Producer Statement - PS1 - Design (Guidance notes on the use of this form are printed in the reverse side) ISSUED BY: Peter Ronald Boardman on behalf of Structure Design Ltd TO: ……………………………………………………………………………………………………………………………………… (Owner) TO BE SUPPLIED TO: ………………………………………………………………………….. (Territorial Authority) IN RESPECT OF: Load testing of Metro Frameless Glass Systems proprietary MB50 Double Disc Series Balustrade System with 10, 12, & 15mm TempaFloat TM Toughened Safety Glass to comply with the load requirements set out in AS/NZS 1170:2002 for Occupancy Types A, B, E & C3 as set out in Table 3.3 and ULS wind loads for maximum parameters as set out in design table: MFG Systems Design Table MB50 – MB50 Series Double Disc Balustrade System Structure Design Ltd has been engaged by Metro GlassTech (Design Firm) (Designer) to provide Monitoring of Testing & Confirmation of Design Load capacity in respect of the requirements of B1, B2, F2 & F4 of the New Zealand Building Code for PART ONLY as specified of the building work. The design has been prepared in accordance with B1/VM1 B2/AS1 F2/AS1 & F4/AS1 (Verification methods/ Acceptable solutions) (respectively) of the approved documents issued by the Department of Building & Housing and the work described on MFG Systems drawings titled and numbered MB50/C/RA, MB50/S/RN, MB50/T/RN & MB50/T/LS and the specifications and other documents according to which the balustrade is proposed to be constructed. As an independent Design Professional Covered by a current policy of Professional Indemnity Insurance to a minimum value of $200,000. I BELIEVE ON REASONABLE GROUNDS that subject to: (i) That the structure to which the Balustrade is fixed is designed by a suitably qualified person to resist the design loadings applied by the balustrade for the design occupancy type as set out in the design table. (ii) The hand rails shall be installed strictly in accordance with the fixing details listed above. (iii) Any installation not explicitly in accordance with the drawings listed above is excluded. the handrails, if constructed in accordance with the drawings, specifications, and other documents provided or listed in the attached schedule, will comply with the relevant provisions of the Building Code. I, Peter Ronald Boardman, am CPEng # 32199. I am a member of IPENZ NZIA and hold the following qualifications: BE (Civil) (Hons), FIPENZ. SIGNED BY: Peter Ronald Boardman ON BEHALF OF Structure Design Limited. DATE: 03/03/2011. Note: This statement shall only be relied upon by the Building Consent Authority named above. Liability under this statement accrues to the Design Firm only. The total maximum amount of damages payable arising from this statement and all other statements provided to the Building Consent Authority in relation to this building work, whether in contract, tort or otherwise (including negligence) is limited to the sum of $200,000*. This form is to accompany Form 2 of the Building (Forms) Regulations 2004 for the application of a Building Consent.

Upload: nguyenanh

Post on 17-Apr-2018

224 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Producer Statement - PS1 - Design · Producer Statement - PS1 - Design ... 6 Design loads are in accordance with AS/NZS 1170.1:2002 table 3.3 and NZBC B1/VM1

Producer Statement - PS1 - Design (Guidance notes on the use of this form are printed in the reverse side)

ISSUED BY: Peter Ronald Boardman on behalf of Structure Design Ltd

TO: ……………………………………………………………………………………………………………………………………… (Owner)

TO BE SUPPLIED TO: …………………………………………………………………………..

(Territorial Authority) IN RESPECT OF: Load testing of Metro Frameless Glass Systems proprietary MB50 Double Disc Series

Balustrade System with 10, 12, & 15mm TempaFloatTM Toughened Safety Glass to comply with the load requirements set out in AS/NZS 1170:2002 for Occupancy Types A, B, E & C3 as set out in Table 3.3 and ULS wind loads for maximum parameters as set out in design table:

MFG Systems Design Table MB50 – MB50 Series Double Disc Balustrade System

Structure Design Ltd has been engaged by Metro GlassTech (Design Firm) (Designer)

to provide Monitoring of Testing & Confirmation of Design Load capacity in respect of the requirements of B1, B2, F2 & F4 of the New Zealand Building Code for PART ONLY as specified of the building work. The design has been prepared in accordance with B1/VM1 B2/AS1 F2/AS1 & F4/AS1 (Verification methods/ Acceptable solutions) (respectively) of the approved documents issued by the Department of Building & Housing and the work described on MFG Systems drawings titled and numbered MB50/C/RA, MB50/S/RN, MB50/T/RN & MB50/T/LS and the specifications and other documents according to which the balustrade is proposed to be constructed. As an independent Design Professional Covered by a current policy of Professional Indemnity Insurance to a minimum value of $200,000. I BELIEVE ON REASONABLE GROUNDS that subject to:

(i) That the structure to which the Balustrade is fixed is designed by a suitably qualified person to resist the design loadings applied by the balustrade for the design occupancy type as set out in the design table.

(ii) The hand rails shall be installed strictly in accordance with the fixing details listed above. (iii) Any installation not explicitly in accordance with the drawings listed above is excluded.

the handrails, if constructed in accordance with the drawings, specifications, and other documents provided or listed in the attached schedule, will comply with the relevant provisions of the Building Code.

I, Peter Ronald Boardman, am CPEng # 32199. I am a member of IPENZ NZIA and hold the following qualifications: BE (Civil) (Hons), FIPENZ.

SIGNED BY: Peter Ronald Boardman ON BEHALF OF Structure Design Limited. DATE: 03/03/2011. Note: This statement shall only be relied upon by the Building Consent Authority named above. Liability under this statement accrues to the Design Firm only. The total maximum amount of damages payable arising from this statement and all other statements provided to the Building Consent Authority in relation to this building work, whether in contract, tort or otherwise (including negligence) is limited to the sum of $200,000*. This form is to accompany Form 2 of the Building (Forms) Regulations 2004 for the application of a Building Consent.

Page 2: Producer Statement - PS1 - Design · Producer Statement - PS1 - Design ... 6 Design loads are in accordance with AS/NZS 1170.1:2002 table 3.3 and NZBC B1/VM1

GUIDANCE ON USE OF PRODUCER STATEMENTS

Producer statements were first introduced with the Building Act 1992. The producer statements were developed by a combined task committee consisting of members of the New Zealand Institute of Architects, Institution of Professional

Engineers New Zealand, Association of Consulting Engineers New Zealand in consultation with the Building Officials

Institute of New Zealand. The original suite of producer statements has been revised at the date of this form as a

result of enactment of the Building Act (2004) by these organisations to ensure standard use within the industry.

The producer statement system is intended to provide Building Consent Authorities (BCAs) with reasonable grounds for the issue of a Building Consent or a Code Compliance Certificate, without having to duplicate design or construction

checking undertaken by others.

PS1 Design Intended for use by a suitably qualified independent design professional in circumstances where the BCA accepts a producer statement for establishing reasonable

grounds to issue a Building Consent;

PS2 Design Review Intended for use by a suitably qualified independent design professional where the BCA accepts an independent design professional’s review as the basis for establishing

reasonable grounds to issue a Building Consent;

PS3 Construction Forms commonly used as a certificate of completion of building work are Schedule 6 of NZS 3910:20031 or Schedules E1/E2 of NZIA’s SCC 2007 2

PS4 Construction Review

Intended for use by a suitably qualified independent design professional who undertakes construction monitoring of the building works where the BCA requests a producer

statement prior to issuing a Code Compliance Certificate.

This must be accompanied by a statement of completion of building work (Schedule 6).

The following guidelines are provided by ACENZ, IPENZ and NZIA to interpret the Producer Statement. Competence of Design Professional This statement is made by a Design Firm that has undertaken a contract of services for the services named, and is signed by a person authorised by that firm to verify the processes within the firm and competence of its designers.

Professional Services during Construction Phase There are several levels of service which a Design Firm may provide during the construction phase of a project (CM1CM5) 3 (OL1-OL4) 2 . The Building Consent Authority is encouraged to require that the service to be provided by the Design Firm is appropriate for the project concerned. Requirement to provide Producer Statement PS4 Building Consent Authorities should ensure that the

A competent design professional will have a professional qualification and proven current competence through

applicant is aware of any requirement for producer statements for the construction phase of building work at

registration on a national competencebased register, the time the building consent is issued as no design

either as a Chartered Professional Engineer (CPEng) or a professional should be expected to provide a producer

Registered Architect. statement unless such a requirement forms part of the

Membership of a professional body, such as the Institution of Professional Engineers New Zealand (IPENZ)or the

Design Firm’s engagement. Attached Particulars

New Zealand Institute of Architects (NZIA), provides additional assurance of the designer’s standing within the profession. If the design firm is a member of the Association of Consulting Engineers New Zealand

Attached particulars referred to in this producer statement refer to supplementary information appended to the producer statement.

(ACENZ), this provides additional assurance about the Refer Also:

standing of the firm. 1 Conditions of Contract for Building & Civil Engineering Construction

Persons or firms meeting these criteria satisfy the term “suitably qualified independent design professional”. 2

NZS 3910: 2003 NZIA Standard Conditions of Contract SCC 2007 (1st edition)

* Professional Indemnity Insurance As part of membership requirements, ACENZ requires all

3 Guideline on the Briefing & Engagement for Consulting Engineering Services (ACENZ/IPENZ 2004)

member firms to hold Professional Indemnity Insurance to a minimum level. The PI insurance minimum stated on the front of this form reflect standard, small projects. If the parties deem this inappropriate for large projects the minimum may be up to $500,000.

www.acenz.org.nz www.ipenz.org.nz www.nzia.co.nz

Page 3: Producer Statement - PS1 - Design · Producer Statement - PS1 - Design ... 6 Design loads are in accordance with AS/NZS 1170.1:2002 table 3.3 and NZBC B1/VM1

Mar-11

Barriers - Design limits for occupancy A/B/E/C3.Maximum

t Cantilever Height H (mm) Max x Min y Max y M* (kNm) T* (kN)500 400 75 600 0.2 2.4600 350 75 600 0.2 2.4700950 450 75 600 0.5 5.2

1050 400 75 600 0.5 5.211501250950 550 100 600 0.6 6.5

1050 500 100 600 0.6 6.51150 450 100 600 0.6 6.31250 400 100 600 0.6 6.1

Pool Fence - Design limits based on occupancy A line load only.Maximum

t Cantilever Height H (mm) Max x Min y Max y M* (kNm) T* (kN)12mm 1250 400 75 600 0.3 4.015mm 1250 400 75 600 0.6 6.1

NOTES1 Glass is to be TempaFloat grade A toughened safety glass by Metro GlassTech.2 Glass panels are at least 1000mm wide unless connected by an interlinking handrail.3 Glass thicknesses shown are nominal thickness Table is based on minimum tolerance as per NZS 4223 1:2008

ULS Wind (kPa)

Design Table MB50

Fixing Dimensions (mm) Design loads to deck structure

MB50 Series Double Disc Balustrade System

1.8

10m

m 3.13.1

15m

m G

lass 3.1

2.42.11.8

12m

m G

lass 2.6

2.1

Fixing Dimensions (mm) Design loads to deck structureULS Wind (kPa)

1.5

SPECIFIC DESIGN

SPECIFIC DESIGN

SPECIFIC DESIGN

SPECIFIC DESIGN

> 1000mm

3 Glass thicknesses shown are nominal thickness. Table is based on minimum tolerance as per NZS 4223.1:20084 Heights (H) are measured from upper glass fixing centre to top of glass, as shown on the diagram.5 Deflection in the glass is restricted to 30mm excluding rotation in the supporting structure.6 Design loads are in accordance with AS/NZS 1170.1:2002 table 3.3 and NZBC B1/VM1.7 Loadings are in accordance with DBH Practice Advisory 10 (Nov 2009).8 For ULS wind pressures exceeding those shown, specific design is required9 Table only valid for use with MB50 (50mm diameter) stainless steel discs or equivalent. Minimum 6mm thick front disc

10 M* denotes bending moment (kNm) around upper glass fixing to be taken by the supporting structure.11 T* denotes maximum pull out load (kN) of fixings to be taken by the supporting structure.12 This table does not take into consideration the structural integrity of the supporting structure.

Loads stated should be used as a guide only.13 This table corresponds to fixing detail drawings MB50/C/RA, MB50/T/LS, MB50/T/RN, MB50/S/RN.14 For designs outside the scope of this table specific design is required.

y

H

Max 200mmx

> 1000mm

APPROVED 03/03/2011:

Peter Ronald Boardman BE (Civil) Hons FIPENZ CPEng #32199

Page 4: Producer Statement - PS1 - Design · Producer Statement - PS1 - Design ... 6 Design loads are in accordance with AS/NZS 1170.1:2002 table 3.3 and NZBC B1/VM1

APPROVED 03/03/2011:

Peter Ronald Boardman BE (Civil) Hons FIPENZ CPEng #32199

Page 5: Producer Statement - PS1 - Design · Producer Statement - PS1 - Design ... 6 Design loads are in accordance with AS/NZS 1170.1:2002 table 3.3 and NZBC B1/VM1

APPROVED 03/03/2011:

Peter Ronald Boardman BE (Civil) Hons FIPENZ CPEng #32199

Page 6: Producer Statement - PS1 - Design · Producer Statement - PS1 - Design ... 6 Design loads are in accordance with AS/NZS 1170.1:2002 table 3.3 and NZBC B1/VM1

APPROVED 03/03/2011:

Peter Ronald Boardman BE (Civil) Hons FIPENZ CPEng #32199

Page 7: Producer Statement - PS1 - Design · Producer Statement - PS1 - Design ... 6 Design loads are in accordance with AS/NZS 1170.1:2002 table 3.3 and NZBC B1/VM1

APPROVED 03/03/2011:

Peter Ronald Boardman BE (Civil) Hons FIPENZ CPEng #32199