  • Procter & Gamble Jim Sexton Section Head Family Care Construction Management October 6, 2016

  • About Procter & Gamble...

    $65B Net Sales

    70 Countries of Operations

    21 Billion Dollar

    Brands

    180 Countries Where Our Brands are

    Sold

    32 Leadership

    Brands

    This document contains proprietary, confidential and copyrighted materials of The Procter & Gamble Company (P&G).

  • Baby, Feminine, and Family Care Fabric and Home Care

    Beauty Health and Grooming

    Industry-Based Sectors

    Copyright 2015 Procter & Gamble (Unpublished). All rights reserved.

  • Six Selling and Marketing Operations

    40% of net sales

    NORTH AMERICA

    10% of net sales

    LATIN AMERICA 8% of net sales

    INDIA, MIDDLE EAST, AND AFRICA (IMEA)

    8% of net sales

    ASIA PACIFIC

    8% of net sales

    GREATER CHINA

    26% of net sales EUROPE

    Copyright 2015 Procter & Gamble (Unpublished). All rights reserved.

  • About P&G Supply Chain

    >130 Plants

    40 Customization

    Centers

    >65K Employees

    1.5B Truck

    km’s/year

    250 Shipping Locations

    >60K External Partners

    About Our Supply Chain...

  • About P&G Construction Types of Projects - Production Facilities - Distribution Centers - Tech Centers/Offices - Chemical processing - Packing and Converting lines - Precision Assembly and Molding - Robotics and Automation - Regulated/cGMP facilities - R&E and Savings Projects - Utility systems/CoGen

    Copyright 2015 Procter & Gamble (Unpublished). All rights reserved.

    Turkey O

    hio, USA

    Japan

    ~4% of NOS

    $1.5B Construction

    Controlled Spending

    ~13,000 construction

    workers on site

    0.22 Construction

    TIR

    ~27MM effort hours

    per year

  • Copyright 2013 Procter & Gamble (Unpublished). All rights reserved.

    What is it? The adaption of Lean principles & practices to project delivery

    Size of Opportunity 15% lower cost & 30% faster schedules by focusing on value, waste, and flow

    Lean IPD

    What we’re already doing to support Lean IPD

    1. Strategic Partners2. Standardization (PLCM)3. Modularization 4. Continuous Improvement5. Digital Technologies (BIM, 4D)6. Lean Manufacturing (IWS)

    What we need to do to fully leverage Lean IPD

    1. Conditions of Satisfaction 2. Collaborative Design Sessions 3. Target Value Design 4. The Big Room5. Last Planner System 6. Incentive-Based Contracts

    What we’re already doing to support Lean IPD

    Strategic Partners

    Standardization (PLCM)

    Modularization

    Continuous Improvement

    Digital Technologies (BIM, 4D)

    Lean Manufacturing (IWS)

    Already doing a lot of things that support Lean IPD.

    1

    What we need to do to fully leverage Lean IPD

    Conditions of Satisfaction

    Collaborative Design Sessions

    Target Value Design

    The Big Room

    Last Planner System

    Incentive-Based Contracts

  • What is it? • BIM, 4D/5D/6D, Laser Scanning, Animated Work

    Instructions, etc.

    Leverage Digital Tools

    Lea

    Note: Lean IPD provides environment to maximize ROI on Digital Tools

  • Leverage Modularization • What is it? Types of Modularization

    (PPMSOF) • Pre-fabrication • Pre-assembly • Module • Skid • Off site Fabrication

    • Size of Opportunity/Benefits • $$$$ • Takes hours off the site = > Safety,

    Quality, Speed • 1 hour off site – 4 hours on site

  • Modular Installation

  • Help we Need • Innovation

    • Partnership → Together We Are Better

    • Safety

    • Quality

    • Cost

    • Speed

    • Capability Where We Need It

    • Make Construction “COOL” Again