7/28/2019 Process Sizing Rev.1-CNG
1/21
ATTACHMENT 01:
SINGLE PHASE LINE SIZING SPREADSHEET
Client: PetroVietnam CNG Joint Stock Co.
Project: CNG Filling Station Project
Line Service:
Line/Unit No: 4" 6"Units SI SI
Flow type Mass MassDiameter Nominal 100 mm 350
Standard volume Rate 12500 Sm3/h 12500Actual inlet Vol.flow 532.3 m3/h 532.3
Mass Flow 10150 kg/h 10150Phase Gas Gas
Temperature 30 C 30
Pressure 22 Barg 22Molecular weight 19.19 19.19
Compressibility 0.9339 0.9339Density 19.06 kg/m3 19.06
Gas Density 19.06 kg/m3 19.06Viscosity 0.01177 cP 0.01177
Design Margin 0 % 0q. engt s
Fittings Eq.Lengh, m 10 0 10Pipe straight Lengh, m 100 m 100
Total Eq.Lengh, m 110Elevation Change 0 m 0
Type of Pipe Commercial Steel Commercial Steel
pe c e u e c cCalculated value
I.D, mm User Input User InputW.T, mm User Input User Input
I.D/W.T, mm 102.26 6.02 154.051Static Head Loss Kpa 0 Kpa
Reynolds No. 2981000Friction factor 0.01653Pressure drop Kpa/100m 49.96 Kpa/100m
Velocity m/s 18 m/s
Sizing criteria Max Velocity m/s 49.7 m/sPress. Drop/lengthVs Kpa/100m 11.0 Kpa/100m
WARNINGS: Recheck
Main Piping at upstream of Compressor (Piping_Seg 01/02)
User can override WT/ID User can ove
PIPING SIZING FOR CNG FILLING S
-
7/28/2019 Process Sizing Rev.1-CNG
2/21
Date:
Pre. By:
Checked:
mmSm3/hm3/hkg/h
C
Barg
kg/m3kg/m3cP%q. engt s
0m
110m
7.1120
19790000.01536
5.987.93
49.711.0
Good
rride WT/ID
TATION
-
7/28/2019 Process Sizing Rev.1-CNG
3/21
SINGLE PHASE LINE SIZING SPREADSHEET
Client: PetroVietnam CNG Joint Stock Co.Project: CNG Filling Station Project
Line Service:
Line/Unit No: 3" 4"Units SI SI
Flow type Mass MassDiameter Nominal 80 mm 100
Standard volume Rate 12500 Sm3/h 12500Actual inlet Vol.flow 45.79 m3/h 45.79
Mass Flow 10150 kg/h 10150Phase Gas Gas
Temperature 45 C 45Pressure 250 Barg 250
Molecular weight 19.19 19.19Compressibility 0.8217 0.8217
Density 221.6 kg/m3 221.6
Gas Density 221.6 kg/m3 221.6Viscosity 0.02558 cP 0.02558
Design Margin 0 % 0q. engt s
Fittings Eq.Lengh, m 5 0 5Pipe straight Lengh, m 50 m 50
Total Eq.Lengh, m 55Elevation Change 0 m 0
Type of Pipe Commercial Steel Commercial Steelpe c e u e c c
Calculated valueI.D, mm User Input User Input
W.T, mm User Input User Input
I.D/W.T, mm 58.42 15.24 87.325Static Head Loss Kpa 0 Kpa
Reynolds No. 2401000Friction factor 0.01872Pressure drop Kpa/100m 79.97 Kpa/100m
Velocity m/s 4.746 m/s
Sizing criteriaMax Velocity m/s 16.6 m/s
Press. Drop/lengthVs Kpa/100m 50.0 Kpa/100m
WARNINGS: Recheck
Main Piping (Header) at downstream of Compressor
(Piping_Seg 03)
User can override WT/ID User can ove
-
7/28/2019 Process Sizing Rev.1-CNG
4/21
Date:Pre. By:
Checked:
mmSm3/hm3/hkg/h
CBarg
kg/m3
kg/m3cP%q. engt s
0m
55m
13.490
16060000.01726
9.8782.124
16.650.0
Good
rride WT/ID
-
7/28/2019 Process Sizing Rev.1-CNG
5/21
SINGLE PHASE LINE SIZING SPREADSHEET
Client: PetroVietnam CNG Joint Stock Co. Date:Project: CNG Filling Station Project Pre. By:
Line Service:Checked:
Line/Unit No: 2" 3"Units SI SI
Flow type Mass MassDiameter Nominal 50 mm 80 mm
Standard volume Rate 2500 Sm3/h 2500 Sm3/hActual inlet Vol.flow 117.7 m3/h 117.7 m3/h
Mass Flow 2029 kg/h 2029 kg/hPhase Gas Gas
Temperature 29.56 C 29.56 CPressure 20 Barg 20 Barg
Molecular weight 19.19 19.19
Compressibility 0.9425 0.9425Density 16.99 kg/m3 16.99 kg/m3Gas Density 16.99 kg/m3 16.99 kg/m3
Viscosity 0.01187 cP 0.01187 cPDesign Margin 0 % 0 %
Eq.Lengt s Eq.Lengt s
Fittings Eq.Lengh, m 2 0 2 0Pipe straight Lengh, m 20 m 20 m
Total Eq.Lengh, m 22 22Elevation Change 0 m 0 m
Type of Pipe Commercial Steel Commercial SteelPipe Sc e u e Sc 40 Sc 40
Calculated valueI.D, mm User Input User Input
W.T, mm User Input User InputI.D/W.T, mm 52.502 3.912 77.927 5.486
Static Head Loss Kpa 0 Kpa 0Reynolds No. 1152000 775900
Friction factor 0.01936 0.01799Pressure drop Kpa/100m 73.61 Kpa/100m 9.493
Velocity m/s 15.33 m/s 6.957
Sizing criteriaMax Velocity m/s 51.8 m/s 51.8
Press. Drop/lengthVs Kpa/100m 11.0 Kpa/100m 11.0
WARNINGS: Recheck Good
Piping at upstream of 01 Compressor
User can override WT/ID User can override WT/ID
-
7/28/2019 Process Sizing Rev.1-CNG
6/21
SINGLE PHASE LINE SIZING SPREADSHEET
Client: PetroVietnam CNG Joint Stock Co.Project: CNG Filling Station Project
Line Service:
Line/Unit No: 1" 2"Units SI SI
Flow type Mass MassDiameter Nominal 25 mm 50
Standard volume Rate 2500 Sm3/h 2500Actual inlet Vol.flow 9.157 m3/h 9.157
Mass Flow 2029 kg/h 2029Phase Gas Gas
Temperature 45 C 45Pressure 250 Barg 250
Molecular weight 19.19 19.19Compressibility 0.8217 0.8217
Density 221.6 kg/m3 221.6
Gas Density 221.6 kg/m3 221.6Viscosity 0.02558 cP 0.02558Design Margin 0 % 0
Eq.Lengt s
Fittings Eq.Lengh, m 3.5 0 3.5Pipe straight Lengh, m 35 m 35
Total Eq.Lengh, m 38.5Elevation Change 0 m 0
Type of Pipe Commercial Steel Commercial SteelPipe Sc e u e Sc 160 Sc 160
Calculated valueI.D, mm User Input User Input
W.T, mm User Input User Input
I.D/W.T, mm 20.701 6.35 42.85Static Head Loss Kpa 0 KpaReynolds No. 1355000
Friction factor 0.02423Pressure drop Kpa/100m 740.9 Kpa/100m
Velocity m/s 7.558 m/s
Sizing criteriaMax Velocity m/s 16.6 m/s
Press. Drop/lengthVs Kpa/100m 50.0 Kpa/100m
WARNINGS: Recheck
Piping at downstream of 01 Compressor
User can override WT/ID User can ove
-
7/28/2019 Process Sizing Rev.1-CNG
7/21
Date:Pre. By:
Checked:
mmSm3/hm3/hkg/h
CBarg
kg/m3
kg/m3cP%Eq.Lengt s
0m
38.5m
8.73806547000.02049
16.491.764
16.650.0
Good
rride WT/ID
-
7/28/2019 Process Sizing Rev.1-CNG
8/21
Formulate Used
Re = (10000 x Dp x Vt x a )/
Vt = Q / A
a =( M x P) /( 8,3145 x (T + 273) x Z )
A = x Dv x HH =4 x Dv
Assume Droplet Dp = 10 microns
Q = (C x s) / a
Flow Actual Area Gas filter Diameter Diamet Mass Viscosity Pressu Tempe Z Velocity Density Gas R
rate flow Capacity Calc Choi Droplet Mole Actual Stand.
Sites Sm3/hr m3/min m2 3/min/m2 mm mm microns /(kg.mol cP kPa(g) deg C unitless m/s kg/m3 kg/sm3
C Q A B (Vt) Dv Dv(* Dp MW P T z Vt a s
NG Filling Station 12,500 9.06 0.71 12.70 238 273 10.0 19.19 0.01193 2200 30.00 0.9375 0.211 18.680 0.814 1
Note:
eparator can by any length, but the ratio of seam-to-seam length to the diameter of the vessel H / Dv usually in the range of 2:1 to 4:1
Calculation choice ratio H / Dv : 4/1The approximate filter capacity have been refered from Fig. 7-16/7-13 _Engineering Data Book ( Approximate Gas Filter Capacity)
ATTACHMENT 02FILTER SIZING FOR CNG FILLING STATION
-
7/28/2019 Process Sizing Rev.1-CNG
9/21
-
7/28/2019 Process Sizing Rev.1-CNG
10/21
-
7/28/2019 Process Sizing Rev.1-CNG
11/21
hoi
mm
H*
905
-
7/28/2019 Process Sizing Rev.1-CNG
12/21
-
7/28/2019 Process Sizing Rev.1-CNG
13/21
-
7/28/2019 Process Sizing Rev.1-CNG
14/21
-
7/28/2019 Process Sizing Rev.1-CNG
15/21
-
7/28/2019 Process Sizing Rev.1-CNG
16/21
Formular Used
z = - 0,0023 x (P +1,01325 ) + 0,9949
Q = (A x s) / a
= (MW *P) / ( R x T x Z )
A = (A x 125%)
Flow Flow Actual Mol.Wt Pressure Temperature. Compres Density Gas Meter
rate rate 125% Flow sibility Actual Stand. Size
Sites Sm3/hr Sm
3/hr m
3/hr kg/mol barg deg C Kg/am3 Kg/sm3 mm
A A Q MW P T z a s d
CNG Filling Station 12500 15625 679.125 19.19 22 30 0.9375 18.68 0.814 150
Note:
The meter turbine and flow meter shall be sizing to ensure that maximum expecting gas velocity and flowrate will be less than about 80% of recommended
manufacture maximum value.
ATTACHMENT 02FLOWMETER SIZING FOR CNG FILLING STATION
-
7/28/2019 Process Sizing Rev.1-CNG
17/21
-
7/28/2019 Process Sizing Rev.1-CNG
18/21
-
7/28/2019 Process Sizing Rev.1-CNG
19/21
Nor
pipe
mm
100
-
7/28/2019 Process Sizing Rev.1-CNG
20/21
-
7/28/2019 Process Sizing Rev.1-CNG
21/21