product end-of-life disassembly instructionsh22235.€¦ · hp 470 g7 notebook pc purpose: the...
TRANSCRIPT
EL-MF877-00 Page 1 Template Revision C
Last revalidation date 09-May-2018
HPI instructions for this template are available at EL-MF877-01
Product End-of-Life Disassembly Instructions Product Category: Notebooks and Tablet PCs
Marketing Name / Model [List multiple models if applicable.]
HP 470 G7 Notebook PC Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive 2012/19/EC, Waste Electrical and Electronic Equipment (WEEE). NOTE: Recyclers should sort plastic materials into resin streams for recycling based on the ISO 11469 plastic marking code on the plastic part. For any questions on plastic marking, please contact HP’s Sustainability Contact. 1.0 Items Requiring Selective Treatment 1.1 Items listed below are classified as requiring selective treatment. 1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description Notes
Quantity of items included in product
Printed Circuit Boards (PCB) or Printed Circuit Assemblies (PCA)
With a surface greater than 10 sq cm (MB, RAM, TP BD, Pick BD, USB BD)
5
Batteries, excluding Li-Ion batteries. All types including standard alkaline, coin or button style batteries
0
Li-Ion batteries. Include all Li-Ion batteries if more than one is provided with the product (such as a detachable notebook keyboard battery, RTC coin cell, etc.)
Battery(ies) are attached to the product by (check all that apply with an “x” inside the “[ ]”): [ X ] screws [ ] snaps [ ] adhesive [ ] other. Explain NOTE: Add detailed removal procedures including required tools in the sections 3.1 and 3.2.
1
Mercury-containing components For example, mercury in lamps, display backlights, scanner lamps, switches, batteries
0
Liquid Crystal Displays (LCD) with a surface greater than 100 sq cm
Includes background illuminated displays with gas discharge lamps (17.3’’)
1
Cathode Ray Tubes (CRT) 0
Capacitors / condensers (Containing PCB/PCT) 0
Electrolytic Capacitors / Condensers measuring greater than 2.5 cm in diameter or height
0
External electrical cables and cords DC Cable for External Power Supply 1
Gas Discharge Lamps 0
Plastics containing Brominated Flame Retardants weighing > 25 grams (not including PCBs or PCAs
0
EL-MF877-00 Page 2 Template Revision C
Last revalidation date 09-May-2018
HPI instructions for this template are available at EL-MF877-01
Item Description Notes
Quantity of items included in product
already listed as a separate item above)
Components and parts containing toner and ink, including liquids, semi-liquids (gel/paste) and toner
Include the cartridges, print heads, tubes, vent chambers, and service stations.
0
Components and waste containing asbestos 0
Components, parts and materials containing refractory ceramic fibers
0
Components, parts and materials containing radioactive substances
0
2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed. Tool Description Tool Size (if
applicable)
Electric screwdriver (Cross) #1, Cross
ODD BRKT support fixture
Support fixture
3.0 Product Disassembly Process 3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment including the required steps to remove the external enclosure:
1. Follow steps described in Disassembly instruction (file attached) 2. If parts can be removed without using a tool, remove it first 3. Use correct screwdriver and torque value before unlock the screw.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations).
MANUFACTURING PROCESS INSTRUCTIONS
MECHANICAL ASSEMBLY MODEL : Harry Potter 17” Standard
Tabulator:Chang Nevil Auditor:Lee Chung-Sheng
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Disassemble hinge Cover
1. Disassemble hinge Cover
1(1/1)
1.00 2018/3/20
Hinge Cover
DF Jet Black 6051B1241801
Snow White 6051B1241802
FF
Smoky Grey 6051B1241803
Sapphire Blue 6051B1241804
Velvet Burgundy 6051B1241805
Serenity Mint 6051B1241806
FF+
Natural Silver 6051B1241807
Pale Gold 6051B1241808
Scarlet Red 6051B1241809
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Disassemble bezel
1. Disassemble bezel in the order 1→2→3 (Fig.1)
2(1/1)
1.00 2018/3/20
Hook Hook
1
2 2
1
3 3
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Loosen screw M2*3(6052A0035101)*4,
Fig.1
Electric screwdriver #1 1
Lossen LCD screw
2
1
4
3
3(1/1)
1.00 2018/3/20
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Disassemble Touch/B
4(1/1)
Only Touch SKU動作 :
1. Disconnect Touch/B FPC(Fig.2)
2. Disassemble Touch/B於A cover (Fig.1)
Fig.1
Fig.2
hook
Do not press
1.00 2018/3/20
Push
here for
remove
touch/B
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1.Disassemble eDP Cable from A cover (Fig.1)
Disassemble edp cable
5(1/1)
Fig.1
1.00 2018/3/20
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Take out the LCD from A case, disconnect
EDP cable from LCD.
Fig.1
Disconnect eDP Cable from LCD
6(1/1)
Fig.2
1.00 2018/3/20
出
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Loosen screws M2.5*2.5 (6052B0096201)*6
Fig.1
Electric screwdriver #1 1
Loossen Hinge screws
2
1
3
7(1/1)
Fig.2
1
2 3
1.00 2018/3/20
預留
預留
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disassemble hinge in the order of picture.
First remove hinge from the hook, and then
disassemble hinge from the rib along the Z
axis.(Fig.2)
Fig.1
Disassemble Hinge
8(1/1)
1.00 2018/3/20
LH連鋐
6055B0056901 Hinge-L
6055B0056902 Hinge-R
SNR鑫禾
6055B0057001 Hinge-L
6055B0057002 Hinge-R
hook
Rib
Fig.2
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disassemble hinge in the order of picture.
First remove hinge from the hook, and then
disassemble hinge from the rib along the Z
axis.(Fig.2)
Fig.1
Disassemble Hinge
9(1/1)
1.00 2018/3/20
LH連鋐
6055B0056901 Hinge-L
6055B0056902 Hinge-R
SNR鑫禾
6055B0057001 Hinge-L
6055B0057002 Hinge-R
hook
Rib
Fig.2
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Tear off the aluminum foil ,
2. Disassemble eDP Cable from A cover
Disassemble eDP & Antenna cable
10(1/1)
1.00 2018/3/20
Fig.1
Fig.2
Fig.3
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Disassemble eDP cable
1. Disassemble Camera Cable frome A cover
Do not over-pull when disassemble the line
Fig.1
11(1/1)
1.00 2018/3/20
Fig.2
rib
rib
hook
Fig.3 Fig.4
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Disassembe Camera
1. Disconnect Webcam Cable,and disassemble Camera
Fig.1
12(1/1)
1.00 2018/3/20
Fig.2 rib rib
Fig.3
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Remove antenna cable from A cover along
the arrow of fig.
Disassemble Antenna cable
13(1/1)
1.00 2018/3/20
Fig.1
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Disassemble Main Antenna Cable
14(1/1)
1.00 2018/3/20
Fig.1
WNC 6036B0214401 Main
6036B0214301 Aux
ACON 6036B0214201 Main
6036B0214101 Aux
INPAQ 6036B0214001 Main
6036B0213901 Aux
YAGEO 6036B0213801 Main
6036B0213701 Aux
1. Disassemble WLAN Antenna (Main) 2. Tear off the aluminum foil
Fig.2
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) LCM SOP Station :
Name : Ver. : Date :
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disassemble WLAN Antenna (AUX) 2. Tear off the aluminum foil
Disassemble AUX Antenna Cable
15(1/1)
1.00 2018/3/20
Fig.1
WNC 6036B0214401 Main
6036B0214301 Aux
ACON 6036B0214201 Main
6036B0214101 Aux
INPAQ 6036B0214001 Main
6036B0213901 Aux
YAGEO 6036B0213801 Main
6036B0213701 Aux
Fig.1
Aux Main
Fig.2
Fig.3
MANUFACTURING PROCESS INSTRUCTIONS
MECHANICAL ASSEMBLY MODEL : Harry Potter 17”
Tabulator:Chang Nevil Auditor:Lee Chung-Sheng
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Loosen screws M2.5x6 *4
Loosen screws 1.00 2018/3/20
2
1 4
3
1(1/1)
Electric screwdriver #1 1
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Remove Rubber
1. Remove Rubber
Rear
Front
下殼腳墊選用配置
D cover Front rubber Rear rubber
DF Jet Black 6054B2049301 6054B2049401
Snow White 6054B2049302 6054B2049402
FF
Smoky Grey 6054B2049303 6054B2049403
Sapphire Blue 6054B2049304 6054B2049404
Velvet Burgundy 6054B2049305 6054B2049405
Serenity Mint 6054B2049306 6054B2049406
FF+
Natural Silver 6054B2049307 6054B2049407
Pale Gold 6054B2049308 6054B2049408
Scarlet Red 6054B2049309 6054B2049409
1.00 2018/3/20
2(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Loosen screws M2.5x6 *6 。
Loosen screws
1 5
2
4 3
6
1.00 2018/3/20
3(1/1)
Electric screwdriver #1 1
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disassemble ODD(Fig2) 2. Loosen screws M2x2*2 (Fig.1) 3. Disassemble ODD Bezel
Disassemble ODD
Fig1
1
2
Fig2
1.01 2018/3/8
4(1/1)
Electric screwdriver #1 1
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Put ODD on the support fixture (Fig1/Fig2)。
2. Loosen M2x2.5* 1 , and disassemble ODD BRKT
(Fig1/Fig2)。
Disassemble ODD BRKT
Electric screwdriver #1 1
ODD BRKT support fixture 1
Fig1
Fig2
螺絲拆解孔 鐵件定位孔
1.00 2018/3/20
5(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disassemble D cover
Disassemble D cover
Fig1
1
2 2
3 3
1.00 2018/3/20
6(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Loosen battery screws
1. Loosen batteryscrews M2x3*4 (Fig1)
Fig1
1 4
3 2
1.00 2018/3/20
7(1/1)
Electric screwdriver #1 1
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disassemble DDR(Fig1) 2. Disassemble battery(Fig2)
Disassemble DDR & BATT
Fig1
DIM
M1
DDR
Fig2
1.00 2018/3/20
8(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disconnect WLAN Antenna cable
terminal (Fig1)
Disconnect Antenna cable
Fig1
1.00 2018/3/20
9(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Remove Antenna Cable (Fig1)
Remove Antenna cable
Fig1 Fig2
1.00 2018/3/20
10(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Loosen SSD, WLAN Module screws M2x3 *2(Fig1 ~3)
2. Disassemble SSD & WLAN Module
Loosen SSD、WLAN Module screws
Electric screwdriver #1 1
Fig1
Fig2
Fig3
1.00 2018/3/20
11(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
Disassemble SSD/B
SSD bracket 1. Disconnect SSD/B FFC CNTR from M/B
(Fig1)
2. Loosen screws M2x3*2(Fig2) 3. Disassemble SSD/B & SSD BRKT
、
Fig1
Electric screwdriver #1 1
Fig2 2
1
1.00 2018/3/20
12(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
HDD
1. Disconnect HDD FFC CNTR from M/B(Fig2) 2. Disassemble HDD from C Cover, (Fig1) 3. Disassemble HDD Bumper(6051B1243301)
Disassemble HDD
Fig1
OK NG NG
Fig2
Fig3
1.00 2018/3/20
13(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disconnect eDP Cable CNTR from M/B (Fig1)
2. Remove eDP cable(Fig1) 3. Disconnect ODD/B FFC CNTR
Disconnect EDP & ODD/B FFC CNTR
Fig1
Fig2
Fig3
1.00 2018/3/20
14(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Open the machine to 135degrees and place it on the fixture
2. Loosen Hinge screws M2.5x6*4 in the order 1 2 3 4
Disassemble Hinge hp
Fig2
Fig1
Support fixture 1
Electric screwdriver #1 1
Fig3
Fig4
1
2
3
4
1.00 2018/3/20
15(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disconnect FFC & Pick Button CNTR,(Fig1)
Disconnect pick button FFC CNTR
Fig1
1.00 2018/3/20
16(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disconnect TP PCB CNTR,(Fig1) 2. Disconnect KB BL FPC CNTR only for BL
SKU(Fig1)
Disconnect TP & KB backlight FFC
Fig2
Fig1
1.00 2018/3/20
17(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disconnect USB FFC CNTR, (Fig1) 2. Disconnect KB membrane CNTR上(Fig2)
Disconnect USB FFC&KB CNTR
Fig1
背膠
背膠
Fig2
1.00 2018/3/20
18(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Loosen FAN screw M2x3*2(Fig1) 2. Loosen MB screw M2x3*1(Fig2) 3. Loosen Hook screw M2x3*1(Fig.3)
Electric screwdriver #1 1
Loosen FAN /Hook screws
Fig1
Fig2
1
2
3
4
Fig3
1.00 2018/3/20
19(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disconnect Speaker Cable CNTR(Fig1) 2. Tear off the tape 3. Disconnect FAN CNTR(Fig2) 4. Disassemble Fan
Disconnect Speaker & FAN CNTR
Fig1
Fig2
1.00 2018/3/20
20(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Loosen Thermal Module screws (Fig1/2) M2*3(6052A0035101)*4 (UMA) M2*3(6052A0035101)*6 (Discrete) M2*3(6052A0035101)*4 (Fan-less) 2. Disassemble Thermal Module or Fan-
less BRKT (Fig2/Fig1)
Electric screwdriver #1 1
Loosen screws
Fig1
1
2
3
4
6
5
Fig2
1
2
3
4
1.00 2018/3/20
22(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Loosen M/B screws M2x3*4(Fig1)
Loosen MB screws
Fig1
1
2
4
3
Electric screwdriver #1 1
1.00 2018/3/20
23(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Fan-less SKU Tear off the Mylar(6054B2058101)(Fig1)
2. Disassemble DC-In Jack and M/B
Fig1
Fig1
缺口對齊
Disassemble MB 1.00 2018/3/20
24(1/1)
Standard Operation Procedure
Document No. : Harry Potter 17” (Snape / Dumbledor) FA SOP Station :
Name : Ver. : Date :
Step:
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard Qty
Notes : If finding anything uncommon, notice foreman or assistant at once.
Tabulator: Department: Lee Chung-Sheng NPSU-PIE Auditor : Chang Nevil
1. Disconnect USB/B FFC (Fig1)
2. Disconnect DC-in Cable
Disconnect USB/B FFC & DC-in cable
Fig1
6035B0184001 Cvilux
6035B0186001 玖東
Fig2
DC-in Cable FOXCONN(富士康) 6017B0738701
Singatron(信音) 6017B0738801
實盈 6017B0738901
TE(泰科) 6017B0739001
1.00 2018/3/20
25(1/1)