process documentintra.itiltd-india.com/bgp/bgp_qa/iso_9001_2015/mm/ig.pdf6 process document the...
TRANSCRIPT
1
Revision 0 1 2 3 4 5
Date 25/09/2017
REVISION STATUS
Contents
Page
Number
Revision Number
Revision Status
Amendment Sheet
Department Procedure
..
..
..
..
Prepared by Signature Designation
Page: 1/13 AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
INWARD GOODS BANGALORE
EEE eEE
ISSUE: 01
DATE : 25/09/17
ISSUE :
DATE” :
ITI LIMITED
BGP/PD/IG
ISSUE :
DATE” :
PROCESS DOCUMENT
2
AMENDMENT SHEET
Clause Number Details of changes Approved By
Revision 0 1 2 3 4 5
Date 25/09/2017
Prepared by Signature Designation
Page: 2/13 AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED
BGP/PD/IG
ISSUE :
DATE” :
INWARD GOODS BANGALORE
EEE eEE
PROCESS DOCUMENT
ISSUE: 01
DATE : 25/09/17
ISSUE :
DATE” :
3
Revision 0 1 2 3 4 5
Date 25/09/2017
1.0 PURPOSE
To receive correct consignment of purchased Items and arrange for their inspection by
Inward Goods Inspection and movement of it to the respective stores / users.
2. 0 SCOPE
It covers the activities performed in the Inward goods requirement of the Transmission
division of Bangalore Plant.
GENERAL
The consignments are received by Inward Goods through:
i. Road
ii. Air Freight
iii. Registered Post Parcel
iv. Bank Parcel
v. Courier
vi. Purchase through inter office note/material pass-in
3.0 OBJECTIVE
To receive correct materials as per P.O
Movement of the items to the respective stores / users after receipt of IGI report - with in
2 days.
4.0 RISK ANALYSIS
As per enclosure BGP/RA/IG
Prepared by Signature Designation
Page: 3/13 AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
INWARD GOODS
BANGALORE
EEE eEE
ISSUE: 01
DATE : 25/09/17
ISSUE :
DATE” :
ITI LIMITED
BGP/PD/IG
ISSUE :
DATE” :
PROCESS DOCUMENT
4
Revision 0 1 2 3 4 5
Date 25/09/2017
5.0 AUTHORITY AND RESPONSIBILITY
i. Head of Inward Goods is Authorised to implement this procedure and is also responsible
for controlling and monitoring of all the activities related to IG.
ii. Organization chart is given Annexure-I
iii. Responsibilities and authorities with interfacing relationship with other deparments is
given in Annexure-II
6.0 RESOURCE MANAGEMENT
The required infrastructure, competent and skilled human resources is available and is
effectively managed to meet the process objectives and ensure continuous improvement.
7.0 IDENTIFICATION OF INPUT/SUPPLIER/OUTPUT/CUSTOMER
INPUT Consignments,
SUPPLIER External Suppliers
OUTPUTS IGI passed Items
CUSTOMER Planning , Stores, Production Departments/ Originator
8.0 PROCESS INTERACTION
9.0 PROCEDURE
9.1 Receipt of consignments:
i. The consignments along with documents in the form of Inward Goods way bills, delivery
challan / invoice, courier shall be received from the Central clearance section, Purchase
department or direct from suppliers.
Prepared by Signature Designation
Page: 4/13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED
BGP/PD/IG
ISSUE :
DATE” :
INWARD GOODS
BANGALORE
EEE eEE
PROCESS DOCUMENT
ISSUE: 01
DATE : 25/09/17
5
Revision 0 1 2 3 4 5
Date 25/09/2017
ii. Whenever modified value taxation (MODVAT) claim is applicable for the
consignment, a duplicate for transporter (copy of the challan) shall also be received
and the same shall be sent to customs and excise cell .The same Information is
incorporated in the Inward Goods Advice document after affixing MODVAT stamp.
In case of Non receipt of it or XEROX or unauthorized copy, the same is informed to
purchase through Inter Office Note A 248-B.
iii. For Foreign /Imported consignments received vide SIC delivery Challan, the taxation
reference is incorporated at the bottom of IGA as per IONT/X/FPA Dt.23.03.1999 from
FM (X). The IGA No. is also indicated on white copy of SIC Delivery challan and sent to
C&E department under acknowledgment in a register.
iv. The originals of the documents shall be checked for security department
endorsement and the same will be retained.
v. All cases, boxes, packets, cartons containing the consignments shall be checked for
weight, quantity and packing conditions. Pending verification of the quantity and
will be accepted and a stamp will be affixed on the delivery challan/ invoice from the
supplier mentioning as " subject to final verification of quality and quantity." In case
damages, pilferage, Shotages or incorrect weight are noticed, an endorsement shall be
obtained on the delivery challan/invoice from Central clearance / Purchase or Supplier.
The same shall be reported to Purchase department through inter office note. In such
cases, the preparation of IGA is delayed. It is done after getting the clarification/reply
from the Purchase Dept. who will correspond with the supplier and lodge a insurance
claim if required. All such claims will be disposed of in liaison with Divisional
Purchase & Finance.
vi. The acknowledgment shall be made in the document and details shall be entered in
main receipt register -XBG/MD/IGD/01.
vii. In case, the documents are found missing in the parcels/cases, the same shall be
collected from the Purchase / Customs & excise cell.
viii The Registered Post Parcels, Air freight parcels and Bank parcels is opened and
checked for item correctness and quantity as per P.O.. The details is recorded in the
available documents. An entry in a separate register is made indicating taxation
reference/central clearance and purchase order. Later the details about the consignments
is entered in the Main Receipt Register.
ix In the case of precious materials, the procedure order no. 49 for Gold potassium
cyanide, Gold salt, Silver potassium cyanide pertaining to precious materials has been
delinked by the management order vide CWM(SX) , Note sheet dt. 17-4-96 and the
procedure is revised as follows.
Prepared by Signature Designation
Page:5 /13 AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED
BGP/PD/IG
ISSUE :
DATE” :
INWARD GOODS
BANGALORE
EEE eEE
PROCESS DOCUMENT
ISSUE: 02
DATE : 25/09/17
6
The items delivered against purchase orders is received in Inwards Goods. Then the
items is taken to Stores by Inward Goods representative along with IGA document. The
bottle/ carton/parcel is opened in the presence of store incharge, Inward Goods
Representative, Chemical lab Representative and Gold Plating Representative. The sample
of Silver/Gold cyanide is collected by Chemical Technology Lab. Representative for
testing purpose from Stores. The balance supplied quantity of item is kept in the custody
of Gold Plating dept for safety reason till the IGA is cleared. Processing of IGA shall be
done as per normal procedure. The item is checked/verified for quantity/wt and the third
copy of the IGA is endorsed by all. In case of discrepancy such as quantity shortage the
same will be intimated to the Purchase for necessary action. In case, the item is passed for
full quantity, the IGA along with stores requisition, is dispatched to X-Inward Goods by
Chemical Lab. Regarding full or partial rejection of items, the IGA is processed as per
clause no. 8.10.4 of Process document.
9.2 Storage of consignment
The location/area is indicated in the respective document of the consignment and it is
shifted accordingly to the location. The details of the consignment is entered in the Main
Receipt Register.
9.3 Allotting the IGA number and preparation of IGAs
i. The Delivery Challan/Invoice/Courier Documents is checked for correctness of codes,
quantity and other details i.e. Batch No. etc. with reference to Purchase Order. IG also
verifies the approximate value of the item/consignment which is written on the
challan/invoice/courier document as the case may be.
ii. Then the IGA number is allotted.
iii. After the allotment of the IGA number and ensuring conformance to P.O. the input data
is entered in P.C. . Clarification if any, is obtained from Purchase / Originator / Central
clearance.
Revision 0 1 2 3 4 5
Date 25/09/2017
Prepared by Signature Designation
Page: 6/13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED
BGP/PD/IG
ISSUE :
DATE” :
INWARD GOODS
BANGALORE
EEE eEE
PROCESS DOCUMENT
ISSUE: 02
DATE : 25/09/17
7
The IGAs in triplicate of computer format F-111-C making a total number of 9
copies is prepared/ generated for all items except Capital Goods by Personal
Computer(PC). In case of computer failure, the MIS Group will co-ordinate to
generate the IGAs. For capital items, the IGAs are prepared manually under a
different IGA series. Location and quantity of consignment, brief description,
Purchase Order, receipt document details and code number is indicated for easy
traceability and facilitate inspection.
iv. Out of 9 IGA copies prepared through PC, the first and third copies of the IGA
bear original signature of the authorised signatory. The remaining seven copies
bear a facimile of signatory. One advance IGA copy is sent to Purchase and 8
copies are routed to IGI through Despatch Register for their further action.
v. In case of I/ C SSUS from other units of ITI, the IGA is prepared manually and
processed as per procedure.
9.4 Duplicate IGA
In case the original IGA is lost/not traceable, the duplicate IGA is prepared only on
prior approval of respective Divisional Heads and the information for cancellation
of earlier IGA is given to all concerned in writing.
9.5 Direct consignment/item
Direct Consignment is received for items such as tables, chairs, instruments, xerox
paper, computer paper, big racks, pilferable items such as trays, bulbs, tubes,
breakable items, testing equipments, emergency lights, Gas installation materials,
machinery, polyethylene covers, towels, chappals HDP clothes fans, etc are verified
by Inward Goods staff and inspection staff as per P.O requirements. The full quantity
is sent to Originator for safe custody after the endorsement on the document.
Acknowledgment receipt is taken from the originator who receives the direct item.
Items shall be issued or used subject to inspection &acceptance . IGAs with
requisition is sent to respective Stores through dispatch Register for regularisation. In
case of production urgency, items are issued to Shop/ Dept on authorised Positive
Recall forms from originators / Shop in quadruplet. One copy of Positive Recall form
is retained for records. In case of issue of partial quantity , the location details of
balance quantity of item is indicated on the IGA.
Revision 0 1 2 3 4 5
Date 25/09/2017
Prepared by Signature Designation
Page: 7/13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED
BGP/PD/IG
ISSUE :
DATE” : INWARD GOODS
BANGALORE
EEE eEE
PROCESS DOCUMENT
ISSUE: 01
DATE : 25/09/17
8
Revision 0 1 2 3 4 5
Date
Revision 0 1 2 3 4 5
Date 25/09/2017
9.6 Paints, Acid and other chemical items
Items such as oil, acid, paint along with documents are received from the supplier by
(OAP) stores. After verification as per P.O. & endorsement made by Inward Goods staff
the IGA is prepared. Acids & Sodium Hydrochloride on receipt in OAP (885) stores are
immediately tested for quality on sampling basis by Chemical Technology Dept. If the
quality of the sample is not OK as declared by CCT , the supplier collects the rejected lot
through a Material Pass Out duly endorsed by the concerned Purchase Dept. In case, the
sample test is passed, the documents from OAP stores are received for the preparation of
the IGA as per procedure. Further, the IGAs are sent to Chemical Lab through Despatch
Register for further action.
9.7 Wood consignment (Check at Supplier's premises)
Wood is inspected by IGI at Supplier’s premises before shipment to ITI. Wood
consignment is received after endorsement from purchase. It is moved to Wood Works
Deptt. in co-ordinations with Security, Originator & Inspection. One copy of challan
shall be endorsed and given to the Supplier. If not Inspected, the wood is inspected for
Quality, Quantity in Format duly endorsed by IG, IGI and Wood Works Representatives.
Original copy shall be retained and IGA shall be prepared for regularisation through IGI
for only accepted quantity. Supplier is called to collect the rejected items on the same
day.
9.8 Despatch of IGAs to Inspection
The details of the IGAs shall be entered in the IGA Main Master follow-up Register and
these 8 IGA copies are sent to Inspection under acknowledgment in the IGA Despatch
Register.
9.9 Samples / full quantity for Inspection
Samples / full quantity as required by Inspection is arranged at Inward Goods stage. This
is endorsed by IG and I G I staff on the back side of the third copy of IGA.
9.10 After Testing
After the tests, the items received from Inspection is acknowledged on the third copy.
After the finalisation of the IGA full/partial quantity passed or rejected item is indicated
in the relevant column of IGA. The quantity consumed for test by Inspection is shown
and the IGA is signed by the Inspecton in-charge.
Prepared by Signature Designation Page:8 /13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED
BANGALOREEEE eEE
PROCESS DOCUMENT
INWARD GOODS
BGP/PD/IG
ISSUE: 01
DATE : 25/09/17
ISSUE :
DATE” :
9
The 7 copies of the IGA with the endorsement by the Inspection is collected
and the date IGA cleared from Inspection is entered in the Master follow-up Register
and then it is handed over to the Material Movement Group of IG.
9.10.1 Movement to stores/Users
i. The Material Movement Group. collects the items/goods from the respective
locations and move to Store / Users and the acknowledgment is obtained in the
Register. The IGAs of direct SRS items sent to Stores for regularisation only.
ii. For Revenue / Capital items, User Dept. is identified by DeptNo.. The IGAs are
generated allotting a different block series . The IGAs are sent to User / Originator
/Dept. Head for acceptance/ remark of the items. The IG copy is retained and other
copies of IGAs are distributed by user /Originator Dept. as per distribution indicated at
the bottom of IGA.
9.10.2 Rejection of consignment
i. Whenever the consignment is rejected by the Inspection, the Inward Goods shall
forward the same to rejected stores with rejected consignment with relevant IGA
under acknowledgment in Despatch Register. The rejected item shall be located in
proper location with identification label marking IGA number with date, purchase
order & quantity of rejection.
ii. In case the consignment is rejected in part, the same shall be moved to rejected
material stores first under acknowledgment after the rejected sequence number is
allotted and the balance quantity of item passed shall be sent to stores/users through IGA
as per procedure.
iii. If full quantity of item is rejected, item is moved to Rejected Stores under
acknowledgment.
iv. When there is no facility for items to keep in rejected stores, Full/partial quantity of
rejected items are retained by Shop /Originator in their custody.
9.10.3 After acceptance of IGA by Stores/Users, one IGA copy with endorsement is
maintained for traceability purpose.
Note: Before the IGA is accepted in stores/originator/dept, any corrections, purchase
order amendment or missing data is corrected. After the acceptance of the IGA in
stores/originator/dept, the corrections or amendments are carried out through inter office
note A-248 -4.
9.10.4 Disposal of rejected consignment:
i. On receipt of the rejected item with IGA, rejected material stores checks for correctness
of quantity, enter the date, IGA number, value in format number 261 and allot a
sequence number & location for easy identification of the item.
Revision 0 1 2 3 4 5
Date 25/09/2017
Prepared by Signature Designation Page: 9/13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED BANGALORE
EEE eEE
PROCESS DOCUMENT
INWARD GOODS
INWARD GOODS
BGP/PD/ IG
ISSUE: 01
DATE : 25/09/17
ISSUE :
DATE” :
10
ii. Prepare an identification/location card and store the rejected items in a suitable
location with proper identification. Further details is filled up in the history card, F-
223-1 such as IGA number, date, quantity rejected, rejected sequence number, value,
supplier name (e.g.., X200C denotes X for jurisdiction, 200 denotes the serial
number, C represents the year up to 31.3.2000 and so on).
iii. A list of such rejected consignment is sent to respective Div. Heads for review and
disposal advice.
9.10.5 Disposal action shall be carried out in the following ways:-
i. Disposal of rejected IGAs within ITI:
On receipt of intimation from purchase department, the consignment will be handed
over to supplier through the material pass-out one copy of disposal advice is sent to
accounts for their records and original copy is retained for records purpose.
ii. Despatch of rejected items direct to supplier: In case Purchase Dept decides to
return the rejected items/wrong supplied items to supplier
outside ITI, they prepare disposal advice along with packing requisition. The packing
requisition consist of rejected item, code, IGA reference, quantity, value of the item
packing instruction, supplier name and mode of despatch. On receipt of disposal
advice from Purchase Dept, the rejected store together with disposal instructions,
packing requisition along with consignment is moved to Shipping Dept.
iii. Movement of item to Scrap Stores: Based on Purchase Dept's advice and on
approval of management, the consignment is moved to Scrap Stores.
iv Issue of rejected samples by rejected stores: Based on intimation received from
Purchase department after obtaining management approval, fresh IGA shall be
prepared and processed as per procedure to arrange for re-inspection.
9.11 Certification of bills for approved contract services
The approved transport carrier contractor will bring 3 copies of bills for certification
of weight/volume of items received with endorsed copy of delivery
challan/invoice/courier/any other documents. Out of 3copies of bills, the original bill
is certified. The same is also be verified with original endorsed challan/
invoice/courier documents at the time of receipt of consignments in Inward Goods
and sent to Accounts Department under acknowledgment. One copy of Bill is
retained.
9.12 Missing/not traceable items
Whenever any material is not traceable from the locations, an investigation is
conducted after intimation to the Security The investigation shall be dealt
confidentially by head of the department/section along with Security and Personnel
& Administration Department. Suitable action is taken as per standing orders of the
company according to the findings of the Enquiry Committee.
Revision 0 1 2 3 4 5
Date 25/09/2017
Prepared by Signature Designation Page: 10/13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED
BANGALOREEEE eEE
PROCESS DOCUMENT
INWARD GOODS
BGP/PD/ IG
ISSUE: 01
DATE : 25/09/17
11
10.0 CONTROL POINTS FOR MONITORING & MEASUREMENTS
1) Verification of received documents along with item with respect to P.O and other requirements
2) Physical verification of items , Packing conditions & Quantity
3) Movement of items to respective Stores / Users through despatch record.
11.0 MEASUREMENT MECHANISM AND CONTROL OF MEASURING DEVICES
Objectives fixed as per clause no 3 of this procedure & records available for this purpose is
monitored & controlled by the concerned official /head of department to achieve the said targets.
Weighing/ Counting Machines is periodically validated.
12.0 HANDLING & PRESERVATION
All items shall be kept separately with proper identification & stored for easy retrieval and
protected against physical damage and environmental hazards and there of till its sent to
Stores./Production Depts The Concerned Officials shall ensure that non - conforming
products/items are prevented from use till the disposal action is complete as per the Sys.procedure
QMS/SP/NCP/01.
13.0 RECORDS
This Department generates the following Records. The dept. ensure control of Records
as per the System procedure of control of records - QMS/SP/REC/01
SI .No Records
i. Main receipt register F-159-1
ii. Register for precious materials
iii. Register for strong room
iv. Register for rejected IGAs
v Register for fresh IGA
vi. Material pass-out
vii. History card for rejected items
viii. Despatch register
ix. Computerised monthly statements. pending with inspection
x. Monthly pending rejected statements.
xi. Office files.
Revision 0 1 2 3 4 5
Date 25/09/2017
Prepared by Signature Designation Page: 11/13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED BANGALORE
EEE eEE
PROCESS DOCUMENT
INWARD GOODS
BGP/PD/ IG
ISSUE: 01
DATE : 25/09/17
12
14.0 DATA ANALYSIS & CONTINUAL IMPROVEMENT
Data pertaining to the objectives clause no3 of this process document and other from the
available record is analysed to ensure Corrective & preventive actions and Continual
improvement in the objectives
15.0 REVIEW OF OBJECTIVES
The Head of the Department shall review the Quality Objectives periodically with all concerned
to ensure effectiveness and continual improvement. Wherever required Dept. head may fix the
new targets for the process.
16.0 REFERENCE DOCUMENTS
Unit Quality Manual.
17.0 DEPARTMENT KNOWLEDGE DOCUMENTS
FORMATS USED
i. Inward Goods Advice Note - F-111-C
ii. Discrepancy Report - XB-AP-IGD-01
iii. Detail of Rejected Material - F-261
iv. Inter office note - A-248-4
v. Inward Goods Stillage/disposal record card - F223-1
vi. Disposal of rejected material - F-429
vii. Material pass-out - A-272-1
viii. Ack. from scrap stores - XB-AP-IGD-03
ix. Request form for Rej. Material - XB-AP-IGD-04
Prepared by Signature Designation Page: 12/13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
Revision 0 1 2 3 4 5
Date 25/09/2017
ITI LIMITED BANGALORE
EEE eEE
PROCESS DOCUMENT
INWARD GOODS
BGP/PD/ IG
ISSUE: 01
DATE : 25/09/17
13
18.0 ANNEXURE:1 ORGANISATIONAL CHART
19.0 AUTHORITY AND RESPONSIBILITY
SECTION PROCESS
OWNER
RESPONSIBILITY INTERFACING
DEPARTMENTS
INWARDS GOODS DGM (CP) Head of production
planning, STC, Inward
goods stores, main stores,
overall administration of
departments, co-ordinating
with interface departments
Purchase, Methods, Assembly,
R&D, PCB plant, Finishing,
Fabrication, Injection, IGI,
moulding, EDP, Finance.
AE(IG)P Incharge of Inward Goods
department - production
Purchase, store, IGI,
Manufacturing shops
Revision 0 1 2 3 4 5
Date 25/09/2017
Prepared by Signature Designation Page: 13/13
AE(IG)P
Checked M (CP)
Approved DGM(CP)
Inwards Goods
ITI LIMITED BANGALORE
EEE eEE
PROCESS DOCUMENT
INWARD GOODS
BGP/PD/ IG
ISSUE: 01
DATE : 25/09/17
DGM (CP)
AE (IGS)
M(CP)