Procurement
Management
-
8/3/2019 Procurement Final Ppt
2/41
Introduction
In many organizations, cost effectivepurchasing and supply chain managementis a matter of survival as purchased goodsand services account for up to 80% of
(sales) revenue. Mistakes made in thisarea can be costly, cause delays and canaffect the quality of goods or servicessupplied to your customers. Our training
has been designed to provide anunderstanding of the basic principles ofpurchasing and how to conduct thepurchasing.
-
8/3/2019 Procurement Final Ppt
3/41
Defining Procurement
Procurement is the sourcing andpurchasing of goods and services for
business use
-
8/3/2019 Procurement Final Ppt
4/41
Procurement
Procurement is one of the most important
function for all types of Businesses i.e small
scale, medium scale or large scale.
It provides support to all user departments of the
organization.
Basic principle of procurement is effectiveness &
economical
Without the successful procurement at some
stage it is impossible to achieve results from
business
-
8/3/2019 Procurement Final Ppt
5/41
Background of Procurement
Public vs. Private Buying
Accountability
Responsiveness
Professionalism
Transparency
Competition
Appeal Rights
-
8/3/2019 Procurement Final Ppt
6/41
Overcoming of OperationalConstraints
Lack of procurement planning
Long lead time of planning process
Lack of procurement involvement in
project planning
Insufficient information & records
Institutional gaps Tied aid
Rigid attitude
-
8/3/2019 Procurement Final Ppt
7/41
Procurement Principles
Buying the right quality
Buying the right quantity
Buying at the right priceBuying from the right source
Buying at the right time & place
-
8/3/2019 Procurement Final Ppt
8/41
Right Quality
First and foremost, quality must be properly defined. No
general description of the character of the material or
desired attributes will be sufficient, like 'high quality' or
'poor or low quality', etc. The definition must be in greater
detail and this must be described in the purchase order.
This description then becomes the essence of the purchase
order. Significant elements like, dimension, physical,
chemical and other properties, suitability and purpose must
all be clearly stated.
-
8/3/2019 Procurement Final Ppt
9/41
Right Quantity
This is also one of the basic considerations. It has a special
meaning in this context, that is to say, what quantity
should be purchased at a time. Since quantity is a
mathematical measure, there have been many attempts to
determine the optimum quantity which is most economical.
Besides this, there are many other considerations which
have to be taken into account.
-
8/3/2019 Procurement Final Ppt
10/41
Right Price
Price is not just one of the terms and conditions of thepurchase order, but is an important economic consideration
which is a guiding factor. A most common equation used in
this connection is:
Quality /Value = Price
This is not just a mathematical formula, but expresses an
axiomatic truth that value varies in direct proportion to
quality and inversely to the price paid. But where quality is
defined in a specification, it is a constant and the
comparison of value can be made in terms of price alone. It
follows, therefore, that the lower the price, the greater the
value.
-
8/3/2019 Procurement Final Ppt
11/41
Right SourceSource selection is also an important factor. Besides the
factors mentioned earlier, reliability and timely delivery
have to be seriously reckoned with. Actually, there are four
stages of source selection:
Survey stage
Enquiry stage
Negotiation stage
Experience stage.
In purchasing, the starting point is the recognition of the
need for a material or a product. Though the exact
specifications mayor may not be fixed, its general natureand purpose are known. What is available in the market?
Who makes such a product? Or, who can make it or supply
it most economically or satisfactorily? All these questions
must be answered before a supply order is placed.
-
8/3/2019 Procurement Final Ppt
12/41
Right Time
Right time implies that in order to be effective, purchases
should be made, in such a way that stores and materials
are made available in time when needed, it being
purchasing department's duty to see that the delivery
schedule is honoured. As such, timing is an important
element in every purchase order, except when such
purchases are made for stock purposes. Even then, in order
to get some price advantage when some seasonal
purchases are resorted to, timing plays its due role.
-
8/3/2019 Procurement Final Ppt
13/41
Right Place
Right place means right place of delivery. Every purchase
contract, in addition to time of delivery, must clearly state
the place of delivery and such other terms like free delivery
or ex-factory delivery. Generally, F.O.B. (Free on Board),
F.O.R. (Free on Rail), CLF. (Cost, insurance and freight)
paid terms are part of the price agreement.
-
8/3/2019 Procurement Final Ppt
14/41
Fundamental Objectives ofProcurement
To maintain continuity of supply to support productionschedule.
In doing so, minimum investment in stores and materialsinventory must be ensured, consistent with safety andeconomy.
Duplication of purchases, wastes, obsolescence and costlydelays must be avoided.
Proper quality standards based on suitability criteria mustbe maintained.
Material must be procured at lowest possible cost,consistent with quality and service requirements.
It must maintain, in so far as materials costs areconcerned, companys competitive position in the market
-
8/3/2019 Procurement Final Ppt
15/41
Scope & Limitations
As procurement is a supportive function so it
requires approvals/ authorizations (formal/
informal). Mostly it is expressed throughpurchase requisition. Some time it is expressed
through manufacturing quota. Generally in Govt.
Departments purchasing is governed by annual
budgets
-
8/3/2019 Procurement Final Ppt
16/41
Centralized Purchasing
In centralized purchasing allpurchasing responsibility is delegatedto a person or department. This
system of purchasing is known ascentralized buying.
-
8/3/2019 Procurement Final Ppt
17/41
Advantages of centralized buying
Better Control
Specialization
Performance improvement
Non- Influenced/ Non- Dominated
-
8/3/2019 Procurement Final Ppt
18/41
Disadvantages of centralizedbuying
Inefficiencies (Greater Lead Time)
Involves so many process steps
-
8/3/2019 Procurement Final Ppt
19/41
Source of Supply & SupplierSelection
Past experience with the supplier
Interview with salesman
Technical & Descriptive catalogues
Trade Directories & Trade Journals
Visits to trade fairs
Consulting Trade Agencies
Open & Limited Tenders for quotations
Periodical Advertisements in the press
-
8/3/2019 Procurement Final Ppt
20/41
Purchasing Policy & Procedures
Ascertaining the need and recognition of product
Accurate statement of specifications, character, quality &quantity requirements with full descriptions
Transmissions of purchase requisitions
Negotiation with the possible source of supply. Analysis of proposal, determination of price, availability &
delivery time
Selection of the vendor and placement of the supply order
Expediting and follow-up
Arranging for receipts, inspection, replacement of therejected and defective material and goods etc.
Checking invoices and bill payment
Completion of records and files
-
8/3/2019 Procurement Final Ppt
21/41
Purchasing Inputs
Purchase Requisitions
Product Specifications
Blueprint
Market Grades
Brand or Trade Names
Commercial Standards
Material Specifications
Performance Characteristics
Resource Limitations
-
8/3/2019 Procurement Final Ppt
22/41
Purchasing Outputs
Supply Source
Market Conditions
Price Determinations
Discounts Purchase Decisions
Buying Locally or Reciprocal Buying
Delivery Terms
Timing of Purchases Hedging
Buying in Relation to Sales Policy
-
8/3/2019 Procurement Final Ppt
23/41
An Overview of Procurement Process
Planning of the solicitation process,includes activities as:
Choice of procurement method Specifying requirement Choice contract type Preparation of bidding documents
The going public of the solicitation,includes activities as:
Advertisement of the solicitation Issuance of the bidding document
Management of the received bids,includes activities as:
Opening of bids Evaluation of bids Possibly negotiation with bidder (s) Recommendation of the relevant
authority
Contract award, includes activities as:
Approval of the relevant authority Actual contract award Debriefing
Management of the contract,includes activities as:
Contract performance Contract completion Payment Possibly dispute settlement
Stage 1-Preparation Stage
Stage 2-Advertising Stage
Stage 3- ResponseManagement Stage
Stage 4-Award Stage
Stage 5-ContractManagement Stage
Procurement Environment
The Environment in which procurementproceedings take place
-
8/3/2019 Procurement Final Ppt
24/41
Regulated Processes ofProcurement
(Followed by PPPRA 2004)
-
8/3/2019 Procurement Final Ppt
25/41
Procedure & Work Flow Indent Scrutiny
Issuance of Tender Enquiry/Release of Press Tender Tender Opening by committee
Preparation of Comparative Statement and Minutes by Tender Opening Committee
Evaluation of Bids by committee (Technical Evaluation Committee / Financial
Evaluation Committee)
Vetting of Technical Evaluation Committees Recommendations by Head of Indenting
Department
Fund Confirmation By Finance Deptt.
Preparation of Executive Summaries
Expenditure Approval (By Directors Committee or Managing Director)
Issuance of Letter of Intent
Preparation Of Draft Contract
Submission of Contract / Performance Bond by the Supplier
Vetting of Contract by Indenting Department Pakistan National Shipping Corporation/Standing Freight Committee in case of C&F
Prices (Foreign Purchase)
Approval from State Bank of Pakistan in case of Cash Foreign Exchange Funding
(Foreign Purchase)
Confirmation Of Authenticity Of Performance Guarantees
Letter of Credit
Signing of Contract
-
8/3/2019 Procurement Final Ppt
26/41
Categories of Purchasing
Local Purchasing
Foreign Purchasing
-
8/3/2019 Procurement Final Ppt
27/41
Local Purchasing
Any material & services which isprocured from local market or of whichpayment is made in the local currency
is called local purchase
-
8/3/2019 Procurement Final Ppt
28/41
Foreign Purchasing (Imports)
Any material & services which isprocured from foreign market or ofwhich payment is made in foreign
currency is called Foreign purchase.
-
8/3/2019 Procurement Final Ppt
29/41
Modes of Procurement
Press Tendering
Limited Competition
Proprietary/ Single SourceSpot Purchase
Pre-Qualification of Bidders
-
8/3/2019 Procurement Final Ppt
30/41
Instructions to Bidders This Section of the Bidding Documents should provide the
information necessary for bidders to prepare responsivebids, in accordance with the requirements of the Employer.It should also give information on bid submission, openingand evaluation, and on the award of Contract.
Matters governing the performance of the Contractor,payments under the Contract, or matters affecting the
risks, rights, and obligations of the parties under theContract are not normally included in this Section, butrather under Section IV, General Conditions of Contract(GCC), and/or Section V, Special Conditions of Contract(SCC). If duplication of a subject is inevitable in thedifferent sections of the documents, care must be exercisedto avoid contradictions between clauses dealing with thesame matter.
These Instructions to Bidders shall not be part of theContract and shall cease to have effect once the Contract issigned.
-
8/3/2019 Procurement Final Ppt
31/41
Instructions to Bidders contd..
A. General 1. Scope of Bid 2. Source of Funds 3. Fraud and Corruption
4. Eligible Bidders 5. Qualifications of the Bidder 6. One Bid per Bidder 7. Cost of Bidding 8. Site VisitB. Bidding Documents 9. Contents of Bidding Documents 10. Clarification of Bidding Documents
-
8/3/2019 Procurement Final Ppt
32/41
Instructions to Bidders contd..
11. Amendment of Bidding DocumentsC. Preparation of Bids 12. Language of Bid 13. Documents Comprising the Bid 14. Bid Prices
15. Currencies of Bid and Payment 16. Bid Validity 17. Bid Security and Bid-Securing Declaration 18. Alternative Proposals by Bidders 19. Format and Signing of Bid
D. Submission of Bids 20. Submission, Sealing and Marking of Bids
-
8/3/2019 Procurement Final Ppt
33/41
Instructions to Bidders contd..
21. Deadline for Sub-mission of Bids
22. Late Bids
23. Withdrawal, Substitution and Modification ofBids
E. Bid Opening and Evaluation 24. Bid Opening
25. Confidentiality
26. Clarification of Bids
27. Examination of Bids and Determination ofResponsiveness
28. Correction of Errors
-
8/3/2019 Procurement Final Ppt
34/41
Instructions to Bidders contd..
29. Currency for Bid Evaluation 30. Evaluation and Comparison of Bids 31. Preference for Domestic BiddersF. Award of Contract 32. Award Criteria
33. Employers Right to Accept any Bid and to Rejectany or all Bids
34. Notification of Award and Signing of Agreement 35. Performance Security 36. Advance Payment and Security
37. Adjudicator
-
8/3/2019 Procurement Final Ppt
35/41
General Conditions of Contract
The General Conditions of Contract (GCC), read in conjunctionwith the Special Conditions of Contract and other documentslisted therein, should be a complete document expressing fairlythe rights and obligations of both parties.
The form of General Conditions of Contract that follows has beendeveloped on the basis of considerable international experience inthe drafting and management of contracts, bearing in mind atrend in the construction industry towards simpler, morestraightforward language.
The form can be used directly for smaller admeasurementscontracts and, with the modifications noted in the footnotes, it canbe adapted for lump sum contracts.
The use of standard General Conditions of Contract for building
and civil works in a country shall promote comprehensiveness ofcoverage, general acceptability of its provisions, savings in costand time in Bid preparation and review, and the development of asolid background of legal case histories.
-
8/3/2019 Procurement Final Ppt
36/41
General Conditions of Contract contd
A. General 1. Definitions 2. Interpretation 3. Language and Law 4. Project Managers Decisions
5. Delegation 6. Communications 7. Subcontracting 8. Other Contractors 9. Personnel
10. Employers and Contractors Risks 11. Employers Risks 12. Contractors Risks
-
8/3/2019 Procurement Final Ppt
37/41
Conditions of Contract contd
13. Insurance 14. Site Investigation Reports 15. Queries about the Special Conditions of Contract 16. Contractor to Construct the Works 17. The Works to Be Completed by the Intended Completion Date 18. Approval by the Project Manager 19. Safety 20. Discoveries 21. Possession of the Site 22. Access to the Site 23. Instructions 24. Disputes 25. Procedure for Disputes 26. Replacement of Adjudicator
-
8/3/2019 Procurement Final Ppt
38/41
Conditions of Contract contd
B. Time Control
27. Program
28. Extension of the Intended Completion
Date 29. Acceleration
30. Delays Ordered by the Project
Manager 31. Management Meetings
32. Early Warning
-
8/3/2019 Procurement Final Ppt
39/41
Conditions of Contract contd
C. Quality Control
33. Identifying Defects
34. Tests35. Correction of Defects
36. Uncorrected Defects
-
8/3/2019 Procurement Final Ppt
40/41
Conditions of Contract contd
D. Cost Control 37. Bill of Quantities 38. Changes in the Quantities 39. Variations 40. Payments for Variations
41. Cash Flow Forecasts 42. Payment Certificates 43. Payments 44. Compensation Events
45. Tax 46. Currencies 47. Price Adjustment 48. Retention
49. LiquidatedDamages
50. Bonus 51. Advance Payment
52. Securities 53. Day-works 54. Cost of Repairs
-
8/3/2019 Procurement Final Ppt
41/41
Conditions of Contract contd
E. Finishing the Contract 55. Completion 56. Taking Over 57. Final Account 58. Operating and Maintenance Manuals
59. Termination 60. Payment upon Termination 61. Property 62. Release from Performance