Process: A Generic View
A software process is a roadmap to building high quality software
products. provides a framework for managing activities. adapts to meet needs of software engineers and
managers. Different types of projects require different
software processes. Best indicators of how well a process worked
are the quality, timeliness, and long-term viability of the resulting software product.
![Page 2: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/2.jpg)
Software Processes
What is a process? Sequence of steps required to develop or maintain
software
Characteristics prescribes major activities constraints and controls apply to activities,
resources, and products utilizes resources, subject to constraints such as
schedule, to produce intermediate and final results constraints on activities: time, budget, tools controls on activities: config. mgmt, reports
![Page 3: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/3.jpg)
These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman. 3
A Process Framework
Process frameworkProcess frameworkFramework activitiesFramework activities
work taskswork productsmilestones & deliverablesQA checkpoints
Umbrella ActivitiesUmbrella Activities
![Page 4: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/4.jpg)
Common Process Framework Activities
Communication Planning Modeling
Analysis of requirements Design
Construction Code generation Testing
Deployment
![Page 5: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/5.jpg)
Umbrella Activities
Software project tracking and control Formal technical reviews Software quality assurance Software configuration management Work product preparation and production (activities to
create models, documents, logs, forms, lists, etc.) Reusability management (defines criteria for work
product reuse and establish mechanisms to achieve component reuse)
Measurement Risk management
![Page 6: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/6.jpg)
These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill, 2009). Slides copyright 2009 by Roger Pressman. 6
A Generic Process Model
![Page 7: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/7.jpg)
These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill, 2009). Slides copyright 2009 by Roger Pressman.
7
Process Flow
![Page 8: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/8.jpg)
8
Identifying a Task Set
A task set defines the actual work to be done to accomplish the objectives of a software engineering action. A list of the task to be accomplished A list of the work products to be produced A list of the quality assurance filters to be
applied
![Page 9: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/9.jpg)
Attributes for Comparing Process Models
Overall flow and level of task dependencies Degree to which work products are identified and
required within each framework activity Manner in which quality assurance activities are
applied Manner in which project tracking and control activities
are applied Overall degree of detail and rigor of process
description Degree to which stakeholders are involved in the
project Level of autonomy given to project team Degree to which team organization and roles are
prescribed
![Page 10: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/10.jpg)
Process Assessment
SPICE (ISO/IE15504) standard defines a set of requirements for process assessment
ISO 9001:2000 for Software defines requirements for a quality management system that will produce higher quality products and improve customer satisfaction
![Page 11: Process: A Generic View n A software process is a roadmap to building high quality software products. provides a framework for managing activities](https://reader036.vdocuments.site/reader036/viewer/2022081700/56649dff5503460f94ae765d/html5/thumbnails/11.jpg)
Software Engineering Institute (SEI) Capability Maturity Model Integration (CMMI)
Level 0: Incomplete (process is not performed) Level 1: Performed (tasks are being conducted) Level 2: Managed (tasks and products are monitored,
reviewed, and evaluated for conformance to process description)
Level 3: Defined (processes documented, standardized, and integrated into organization-wide software process)
Level 4: Quantitatively Managed (software process and products are quantitatively understood and controlled using detailed measures)
Level 5: Optimizing (continuous process improvement is enabled by quantitative feedback from the process and testing innovative ideas)