Page 1: product handbook - Scene7

product handbook

Energy in all we do

Page 2: product handbook - Scene7

lw

h

Gas turbinE GEnErator packaGEsproduct ovErviEw 1 to 22 Mw

including (standard supply) • Gas turbine, Reduction Gear Box, Generator• Starting equipment• Gas fuel system• Lubrication system• Turbine compressor cleaning system• Base frame• Spring dampers

• Enclosure• Air filtration system• Integrated control system• Fire detection and extinguishing equipment• Electrical cables• Erection, commissioning and tests

2

Page 3: product handbook - Scene7

3

4) Site Conditions for Steam production: Sea level, 15°C, 75 mmH2O inlet loss, 250 mmH2O exhaust loss Natural gas fuel; Full load; Feed water temperature: 105°C, 100% condensate return, no deaerator, no blowdown 5) H & Weight = including Filter system and for outdoor installation6) Chilling capacity is calculated based on two stages Exhaust Chiller with Exhaust Temperature in/out aprox. 500/170°C, chilled water outlet/inlet temperature 7/12°C. Condensation temperature 26°C maximum.7) Single stage Exhaust Chiller

All specifications are for reference only, subject to change without notice.

T-1601 1.20 14’810 5.0 24.3 6.5 506 NG/LF/LPG/LBTu S, WI T-4700 3.51 12’900 12.6 27.9 19.0 443 NG/LF/LPG/LBTu S, DLE, WI T-6201 4.60 12’266 15.7 29.3 19.1 509 NG/LF/LPG/LBTu S, DLE, WI T-6401 4.60 9’350 12.0 38.5 17.8 374 NG/LBTu DLE T-7901 5.67 11’427 18.0 31.5 21.8 510 NG/LF/LPG/LBTu S, DLE, WI T-8401 6.30 10’945 19.2 32.9 21.1 549 NG DLE T-10801 7.96 10’503 23.2 34.3 26.9 508 NG/LF/LPG/LBTu S, DLE T-13002 9.87 10’827 29.7 33.2 40.2 465 NG/LF/LPG/LBTu S, DLE, WI T-16002 11.35 10’934 34.5 32.9 42.6 484 NG/LF/LPG/LBTu S, DLE, WI T-20501 15.00 10’227 42.6 35.2 49.8 496 NG/LF/LPG/LBTu S, DLE T-30002 21.75 9’256 55.9 38.9 68.2 463 NG DLE

saturn 20 cEntaur 40 cEntaur 50 MErcury 50 taurus 60 taurus 65 taurus 70 Mars 90 Mars 100 titan 130 titan 250

turbinetype vers

ion

iso1)

out

put p

ower

iso1)

hea

t rat

e

Fuel

inpu

t

Elec

trica

l Ef

ficie

ncy

Exha

ust g

as F

low

Exha

ust g

as te

mp.

Fuel

s2)

com

tust

ion

syst

ems

avai

labl

e3)

Mw kJ/kwh MJ/s % kg/s °c

1) ISO conditions: Sea level, 15°C, no gas path losses 2) NG = natural gas; LF = liquid fuel; LPG = liquified propane gas; LBTu = low BTu gas 3) S = standard combustion system; WI = water injection; DLE = SoLoNOx

0.4 3.9 7.6 2.4 11.6 5 3’728 - 641 6.0 1.8 7.6 14 6.3, 11 8.9 21.5 8.3 33.8 16 8’933 - 1’563 10.0 2.2 6.6 40 6.3, 11 11.5 22.2 6.8 34.4 15 10’878 - 1’871 10.0 2.2 6.6 45 6.3, 11 5.9 19.8 9.3 31.3 17 3’744 - 6447) 13.7 2.9 6.7 52 6.3, 11 13.2 25.3 7.8 38.9 17 12’412 - 2’134 10.0 2.2 6.6 45 6.3, 11 14.5 24.5 6.5 38.0 15 13’436 - 2’311 11.0 2.2 6.6 56 6.3, 11 16.2 30.9 9.7 48.5 21 15’328 - 2’636 12.6 2.9 9.4 68 6.3, 11 20.7 47.0 16.5 72.0 33 20’648 - 3’551 14.9 2.9 9.7 84 6.3, 11 24.0 50.1 16.6 76.7 34 23’404 - 4’025 14.9 2.9 9.7 85 6.3, 11 29.8 59.0 18.7 89.6 39 28’391 - 4’882 15.6 2.9 10.0 90 11 36.2 80.5 28.3 122.9 56 34’820 - 5’988 18.2 3.4 14.0 99

saturn 20 cEntaur 40 cEntaur 50 MErcury 50 taurus 60 taurus 65 taurus 70 Mars 90 Mars 100 titan 130 titan 250

turbinetype Gene

rato

r vo

ltage

stea

m p

rodu

ctio

n4) @

10 b

ar(a

) sat

urat

ed

stea

m p

rodu

ctio

n4) @

10

bar

(a) s

atur

ated

,fir

ed to

800°

c

addi

tiona

l fue

l inp

utto

reac

h 80

0°c

stea

m p

rodu

ctio

n4) @

10 b

ar(a

) sat

urat

ed,

fire

d to

1100

°c

addi

tiona

l fue

l inp

utto

reac

h 11

00°c

chill

ing

capa

city

6)

l w wei

ght5)

h5)

kv t/h t/h MJ/s t/h MJ/s MJ/s - m3/h m m m t

product ranGE

Page 4: product handbook - Scene7

4

Gas turbinE GEnErator packaGE

saturn 20turbinE typE: saturn 20 (t 1601) Main data (ISO, no losses)

Electrical power: MW 1.20Heat rate: kJ/kWE-hr 14’810 Fuel input: MJ/s 4.95Efficiency: % 24.32Exhaust gas flow: kg/s 6.54Exhaust gas temp. °C 506Fuel: NG/LF/LPG/LBTuStart system: ACGen. Voltage: kV 0.4Comb. Syst. Avail.: * S/WI

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

typical layout

corrEction curvEs

14,700

14,800

14,900

15,000

15,100

15,200

15,300

15,400

15,500

15,600

15,700

1,020

1,040

1,060

1,080

1,100

1,120

1,140

1,160

1,180

1,200

1,220

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe

HR

370

384

398

412

426

440

454

468

482

496

510

524

538

552

5.90

6.00

6.10

6.20

6.30

6.40

6.50

6.60

6.70

6.80

6.90

7.00

7.10

7.20

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 5: product handbook - Scene7

5

Gas turbinE GEnErator packaGE

cEntaur 40turbinE typE: cEntaur 40 (t 4700) Main data (ISO, no losses)

Electrical power: MW 3.51Heat rate: kJ/kWE-hr 12’900 Fuel input: MJ/s 12.59Efficiency: % 27.90Exhaust gas flow: kg/s 18.99Exhaust gas temp. °C 443Fuel: NG/LF/LPG/LBTuStart system: ACGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * S/WI/DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

corrEction curvEs

12,300

12,400

12,500

12,600

12,700

12,800

12,900

13,000

13,100

13,200

13,300

13,400

13,500

13,600

13,700

13,800

13,900

2,800

2,900

3,000

3,100

3,200

3,300

3,400

3,500

3,600

3,700

3,800

3,900

4,000

4,100

4,200

4,300

4,400

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe HR

428

430

432

434

436

438

440

442

444

446

448

450

452

454

456

458

460

16.70

17.00

17.30

17.60

17.90

18.20

18.50

18.80

19.10

19.40

19.70

20.00

20.30

20.60

20.90

21.20

21.50

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 6: product handbook - Scene7

6

Gas turbinE GEnErator packaGE

cEntaur 50turbinE typE: cEntaur 50 (t 6201) Main data (ISO, no losses)

Electrical power: MW 4.60Heat rate: kJ/kWE-hr 12’266 Fuel input: MJ/s 15.68Efficiency: % 29.34Exhaust gas flow: kg/s 19.08Exhaust gas temp. °C 509Fuel: NG/LF/LPG/LBTuStart system: ACGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * S/WI/DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

typical layout

corrEction curvEs

11,900

12,000

12,100

12,200

12,300

12,400

12,500

12,600

12,700

12,800

12,900

13,000

13,100

13,200

3,700

3,850

4,000

4,150

4,300

4,450

4,600

4,750

4,900

5,050

5,200

5,350

5,500

5,650

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe

HR

498

500

502

504

506

508

510

512

514

516

518

520

522

524

526

528

530

16.70

17.00

17.30

17.60

17.90

18.20

18.50

18.80

19.10

19.40

19.70

20.00

20.30

20.60

20.90

21.20

21.50

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 7: product handbook - Scene7

7

Gas turbinE GEnErator packaGE

MErcury 50turbinE typE: MErcury 50 (t 6401) Main data (ISO, no losses)

Electrical power: MW 4.60Heat rate: kJ/kWE-hr 9’350 Fuel input: MJ/s 11.95Efficiency: % 38.49Exhaust gas flow: kg/s 17.82Exhaust gas temp. °C 374Fuel: NG/LBTuStart system: ACGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

corrEction curvEs

8,600 8,685 8,770 8,855 8,940 9,025 9,110 9,195 9,280 9,365 9,450 9,535 9,620 9,705 9,790 9,875 9,960 10,045 10,130 10,215

3,600 3,700 3,800 3,900 4,000 4,100 4,200 4,300 4,400 4,500 4,600 4,700 4,800 4,900 5,000 5,100 5,200 5,300 5,400 5,500

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe HR

330

334

338

342

346

350

354

358

362

366

370

374

378

382

386

390

394

398

15.50

15.75

16.00

16.25

16.50

16.75

17.00

17.25

17.50

17.75

18.00

18.25

18.50

18.75

19.00

19.25

19.50

19.75

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

EGF EGT

Engine Inlet Temperature (°C)

typical layout

Page 8: product handbook - Scene7

8

Gas turbinE GEnErator packaGE

taurus 60turbinE typE: taurus 60 (t 7901) Main data (ISO, no losses)

Electrical power: MW 5.67Heat rate: kJ/kWE-hr 11’427 Fuel input: MJ/s 18.00Efficiency: % 31.50Exhaust gas flow: kg/s 21.77Exhaust gas temp. °C 510Fuel: NG/LF/LPG/LBTuStart system: ACGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * S/WI/DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

typical layout

corrEction curvEs

11,000

11,100

11,200

11,300

11,400

11,500

11,600

11,700

11,800

11,900

12,000

12,100

12,200

12,300

4,500

4,700

4,900

5,100

5,300

5,500

5,700

5,900

6,100

6,300

6,500

6,700

6,900

7,100

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe HR

493 495 497 499 501 503 505 507 509 511 513 515 517 519 521 523 525 527 529 531 533 535 537

19.40 19.60 19.80 20.00 20.20 20.40 20.60 20.80 21.00 21.20 21.40 21.60 21.80 22.00 22.20 22.40 22.60 22.80 23.00 23.20 23.40 23.60 23.80

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 9: product handbook - Scene7

9

Gas turbinE GEnErator packaGE

taurus 65turbinE typE: taurus 65 (t 8401) Main data (ISO, no losses)

Electrical power: MW 6.30Heat rate: kJ/kWE-hr 10’945 Fuel input: MJ/s 19.16Efficiency: % 32.88Exhaust gas flow: kg/s 21.10Exhaust gas temp. °C 549Fuel: NGStart system: ACGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

corrEction curvEs

10,300

10,400

10,500

10,600

10,700

10,800

10,900

11,000

11,100

11,200

11,300

11,400

11,500

11,600

11,700

11,800

11,900

12,000

4,700

4,900

5,100

5,300

5,500

5,700

5,900

6,100

6,300

6,500

6,700

6,900

7,100

7,300

7,500

7,700

7,900

8,100

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe HR

525

530

535

540

545

550

555

560

565

570

575

580

18.50

19.00

19.50

20.00

20.50

21.00

21.50

22.00

22.50

23.00

23.50

24.00

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 10: product handbook - Scene7

10

Gas turbinE GEnErator packaGE

taurus 70turbinE typE: taurus 70 (t 10801) Main data (ISO, no losses)

Electrical power: MW 7.96Heat rate: kJ/kWE-hr 10’503 Fuel input: MJ/s 23.24Efficiency: % 34.27Exhaust gas flow: kg/s 26.88Exhaust gas temp. °C 508Fuel: NG/LF/LPG/LBTu Start system: DCGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * S/DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

typical layout

corrEction curvEs

10,250

10,350

10,450

10,550

10,650

10,750

10,850

10,950

11,050

11,150

11,250

11,350

11,450

11,550

6,250

6,500

6,750

7,000

7,250

7,500

7,750

8,000

8,250

8,500

8,750

9,000

9,250

9,500

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe

HR

495

498

501

504

507

510

513

516

519

522

525

528

531

534

537

23.00

23.50

24.00

24.50

25.00

25.50

26.00

26.50

27.00

27.50

28.00

28.50

29.00

29.50

30.00

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 11: product handbook - Scene7

11

Gas turbinE GEnErator packaGE

Mars 90turbinE typE: Mars 90 (t 13002) Main data (ISO, no losses)

Electrical power: MW 9.87Heat rate: kJ/kWE-hr 10’827 Fuel input: MJ/s 29.69Efficiency: % 33.24Exhaust gas flow: kg/s 40.16Exhaust gas temp. °C 465Fuel: NG/LF/LPG/LBTuStart system: ACGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * S/WI/DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

corrEction curvEs

11,050 11,120 11,190 11,260 11,330 11,400 11,470 11,540 11,610 11,680 11,750 11,820 11,890 11,960 12,030 12,100 12,170 12,240 12,310 12,380

7,200 7,400 7,600 7,800 8,000 8,200 8,400 8,600 8,800 9,000 9,200 9,400 9,600 9,800

10,000 10,200 10,400 10,600 10,800 11,000

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe HR

435

440

445

450

455

460

465

470

475

480

485

490

495

33.50

34.50

35.50

36.50

37.50

38.50

39.50

40.50

41.50

42.50

43.50

44.50

45.50

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 12: product handbook - Scene7

12

Gas turbinE GEnErator packaGE

Mars 100turbinE typE: Mars 100 (t 16002) Main data (ISO, no losses)

Electrical power: MW 11.35Heat rate: kJ/kWE-hr 10’934 Fuel input: MJ/s 34.47Efficiency: % 32.92Exhaust gas flow: kg/s 42.57Exhaust gas temp. °C 484Fuel: NG/LF/LPG/LBTuStart system: ACGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * S/WI/DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

typical layout

corrEction curvEs

10,750

10,800

10,850

10,900

10,950

11,000

11,050

11,100

11,150

11,200

11,250

11,300

11,350

11,400

11,450

11,500

11,550

11,600

9,000

9,250

9,500

9,750

10,000

10,250

10,500

10,750

11,000

11,250

11,500

11,750

12,000

12,250

12,500

12,750

13,000

13,250

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe HR

455

460

465

470

475

480

485

490

495

500

505

510

37.00

38.00

39.00

40.00

41.00

42.00

43.00

44.00

45.00

46.00

47.00

48.00

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 13: product handbook - Scene7

13

Gas turbinE GEnErator packaGE

titan 130turbinE typE: titan 130 (t 20501) Main data (ISO, no losses)

Electrical power: MW 15.00Heat rate: kJ/kWE-hr 10’227 Fuel input: MJ/s 42.62Efficiency: % 35.19Exhaust gas flow: kg/s 49.79Exhaust gas temp. °C 496Fuel: NG/LF/LPG/LBTuStart system: DCGen. Voltage: kV 6.3 or 11Comb. Syst. Avail.: * S/DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

corrEction curvEs

10,000

10,100

10,200

10,300

10,400

10,500

10,600

10,700

10,800

10,900

11,000

11,100

11,200

11,300

11,800

12,200

12,600

13,000

13,400

13,800

14,200

14,600

15,000

15,400

15,800

16,200

16,600

17,000

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe HR

475

480

485

490

495

500

505

510

515

520

525

530

44.00

45.00

46.00

47.00

48.00

49.00

50.00

51.00

52.00

53.00

54.00

55.00

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF

EGT

typical layout

Page 14: product handbook - Scene7

14

Gas turbinE GEnErator packaGE

titan 250turbinE typE: titan 250 (t 30002) Main data (ISO, no losses)

Electrical power: MW 21.75Heat rate: kJ/kWE-hr 9’256 Fuel input: MJ/s 55.92Efficiency: % 38.89Exhaust gas flow: kg/s 68.21Exhaust gas temp. °C 463Fuel: NGStart system: ACGen. Voltage: kV 11Comb. Syst. Avail.: * DLE

*S = standard combustion system; WI = water injection; DLE = SoLoNOx

corrEction curvEs

9,100

9,150

9,200

9,250

9,300

9,350

9,400

9,450

9,500

9,550

9,600

9,650

9,700

9,750

9,800

9,850

9,900

9,950

17,000

17,500

18,000

18,500

19,000

19,500

20,000

20,500

21,000

21,500

22,000

22,500

23,000

23,500

24,000

24,500

25,000

25,500

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Hea

t Rat

e (k

J/kW

h)

Gen

. Out

put P

ower

(kW

e)

Engine Inlet Temperature (°C)

kWe HR

441 444 447 450 453 456 459 462 465 468 471 474 477 480 483 486 489 492 495

58.00 59.00 60.00 61.00 62.00 63.00 64.00 65.00 66.00 67.00 68.00 69.00 70.00 71.00 72.00 73.00 74.00 75.00 76.00

-20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Exh.

Gas

Tem

pera

ture

(°C)

Exh.

Gas

Flo

w (k

g/s)

Engine Inlet Temperature (°C)

EGF EGT

typical layout

Page 15: product handbook - Scene7

15

operation or operation supervision

service parts

troubleshooting & repair on package or plant

turbine unscheduled oh and repair

turbine scheduled oh or pro rata warranty

annual boroscope inspection of Gt & rGb

annual maintenance on package or plant

pMc buoa EMc FMc o&M

These services can be provided in the frame of maintenance agreements, individually tailored to meet your requirements. Contracts are generally grouped under the following contractual models:

pMc: Preventive Maintenance Contract buoa: Beneficial use Overhaul AgreementEMc: Extended Maintenance ContractFMc: Full Maintenance Contract (or Long Term Service Agreement)o&M: Operation and Maintenance

• MAINTENANCE• LONG-TERMSERVICEAGREEMENTS• REMOTE DIAGNOSTICS WITH INSIght SyStem• SUPPLYOFCERTIFIEDSERVICEPARTS

• EQUIPMENTOVERHAUL• GASTURBINEEXCHANGEPROGRAM• GASTURBINEFIELDREPAIR• UPGRADES,RETROFITSANDPLANT MODIFICATIONS

custoMEr sErvicEs

Page 16: product handbook - Scene7

16

watt’s insidE our packaGE

7 . air FiltEr systEM For GEnErator coolinG and vEntilation air

8 . Gas turbinE Solar industrial gas turbines combine ease of maintenance with highest reliabil-ity, durability and efficiency. This guaran-tees you the best payback throughout the lifetime of the plant.

9 . rEduction GEar Matches gas turbine rotational speed to speed of generator rotor.

10 . GEnErator Transforms mechanical energy into electrical power.

11 . subsystEMsAir, Fuel, Oil and Start Subsystems are fully integrated and tested before ship-ment. This safes time and cost on site.

12 . startinG systEM

13 . FuEl systEM

14 . lubE-oil systEMwith integrated lube-oil cooler

15 . connEctionsThe simple interfaces guarantee an easy and fast installation and integration. This saves time and cost on site.

16 . intErFacE connEctions•fuel•instrumentair•400Vauxiliarypower•mediumvoltagepower•connectiontocompressorwashing system

1 . EnclosurE The enclosure protects the package from weather, and reduces operational noise, allowing an outdoor installation. This eliminates the need for a building and saves investment cost. Modular panels allow the entire enclosure to be disas-sembled in sections.

2 . EnclosurE doorsDoors allow full access to every side of the package making inspection and maintenance operations fast, safe and easy.

3 . basE FraME The base frame integrates all subsys-tem components with gas turbine and generator and allows an easy and fast single-lift installation or relocation

4 . sprinG daMpErs The spring dampers absorb operational vibrations and minimise the require-ments for the foundation, allowing an installation practically anywhere.

5 . MaintEnancE provisionsThe package is designed for ease of maintenance, with built-in maintenance devices. Provisions to remove the genera-tor and gas turbine are integrated in the package design. This safes time and cost during maintenance.

6 . FiltEr structurE For coMbustion airCan be configured to local conditions and allows for installation of inlet air cooling.

control systEMThe advanced control system can ope-rate the package completely automati-cally, and allows easy communication with other systems. This provides equipment safety, operator convenience and low operating cost.

control rooM The control and electrical systems are housed in a tightly sealed and air-condi-tioned control room, which is integrated on the package. This eliminates the need for a separate control room and associated construction costs.

2

7

Page 17: product handbook - Scene7

17

cablinG The interconnecting cabling is installed and tested before shipment. This guaran-tees highest quality and reliability.

auXiliary powEr switchGEar

battEry systEM

huMan MachinE intErFacE (hMi)The user-friendly interface can be oper-ated locally or via the remote operator station. This guarantees an optimum operation of your equipment.

910 8

12

13

11

15

3

4

5

1

16

14

options availablEsome of the available options are:•alternativefuelcapability(gas,liquid,lowBTU)•waterinjectionorSoLoNOx combustion system for lowest emissions is available for most turbines•packagingdesignedforawidevarietyof environmental conditions •combustionairinletchilling•generatorvoltagesof6.3or11kV

6

Page 18: product handbook - Scene7

18

turboMach - providinG industrial powEr GEnEration

about us

Turbomach is a leading provider of industrial gas tur-bine-based cogeneration systems.We are fully dedicated to our power generation mar-kets, leveraging the experience with over 4500 powergeneration units installed worldwide. Together with Solar Turbines, Turbomach is part of a diverse multi-talented team of more than 6000 employees with dec-ades of experience working as a global team com-mitted to the common goal of delivering complete customer satisfaction.

Page 19: product handbook - Scene7

19

netherlands2171 AL SassenheimTel: +31 71 408 09 [email protected]

pakistan54000 LahoreTel: +92 42 35 87 [email protected]

russia114400 MoscowTel: +7 495 755 81 [email protected]

singaporeSingapore 627973Tel: +65 6828 [email protected]

spain08290 Cerdanyola - BarcelonaTel: +34 93 586 41 [email protected]

thailandBangkok 10250 Tel: +66 2 366 [email protected]

turkey34330 IstanbulTel: +90 212 284 [email protected]

united arab EmiratesDubaiP.O.BOX17779Jazfa, united Arab EmiratesTel: +971 4 816 [email protected]

or our nEarEst FiEld oFFicE.

brazilSao PauloTel: +55 11 2109 2015 orTel: +34 93 586 41 [email protected]

colombiaCartagena de IndiasTel: +57 5 664 72 16 orTel: +34 93 586 41 [email protected]

EgyptCairoTel: +20 10 00 36 76 [email protected]

France91280 St-Pierre-Du-PerrayTel: +33 1 6989 00 [email protected]

Germany64347 GriesheimTel: +49 6155 [email protected]

indiaMumbai 400 076Tel: +91 22 4042 54 [email protected]

italy43122 ParmaTel: +39 0521 275 [email protected]

For FurthEr inForMation, plEasE visit www.turboMach.coM or contact us at:

turboMachswitzerlandVia Campagna 15 6595 RiazzinoTel: +41 91 851 15 11Fax: +41 91 851 15 55 [email protected]

solar turbinEs usaSolar Turbines IncorporatedSan Diego, CaliforniaTel: +1 (619) 544 [email protected]

contacts

Page 20: product handbook - Scene7

www.turbomach.com

©2012 Turbomach. All rights reserved. BPHBTBM/512

CAT and CATERPILLAR are trademarks of Caterpillar Inc. Solar, Insight System, titan, mars, taurus, Centaur, Saturn, mercury, SoLoNOx are trademarks of Solar Turbines Inc. turbomach is the trademark of Turbomach S.A.