Production Facilities
2
Martifer was established on 21st February 1990, and
still maitains its head office in the industrial zone of
Oliveira de Frades, Portugal, where is located the main
factory of Steel Structures with 30.000 m2.
The factory is supplying the Portuguese, Spanish,
Western Europe and North African Market.
During the first quarter of 2002, it began the
construction of a new plant in Benavente, Portugal.
The main goal of this was to engage in the
construction of the new EURO 2004 football stadiums
and to supply the Spanish market at the time.
The area occupied by this factory has a total value of
24.000 m2.
MARTIFER CONSTRUÇÕESOliveira de Frades | Portugal
MARTIFER BENAVENTEBenavente | Portugal
![Page 3: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/3.jpg)
Production Facilities
Located in Gliwice, Poland, the production unit of
Martifer started operating in August 2004.
This unit has a nominal annual capacity of 10.000
tons of steel structure and is possible to per-form shot
blasting, painting and coating. It is equipped with
state of the art CNC cut and dril-ling equipment for
plates and profiles, as well as cutting and bending of
thin plate in the fini-shing sector.
MARTIFER POLSKAGliwice | Polska
In the summer of 2008 it started production the unit
of Martifer Constructii in Calarasi, Romania. This
facility comprehends 25.000 m2 of industrial
pavilions with an installed capacity of 10.000
tons/year.
MARTIFER CONSTRUCTIICalarasi | Romania
![Page 4: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/4.jpg)
Production Facilities
Projected to supply the Central and South African market the factory will start production in September 2009
equipped with a line for cutting and drilling profiles, oxicut machine with plasma, guillotine, plate bending
machine, plate drilling machine and automatic shoot blasting chamber.
MARTIFER CONSTRUÇÕESLuanda | Angola
4
AREA OF PRODUCTION 12 000
M2
N. Workers 160
Production Capacity – 1st
Year
150
ton/Week
Start Production September - 2009
![Page 5: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/5.jpg)
International Projects Experience
![Page 6: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/6.jpg)
DRAGÃO STADIUM . Oporto
2800 tons of steel in the roof; 1000 tons of steel for
support of production. 42.000sqm application of
polycarbonate. Assembly: 7 months
PROJECT EXPERIENCE
![Page 7: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/7.jpg)
Dragão Stadium| Oporto
2800 tons of steel in the roof; 1000 tons of steel for support of production. 42.000sqm application of polycarbonate.Assembly: 7 months
Martifer Construction
![Page 8: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/8.jpg)
BENFICA STADIUM . Lisbon
The structure is composed by 4 tube arcs with 2000x40mm, main
trusses with girders and tubular sections, struts/ties that connect
the tubes and trusses, that sustain the roof purlins. Assembly: 8
months
PROJECT EXPERIENCE
![Page 9: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/9.jpg)
Benfica Stadium| Lisbon
The structure is composed by 4 tube arcs with 2000x40mm, main trusses with girders and tubular sections, struts/ties that connect the tubes and trusses, that sustain the roof purlins. Assembly: 8 months
Martifer Construction
![Page 10: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/10.jpg)
ALVALADE STADIUM . Lisbon
Roof constituted by a three-dimensional truss sustained on 16 ties
connected to 4 masts. The main girders are perpendicular to the
interior ring and are sustained on it. Assembly: 8 months.
PROJECT EXPERIENCE
![Page 11: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/11.jpg)
Alvalade Stadium| Lisbon
Roof constituted by a three-dimensional truss sustained on 16 ties connected to 4 masts. The main girders are perpendicular to the interior ring and are sustained on it. Assembly: 8 months.
Martifer Construction | Martifer Inox
![Page 12: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/12.jpg)
CAJA MAGICA | Spain
Steel coverage: 4.250 Ton divided by three stadiums The stadium has a movable coverage.
Martifer Construction
![Page 13: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/13.jpg)
CAJA MAGICA | Spain
Steel coverage: 4.250 Ton divided by three stadiums The stadium has a movable coverage.
Martifer Construction
![Page 14: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/14.jpg)
14
ASSEMBLY PROCEDURES
![Page 15: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/15.jpg)
15
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
Restructuring of an ancient bull Square In a Shopping Centre
Location: Spain – Barcelona / Spain Square
Weight Of Steel Structure Construction – 2.000Ton
![Page 16: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/16.jpg)
16
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
“Plateia” Assembly Procedure
Phase IPré – Montagem Plateia“Plateia” Pré-Assembly
Phase IIElevação Plateia
“Plateia” Erection
![Page 17: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/17.jpg)
17
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
Caracteristics and Conditionings
Caracteristics
-Plateia:120 Ton
-Diameter: 25 m
-Erection Hight: 30 m
Conditionings
-Limited Space
-The existent Cranes in building site
has a restricted Capacity
![Page 18: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/18.jpg)
18
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
“Plateia” Pré – Assembly
Assembly Erection Tower
Erection (Erection Mechanism)
3 2
1
1
2
3
![Page 19: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/19.jpg)
19
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
“Plateia” Pré – Assembly
Assembly Erection Tower
Erection (Erection Mechanism)
1
2
3
![Page 20: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/20.jpg)
20
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
“Plateia” Pré – Assembly
Assembly Erection Tower
Erection (Erection Mechanism)
1
2
3
![Page 21: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/21.jpg)
21
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
“Plateia” Pré – Assembly
Assembly Erection Tower
Erection (Erection Mechanism)
1
2
3
![Page 22: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/22.jpg)
22
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
Erection
![Page 23: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,](https://reader036.vdocuments.site/reader036/viewer/2022062409/5697bfc21a28abf838ca510a/html5/thumbnails/23.jpg)
23
BUSINESS MEETING
LEISURE CENTER – LAS ARENAS
Other Works…
Plateia
Disco
Columns