product overview presentation. digital construction try running a grade control system without data...

36
Product Overview Presentation

Upload: nicholas-jeffry-jones

Post on 29-Dec-2015

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Product Overview Presentation

Page 2: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Digital Construction

Try running a Grade Control System without data Try running a Site Positioning System without data Try building a project without a set of plans In today's construction world, it’s all about …

– the project’s data model– the process of creating and refining that model

Including representation of the necessary construction steps

– the management of data over the project lifecycle– the productivity that can come from effectively

analyzing and acting on that information

Page 3: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

The Need for Usable Digital Data

Trimble’s systems and products depend on it– Site positioning systems– Grade control systems– Takeoff and estimating

Rarely is it available ready to use– Sometimes it’s not available at all

You must typically…– Acquire– Perfect– Create– Manage

Page 4: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Digital Data is a Valuable Asset

Modern construction operations…– Demand quality, graphical digital design data– Generate a significant amount of digital data

Effective management of that data is the key to benefiting from its creation

Trimble’s office software products help you…– Acquire– Create– Perfect– Manage– Exploit digital construction data as a valuable

asset

Page 5: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Trimble’s Response to That Need

Page 6: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Data ManagerSurveyorEngineer

Grade CheckerForeman

Supervisor

Data ManagerEquipment ManagerMachine Operator

Fleet ManagerMaintenance Manager

Service ManagerDispatch Team

Compliance ManagerPermitting

Project, Site and Corporate Management TeamTakeoff, Estimate, Bid, Schedule, Plan

Site Positioning Grade Control Fleet Management

Organization-Wide Customer Needs

HQ & Regional Office Functions

Page 7: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Trimble Connected Community – Management Tools

Site PositioningWorkflow

BusinessCenter

Intelligent DataTracking

2 Way Data

Auto - Synchronization

Grade ControlWorkflow

Business CenterSiteVision Office

Wireless Data

ProductivityAnalysis

IntelligentCompaction

Fleet ManagementWorkflow

VisionLink

Equipment Use

Cycle Times

Maintenance Planning

Trimble Connected Community – Aggregating Tools

Organization-Wide Customer Needs

Page 8: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Integrated Solutions

Providing great support for GCS900 & SCS900– All components managed through a centralized office

solution– Capable of Serving multiple crews and machines

Page 9: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Innovative Modeling Solutions

Data preparation for road projects– Alignment based surface object– Roadway oriented surface model interpretation

Data preparation for site projects– Linestring object and data prep tools– Automated model densification through curves,

vertical curves and straight sections– Plan, profile, cross section and 3D views– Dynamic object dependency resolution

Page 10: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Main Customer Value Streams

Data Management– For site positioning and machine control systems– Data review, cleanup and validation

Data Preparation– Converting CAD data into 3D construction models

Takeoff– Computing material and site improvement quantities

and bid unit pricing

Survey– Sophisticated raw data reduction, post processing,

network adjustment and geodetic capabilities

Page 11: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Three Cornerstone ProductsPowered by Trimble

Business Center – HCE– Data Management, Data

Preparation, Takeoff

VisionLink– Asset and Fleet Management

Connected Community– Centralized Data Management,

Collaboration, Connected Site Backbone and Remote Connectivity

Page 12: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Product Structure

Page 13: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Product Structure

Core Product

Add-on Modules

Surface ToolsImage Manager

Data PrepTakeoff

TS & GNSS Processing

Field Data

Menu/Toolbar Layouts

Data PrepTakeoff

ConstructionConstruction & Survey

Free Product From Web& Sold in Box Sets of 20

DVDs

Sold By

TrainedTrimble DealersSITECH Dealers

Trimble CAT Dealers

Page 14: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Existing Add-On Modules

Module Description

Surface Tools Provides advanced surface modeling feature set for TIN models and Corridor surfaces

Image Manager Provides tools to import, manage, georeference and drape imagery on surface models and to export imagery to Google Earth / Connected Community

Data Prep Provides automation tools to cleanup CAD files, elevate data to 3D and create surface models quickly from imported 2D CAD files

Takeoff Provides a complete workflow management tool to calculate earthworks and construction material quantities from digitized data or imported CAD files

Total Station Processing Provides tools to reduce, compute and adjust data from raw Total Station observations

Total Station and GNSS Processing

Provides tools to reduce, compute and adjust data from raw Total Station and GNSS GPS observations

Page 15: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Supported Languages

US English British English German Italian Dutch French

Chinese Russian Japanese Spanish Swedish Portuguese

Page 16: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Simplified Use and

Improved Speed of Learning

Modes of Operation and Workflow Guides

Page 17: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Five Modes of Operation

Page 18: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Menu/Toolbar Layouts Five new workflow-oriented menu/toolbar layouts to choose from

Or, create your own

Menu Layout

Core Product

Surface Tools

Image Manager

Data Prep

Takeoff TS & GNSS Processing

Field Data X

Data Prep X X X X

Takeoff X X X X

Construction X X X X X

Construction & Survey X X X X X X

Modules

Page 19: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Menu/Toolbar Layouts

Each layout configures the menus and toolbars to suit a particular use case

Provides a functionality-focused presentation Exposes the user to only the tools that are

needed to do a particular job Layouts can be changed at any time Supported by new Workflow Guides

Page 20: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Workflow Guides

They provide step-by-step guidance for commonplace tasks

They describe the process by which you accomplish a specific task

Page 21: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Existing Customer Transition

Page 22: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

For a SiteVision Office Core User

Supports for all versions of machine software– SiteVision v5.5– GCS900 v5.5 to current– PCS900 v1.0 to current– AccuGrade

Provides tools to validate, check, correct and improve data prior to delivery to machine or a site positioning system

Import of .svd/.svl, .avoid.svl, .tsd and .cfg files Incorporates the benefits of Terramodel and Paydirt

with the feature set of SiteVision Office in a single solution

Page 23: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

For a Paydirt SiteWork User

BC-HCE’s Takeoff module is the next step for Paydirt SiteWork users– Supports digitized takeoff processes

Digitizer tablet support for hard copy plans Includes heads up digitizing of raster image files

– Supports takeoff from imported CAD data– Utilizes TIN models not grids– Provides interactive viewing and editing– Manages drill holes and subsurface strata– Computes material quantities and bid unit pricing

Includes topsoil handling, mass earthworks and construction material quantities

– Provides 3D visualization and rendering

Page 24: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

For a Terramodel User

Import of PRO files (Background Converter) Modeling, corridors, data prep and field device data management in one solution

Terramodel Data Type Transferred Via BC-HCE Imports As

Points DXF Files Points

Plines DXF Files Polylines

Sets DXF Files Linestrings

Blocks DXF Files Blocks

Text DXF Files Text Objects

Surfaces TTM Files Internal Surfaces

Alignments & Profiles DC Files Alignment with Profile

Roads DC Files Corridors (No Subgrades)

Page 25: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

For an SCS900 and GCS900 User

Wide range of data importers Advanced data management tools

– Intelligent data tracking– Multiple crew, multiple site management– Identification and resolution of data issues– Geodetic support for site calibrations– Manages data for all versions of SCS900, GCS900, SiteVision

and AccuGrade– Plan, profile, cross section, 3D, 3D drive through,

spreadsheet and surface slicer views to analyze data– Computes stockpile and progress volumes in addition to full

takeoff quantities

Page 26: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

For a Survey User

Trimble Geomatics Office project importer Numerous Total Station, GNSS and raw data

processing and reporting improvements Supports Survey Controller, Trimble Access

and DiNi controller formats Integrates all data types into a single network

adjustment process

Page 27: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

User Categories

Page 28: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Estimator / Bid Team

Recommended Modules– Core Product– Takeoff Module– Image Manager Module

Optional Modules– Data Prep Module– Surface Tools Module– Road Takeoff Tools

Page 29: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Functions Provided

Digitizing of paper plans Import and management of CAD data Material and installation costs Topsoil stripping and replacement Managing subsurface strata and drillholes Managing over-excavation areas Calculate Takeoff quantities and reports Produce Cut and Fill maps Visualization and validation Creation of surface models

Page 30: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Data Preparation Specialist

Recommended Modules– Core Product– Data Prep Module– Surface Tools Module– Image Manager Module– SCS Data Manager– Trimble Office Synchronizer– SCS Report Utility

Optional Modules– Takeoff Module– Road Takeoff Tools

Page 31: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Functions Provided

Importing CAD data Data preporation tools (join lines, elevate data, etc) Creation of models Creation of corridor models and subgrades Applying surface textures Creating 3D visualizations Delivering & Retrieving data to field crews and

machines Analyzing and reporting data Volume computations As-built drawings

Page 32: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Survey Manager / Crews

Recommended Modules– Core Product– Total Station & GNSS Processing Module– Surface Tools Module– SCS Data Manager– Trimble Office Synchronizer– SCS Report Utility

Optional Modules– Data Prep Module

Page 33: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Functions Provided

Managing GNSS and Total Station data Control network and traverse calculations GNSS baseline processing Level run calculations Network adjustment and analysis Control management Importing CAD data Building surface models Preparing, Delivering, & Retrieving data to/from field crews and machines Analyzing and QA/QC reporting Volume computations As-built drawings Editing of data QA/QC Report generation

Page 34: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Grade Checker / Site Engineer

Recommended Modules– Core Product– SCS Data Manager– SCS Report Utility– Trimble Office Synchronizer

Optional Modules– Surface Tools Module

Page 35: Product Overview Presentation. Digital Construction  Try running a Grade Control System without data  Try running a Site Positioning System without

Functions Provided

Importing CAD data Building surface models Contouring Preparing data for field crews and machines Delivering data to field crews and machines Retrieving data from machines and crews Analyzing and QA/QC reporting Volume computations As-built drawings Editing of data QA/QC Report generation