencing, Product Sequencing, Cell Loading, Cell Scheduling, etc.)Use Kanban System (Pull, Just-in-Time) to control production
PPC Class Notes-Chapter13. Execution of PlansHierarchical Planning ContdPurchasingPurchasing PlanVendor SearchQuotationOrder ReleaseOrder Follow-upVendor Capacity
PPC Class Notes-Chapter1Planning vs. ControlPlans are madeResults are compared with plans (control)Results are OK Wait until next control periodResults are not OK Go to Step 1 (Revise plans) 4PPC Class Notes-Chapter1An ExampleResource Planning:Assume that a jewelry manufacturing company decided to open three manufacturing sites (US, Ireland and Singapore). Each plant is going to run one shift except plating area which will be run 2 shifts due to high investment requirement.
PPC Class Notes-Chapter1Example Contd
PPC Class Notes-Chapter1Example Contd
PPC Class Notes-Chapter1Example Contd
PPC Class Notes-Chapter1Example Contd
PPC Class Notes-Chapter1Example Contd
Demand Management:
Demand is forecasted for different product families and different plants as follows:
US plantIreland plantSingapore
plant
Earrings300000units/yr200000units/yr150000units/yr
Pendants350000225000200000
Rings15000010000075000
Production Plans:
US Plant
Months
123456789101112
Earring20K20K20K20K20K20K30K30K30K30K30K30K
Pendant20K20K20K20K20K20K30K40K40K40K40K40K
Ring10K10K10K10K10K10K15K15K15K15K15K15K
PRODUCTION PLAN IS PREPARED FOR IRELAND AND SINGAPORE PLANTS AS WELL.
Demand Management:
Following manpower and resources requirements are estimated for each plant:
US plantIreland plantSingapore
plant
Manpower300200150
Machine Type X504030
Machine Type Y10012050
Machine
Type Z1504070
Master Production Schedule:
US Plant Earring Family 1ST Month
Weeks
1234
Gold Earring 1K1K1K2K
Gold Earring with red stone1K1K2K1K
Silver Earring1K2K1K1K
Silver Earring with red stone2K1K1K1K
TOTAL5K5K5K5K
MASTER SCHEDULE IS PREPARED FOR EACH MONTH (POSSIBLY FOR THE 1ST COUPLE OF MONTHS, NOT FOR THE ENTIRE YEAR) AND PRODUCT FAMILY.
Rough-cut Capacity Planning:
Manpower and machine requirements are revised.
US plant
Manpower330
Machine Type X55
Machine Type Y95
Machine
Type Z190