IntroductionGroutec is a mechanical splicing system with one threaded end designed for the connection of pre-cast concrete elements. Groutec splice comply with Eurocode 2, BS8110, ISO 15835, ACI 318 type 2, and AASHTO code requirements. Metric ribbed reinforcing bars of grades up to 600 MPa and ASTM deformed reinforcing bars of grades up to 80 ksi can be spliced with Groutec.
Splicing is usually done in two steps: the Groutec coupler is first screwed onto the reinforcement prepared at the precast factory, installed flush with the formwork, after which the element is concreted.
Groutec couplers have been designed to work with grouts commonly-available on the market place. Grouts must be non-shrink types, with a minimum compressive strength of 65 MPa.
Two alternative models are available. Groutec L has a wide body allowing for more tolerance for the connection of two precast elements.
Groutec S (slim body) can be used in compact applications such as slim panels or narrow columns.
Groutec has been tested with grouts from major manufacturers such as Sika, Parex-Davco, Fosroc and BASF, which have a worldwide distribution network. However, attention is raised to the fact that such cement-based products are often produced locally from local raw materials, and that their properties vary depending not only on their origin, but also on climate conditions.
For first-time users, we strongly recommend that prior tests be carried in order to confirm the suitability of the selected grout.
Email us at [email protected] for any assistance.
The connection is then completed at the construction site, where the precast element is positioned next to the adjacent element so that its protruding bars enter the cavities inside the Groutec couplers. The cavities are then filled with grout, either by gravity or by means of a grouting pump.
CAD & BIM
CAD & BIM tools to support design engineers in the drawing and modeling of structures are available in the download section of www.dextragroup.com
For designer tools support, contact us at: [email protected]
Typi
cal w
all c
onne
ctio
n
3 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Coupler dimensions
For one rebar diameter, different thread sizes are possible depending on whether BARTEC/FORTEC or ROLLTEC is used. It is threfore necessary to indicate the rebar diameter together with the system used to thread it (BARTEC / FORTEC or ROLLTEC).
Groutec is available in two versions:• Groutec L, which allows for larger misalignment tolerances thanks to a wide cavity.• Groutec S, which accomodates slim panels and narrow columns thanks a more compact design.
For both L and S models and all rebar diameters, the inlet & outlet holes are designed to fit with PE pipes (PE80/PN12.5) as per ISO 4427-2 and BS EN12201-2:2003 standards.
ModelBar size Thread
type Product codeA B C D E F
mm US mm mm mm mm mm mm
Gro
utec
L
12 #4
Bartec Fortec
FPPC1214201 73 44 182
25 20
61
16 #5 FPPC1620251 73 44 182 61
20 #6 FPPC2024301 77 48 195 65
25 #8 FPPC2530351 80 50 220 68
28 #9 FPPC2833351 93 62 290 81
32 - FPPC3236401 93 62 290 81
36 - FPPC3642451 107 72 340 95
40 - FPPC4045451 107 72 340 95
12 #4
Rolltec
FPPC1213153 73 44 182
25 20
61
16 - FPPC1617173 73 44 182 61
20 - FPPC2021203 77 48 195 65
22 - FPPC2224303 77 48 195 65
25 - FPPC2526253 80 50 220 68
28 #9 FPPC2829303 93 62 290 81
32 #10 FPPC3233303 93 62 290 81
36 - FPPC3637301 107 72 340 95
40 FPPC4041303 107 72 340 95
Groutec S» Slim outside diameter «
Groutec L« Large tolerance »
C
D
E
B
AF
Table 1: Dimensions of Groutec L couplers.
4 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
ModelBar size Thread
type Product codeA B C D E F
mm US mm mm mm mm mm mm
Gro
utec
S
12 #4
Bartec Fortec
FPPC1214207 52 25 155
25 20
39
14 - FPPC1216207 52 25 155 39
16 #5 FPPC1620257 57 30 184 44
18 - FPPC1622257 57 30 184 44
20 #6 FPPC2024307 61 34 204 48
22 #7 FPPC2027307 61 34 204 48
25 #8 FPPC2530357 67 40 240 55
28 #9 FPPC3233357 80 50 310 68
32 - FPPC3236407 80 50 310 68
36 - FPPC4042457 95 60 377 83
40 - FPPC4045457 95 60 377 83
12 #4
Rolltec
FPPC1213157 52 25 155
25 20
39
14 - FPPC1215177 52 25 155 39
- #5 FPPC1216207 52 25 155 39
16 - FPPC1617177 57 30 184 44
18 - FPPC1619257 57 30 184 44
19 #6 FPPC2020257 61 34 204 48
20 - FPPC2021207 61 34 204 48
22 - FPPC2024307 61 34 204 48
24 #8 FPPC2525257 67 40 240 55
25 - FPPC2526257 67 40 240 55
26 FPPC2527307 67 40 240 55
28 #9 FPPC3229307 80 50 310 68
32 #10 FPPC3233307 80 50 310 68
36 - FPPC4037307 95 60 377 83
40 - FPPC4041307 95 60 377 83
Table 2: Dimensions of Groutec S couplers.
B
C
D
E
AF
5 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Note *: The weight of the crates may vary depending on ambient humidity.
ModelBar size
Thread type Product code Quantity(pcs)
Unit weight (kg)
Net weight (kg)
Gross weight* (kg)mm US
Gro
utec
L
12 #4
Bartec Fortec
FPPC1214201 500 1.5 750 800
16 #5 FPPC1620251 200 1.5 300 350
20 #6 FPPC2024301 400 1.8 720 770
25 #8 FPPC2530351 300 2.4 720 770
28 #9 FPPC2833351 200 4.3 860 925
32 - FPPC3236401 100 4.3 430 495
36 - FPPC3642451 125 6.7 838 903
40 - FPPC4045451 125 6.7 838 903
12 #4
Rolltec
FPPC1213153 500 1.5 750 800
16 - FPPC1617173 500 1.5 750 800
20 - FPPC2021203 400 1.8 720 770
22 - FPPC2224303 400 1.8 720 770
25 - FPPC2526253 200 2.4 480 530
28 #9 FPPC2829303 200 4.3 860 925
32 #10 FPPC3233303 200 4.3 860 925
36 - FPPC3637301 125 6.7 838 903
40 - FPPC4041303 125 6.7 838 903
Packing
Groutec products are packed in wooden crates that can be lifted by a forklift. All products must be stored under a roof and protected from the elements.
Please ensure that order quantities are a multiple of the packaging quantities stated in the table.
Table 3: Packing of Groutec L couplers.
6 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
ModelBar size
Thread type Product code Quantity(pcs)
Unit weight(kg)
Net weight (kg)
Gross weight* (kg)mm US
Gro
utec
S
12 #4
Bartec Fortec
FPPC1214207 200 0.8 160 185
14 - FPPC1216207 200 0.8 160 185
16 #5 FPPC1620257 200 1.1 220 245
18 - FPPC1622257 200 1.1 220 245
20 #6 FPPC2024307 250 1.3 325 364
22 #7 FPPC2027307 250 1.3 325 364
25 #8 FPPC2530357 200 1.9 380 419
28 #9 FPPC3233357 150 3.7 555 603
32 - FPPC3236407 150 3.7 555 603
36 - FPPC4042457 100 7 700 748
40 - FPPC4045457 100 7 700 748
12 #4
Rolltec
FPPC1213157 200 0.8 160 185
14 - FPPC1215177 200 0.8 160 185
- #5 FPPC1216207 200 0.8 160 185
16 - FPPC1617177 200 1.1 220 245
18 - FPPC1619257 200 1.1 220 245
19 #6 FPPC2020257 250 1.3 325 364
20 - FPPC2021207 250 1.3 325 364
22 - FPPC2024307 250 1.3 325 364
24 #8 FPPC2525257 200 1.9 380 419
25 - FPPC2526257 200 1.9 380 419
26 - FPPC2527307 200 1.9 380 419
28 #9 FPPC3229307 150 3.7 555 603
32 #10 FPPC3233307 150 3.7 555 603
36 - FPPC4037307 100 7 700 748
40 - FPPC4041307 100 7 700 748
Table 4: Packing of Groutec S couplers.
7 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Components necessary for the use of Groutec couplers
Item No. Description Standard scope of supply
Optional items available upon
request
1 Groutec coupler x
2 Inlet plug x x
3 Outlet plug x x
4 Dust protection cap x x
5 Coupler protection cap x
6 Inlet pipe plug (pre-casting phase) x
7 Outlet pipe plug (pre-casting phase) x
8 Inlet Coupler plastic cap plug (grouting phase) x
9 Outlet Coupler plastic cap plug (grouting phase) x
10 Sealing disc x
11 Formwork positioner (screw type) x
12 Formwork positioner (magnetic type) x
#5 Coupler protection cap
#9 Outlet pipe plug (grouting phase)
#8 Inlet plug (grouting phase)
Inlet pipe (by others)
#11 Formwork positioner (screw type)
#10 Sealing disc
#12 Formwork positioner(magnetic type)
Outlet pipe (by others)
#1 Groutec coupler
#3 Outlet plug
#2 Inlet plug
#4 Dust protection cap
#6 Inlet pipe plug (pre-casting phase)
#7 Outlet pipe plug (pre-casting phase)
Table 5: Components neccessary for the use of Groutec couplers
8 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Items which are delivered with the couplers
Optional items available upon request
Bar size Coupler Protection Cap (#5)Sealing
disc (#10)mm US Bartec & Fortec
threadsRolltec threads
12 #4 GMEC0002808 GMEC0010919 GMEC0900143
14 - GMEC0002816 GMEC0010920 GMEC0900143
16 #5 GMEC0002818 GMEC0002817 GMEC0900147
18 - GMEC0002819 GMEC0900071 GMEC0900147
19#6
- GMEC0002818 GMEC0900153
20 GMEC0002820 GMEC0002819 GMEC0900153
22 #7 GMEC0002821 GMEC0900072 GMEC0900153
24#8
- GMEC0010959 GMEC0900145
25 GMEC0002822 GMEC0002821 GMEC0900145
26 - - GMEC0900073 GMEC0900145
28 #9 GMEC0002823 GMEC0002822 GMEC0900142
32 #10 GMEC0002824 GMEC0002823 GMEC0900154
36 - GMEC0002826 GMEC0009180 GMEC0900154
40 - GMEC0002827 GMEC0002826 GMEC0900141
Bar size(mm)
Inlet pipe plug (grouting phase) (#8)
Outlet pipe plug (grouting phase) (#9)
All models GACC2090002 GACC2090001
ModelBar size Formwork Positioner Dust
ProtectionCap (#4)mm US Screw type
(#11)Magnetic type
(#12)
Gro
utec
L
12 #4 GACC2090046 GACC2090012 GACC0990009
16 #5 GACC2090046 GACC2090012 GACC0990009
20 #6 GACC2090033 GACC2090013 GACC0990010
22 - GACC2090033 GACC2090013 GACC0990010
25 #8 GACC2090033 GACC2090014 GACC0990006
28 #9 GACC2090034 GACC2090015 GACC0990001
32 #10 GACC2090034 GACC2090015 GACC0990001
36 - GACC2090047 GACC2090016 GACC0990002
40 - GACC2090047 GACC2090016 GACC0990002
Gro
utec
S
12 #4 GACC2090027 - GACC0990018
14 - GACC2090027 - GACC0990018
16 #5 GACC2090028 GACC2090051 GACC0990019
18 - GACC2090028 GACC2090051 GACC0990019
19#6
GACC2090029 GACC2090052 GACC0990020
20 GACC2090029 GACC2090052 GACC0990020
22 #7 GACC2090029 GACC2090052 GACC0990020
24,25,26 #8 GACC2090030 GACC2090053 GACC0990021
28 #9 GACC2090033 GACC2090054 GACC0990006
32 #10 GACC2090033 GACC2090054 GACC0990006
36 - GACC2090034 GACC2090055 GACC0990001
40 - GACC2090034 GACC2090055 GACC0990001
Bar size(mm)
Inlet plug (#2)
Outletplug (#3)
All models GACC0990011 GACC0990012
#3 Outlet plug
#2 Inlet plug
#4 Dust protection cap
#1 Grouteccoupler
Bar size(mm)
Outlet pipe plug (pre-casting phase) (#7)
Inlet pipe plug (pre-casting phase) #6)
All models GMEC0002820 GMEC0900071
#5 Coupler Protection Cap
#9 Outlet pipe plug (grouting phase)
#8 Inlet pipe plug (grouting phase)
Inlet pipe (by others)
#11 Formwork positioner(screw type)
#10 Sealing disc
#12 Formwork positioner(magnetic type)
Outlet pipe (by others)
#1 Groutec coupler
#3 Outlet plug
#2 Inlet plug#4 Dust
protection cap
#7 Outlet pipe plug (pre-casting phase)
#6 Inlet pipe plug (pre-casting phase)
Table 6: Codes of Coupler Protection Caps and Sealing disc for Groutec L & S.
Table 7: Codes of Formwork Positioner & Dust protection caps for Groutec L & S.
Table 8: Codes of Inlet plug & Outlet plug for Groutec L & S.
Table 9: Codes of Inlet pipe plug & Outlet pipe plug (grouting phase) for Groutec L & S.
Table 10: Codes of Outlet pipe plug & Inlet pipe plug (pre-casting phase) for Groutec L & S.
9 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
How to determine the rebar cutting length?
Protruding length (P) Embedment length (E) + Sealing mortar height (M)
Cutting length after threading Element height + Sealing mortar height (M) + E – L + Thread engagement (T)
Standard splicing
ModelBar size Product
Code
L E min E max T
mm US (mm) (mm) (mm) (mm)
Gro
utec
L
12 #4 FPPC1214201 182 140 155 15
16 #5 FPPC1620251 182 145 155 22
20 #6 FPPC2024301 195 150 160 27
25 #8 FPPC2530351 220 165 180 33
28 #9 FPPC2833351 290 225 240 35
32 - FPPC3236401 290 225 240 39
36 - FPPC3642451 340 270 285 45
40 - FPPC4045451 340 270 285 48
Gro
utec
S
12 #4 FPPC1214207 155 115 130 15
14 - FPPC1216207 155 115 130 17
16 #5 FPPC1620257 184 140 155 22
18 - FPPC1622257 184 140 155 23
20 #6 FPPC2024307 204 150 170 27
22 #7 FPPC2027307 204 150 170 33
25 #8 FPPC2530357 240 170 200 33
28 #9 FPPC3233357 310 230 260 35
32 - FPPC3236407 310 230 280 39
36 - FPPC4042457 377 280 320 45
40 - FPPC4045457 377 280 320 48
Bartec Fortec Thread - Standard Splice
This is the standard case when Groutec connected by thread and by grout are of the same diameter.
Embedment length (E)
Body length (L)
TM
Element height
Note: The above calculations assume that the sealing mortar height (M) is the same between each concrete element.
Marketing | Fill space with photo
Rebar length after threading
Table 11: Dimensions of Bartec Fortec thread Standard Slices for Groutec L & S.
Protruding length (P)
10 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
ModelBar size Product
CodeL E min E max T
mm US (mm) (mm) (mm) (mm)
Gro
utec
L
12 #4 FPPC1213153 182 140 155 19
16 - FPPC1617173 182 145 155 23
20 - FPPC2021203 195 150 160 28
22 - FPPC2224303 195 150 160 30
25 - FPPC2526253 220 165 180 33
28 #9 FPPC2829303 290 225 240 33
32 #10 FPPC3233303 290 225 240 43
36 - FPPC3637301 340 270 285 43
40 - FPPC4041303 340 270 285 50
Gro
utec
S
12 #4 FPPC1213157 155 110 130 19
14 - FPPC1215177 155 115 130 20
#5 FPPC1216207 155 115 130 23
16 - FPPC1617177 184 140 155 23
18 - FPPC1619257 184 140 155 25
19 #6 FPPC2020257 204 150 170 28
20 - FPPC2021207 204 150 170 28
22 - FPPC2024307 204 150 170 30
24 #8 FPPC2525257 240 170 200 33
25 - FPPC2526257 240 170 200 33
26 - FPPC2527307 240 170 200 33
28 #9 FPPC3229307 310 230 260 33
32 #10 FPPC3233307 310 230 280 43
36 - FPCC4037307 377 280 320 43
40 - FPPC4041307 377 280 320 50
Rolltec Thread - Standard Splice
Table 12: Dimensions of Rolltec thread Standard Slices for Groutec L & S.
11 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Transition splicing
Protruding length (P2) = E2 + (M) Sealing mortar height Protruding length (P3) = E3 + (M) Sealing mortar height
Protruding length (P1) = E1 + (M) Sealing mortar height Protruding length (P4) = E4 + (M) Sealing mortar height
Rebar length after threading (Lc1) = h2 + P1 - L2 + T2 Rebar length after threading (Lc3) = h3 + P4 - L3 + T3
Note: The above calculations assume that the sealing mortar height (M) is the same between each concrete element.-
This is the case when the bar inserted in the cavity is of a diameter different from the one on the threaded side.Connection of precast members reinforced with bars of different diameters can be made in two options :
1) Small diameter rebar threaded connection and large diameter rebar grouted connection.
2) Large diameter rebar threaded connection and small diameter rebar grouted connection.
If multiple concrete elements are assembled, embedment lengths may vary: E1 ≠ E2. Extra care should be taken in the design to ensure thedimensions of the correct coupler are taken into account.
Pro
trudi
ng le
ngth
(P1)
Ele
men
t hei
ght (
h2)
Em
bedm
ent
leng
th (E
1)
M
Coupler #1
T2
Coupler #2
Bod
y le
ngth
(L4)
Em
bedm
ent l
engt
h(E
4)
Pro
trudi
ng le
ngth
(P4)
Coupler #4
Ele
men
t hei
ght (
h3)
Coupler #3
Small diameter rebar threaded connection and large diameter rebar grouted connection See Table 13 & 14 for applicable dimensions
Large diameter rebar threaded connection and small diameter rebar grouted connection See Table 15 & 16 for applicable dimensions
Reb
ar l
engt
h af
ter t
hrea
ding
(Lc1
)
T3
Reb
ar le
ngth
afte
r thr
eadi
ng (L
c3)
Ele
men
t hei
ght (
h2)
T1
Bod
y le
ngth
(L1)
Bod
y le
ngth
(L2)
Em
bedm
ent
leng
th (E
2)
Pro
trudi
ng le
ngth
(P2) E
lem
ent h
eigh
t (h4
)
Pro
trudi
ng le
ngth
(P3)
T4E
mbe
dmen
t len
gth
(E3)
Body
leng
th (L
3)
MM
M
12 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
This is the case when the bar inserted in the cavity is of a diameter different from the one on the threaded side.Connection of precast members reinforced with bars of different diameters can be made in two options :
1) Small diameter rebar threaded connection and large diameter rebar grouted connection.
2) Large diameter rebar threaded connection and small diameter rebar grouted connection.
If multiple concrete elements are assembled, embedment lengths may vary: E1 ≠ E2. Extra care should be taken in the design to ensure thedimensions of the correct coupler are taken into account.
13 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Small diameter rebar threaded connection and large diameter rebar grouted connection / Injection grouting.
Model Type of thread
Rebar diameter
Product Code
L(mm)
E min(mm)
E max(mm)
T(mm)Larger bar (grouted) Smaller bar
(threaded)
mm (US) mm (US)
Gro
utec
L
Bartec Fortec
14,16,18,20 #5, #6 12 #4 FPPC1214201 182 140 155 15
18,20 - 16 #5 FPPC1620251 182 145 155 22
22,25 #7,#8 20 #6 FPPC2024301 195 150 160 27
28,32 #9,#10 25 #8 FPPC2530351 220 165 180 33
32,36,40 #10,#11 28 #9 FPPC2833351 290 225 240 35
36,40 - 32 - FPPC3236401 290 225 240 39
40 - 36 - FPPC3642451 340 270 285 45
Rolltec
14,16,18,20 #5, #6 12 #4 FPPC1213153 182 140 155 19
18,20 - 16 - FPPC1617173 182 145 155 23
22,25 - 20 - FPPC2021203 195 150 160 28
28,32 - 25 - FPPC2526253 220 165 180 33
32,36,40 #10,#11 28 #9 FPPC2829303 290 225 240 33
36,40 #11 32 #10 FPPC3233303 290 225 240 43
40 36 - FPPF3637301 340 270 285 43
Transition splicing
Table 13: Dimensions of Small diameter rebar threaded connection and large diameter rebar grouted connection (Injection gouting) for Groutec L.
T
L
E max
E min
14 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Model Type of thread
Rebar diameter
Product Code
L(mm)
E min(mm)
E max(mm)
T(mm)
Larger bar (grouted) Smaller bar (threaded)
mm (US) mm (US)
Gro
utec
S
Bartec Fortec
14 #5 12 #4 FPPC1214207 155 110 130 15
18,20 #6 16 #5 FPPC1620257 184 140 155 22
20 - 18 - FPPC1622257 184 140 155 23
22,25 #7 20 #6 FPPC2024307 204 150 170 27
25 #8 22 #7 FPPC2027307 204 150 170 33
28 #9 25 #8 FPPC2530357 240 170 200 33
32,36 #10 28 #9 FPPC3233357 310 230 260 35
36 - 32 - FPPC3236407 310 230 280 39
40 - 36 - FPPC4042457 377 280 320 45
Rolltec
14 - 12 - FPPC1213157 155 110 130 19
18,20 - 16 - FPPC1617177 184 140 155 23
20 - 18 - FPPC1619257 184 140 155 25
- #7 - #6 FPPC2020257 204 150 170 28
22,25 - 20 - FPPC2021207 204 150 170 28
28 #9 24 #8 FPPC2525257 240 170 200 33
28 - 25 - FPPC2526257 240 170 200 33
28 - 26 - FPPC2527307 240 170 200 33
32, 36 #10 28 #9 FPPC3229307 310 230 260 33
36 #11 32 #10 FPPC3233307 310 230 280 43
40 36 - FPPC4037307 377 280 320 43
Table 14: Dimensions of Small diameter rebar threaded connection and large diameter rebar grouted connection (Injection gouting) for Groutec S.
15 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Model Type of thread
Rebar diameter
Product Code
L(mm)
E min(mm)
E max(mm)
T(mm)
Larger bar (threaded) Smaller bar (grouted)
mm (US) mm (US)
Gro
utec
L
Bartec Fortec
12 #4 10 #3 FPPC1214201 182 140 155 15
16 #5 12,14 #4 FPPC1620251 182 145 155 22
20 #6 16,18 #4,#5 FPPC2024301 195 150 160 27
25 #8 20,22 #6,#7 FPPC2530351 220 165 180 33
28 #9 20,25 #7,#8 FPPC2833351 290 225 240 35
32 - 25,28 - FPPC3236401 290 225 240 39
40 - 25, 28,32,36 - FPPC4045451 340 270 285 48
Rolltec
12 #4 10 #3 FPPC1213153 182 140 155 19
16 - 12,14 - FPPC1617173 182 145 155 23
20 - 16,18 - FPPC2021203 195 150 160 28
22 - 16,18,20 - FPPC2224303 195 150 160 30
25 - 20,22 - FPPC2526253 220 165 180 33
28 #9 20,25 #7,#8 FPPC2829303 290 225 240 33
32 #10 25,28 #8,#9 FPPC3233303 290 225 240 43
36 - 28, 32 - FPPC3637301 340 270 285 43
40 - 25,28,32,36 FPPC4041303 340 270 285 50
Large diameter rebar threaded connection and small diameter rebar grouted connection / Gravity grouting.
Transition splicing
Table 15: Dimensions of Large diameter rebar threaded connection and small diameter rebar grouted connection (Gravity gouting) for Groutec L.
L
E min
T
E max
16 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Model Type of thread
Rebar diameter
Product Code
L(mm)
E min(mm)
E max(mm)
T(mm)
Larger bar (threaded) Smaller bar (grouted)
mm (US) mm (US)
Gro
utec
S
Bartec Fortec
12 #4 10 #3 FPPC1214207 155 110 130 15
14 - 10,12 - FPPC1216207 155 115 130 17
16 #5 12,14 #4 FPPC1620257 184 140 155 22
18 - 12,14,16 - FPPC1622257 184 140 155 23
20 #6 16,18 #4,#5 FPPC2024307 204 150 170 27
22 #7 16,18,20 #5,#6 FPPC2027307 204 150 170 33
25 #8 20,22 #6,#7 FPPC2530357 240 170 200 33
28 #9 20,25 #7,#8 FPPC3233357 310 230 260 35
32 - 25,28 - FPPC3236407 310 230 280 39
36 - 32 - FPPC4042457 377 280 320 45
40 - 32,36 - FPPC4045457 377 280 320 48
Rolltec
12 #4 10 #3 FPPC1213157 155 110 130 19
14 - 10,12 - FPPC1215177 155 115 130 20
16 - 12,14 - FPPC1617177 184 140 155 23
18 - 12,14,16 - FPPC1619257 184 140 155 25
- #6 - #4,#5 FPPC2020257 204 150 170 28
20 - 16,18 - FPPC2021207 204 150 170 28
25 - 20,22 - FPPC2526257 240 170 200 33
26 - 20, 22 - FPPC2527307 240 170 200 33
28 #9 25,22, 20 #6, #7,#8 FPPC3229307 310 230 260 33
32 #10 25,28 #8,#9 FPPC3233307 310 230 280 43
36 - 28, 32 - FPPC4037307 377 280 320 43
40 - 32,36 - FPPC4041307 377 280 320 50
Large diameter rebar threaded connection and small diameter rebar grouted connection / Gravity grouting.
Table 16: Dimensions of Large diameter rebar threaded connection and small diameter rebar grouted connection (Gravity gouting) for Groutec S.
17 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
A. Connect the coupler to the bar
1. Check from the coupler marking that the coupler (#1) corresponds to the bar size.
2. Remove the Thread Protection Cap from the threaded bar (if any) and the Coupler Protection Cap (#5, if any).
3. Inspect the threads of both the bar end and the coupler (#1). Clean any rust or dirt with a wire brush. Make sure that the provider of bars has made their threads in compliance with the ‘Type A’ tolerances from Dextra’s Bar-end preparation Quality Manual.
4. Screw the coupler (#1) onto the threaded bar until until snug fit. Check with a measure ruler that the depth of the coupler cavity is not less than the value Emin specified at pages 8 & 9.
B1. If no positioner is used1. If no positioner is used, make sure that the
Dust Protection Cap (#4) is present and tight. Position coupler flush with formwork.
2. Rotate coupler so that holes face the right direction. Tightly lock coupler together with the reinforcement by the use of wires.
B2. If formwork can be drilled3. Install the screw type positioner (#11)
through the formwork at the correct location. Rotate coupler so that holes face the right direction.
4. Then fit the coupler and bar onto the positionner (#11).
5. Finally tighten the positioner by the use of the locknut (#11) to firmly lock the assembly.
B3. If steel formwork is used1. Lock the magnetic type positioner (#12)
inside the coupler (#1) first, 2. Pre-position coupler and bar onto the
formwork at the correct position, rotate accordingly so that holes face the right direction.
3. Tightly lock coupler together with the reinforcement by the use of wires.
C. Install the inlet and outlet pipes
If the couplers are intended to be filled by gravity pouring, skip this part.
1. For each coupler, make sure that the inlet and outlet pipes have the proper length to reach the internal face of the formwork at the desired location.
2. Remove the plugs (#2, #3) and insert the pipes into the coupler holes. A mallet may be used to facilitate insertion. At this stage, it should not be possible to remove the pipes by hand anymore.
3. Check that there is no gap between the pipes and their holes. Use any kind of sealant or glue to close any gap.
4. Close the opposite end of both pipes with inlet/outlet pipe plug (#6, #7) or adhesive tape.
5. Check that the pipe plugs (#6, #7) are tight enough so that they won’t fall off during handling.
Rebar with threaded end
#5 Coupler protection cap
Thread protection cap
#9 Outlet pipe plug (grouting phase)
#8 Inlet plug (grouting phase)
Inlet pipe (by others)
#11 Formwork positioner (screw type)
#10 Sealing disc
#12 Formwork positioner(magnetic type)
Outlet pipe (by others)
#1 Groutec coupler
#3 Outlet plug
#2 Inlet plug
#4 Dust protection cap
#6 Inlet pipe plug (pre-casting phase)
#7 Outlet pipe plug (pre-casting phase)
Installation procedure at the precast factory
18 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
D. Casting of the concrete element
1. Close the formwork.2. Check that the couplers (#1) are tightly fixed, so that vibration won’t
cause them to move.3. Check that the couplers (#1) are orthogonal to the formwork and that
no thread is visible between the coupler and the bar.4. Check that the inlet and outlet pipes are facing the direction that
is intended for their grout injection, that they are tightly fixed so that vibration won’t cause them to move, and that there is no gap between them and the coupler that could allow cement paste to penetrate into the coupler.
5. Check that the Dust Proteciton Cap (#5) (or the Groutec positioner, #11 or #12) and the pipe plugs (#6, #7) are flush with the formwork, and that they are tight enough to prevent cement paste penetrating into the coupler.
6. Mark the location of all couplers (#1) and their inlet and outlet pipes on the external face of the formwork.
7. Check the length of reinforcing bar that emerges from the formwork on the opposite side (taking into account the thickness of the formwork). Make sure it is within the minimum embedment length and maximum protrusion length specified on page 5.
8. Pour the concrete, making sure not to displace any pipes.v
E. Formwork removal & inspection
1. Once the concrete is cured, remove the formwork and locate all couplers (#1).
2. Remove the Dust Protection Cap (#5), positioners (#11, #12) and pipe plugs (#8, #9) and check that no cement paste has penetrated.
3. Immediately clean any unwanted material by water. 4. After inspection, seal with grouting plugs (#8, #9).
OUTLETINLET
Rebar with threaded end
Groutec coupler (#1)
Groutec positioner (screw type) (#9)
Formwork
Groutec installation in wooden formworkNote: pipes may face upwards or downwards flush with formwork depending on prefered production method.
OUTLETINLET
Rebar with threaded end
Groutec coupler (#1)
Magnetic positioner (inside) (#10)
Formwork
Groutec installation in steel formworkNote: pipes may face upwards or downwards flush with formwork depending on prefered production method.
F. Formwork
Drill diameter for Positioner screw type
Drill diameter
Formwork
Model Positioner screw type
Drill diameter Model Positioner
screw typeDrill
diameter
Gro
utec
L
12 #4 9/16” or 14 mm
Gro
utec
S
12 #4 7/16” or 11 mm16 #5 14 -
20 #6
11/16” or 17 mm
16 #5
9/16” or 14 mm
18 -
22 - 19 #6
25 #820
22 #7
28 #9 24,25,26 #8
32 #1028 #9
11/16” or 17 mm
32 #10
36 - 36 -
40 - 40 -
Table 17: Drill diameter of Positioner screw type for Groutec L & S.
19 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Pipe placement dataW = distance from center of couplers to concrete face Pipe Length = W - R
ModelBar size R
(mm)S
(mm)Y
(mm)mm US
Gro
utec
L
12 #4 28 29 115
16 #5 28 29 115
20 #6 30 34.5 120
22 - 30 34.5 120
25 #8 30 28.5 145
28 #9 38 40 195
32 #10 38 40 195
36 - 45 40.5 238
40 - 45 40.5 238
Gro
utec
S
12 #4 19 27 95
14 - 19 27 95
16 #5 22 32 115
18 - 22 32 115
19 #6 24 33 129
20 24 33 129
22 #7 24 33 129
24 - 27 40 152
25 #8 27 40 152
26 - 27 40 152
28 #9 34 40 212
32 #10 34 40 212
36 - 41 40 272
40 - 41 40 272
OU
TIN
Y
S
R
W
Pipe length
Example of pipes placement
Case where it is possible to proceed with grout injection from any side of the precast element.
Case where access is limited and grout injection must be performed from one side only.
Table 18: Dimensions of Pipe placement for Groutec L & S.
20 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
ModelBar size R
(mm)S
(mm)Y
(mm)mm US
Gro
utec
L
12 #4 28 29 115
16 #5 28 29 115
20 #6 30 34.5 120
22 - 30 34.5 120
25 #8 30 28.5 145
28 #9 38 40 195
32 #10 38 40 195
36 - 45 40.5 238
40 - 45 40.5 238
Gro
utec
S
12 #4 19 27 95
14 - 19 27 95
16 #5 22 32 115
18 - 22 32 115
19 #6 24 33 129
20 24 33 129
22 #7 24 33 129
24 - 27 40 152
25 #8 27 40 152
26 - 27 40 152
28 #9 34 40 212
32 #10 34 40 212
36 - 41 40 272
40 - 41 40 272
Table 18: Dimensions of Pipe placement for Groutec L & S.
Special case of removable pipes
In case the formwork can be drilled to let the pipes go through, letting them protrude at least 30cm out of the formwork may permit to pull them out after the concrete has set. The grout injection can then be done through the holes left in the concrete, but larger pipe plugs are then necessary.
Form
wor
k w
idth
P
rotru
dein
d le
ngth
> 3
0 cm
Special case of flexible hoses
In case flexible hoses are preferred, cut the PVC pipes short so that they fit with the flexible hose without being loose. Select hoses that can be bent without any dent, like polyester- or steel wire-reinforced hoses.
21 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Installation procedure at the construction site1. Vertical applications – By injection
A. Prepare the foundation/bottom element
1. Compare the dimensions of the foundation with the drawings. Make sure that any misalignment is within the tolerances allowed.
2. Check that the protruding lengths of the rebars are within the range given in chapter 1.2 of this document.
3. Clean the protruding bars of any cement or dirt.4. Make sure that the surface of the foundation is clean. Sweep out any
dust and residues.5. Put the sealing discs over the top of the protruding rebars and
push them down by 2.5 to 5 cm (1 to 2 inches) from the bar ends.
6. Ensure that the sealing discs are not in contact with the foundation before installation.
B. Install the top panel
1. Select the panel to install and check that the protruding lengths of its bars are also within the range given in chapter 1.2.
2. Lift the panel and position it on top of the foundation.3. Check that the cavities inside the Groutec couplers are clean
(Rust is no problem). Clean them with compressed air if necessary.4. Prepare the bedding mortar and place the shim plates on the top of
the foundation as required.5. Lower the panel down and check its verticality with a spirit level.
6. Once the bedding mortar has hardened, inject cement grout into the Groutec couplers.
Sealing disc 2.5 to 5 cm (1 to 2 inches)
22 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
2. Vertical applications – By gravity
A. Prepare the foundation/bottom element
1. Compare the dimensions of the foundation with the drawings. Make sure that any misalignment is within the tolerances allowed.
2. Remove the dust protection caps from the Groutec couplers and check that the coupler cavities are clean. (Rust is no problem) Clean them with compressed air if necessary.
3. Make sure that the surface of the foundation is clean. Sweep out any dust and residues.
B. Install the top element
1. Select the top element to install and check that the protruding lengths of its bars are within the range given in chapter 1.2.
2. Lift the element and position it on top of the foundation.3. Prepare the formwork around the grouting area.4. Put the bedding mortar and place the shim plates on top of the foundation as required.5. Pour the grout into the Groutec couplers, up to the level L shown in the table of page 11.6. Lower the element down and check its verticality.7. Clean the excess grout after installation.
Sealing Mortar
Bedding Mortar
Shim Formwork
23 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
3. Horizontal applications – by injection
A. Prepare the precast elements
1. Compare the dimensions of the precast elements to the drawings. Make sure that any misalignment is within the tolerances allowed.
2. Check that the protruding lengths of the rebars are within the range given in chapter 1.2 of this document.
3. Check that the cavities inside the Groutec couplers are clean (Rust is no problem). Clean them with compressed air if necessary.
4. Make sure that the surfaces of both elements are clean. Wipe out any dust and residues.
B. Install the sealing discs
1. Put the sealing discs over the top of the protruding rebars and push them down by 1”- 2” (2.5 to 5 cm) from the bar ends.
2. Make sure that the sealing discs are not in contact with the concrete face.
C. Connect the 2 elements
1. Lift the second concrete element and position it in front of the first element.
2. Move the sealing discs completely against the mouth of the Groutec couplers.
3. Push the second element to its final position against the first element.4. Check the level and alignment of both elements.5. Prepare the formwork around the grouting area.6. Put bedding mortar to seal the gap between the two elements.7. Once the bedding mortar has hardened, inject cement grout into the
Groutec couplers.
Sealing Disc
Sealing Disc
Pouring Area
Formwork
Mortar
Remove Formwork
A
C
D
B
Remark : Connections on site mut be done as per the correct Installation Procedure, as referenced in this document. They are available upon request or at www.dextragroup.com/downloads-bim.
24 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
4. Grout consumption
These figures of grout consumption are theoretical computations of the cavity inside the coupler.
For practical purpose they could be increased 15% in order to take into account :
1. The volume used in the inlet and outlet pipes.2. The volume used to join the two precast
elements.3. The volume that stays in the mixing tool.4. The volume that stays in the injection tool.5. Any other wastage.6. The effect of climatic conditions (Ambient
temperature, relative humidity, etc)7. The actual bar embedment length.
Model
Rebar size Theoretical volume of
grout required to fill a coupler
(ml)
Number of couplers per
mm US 25 kg/bag
Gro
utec
L
12 #4 275 42
16 #5 261 44
20 #6 307 38
22 - 296 39
25 #8 341 34
28 #9 707 16
32 #10 661 17
36 - 1,075 11
40 - 1,007 11
Gro
utec
S
12 #4 71 162
14 - 66 175
16 #5 110 105
18 - 102 113
19 #6 145 80
20 139 83
22 #7 228 50
24 214 54
25 #8 206 56
26 198 58
28 #9 435 26
32 #10 386 30
36 - 704 16
40 - 627 18
Standard splices
Table 19: Theoretical volume of grout for Standard splices Groutec L & S.
5. Grout recommendation
Dextra Groutec coupler can be used with standard non-shrink grouts meeting the following minimum specifications:
- Compressive strength : ≥ 65 MPa after 28 days as per ASTM C109 (50 mm cube)- Flowability: high flowability - Shrinkage: non-shrinking- Setting time ≥ 30 min
Note: Please contact your local Dextra representative to verify the performance of the selected grout.
25 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
6. Grouting process
A. Mixing
1. Make sure to strictly follow the work instructions provided by the grout manufacturer in the product datasheet and printed on the bag. Particularly, do not exceed the recommended water content. Always start with the median value of water content specified by the manufacturer.
2. Check the manufacturing expiry date of grouts before use. Do not use bags that are past their expiry date.
3. Do not use bags that have previously been opened or damaged. 4. Use mixers with a speed of not over 500 rpm to avoid the creation of
air bubbles inside the grout.5. In parallel, prepare the cube specimens (around 6 - 12 at a time) and
record the details such as date of preparation, testing date, batch no. of cement grout, water ratio, name or number of building, etc.
B. Grouting
1. Remove all residues from inside the coupler by water or air. In case you use water ensure that the couplers are dry before you start grouting .
2. Inject the cement grout by pump through the inlet hole.3. If the cement grout flows out from the outlet hole, then the inside of
the coupler is completely filled. 4. Tightly close the outlet hole with a pipe plug. Then inject more grout
during approx. 3 seconds. After that remove the injection valve and quickly close the inlet hole.
C. Bracing
1. You must install the bracing equipment before grouting.2. The fixing of the bracing equipment must be completed before the
grouted cement has hardened.3. You can remove the bracing equipment after grout strength has
been reached >30 MPa. The grout strength can be confirmed by tests on the grout sample specimens.
Outlet pipe plug #1
Inlet pipe plug #2
26 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Quality AssuranceGroutec couplers is manufactured according to strict technical specifications and under a production process that has been certified to satisfy to the ISO9001 and ASME NCA-3800 quality assurance standard.
Agency Certificate N°
The American Society of Mechanical Engineers QSC-706
Bureau Veritas TH010882
Products described in this document are warranted to be free from manufacturing defects and to perform in accordance with the manufacturer’s specifications providing that they are installed in accordance with our written instructions.
Approvals
DisclaimerAs a result of our continuous thrive for technological improvement, Dextra reserves its right to modify the contents of this specification sheet at any time without prior notice. In particular, various sources of raw materials may lead to variations in outside diameters. The information provided on this document, and any outside information linked to, is for guidance only.
Dextra products shall be installed and used only as indicated in Dextra’s documentation and training materials. Aforementioned documents are available at www.dextragroup.com and from your Dextra customer service representative. Improper installation, misuse, misapplication or other failure to completely follow Dextra’s instructions and warnings may cause product malfunction, property damage, serious bodily injury and death. Dextra cannot accept any liability in respect thereof.
Groutec mechanical splices has been approved by the most demanding international regulators:
Country Agency Certificate N°
IAPMO 312
ROMANIA Nr 003-01/135-2019
Dubai Municipality CL 17020493
Table 20: Quality assurance certifications
Table 21: Product certifications
27 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Topic Method Picture
1/ Inlet and/or Outlet port(s) do not reach the surface.
1. Check and mark the position of the ports according to the drawings.
2. Chip out the concrete at the marked positions to find the embedded ports.
3. Blow out the ports with air compressors or water and confirm that there is a clear passage from the inlet to outlet port.
2/ Due to dirt on the protruding rebar, the sealing disc gets stuck, slides into the coupler and reduces the gap of inlet port.
1. Try to clear the Inlet port by inserting a steel rod into it.
2. Follow step 3 of item 1.
3/ The sealing disc was forgotten, and the bedding mortar from the joint clogs the Inlet port.
1. Try to clear the Inlet port by inserting a steel rod into it.
2. Follow step 3 of item 1.
6/ Clogging has occurred inside the coupler.
1. Clean the inside with high pressure water.
2. After confirm a clear passage by blowing air through the ports, start re-grouting at about half the speed of normal operation.
7/ Protruding rebar is too close to the inlet and/or outlet port(s), restricting grout flow.
Insert e.g. a steel rod into the inlet or outlet port(s) and strike with sledge hammer to bend the rebar away from the ports and reduce restriction.
4/ Inlet and/or Outlet port(s) are clogged.
Due to debris etc.: Insert a steel rod into the port and hammer it to clean the port.
Due to plugs:
1. Use a hooked rod to scrape plugs out of the ports.
2. Repeat step 3 of item 1.
5/ Leakage during pumping of grout through the joint due to incomplete grouting of the joint.
1. Seal the joint with polyurethane, mortar, etc.
2. Clean the inside of coupler with water. (Preferably high pressure).
3. Confirm a clear passage by blowing air through the ports.
4. Re-grout.
Troubleshooting
28 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Example of inspection sheet
Inspection Sheet
ProjectLocationDate of GroutingDate of Inspection
AmbientDry Grout
Tempreture
Grout Cement
Mixing WaterMixed Grout
°C°C°C°C
Report By
Approved By
BrandModelBatch No.MFG DateEXP Date
Dextra
Coupler Size Q’ty/pcs. Plan Action Balance Remark
29 / 31| Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Quality assessment form
DM-QA-FR-81 Rev02
Where did it occur?Company name:Problem observed & Reported by:Project for which the production was done:
Details of Production Parameters
Bar used when the problem occurred:Dia: Grade:
Mill:
Threading parameterType of products Bartec Rolltec Griptec
Type of thread
Actual thread diameter mm M________ x ________pitch(measuring by vernier caliper)
GO gauge Can go Can not go
NO GO gauge Can go Can not go
Grouting
Cement & Sample preparationBrand of grout cement ModelBatch no. MFG date EXP date
Mixing ratio: Grout cement kgs Water ml
Mixing times mins Aging time days
Temperature(Surface) ˚C Temperature(Inside) ˚C
Slump test diameter mm
Water pH of water Temperature ˚C
Specimen Dimension cm Aging time days
Storage Temperature ˚C
Alignment For sample Alignment Mis-alignment
Filling method Gravity Injection
Tooling Mixer rpm
Assembly conditions
Coupler on which the problem occurred:Marking:Box No. :
Packaging Information (Sampling vs Box label)All couplers marking numbers are recorded in the box lableSome couplers marking numbers are not recorded in the box label
Other information (if have)
Steel mechanical testing report
Total samples length: meterWho prepared the samples:
Brittle DuctiteControl bar -
123
Please send back this form to Attn: QA Manager
DEXTRA MANUFACTURING CO., LTD.
191 Chalermprakiet Rama 9 Road Soi 48, Dokmai, Pravet, Bangkok 10250, Thailand.Tel: +66-23280211 Fax: +66-27262981
Groutec Quality Assessment Form
Item
Yield Strength
Tensile StrengthFailure mode (tick the boxes)
Bar Coupler
(MPa) (MPa)Thread cross Thread
pull outBar break
Cross section
Thread pull out
Groutec sample
30 / 31 | Product Datasheet | Groutec-PDS010-Rev.04_en November 2019
Commercial presence in more than 55 countries.
HEADQUARTERS THAILANDDextra Manufacturing Co., Ltd.Tel: (66) 2 021 2800 Fax: (66) 2 328 0374E-mail: [email protected]
HONG KONGDextra Pacific Ltd.Tel: (852) 2845 7766 / 2511 8236Fax: (852) 2586 1656 / 2519 0852E-mail: [email protected]
NORTH AMERICADextra America Inc.Tel: (1) 805 915 4734 / 818 261 5166E-mail: [email protected]
INDIADextra India Pvt. Ltd.Tel: (91) 22 2838 6294 / 22 2839 2694Fax: (91) 22 2839 2674E-mail: [email protected]
MIDDLE EASTDextra Middle-East FZETel: (971) 4886 5620 Fax: (971) 4886 5621E-mail: [email protected]
SOUTH AMERICADextra do BrasilTel: (55) 11 5505 2475 / 11 5505 2477E-mail: [email protected]
CHINADextra Building Products (Guangdong) Co., Ltd.Tel: (86) 20 2261 9901 Fax: (86) 20 2261 9902E-mail: [email protected]
EUROPEDextra Europe SARL.Tel: (33) 1 45 53 70 82 Fax: (33) 1 47 04 28 97E-mail: [email protected]
LATIN AMERICA Dextra LatamTel: (507) 6454 8100 / 831 1442E-mail: [email protected]
www.dextragroup.com
Gua
ngzh
ou
Hon
g K
ong
Mum
bai
São
Pau
lo
Pan
ama
Dub
ai
Par
is
Los
Ang
eles
Los
Ang
eles
Ban
gkok
Gro
utec
-PD
S-0
10 R
ev.0
4_en
Nov
embe
r 201
9