Process Control Systems forPower Plants
-
2
-
Contents Page
General Information 4
Generating Unit Control Systems 7
Fail-Safe Burner Control 9
Turbine Control Systems 10
Flue Gas Desulfurization Plants 13
Hydropower Stations 14
Coal Feeder Plants 18
Water Treatment Plants 19
DeNOx Plants 20
Ammonia (NH3) Tank Farms 20
Waste Incineration Plants 22
Expert Systems 23
Soot Reinjection Plants 26
Block-Type Thermal Power Stations 27
Building Services Control 28
Gas and Steam Power Plant 30
Power Plant Simulators 31
3
-
4Demands on Modern Automation Today, in all fields of engineer-ing, industrial production which is economical and at the same time goes easy on resources and environment is not possible without a high degree of automa-tion. Process control systems used for the automation of power stations must meet particularly high requirements for increased availability, large functional range and decentralized architecture.
Our ME 4012 process control sys-tem meets these high demands. Not only does it provide all the facilities necessary for the acquisi-tion, preparation and processing of plant data; it is also equipped with sufficient intelligence for sequence and closed-loop control tasks and for the monitoring and optimization of plants and plant components.
Observation, monitoring and operator control of the plant as a whole are done in a central control room equipped with monitors. The architecture of the ME 4012 process control system is based on the decentralized, redundant SUB-NET process bus, the AE4012 programmable controllers and the ME-VIEW operator control and process monitoring system.
ME 4012 structures the entire process in a hierarchy of horizontal control levels thus fulfilling the different tasks of the plant:
Interfacing to plant and processes
Sequence, logic and closed-loop control of individual drives
Individually automated function groups providing a high degree of plant automation
In addition, the plant is sectioned vertically into a number of functional units. This division is governed by criteria such as:
Process correlations
Standby requirements
Minimization of signal exchange
ME 4012 ensures complete standby facilities in the areas of data communication and operator control.
Economical Solutions The hardware of the ME 4012 pro-cess control system is of modular design. Therefore, with ME 4012 you will be able to find a made-to-measure solution for your specific problem whatever the automation task is.
Economical solutions for small ap-plications may comprise just one AE 4012 programmable control-ler. These can be expanded as required, responding to increasing demands in the areas of:
Plant and process control
Geographical expansion
Standby and redundant configurations
Plant automation
Auxiliary machinery can easily be integrated using the programmable controller which is compatible with the process bus and can be configured and programmed by the machine manufacturer.
Field-proven Solutions and Technological Know-how
For many years now, our applica-tion experts have proven their experience and know-how in the design of automation and process control schemes for technological processes in the fields of:
Block-type thermal power sta-tions (lignite or coal boilers)
Fail-safe burner control (oil, gas or coal)
Steam turbine control
Gas turbine control
Flue gas desulfurization
DeNOx plants / Ammonia (NH3) tank farms
Coaling plants, supply and disposal installations
Waste incineration
Water treatment
Water power stations
Training schemes for power station control
General Information
-
5Field instruments and installation For all applications mentioned in this Reference List we supplied the control system (inner plant control). In almost all cases, we also pro-vided, installed and commissioned the complete instrumentation, measuring and control equipment for the process peripherals. This includes in particular the transduc-ers for measured quantities such as temperature, pressure, flow, level, water and flue gas analysis, revolutions per minute, position etc.
Equipment and systems are usu-ally installed by our own personnel. Our responsibilities also cover the installation of hook-ups according to our own design, and all pipe-work in connection with stepping lines, which is mostly welded and always carried out using standard and quality-approved conduit material. The frames required for the installation of transducers and the cable subdistributors are manufactured by ourselves to the highest quality standards and adapted to the specific application.
Inline components such as control valves, fittings, covers, nozzles etc. were purchased and provided by us according to the specification of the plant supplier or planning engineers, ready for being installed by the plant supplier.
After completion of all mount-ing and installation work by our personnel, we commissioned the systems and finally provided a complete set of system documents
according to the high technical VGB Standards, R 170 C (VGB = German Association of the Power Station Industries).
Hydraulic Mechanical Systems The scope of our services comprises:
Planning and layout of hydraulic components and systems
Design and delivery of hydraulic mechanical components
Optimization tests of all hydraulic components in our own testing bays before they are shipped
Modernization of hydraulic systems (units, pipelines, control modules) and adaptation on existing machines
Commissioning of hydraulic systems and plants
Delivery and installation of all systems required for turbine strain, vibration, speed, etc. measurement
Maintenance services after project completion
Training of customer personnel for direct plant maintenance/monitoring
Our project engineers prepare hydraulic diagrams, define the component specifications and develop concepts for the con-structing engineers. The configu-ration and design documentation is created with 3D (Solid Works Software (SW)) and 2D (Auto CAD Software) systems.
-
6Coal power station
Computer Animation Power Plant
Computer Animation Power Plant
Brown coal-fired power plant Boxberg Unit RBase load operation Availability: > 91 % Controllability: 50 % to 103 %High level of automationTransmission Code complianceNet efficiency> 43.7 % Live steam: T = 600 C; p = 285 bar IS steam: T = 610 C; p = 52 barCoal consumption: 4.5 million t/aSpecific CO2 emissions: 924 g/kWh
Hard coal-fired power plant Moorburg Unit ACombustion heat output: 3700 MW max.
Combustion heat output: 3354 MW under design cond.
Gross electrical output: 1654 MW under design cond.
District heating output: 650 MW max.
Live steam: T = 600 C, p = 276 bar
IS steam: 610 C, p = 52 bar
Controllability at load operation: 35 to 103%
Hard coal consumption: 480 t/h; 4.21 million t/a approx.
Ashes produced: 63 t/h; 0.56 million t/a approx.
Hard plaster produced: 18 t/h; 0.16 million t/a approx.
Flue gas desulfurization
Induced draft Electric filter Steam generator Power houseCooling tower with flue gas passes
-
7Generating Unit Control SystemsExcerpt
Customer Location Block Output Power Mechanical Engineering
E.ON Kraftwerke Ingolstadt 3+4 420 MW each EVT
GDF Suez-Gruppe Zolling 5 450 MW VKW-Babcock
E.ON Kraftwerke Irsching 3 300 MW EVT
STEAG-RWE Voerde A 750 MW Auxiliary plant
STEAG-RWE Voerde B 750 MW Auxiliary plant
STEAG-VEW Bergkamen 750 MW Auxiliary plant
swb Bremen-Hafen 6 320 MW EVT
E.ON Kraftwerke Shamrock 1 130 t / h Babcock
E.ON Kraftwerke Shamrock 2 130 t / h Steinmller
E.ON Kraftwerke Shamrock 3 130 t / h EVT
E.ON Kraftwerke Shamrock 4 130 t / h Drr
E.ON Kraftwerke Scholven FWK-Buer District heating Steinmller
Stadtwerke Duisburg HKW III District heating Standardkessel
Daimler Benz HKW I District heating EVT
Eletrosul, Brasilien Jorde Lacerda lll 5 125 MW Skoda
Eletrosul, Brasilien Jorde Lacerda lll 6 125 MW Skoda
Kasseler Fernwrme Kassel 2 Fluidization 180 t / h Lurgi / Lentjes
AllessaChemie Frankfurt 1 Process heat Steinmller
AllessaChemie Frankfurt 2 Process heat Steinmller
AllessaChemie Frankfurt 3 Process heat Steinmller
swb-Erzeugung Mittelsbren 4 240 MW EVT
Freundenberg Service Weinheim 5 45 t / h Standardkessel
Vattenfall Europe Boxberg R 700 MW Hitachi Europe
Vattenfall Europe Moorburg A 820 MW Hitachi Europe
Vattenfall Europe Moorburg B 820 MW Hitachi Europe
-
8Computer Animation Power Plant Boxberg
Waste Incineration Plant
-
9Fail-Safe Burner Control Excerpt
Customer Location Block Output Power Mechanical EngineeringE.ON Kraftwerke Ingolstadt 4 420 MW EVT E.ON Kraftwerke Ingolstadt 3 420 MW EVT GDF Suez-Gruppe Zolling 5 450 MW VKW-BabcockE.ON Kraftwerke Irsching 3 300 MW Balcke Drrswb HKW Hafen 6 320 MW EVTswb HKW Hastedt 1 100 t / h MACCIswb HKW Hastedt 2 100 t / h MACCIswb Mittelsbren 4 240 MW BabcockE.ON Kraftwerke Scholven F 750 MW EVTE.ON Kraftwerke Scholven FWK-Buer District heating SteinmllerE.ON Energy f. Waste Stapelfeld 1 165 000 t / a SteinmllerE.ON Energy f. Waste Stapelfeld 2 165 000 t / a SteinmllerKasseler Fernwrme Kassel 2 Fluidization 180 t / h Lurgi / LentjesFreudenberg Service Weinheim 3 Process heat EVTFreudenberg Service Weinheim 4 Process heat EVTEletrosul, Brasilien Jorde Lacerda lll 5 125 MW SkodaEletrosul, Brasilien Jorde Lacerda lll 6 125 MW SkodaRWE Wesseling 1 Process heat Balcke DrrRWE Wesseling 2 Process heat Balcke DrrRWE Wesseling 6 Process heat Balcke DrrTechnische Werke Stuttgart 23 35 MW BabcockGemeinschaftkraft-werke
Veltheim 1 100 MW Balcke Drr
Gemeinschaftkraft-werke
Veltheim 2 100 MW Balcke Drr
Gemeinschaftkraft-werke
Veltheim 3 300 MW Babcock
Gemeinschaftkraft-werke
Veltheim 4 300 MW Balcke Drr
Gemeinschaftkraft-werke
Veltheim HK 35 t / h Eisenw. Baumgarte
AllessaChemie Frankfurt 2 Process heat SteinmllerCasella AG Frankfurt 3 Process heat SteinmllerStadtwerke Frankfurt HKW Messe District heating StandardkesselAWG Wuppertal Wuppertal 12 Waste incineration LentjesAWG Wuppertal Wuppertal 14 Waste incineration LentjesAWG Wuppertal Wuppertal 15 Waste incineration LentjesAWG Wuppertal Wuppertal 16 Waste incineration LentjesStadtwerke Duisburg Duisburg I Heating and power station StandardkesselHoltzmann Karlsruhe-Maxau Process heat StandardkesselVattenfall Europe Boxberg R 700 MW Hitachi Power EuropeVattenfall Europe Moorburg A 820 MW Hitachi Power EuropeVattenfall Europe Moorburg B 820 MW Hitachi Power Europe
-
10
Turbine Control Systems Excerpt
Customer Location Block Turbine * Output Power Function *swb-Erzeugung Hafen 6 ME 320 MW TCSE.ON Kraftwerke Buschhaus 1 ME 350 MW TCSRWE Power AG Frimmersdorf Q AEG 350MW TCSRWE Power AG Huckingen A ME 300 MW TCSRWE Power AG Huckingen B ME 300 MW TCSESKOM Engineering Group, Sdafrika Lethabo 1 ME 620 MW TCSESKOM Engineering Group, Sudafrika Lethabo 2 ME 620 MW TCSESKOM Engineering Group, Sdafrika Lethabo 3 ME 620 MW TCSESKOM Engineering Group, Sdafrika Lethabo 4 ME 620 MW TCSESKOM Engineering Group, Sdafrika Lethabo 5 ME 620 MW TCSESKOM Engineering Group, Sdafrika Lethabo 6 ME 620 MW TCSESKOM Engineering Group, Sdafrika Matimba 1 ME 665 MW TCSESKOM Engineering Group, Sdafrika Matimba 2 ME 665 MW TCSESKOM Engineering Group, Sdafrika Matimba 3 ME 665 MW TCSESKOM Engineering Group, Sudafrika Matimba 4 ME 665 MW TCSESKOM Engineering Group, Sdafrika Matimba 5 ME 665 MW TCSESKOM Engineering Group, Sdafrika Matimba 6 ME 665 MW TCSIEC Israel Electric Corporation Limited Rutenberg 1 ME 550 MW TCSIEC Israel Electric Corporation Limited Rutenberg 2 ME 550 MW TCSIEC Israel Electric Corporation Limited MD-B, Hadera 5 ME 550 MW TCSIEC Israel Electric Corporation Limited MD-B, Hadera 6 ME 550 MW TCSRheinbraun AG Wachtberg 1 ME 90 MW TCSVattenfall Europe Tiefstack-Ersatz ME 160 MW TCSEPON, Niederlande Bergum 1 ME 300 MW TCSEPON, Niederlande Bergum 2 ME 300 MW TCSENSO Gutzeit OY, Finnland Imatra TU 7 ME 92 MW TCSVSE Ensdorf 1 AEG 110 MW TCSRWE Energie AG / VSE Ensdorf 3 ME 315 MW TCSHaindl Papier Augsburg VII ME 25 MW TCSVoest AG, sterreich Linz IV ME 85 MW TCSVattenfall Europe Jnschwalde A LMZ 500 MW TCSVattenfall Europe Jnschwalde B LMZ 500 MW TCSVattenfall Europe Jnschwalde C LMZ 500 MW TCSVattenfall Europe Jnschwalde D LMZ 500 MW TCSVattenfall Europe Jnschwalde E LMZ 500 MW TCSVattenfall Europe Jnschwalde F LMZ 500 MW TCSESKOM Engineering Group, Sdafrika Matla 1 ME 600 MW TCSESKOM Engineering Group, Sdafrika Matla 2 ME 600 MW TCSESKOM Engineering Group, Sdafrika Matla 3 ME 600 MW TCSESKOM Engineering Group, Sdafrika Matla 4 ME 600 MW TCS
-
11
Customer Location Block Turbine * Output Power Function *ESKOM Engineering Group, Sdafrika Matla 5 ME 600 MW TCSESKOM Engineering Group, Sdafrika Matla 6 ME 600 MW TCSE.ON Kraftwerke G. Knepper C AEG 350 MW TCSSTEAG Lnen 7 AEG 350 MW TCSMVA Kiel Kiel L1 + L2 B&V 9 MW TCSTha Toom Thailand 1 GAE 160 MW TCSTha Toom Thailand 2 GAE 160 MW TCSVALA Finnland 1 GAE 230 MW TCSPCK Schwedt Schwedt 1 GAE 90 MW TCSPCK Schwedt Schwedt 2 GAE 90 MW TCSNOK Thei, Austria Thei - GAE 250 MW TCSE.ON Kraftwerke, KW Heyden Petershagen 4 Siemens 920 MW TCSESKOM Engineering Group, Sdafrika Grootvlei 1-6 ME 6 x 200 MW TCSElectrabel MV NP, Belgium Doel 4 Alstom 1100 MW TCS / THSElectrabel MV NP, Belgium Tihange, Huy 3 Alstom 1100 MW TCS / THSElectrabel MV NP, Belgium 2 x SPAT/TFP 3 Ratau 3000 t/h TCS / THS
* Turbine / turbine ME = MAN-ENERGIE, Nrnberg
AEG = AEG-AG, Berlin
LMZ = Leningrader Metallwerke Sankt Petersburg
GAE = GEC-Alsthom Energie, Nrnberg
B&V = Blohm & Vo, Hamburg
** Turbine Control System Functions:
TCS = Turbine control system retrofit
THS = Turbine hydraulic system retrofit
Turbine
Matimba, South Africa Installation Power Plant Doel, Belgium
-
12
Coal power station (Flue gas desulfurization)
Lignite-fired power plant
-
13
Flue Gas Desulfurization Plants Excerpt
Customer Location Block Output Power Mechanical EngineeringE.ON Kraftwerke Ingolstadt 3+4 420 MW KRC-Umwelttechnik
STEAG-VEW Bergkamen A 750 MW Steinmller
STEAG-RWE Voerde A 750 MW Steinmller
STEAG-RWE Voerde B 750 MW Steinmller
VEBA KW Ruhr AG Shamrock 1+2 District heating 2x130 t / h Thyssen
VEBA KW Ruhr AG Shamrock 3+4 District heating 2x130 t / h Thyssen
swb Hafen 5 300 MW Babcock
swb Hafen 6 420 MW Babcock
VSE / RWE Ensdorf 3 315 MW NIRO / KRC
VSE / RWE Ensdorf 1 150 MW NIRO / KRC
E.ON Kraftwerke Scholven B 300 MW Thyssen
E.ON Kraftwerke Scholven C 300 MW Thyssen
E.ON Kraftwerke Scholven D 300 MW Thyssen
E.ON Kraftwerke Scholven E 300 MW Thyssen
E.ON Kraftwerke Scholven FWK-Buer District heating Thyssen
VEAG Berlin Jnschwalde A 540 MW KRC-Umwelttechnik
VEAG Berlin Jnschwalde B 540 MW KRC-Umwelttechnik
VEAG Berlin Jnschwalde C 540 MW KRC-Umwelttechnik
VEAG Berlin Jnschwalde D 540 MW KRC-Umwelttechnik
VEAG Berlin Jnschwalde E 540 MW KRC-Umwelttechnik
VEAG Berlin Jnschwalde F 540 MW KRC-Umwelttechnik
VEAG Berlin Boxberg N 540 MW L. & C. Steinmller
VEAG Berlin Boxberg P 540 MW L. & C. Steinmller
Vattenfall Europe Boxberg R 700 MW Babcock Noell
Vattenfall Europe Moorburg A 820 MW Babcock Noell
Vattenfall Europe Moorburg B 820 MW Babcock Noell
AllessaChemie Frankfurt 2 Process heat Steinmller
Casella AG Frankfurt 3 Process heat Steinmller
Stadtwerke Frankfurt HKW Messe District heating Standardkessel
AWG Wuppertal Wuppertal 12 Waste incineration Lentjes
AWG Wuppertal Wuppertal 14 Waste incineration Lentjes
AWG Wuppertal Wuppertal 15 Waste incineration Lentjes
AWG Wuppertal Wuppertal 16 Waste incineration Lentjes
Stadtwerke Duisburg Duisburg I Heating and power station Standardkessel
Holtzmann Karlsruhe-Maxau Process heat Standardkessel
Vattenfall Europe Boxberg R 700 MW Hitachi Power Europe
Vattenfall Europe Moorburg A 820 MW Hitachi Power Europe
Vattenfall Europe Moorburg B 820 MW Hitachi Power Europe
-
14
Hydropower Plants Excerpt
Customer Location Type of PlantOutput Power
Mechanical Engineering
E.ON Wasserkraft
Eitting Run-of-river power station Turbosets
Scope of delivery: Start and stop automatics, ME 4002
4 x 10 MW
VOITH
E.ON Wasserkraft
Aufkirchen Run-of-river power station Turbosets
Scope of delivery: Start and stop automatics, ME 4002
4 x 10 MW
VOITH
E.ON Wasserkraft
Finsing Run-of-river power station Turbosets Turboset
Scope of delivery: Start and stop automatics, ME 4002
3 x 4 MW 0,25 MW
VOITH
E.ON Wasserkraft
Niedernach Walchensee
Run-of-river power station Turbosets
Scope of delivery: Start and stop automatics, ME 4002
3 MW
Escher-Wyss
E.ON Wasserkraft
Haag Oberzolling
Run-of-river power station Turboset 3 Weir control systems
Scope of delivery: Start and stop control, level control, ME 4012 Remote control of the weirs at Oberzolling, ME8018 Remote data transmission to the central control station at Zolling, ME 8008 Remote control of the plant, ME-VIEW Centralized alarm and event monitoring , ME2015
4 MW
Escher-Wyss NOELL
-
15
Customer Location Type of PlantOutput Power
Mechanical Engineering
RWE Energie AG Herdecke / Ruhr
Pumped storage power station
Scope of delivery: Signal conditioning and drive control, ME 4012 Automatic synchronization, Distributed visual/acoustic alarm handling ME 3008 / ME 7002 Event and alarm recording system , ME 2015M Mechanical protection , ME 4002 Equipment for central control room: control desks, mosaic boards and panels as well as complete indoor installation and furnishing ,sup-ply of the machine control panel
150 MW / 200 MVA
VOITH / SEW
E.ON Wasserkraft
Ettling Run-of-river power station Turbosets 4 Weir control systems
Scope of delivery: Start /stop automatic with automatic synchroni-zation of the turbosets, ME 4002 Control system for 4 weirs Complete equipment for central control room and machine control panel
3 x 4 MW
Escher-Wyss NOELL
BKW Bernische Kraftwerke AG
Unterwerk Schwarzen-burg (CH)
ME 400 Signalling and monitoring system
BKW Bernische Kraftwerke AG
Wasserkraft-werk Brgg(CH)
ME 400 Signalling and monitoring system
BKW Bernische Kraftwerke AG
Unterwerk Schwarzen-burg (CH)
ME 400 Signalling and monitoring system
BKW Bernische Kraftwerke AG
Unterwerk Amsoldingen (CH)
ME 400 Signalling and monitoring system
BKW Bernische Kraftwerke AG
Unterwerk Heimiswil (CH)
ME 400 Signalling and monitoring system
-
16
Hydropower Plants Excerpt
Customer Location Type of PlantOutput Power
Mechanical Engineering
Weiachtal-Kraftwerks eG
Oberstaufen Werk III
Run-of-river power station Turboset Run-of-river power station Pump turboset
Scope of delivery: Automatic machine control with automatic synchronization, ME 4012, Level control, Refer-ence control
0,5 MW 0,15 MW
VOITH VOITH
EnBW Kraftwerke
Rudolf Fettweis Werk
Pumped storage power station
Scope of delivery: Automation of the pump turbine, machine 6, ME4012, Supply of machine control panel Remote central control room with integrated process bus for the communication with 16substations for remote level measurement in the water collecting area , and for a connection to the load distribution plant at Daxlanden Report generator (ME-AIS) for status and accounts reports on the inlets and outlets Operator control and process monitoring system, ME-VIEW Configuration and diagnostics station, ME-PC
25 MW Escher-Wyss
Nordost Sch-weizerische Kraftwerke AG
Beznau, CH Run-of-river power station Turbosets Scope of delivery: ME 4012 for the control and monitoring of the machine groups and of the 8kV switchgear stations, Sequence and closed-loop control in various auxiliary plant, Plant operator control and VDU operator control system ME-VIEW in redundant configuration, Central configuration and diagnostics station ME-PC
11 x 2,5 MW
Bell / Escher-Wyss
E.ON Wasserkraft
Pfrombach Run-of-river power station 7 Turbosets
Scope of delivery: Start and stop automatics with ME 4002
20 MW total
VOITH
-
17
Customer Location Type of PlantOutput Power
Mechanical Engineering
E.ON Wasserkraft
Pielweichs Run-of-river power station Turbosets 4 weir control systems
Scope of delivery: Start and stop automatics with automatic synchronization, Level control with respect to the power stations at Oberlieg, Surge control, ME4012, (Complete instrumentation and measurement equipment), Remote control of the weirs , ME 8008, Complete equipment for central control room and machine control panel
3 x 4 MW
Escher-Wyss NOELL
Weiachtalkraft-werke AG
Oberstaufen Werk I
Run-of-river power station 3 Turbosets Peak power output Diesel generator
Scope of delivery: Automatic machine control with automatic synchronization, ME 4012, Level control, refer-ence control, master control system for diesel generators, Machine control panel
1100 kW 450 kW 100 kW 1100 kW 2 x 880 kW
VOITH
Nordost Schweizerische Kraftwerke AG
Wildegg-Brugg, CH
Run-of-river power station Turbosets
Scope of delivery: Control of machine groups and auxiliary plant, ME 4012, Analysis of water resources , control of proportioning machines and 110kV switchgear Control of station service equipment, ME-VIEW VDU system in redundant configuration for op-erator control, Plant information system ME-AIS Central configuration and diagnostics station ME-PC
2 x 23 MW
Bell / Escher-Wyss
-
18
Coaling PlantExcerpt
Customer Location Block Control and Monitoring of
swb-Erzeugung KW Hafen 5, 6 Coal loading bridge
STEAG Voerde A, B Bunker coaling, Up and down coal stacker, Ash removal and loading Shipper with surge guard, Coal sampler
STEAG Voerde West 1, 2 Bunker coaling, Up and down coal stacker, Ash removal and loading Shipper with surge guard, Coal sampler
GDF Suez-Gruppe
Zolling 5 Bunker coaling, Coal up and down stacker, Ash removal and loading
Kasseler Fernwrme
Kassel 2 Coaling plant, Ash removal and loading
Vattenfall Europe
Moorburg, Hamburg
A / B Bunker coaling; Ash removal and loading, Shipper with surge guard coaling plant; coal bunker, belt conveyor; grinding mill, coal pulveriser, circular coal storage, reclaimer system, weighing scale; from-bin transfer; block distribution
-
19
Water Treatment Plants Excerpt
Customer Location Block Control and MonitoringE.ON Wasserkraft Ingolstadt 4 Waste water treatment, Company: Hager & Elssser
GDF Suez-Gruppe Zolling 5 5 District heating 5
Desalinization plant, Company: WABAG Condensate treatment, Company: WABAG Component current cleaning Heating water, Company: WABAG Waste water treatment, Company: Philipp Mller
STEAG-RWE Voerde A, B Waste water treatment, Company: Philipp Mller Cooling tower make-up water treatment, Philipp Mller Desalinization plant, Company: WABAG Condensate treatment
STEAG-VEW Bergkamen A Desalinization plant, Company: Steinmller
swb, HKW Hastedt 1 2 Desalinization plants, Company: Babcock
swb, HKW Hafen 5, 6 Waste water treatment, Company: Philipp Mller
RWE Mhlheim-Krlich
Cooling tower make-up water treatment, Philipp Mller
Gemeinschafts-KW Weser
Veltheim Desalinization plant, Company: Polysius
ARA Buholz Emmenbrcke (CH)
Alarm and event indication system for the entire waste treat-ment plant with interface to the ME 4012 SUB-NET process control system of the sludge incineration plant 6 off ME300 event data acquisition systems connected to the SUB-NET bus
Stadtwerke Mnchen HKW Mnchen-Sd
ME 4012 screen control in central control room
Vattenfall Europe Moorburg / Hamburg
A, B ME-REG with printer in central control room Desalinization plant, Company: WABAG Condensate treatment, Company: WABAG Desalinization plant, Company: WABAG Condensate treatment, Company: WABAG Chemicals supply: HCC, NaOH, FeCl3, Antiscalant, Biocid, NaHSO3Component current cleaning Heating water, Company: WABAG Waste water treatment, Company: Philipp Mller Cooling tower make-up water treatment, Philipp Mller Process water treatment, Fa. ELGA, Berkefeld (VWS Deutschland)
-
20
De-NOx PlantsExcerpt
Customer Location Block Control and Monitoring of
E.ON Kraftwerke Ingolstadt 4 De-NOx, Fa. EVT
GDF Suez-Gruppe Zolling 5 De-NOx, Fa. Uhde
swb-Erzeugung Hafen 5, 6 De-NOx, Fa. EVT
E.ON Kraftwerke Shamrock 1+2, 3+4 De-NOx, Fa. Thyssen
E.ON Kraftwerke Scholven FWK Buer De-NOx, Fa. Thyssen
Vattenfall Europe Boxberg R Hitachi Power Europe
Vattenfall Europe Moorburg, Hamburg A, B Hitachi Power Europe
Customer Location Block Control and Monitoring of
STEAG Bergkamen De-NOx, Fa. EVT
Gemeinschaftskraftwerk Veltheim Veltheim De-NOx, Fa. Uhde
swb-Erzeugung Hafen De-NOx, Fa. EVT
GDF Suez-Gruppe Zolling De-NOx, Fa. Thyssen
Vattenfall Europe Boxberg De-NOx, Fa. Thyssen
Vattenfall Europe Moorburg, Hamburg Hitachi Power Europe
Vattenfall Europe Moorburg, Hamburg A, B Hitachi Power Europe
Ammonia (NH3) Tank FarmsExcerpt
-
21
Coal power station (Flue gas desulfurization)
DeNOx Plant for Nitrogen Oxide Reduction Coal contains small amounts of nitrogen that is partly formed into nitrogen oxide during the combus-tion process. In the DeNOx plant, the nitrogen oxide is removed from the flue gases of the coal combus-tion process. This is done by injecting ammonia into the flue gas and then conveying the mixture across catalyzers. A catalyzer stimulates chemical reactions but is chemically unchanged at the end of the reaction (selective catalytic reaction, SCR). In the power station catalyzers, ammonia and nitrogen oxide react with each other and produce nitrogen and steam, which are natural compo-nents of our breathing air.
Ammonia tank farm
Ammonia Tank Farm Ammonia (NH3 ) is a chemical compound derived from the reaction of nitrogen and hydrogen. Ammonia is pungent smelling, colorless, water-soluble and toxic gas and must be safely stored and transported in compliance with the regulations of the Hazardous Incident Ordinance. The neces-sary process control measures are thus very complex, especially with respect to the protection against risk from fire and explosion.
-
22
Customer Location Boiler No. Output Power Mechanical Engineering
MVA Stapelfeld Hamburg Linie 1,2 je 165.000 t / a Steinmller, H. Petersen, v. Roll
Scope of delivery: Automation of the incineration lines no. 1 and 2 and all auxiliary plant, such as flue gas washery, DeNOx plants, flue gas secondary treatment, cyclone combustion chamber, water treatment, evaporation plant, district heating output and electrical station service equipment.
AWG Wuppertal Wuppertal Kessel 11 bis 16 Lentjes-Umwelttechnik
Scope of delivery: Automation of boilers, general plant, flue gas treatment using open-hearth furnace coke filter and SCR nitrogen removal of lines 1 to 3 Modernization of central control room
KVA Bern Bern (CH) Linie 23, 24 von Roll
Scope of delivery: Automation of combustion, boiler, DeNox, washery and fly-ash treatment of lines 23 and 24, and of radiant type boiler, hot water boiler, threepass boiler, district heating supply and steam turbine, flue gas treatment
MVA Oftringen Oftringen (CH) Scope of delivery: Control of station services and local control
MVA Zricher Oberland
Hinwil (CH) Scope of delivery: Control of station services and local control
Papierfabrik Ziegler
Grellingen (CH) Scope of delivery: Control of station services and local control
SVA Buholz Emmenbrcke (CH)
Slurry incineration Thyssen
Scope of delivery: Automation of the slurry incineration and general plant Modernization of the central control room
Waste Incineration Plants Excerpt
-
23
Expert SystemsExcerpt
Definition of Process Quality There is not yet a generally ac-cepted definition of the term Process quality in conjunction
with power plant processes. We use the definition illustrated in Figure 1 on the basis of the follow-ing explanations.
Index "IST" represents the actual unit efficiency factor under the present operating conditions. Index "SOLL" represents the maximum unit efficiency factor theoretically possible under the same operating conditions, or the specific heat consumption deter-mined for that unit.
The term Process quality can therefore be understood as a complex status description of the overall system according to the above definition. Determination of the process quality by continuous comparing actual and required values allows efficient monitoring of the entire power plant process.
Fig. 1
Process quality monitoring of the water-steam cycle
Customer Location Application
Vattenfall Europe Boxberg Power/path diagnosis pipeline Main steam line service life calculation Unit allowance computer Energetic calculation for the process quality PIGM interface balances and reports
Vattenfall Europe Moorburg, Hamburg Power/path diagnosis pipeline Main steam line service life calculation Unit allowance computer Energetic calculation for the process quality PIGM interface balances and reports PI system OSI-Soft balances and reports
swb HKW Hafen, Block 6, Bremen
Process quality monitoring for sustained plant management and efficiency enhancement in cogeneration plant Hafen, unit 6, 320MW
Process Quality
-
24
Plant Management System Monitoring the remaining service life of components subjected to high stress is an important task in the responsible operation of a power plant, which becomes even more pressing the longer these components stay in operation. In order to assess the effects of the operating conditions on the life span of the steam generator components, appropriate meas-urements and calculations must be carried out. The analysis of these results in compliance with the specifications of the technical rules and standards acc. to DIN EN 12952 provides information about any reduction of the components initial life expectancy that may become necessary.
Service Life Management of Mechanical Components (components subjected to high stress and pressure; failure is not permitted)
Time-oriented MaintenanceMaintenance cycles are specified on the basis of experience observ-ing high safety margins. (Periodic inner test 3 years max.).
The service life reserve of a component can be continu-ously monitored with diagnostic methods. When optimally imple-mented, this condition-oriented maintenance represents the most efficient way.
Failure-oriented maintenance is the most efficient if safety and availability of the overall system is not a relevant factor.
Pipeline monitoringLoad condition:
Operation
Weight
Thermal expansion
Display:
Shift
unscheduled
Time-oriented Maintenance
Preventive Maintenance
Condition-oriented MaintenanceFailure-oriented Maintenance
Cond
ition of the co
mpone
nt
Time
-
25
Application example: Process quality monitoring in power plant Hafen Unit 6, 320MW for sus-tained system management and efficiency enhancement The process quality monitoring system (PG) was modeled, and thus on the basis of the valid data, the closed water-steam cycle as well as the air-flue gas system including the fuel model.
The successful implementation in the utility company swb genera-tion, Hafen power plant Bremen, coal unit 320MW, is used as a reference example.
To enable online usage of this important tool for plant efficiency enhancement, the results of the process quality monitoring (PG) are entered in the ME-VIEW user interface. Deviations from the optimum capacity are displayed in color and recorded by the
signalling system. The data is transmitted over a bidirectional line in the form of 5-minute values via a database interface.
Some excerpts from the ME-VIEW user interface are shown below:
Process quality monitoring fluegas-air path
-
26
Steam blower Water blower
Customer Location Application
STEAG RWE Voerde A 108 ED, 4 Luvo und 46 LS
STEAG RWE Voerde B 108 ED, 4 Luvo und 46 LS
STEAG RWE De-NOx, Block A 30LS
STEAG RWE De-NOx, Block B 40LS
STEAG KW-West I 25 ED, 2 Luvo und 26 LS
STEAG KW-West II 25 ED, 2 Luvo und 26 LS
RWE-Ensdorf 1 2 Luvo und 14 LS
RWE-Ensdorf 2 2 Luvo und 14 LS
Vattenfall Europe Moorburg A 73 DB, 8 WB
Vattenfall Europe Moorburg B 73 DB, 8 WB
Vattenfall Europe Boxberg R 118 DB, 56 WB
swb Heizkraftwerk Hafen, Block 6 25 ED, 2 Luvo und 26 LS
ED = Single jet blower Luvo = Preheater blower LS = Long or lance screw-motion blower WB = Water blower DB = Steam blower
Soot Reinjection Plants Excerpt
-
27
Block-Type Thermal Power Stations Excerpt
Combined Heat and Power Plant (CHP)
Customer Block Plant Application
E.ON Ebersberg 1 Gas motor 822 kWth / 471 kWel1 Gas boiler 2,4 MW 1 Electric boiler 1,2 MW 1 Storage heater 13 m3
Automation and ON/OFF logics of the heat exchangers, consider-ing the heat requirements and applied fuel materials. Heat loop control supplied by BoB. Remote control, local control panel in mosaic design.
E.ON Unterhaching 1 Gas motor 520 kWth / 348 kWel1 Gas boiler 1,8 MW 1 Electric boiler 1,2 MW 2 Storage heaters 10 m3
E.ON Puchheim 4 Gas motors 798 kWth / 542 kWel1 Gas boiler 2,3 MW 1 Gas boiler 7 MW 3 Electric boilers 1,2 MW 1 Storage heater 21 m3
-
28
Building Services Control Excerpt
Customer Location Application
Coutts & Co. AG Zrich (CH) Spillway bridge
Building monitoring and gate reception, ME 4012 control system ME 8018 remote control system, mosaic-type control room
Telekurs AG Zrich (CH) Computer Centre
Power distribution control, resource management and gate recep-tion, ME 4012 system, ME-VIEW / ME 2015, mosaic-type control room, ME-PC
Schweizerischer Bankverein
Altstetten (CH) Computer Centre
Power distribution control, energy control ME 4012 system
Schweizerischer Bankverein
Altstetten (CH) Office building
Power distribution control, energy control ME 4012 system
Schweizerische Bankgesellschaft
Zrich (CH) Building control for heating, cooling, air-conditioning and ventila-tion, ME 4012 system
Bank Leu Stettbach (CH) Computer Centre
Power distribution control, energy control ME 4012, ME 2015 systems
Schweizerische Nationalbank
Zrich (CH) Telekurs remote monitoring system ME 8018 systems for SNB, mosaic-type control room
Swiss Stock Exchange Zrich (CH) Control system for security centre AE 4012 systems, mosaic-type control room
Swiss Stock Exchange Zrich (CH) Computer Centre
Energy control and energy management system AE 4012 systems, ME-PC, ME-VIEW
Schweizerische Nationalbank
Zrich (CH) Remote monitoring system Seefeld SNB stock exchange, ME 8018 remote control system, mosaic-type control panel ME 2025 event indication
Schweizerischer Bankverein
Opfikon (CH) Power distribution control, energy control ME 4012, ME 2015 systems, mosaic-type control room, H1 bus coupler, ME-PC
-
29
Customer Location Application
Credit Suisse Horgen (CH) Computer Centre
Power distribution control, energy control ME 4012-SUB-NET system, mosaic-type control room, ME-VIEW
Schweizerischer Bankverein
Opfikon (CH) UPS monitoring system, Energy control with LAN coupler ME 4012-SUB-NET system, ME-VIEW
Zrich Insurance Schlieren (CH) Computer Centre
Power distribution control, energy control with LAN coupler, ME 4012-SUB-NET system, ME-VIEW
Schweizer Rck Zrich (CH) Power distribution control for main low-voltage distribution for securing the energy supply in the event of mains failure or inter-ruption 3 programmable controllers with SUB-NET 1 operator control and process monitoring system 1 active mimic diagram
St. Galler Kantonalbank
Headquarters St. Gallen (CH)
Power distribution control for main low-voltage distribution for securing the energy supply in the event of mains failure or inter-ruption 6 programmable controllers with SUB-NET 1 operator control and process monitoring system ME-VIEW 1 active mimic diagram
University Hospital Zrich
Zrich (CH) Power distribution control for main medium and low voltage distribution for securing the energy supply in the event of mains failure and interruption 12 programmable controllers with SUB-NET 2 operator control and process monitoring systems ME-VIEW 1 active mimic diagram
-
30
Gas and Steam Power Plant Excerpt
Power plant AltbachControl room
Customer Manufacturer turbine ST / GT Function / Gas turbine (GT)
HKW Halle / Trotha Siemens / Siemens V 64.360 MW / 25 MW
Serial integration of the gas turbine and steam turbine control into the main control system ME 4012
Public services Munich CHP Munich South Gas and steam power plant 1
Siemens / Siemens V 94.1105 MW / 2 x 100 MW
Overall plant control technology, ME4012 for control technology and protection
Public services Munich CHP Munich South Gas and steam power plant 2
ALSTOM Power / General Electric Frame9E
140 MW / 2 x 140 MW
Overall plant control technology, ME4012 for control technology and protection process bus integration of the Mark 5 gas turbine control
EnBW KW Altbach / Deizisau, GT-A
Siemens V93.0 50 MWOverall plant control technology, ME4012 for control technology and protection
Industrial power plant Freudenberg Service, Weinheim, GT1
Ruston Tornado 6,3 MWlink up to the block control of boiler 4 by parallel coupling
Industrial power plant Freudenberg Service, Weinheim, GT2
Turbomach Caterpillar, Taurus T60
5,5 MWlink up to the block control of boiler 5 by parallel coupling
-
31
Power Plant Simulators Excerpt
Customer Power Station
Trainingsinstitut Faisalabad WAPDA, Pakistan
KWS-Essen Stadtwerke Bremen, KW Hafen
Sultan Salahuddin Abdul Aziz Kraftwerk Abdul Aziz, Malaysia
Krnkraftskerhet och Utbildning AB - Studsvik Vattenfall AB, Ringhals Block 1, Schweden
STN-Atlas Elektronik, Bremen Escom, Matimba Block 1-6, Sdafrika
STN-Atlas Elektronik, Bremen Escom, Kendal Block 1-6, Sdafrika
Leibstadt KKW Leibstadt, Schweiz
Thomson, Frankreich Pacific Power, KW Mount Piper, Australien
KSG-Essen Kernkraftwerk Emsland (nuclear power plant)
KSG-Essen Kernkraftwerk Biblis
KSG-Essen Kernkraftwerk Philippsburg 2
KSG-Essen Kernkraftwerk Brokdorf
KSG-Essen Kernkraftwerk Philippsburg 1
KSG-Essen Kernkraftwerk Isar 1
KSG-Essen Kernkraftwerk Isar 2
Krnkraftskerhet och Utbildning AB-Studsvik Vattenfall AB, Ringhals Block 2, Schweden
KSG-Essen Kernkraftwerk Unterweser
KSG-Essen Kernkraftwerk Neckarwestheim
KSG-Essen Kernkraftwerk Obrigheim
KSG-Essen Kernkraftwerk Borssele
Tenagu Nasional Berhadad Kernkraftwerk Connaught Bridge, Malaysia
Kernkraftwerk Gsgen KKW Gsgen, Schweiz
Kernkraftwerk Mhleberg KKW Mhleberg, Schweiz
Siemens, Erlangen KKW Tianwan, China
Krnkraftskerhet och Utbildning AB-Studsvik KKW Oskarshamn Block 2, Schweden
Krnkraftskerhet och Utbildning AB-Studsvik KKW Oskarshamn Block 3, Schweden
CAE Electronics, Canada KKW Beznau, Schweiz
Westingshouse, Pittsburgh Ringhals, Schweden
CAE Electronics, Canada Hartlepool, England
British Energy Heysham, England
Siemens, Erlangen Olkiluoto 3, Finnland
Southern California Edison San Onofre Nuclear Genarating Station, USA
Soluziona Ing. / Tecnatom Trillo, Spanien
-
www.mauell.com
Head officeGermanyHelmut Mauell GmbHAm Rosenhgel 1-742553 VelbertGermany
BrazilHelmut Mauell do Brasil Ltda.Estr. Est. Salvador de Leone 299806850-000 ITAPECERICA DA SERRA SAO PAULOBrazil
NetherlandsHelmut Mauell B.V.Lorentzstraat 313846 AV HARDERWIJKNetherlands
SwitzerlandMauell AGFurtbachstrae 178107 BUCHSSwitzerland
USAMauell Corporation31 Old Cabin Hollow RoadDILLSBURG PA 17019USA
Africa
Argentina
Australia
Austria
Belgium
Czech Republic
Denmark
Finland
France
Great Britain
Hungary
Indonesia
Iran
Korea
Kuwait
Malaysia
Norway
Poland
Portugal
Rumania
Russia
Sweden
Singapore
Spain
Thailand
Turkey
U.A.E.
Subject to change.01.0000.04E12