process effectiveness assessment report (pear) form for weatherford aerospace

2
WEATHERFORD AEROSPACE, INC. PROCESS EFFECTIVENESS ASSESSMENT REPORT Organization: Site(s): OIN(s): PEAR Number: Audit Report Number: Issue Date: SECTION 1 – PROCESS DETAILS Process Name: AQMS Standard(s): AS9100C Applicable AS9100 Clause(s): Inputs: Activities: Outputs: Interactions: Section 2 – PROCESS RESULTS Organization’s method for determining process results: Performance Measures: KPI 1: KPI 2: KPI 3: Auditor observations and comments supporting process result determination: Reference Target for Audited Period Value Measured for Audited Period Comments KPI 1: KPI 2: KPI 3: Page 1 of 1 Form IA 1006 (05/29/2014)

Upload: granburyjohnstevens

Post on 15-Oct-2015

398 views

Category:

Documents


0 download

DESCRIPTION

Process Effectiveness Assessment Report (PEAR). This document was established to mirror that found in the AS9101 Audit Criteria Checklist. The PEAR is used to rate the effectiveness of processes under AS9100, Clause 7. Product Realization. Its use is mandatory for Internal Audit activity related to the quality management system (QMS) used for aerospace work.Reference the necessity of such forms per ISO 19011, AS9100, AS9101 and other QMS-related standards. Can be used for supporting processes that fall outside of product realization, such as document control, records control, corrective action and preventive action.

TRANSCRIPT

Organization:

WEATHERFORD AEROSPACE, INC.

PROCESS EFFECTIVENESS ASSESSMENT REPORT

Organization:Site(s):OIN(s):

PEAR Number:Audit Report Number:Issue Date:

SECTION 1 PROCESS DETAILS

Process Name:

AQMS Standard(s): AS9100CApplicable AS9100 Clause(s):

Inputs:

Activities:

Outputs:

Interactions:

Section 2 PROCESS RESULTS

Organizations method for determining process results:

Performance Measures:

KPI 1:

KPI 2:

KPI 3:

Auditor observations and comments supporting process result determination:

ReferenceTarget for Audited PeriodValue Measured for Audited PeriodComments

KPI 1:

KPI 2:

KPI 3:

Page 1 of 1

Form IA 1006 (05/29/2014)