proceedings of the xvi ecsmge isbn 978-0-7277-6067-8 © the ... · basal reinforced piled...

6
1217 Proceedings of the XVI ECSMGE Geotechnical Engineering for Infrastructure and Development ISBN 978-0-7277-6067-8 © The authors and ICE Publishing: All rights reserved, 2015 doi:10.1680/ecsmge.60678 Load-settlement behaviour of three pile groups: a case study Le comportement de trois groupes de pieux vissés : étude d’un cas réel P.O. Van Impe *1,2 , W.F. Van Impe 1,2 , A. Manzotti 2 and L. Seminck 3 1 Ghent University, Ghent, Belgium 2 AGE Consultants bvba, Ghent, Belgium 3 GFS Industries NV, Belgium * Corresponding Author ABSTRACT The paper presents the case study on the construction of three 48m diameter steel tanks, each founded on a group of 422 dis- placement cast in-situ piles. The three tanks are close enough to each other to induce interaction. The movements of the tank foundations have been monitored during the hydro-testing of the steel tanks, and during the subsequent working stage of the tanks. The bearing layer for the pile group is a 5 m thick stiff sand layer at a depth of about 20m, overlain by a very heterogeneous soft fill containing sand pockets, and underlain by a very thick slightly overconsolidated clay. The authors present some short and long term settlement prediction for the tanks, based on soil parameters derived from CPT on site, and compare this to the measured settlements. The initially derived soil parameters are re-evaluated in order to predict the long term settlement for the full life span of the construction. RÉSUMÉ Cette contribution décrit le cas réel de trois groupes de pieux servant comme fondations de trois réservoirs de combustibles; chaque réservoir, en acier, se trouvant fondé sur 422 pieux vissés avec refoulement. Les trois réservoirs se trouvent en proximité l’un de l’autre et peuvent donc être considéré se comportant en interaction majeure. Les déformations en trois axes ont été mesurées pendant les épreuves hydraulique de chaque réservoir et en plus durant l’exploitation des réservoirs remplis de combustibles. La couche r ésistante des groupes de pieux a une épaisseur de 5m de sable très rigide, à une profondeur de 20m, recouverte par de multiples couches ou lentilles minces et très hétérogènes jusqu’à la surface du terrain naturel. Le sol en dessous de la couche portante peut être considéré comme une ar- gile légèrement sur-consolidée sur une épaisseur d’environ 100m. On présente ici la comparaison entre les résultats d’analyse de prédiction des tassements immédiats et à long terme, pour les trois réservoirs en interaction, partant de l’interprétation de multiples essais de pénétra- tion en profondeur d’un côté, et les mesures en fonction du temps de ces tassements des trois réservoirs de l’autre côté. Les estimations des paramètres de rigidité des diverses couches ont été ré-analysées utilisant cette banque de données des tassements mesurés afin de pouvoir prévoir avec plus de confidence les tassements à très long terme. 1 INTRODUCTION The three tanks (each 33.000 m³) are steel structures of 48m in diameter and a height of 19m. Figure 1 shows the relative location of the tanks on the site in Ostend, Belgium. The tanks are positioned in a triangular arrange- ment at an interdistance (centre-to-centre) of about 65m. (Tanks 1 and 3 are slightly further apart, see figure 1). They are founded on a 48.8m diameter, 60cm thick reinforced concrete slab, supported by 422 displacement screw piles. The 460mm diameter displacement screw piles of the Omega type are placed at an interdistance of 2.2 m (centre-to-centre) and reach to a depth of 21.5m. They are designed to each take a maximum design load of 960 kN, including some 180 kN negative skin friction. We refer to Van Impe et al. (2013), and the dis- cussion by Fellenius (2014), for more details on the design and related pile testing. Both papers also pre- sent some initial settlement predictions.

Upload: others

Post on 19-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

  • 1217

    Proceedings of the XVI ECSMGEGeotechnical Engineering for Infrastructure and DevelopmentISBN 978-0-7277-6067-8

    © The authors and ICE Publishing: All rights reserved, 2015doi:10.1680/ecsmge.60678

    better with the measurements than the load distribu-tion assumed by Boussinesq.

    296 306 316 326 336 346 356

    -14-12-10-8-6-4-202-1

    01234567

    19 20 21 22 23distance (m)

    axia

    lfor

    cein

    pile

    693

    (kN

    ,fro

    mto

    pop

    ticfib

    rest

    rain

    gaug

    e)

    tota

    lloa

    dA

    +Bon

    pile

    cap

    693,

    kN

    time (sec)

    (A+B)

    2.27 m

    5.15 m

    15.6 m

    Axialforce N

    Figure 8. Axial force determined from strain measured with opticfibre 0.53 m below pile cap and pile load A+B measured with TPC(minimum interpretation). On top: determination of spreading an-gle of axle load of truck 1339b load.

    0

    5

    10

    15

    20

    25

    30

    0 5 10 15calc

    ulat

    edlo

    adpe

    rpile

    forp

    ile69

    3(k

    N/p

    ile)

    measured load per pile for pile 693 including loadon subsoil (kN/pile)

    spreading angle / optic fibresspreading angle / TPC(A+B)measured=calculatedBoussinesq / optic fibresBoussinesq / TPC(A+B)

    diameter pilecap d = 0.85m, CTCdistance pilessx=sy=2.25 m,heightembankmentH=1.79 m,virtual height2.27 m, unitweight 18.3kN/m3

    Figure 9. Calculated and measured change of total load on pile693 due to truck 1339b. TPC (A+B) is the average of the minimumand maximum interpretation.

    6 CONCLUSIONS

    Truck passages give changes in axial pile forces in abasal reinforced piled embankment. These changeswere measured using (1) optic fibres attached to thesquare steel tube piles, measuring pile strains at tenpositions along the pile shaft and (2) total pressurecells on the circular pile caps. Additionally, the axleloads, truck configurations and the load on the sub-soil were measured.

    The measured pile strain changes show a decreasewith depth. The pile toe barely feels the truck. Thisshows that most truck load is transported to the sub-soil by friction along the pile shafts.

    For design purposes it is necessary to convert apassing truck into a uniformly distributed load. Twocalculation methods are described and compared tothe measurements: a Boussinesq-based method andspreading each wheel load with a spreading angle of67o. This value followed from the truck velocity andtime that the truck is felt by the pile. The spreadingcalculations agree better with the measurements thanthe load distribution assumed by Boussinesq.

    ACKNOWLEDGEMENT

    The authors are grateful for the support in the moni-toring project of the Dutch research program GeoIm-puls, Province Utrecht, The Dutch Ministry of Publicworks, Huesker, KWS Infra, Movares and Deltares.The financial support from Deltares, Naue, TenCateand Huesker for the research on piled embankmentsis greatly appreciated.

    REFERENCES

    NEN 9997-1: 2011 NL, (2011). Geotechnical Design - part 1: ge-neral Rules. Nederlands Normalisatie Instituut, Delft, Netherlands.Van Duijnen, P.G., Van Eekelen, S.J.M., Van der Stoel, A.E.C.,2010. Monitoring of a railway piled embankment. Proceedings,9 ICG, Brazil, 1461-1464.Van Eekelen, S.J.M, Bezuijen, A. & Alexiew, D., 2010a. TheKyoto Road Piled Embankment: 31/2 Years of Measurements.Proceedings, 9 ICG, Brazil, 1941-1944.Van Eekelen, S.J.M., Jansen, H.L., Van Duijnen, P.G., De Kant,M., Van Dalen, J.H., Brugman, M.H.A., Van der Stoel, A.E.C. &Peters, M.G.J.M., 2010b. The Dutch design guideline for piledembankments. Proceedings, 9 ICG, Brazil, 1911-1916.Van Eekelen, S.J.M., Bezuijen, A., van Duijnen, P.G., 2012. Doesa piled embankment ‘feel’ the passage of a heavy truck? High fre-quency field measurements. Proceedings, EuroGeo 5. Valencia.Digital version: volume 5: 162-166.Van Eekelen, S.J.M., Bezuijen, A. & Van Tol, A.F., 2015a. TheWoerden piled embankment. Part I: long-term measurements. Tobe published in J. Geotech. Geoenviron. Eng.Van Eekelen, S.J.M., Bezuijen, A. & Van Tol, A.F., 2015b. TheWoerden piled embankment. Part II: truck passages and compari-son to analytical calculations. To be published in J. Geotech. Ge-oenviron. Eng.Van Eekelen, S.J.M., Bezuijen, A. & Van Tol, A.F., 2015c. Vali-dation of analytical models for the design of basal reinforced piledembankments. Geotext. Geomemb. 43, 56-81.

    Load-settlement behaviour of three pile groups: a case study

    Le comportement de trois groupes de pieux vissés : étude d’un cas réel

    P.O. Van Impe*1,2, W.F. Van Impe1,2 , A. Manzotti2 and L. Seminck3 1 Ghent University, Ghent, Belgium

    2 AGE Consultants bvba, Ghent, Belgium 3 GFS Industries NV, Belgium

    * Corresponding Author ABSTRACT The paper presents the case study on the construction of three 48m diameter steel tanks, each founded on a group of 422 dis-placement cast in-situ piles. The three tanks are close enough to each other to induce interaction. The movements of the tank foundations have been monitored during the hydro-testing of the steel tanks, and during the subsequent working stage of the tanks. The bearing layer for the pile group is a 5 m thick stiff sand layer at a depth of about 20m, overlain by a very heterogeneous soft fill containing sand pockets, and underlain by a very thick slightly overconsolidated clay. The authors present some short and long term settlement prediction for the tanks, based on soil parameters derived from CPT on site, and compare this to the measured settlements. The initially derived soil parameters are re-evaluated in order to predict the long term settlement for the full life span of the construction.

    RÉSUMÉ Cette contribution décrit le cas réel de trois groupes de pieux servant comme fondations de trois réservoirs de combustibles; chaque réservoir, en acier, se trouvant fondé sur 422 pieux vissés avec refoulement. Les trois réservoirs se trouvent en proximité l’un de l’autre et peuvent donc être considéré se comportant en interaction majeure. Les déformations en trois axes ont été mesurées pendant les épreuves hydraulique de chaque réservoir et en plus durant l’exploitation des réservoirs remplis de combustibles. La couche résistante des groupes de pieux a une épaisseur de 5m de sable très rigide, à une profondeur de 20m, recouverte par de multiples couches ou lentilles minces et très hétérogènes jusqu’à la surface du terrain naturel. Le sol en dessous de la couche portante peut être considéré comme une ar-gile légèrement sur-consolidée sur une épaisseur d’environ 100m. On présente ici la comparaison entre les résultats d’analyse de prédiction des tassements immédiats et à long terme, pour les trois réservoirs en interaction, partant de l’interprétation de multiples essais de pénétra-tion en profondeur d’un côté, et les mesures en fonction du temps de ces tassements des trois réservoirs de l’autre côté. Les estimations des paramètres de rigidité des diverses couches ont été ré-analysées utilisant cette banque de données des tassements mesurés afin de pouvoir prévoir avec plus de confidence les tassements à très long terme.

    1 INTRODUCTION

    The three tanks (each 33.000 m³) are steel structures of 48m in diameter and a height of 19m. Figure 1 shows the relative location of the tanks on the site in Ostend, Belgium.

    The tanks are positioned in a triangular arrange-ment at an interdistance (centre-to-centre) of about 65m. (Tanks 1 and 3 are slightly further apart, see figure 1). They are founded on a 48.8m diameter, 60cm thick reinforced concrete slab, supported by 422 displacement screw piles.

    The 460mm diameter displacement screw piles of the Omega type are placed at an interdistance of 2.2 m (centre-to-centre) and reach to a depth of 21.5m. They are designed to each take a maximum design load of 960 kN, including some 180 kN negative skin friction.

    We refer to Van Impe et al. (2013), and the dis-cussion by Fellenius (2014), for more details on the design and related pile testing. Both papers also pre-sent some initial settlement predictions.

  • Geotechnical Engineering for Infrastructure and Development

    1218

    2 SOIL CONDITIONS AT THE SITE

    2.1 Soil layering from CPT

    The area where the tanks are located has been exca-vated and hydraulically refilled over several decades before reaching the today’s level. This has resulted in a very heterogeneous fill of about 20m, consisting of a very soft clayey/silty material containing sandy lenses. The location and thickness of these lenses vary considerably across the site. At the base of this fill, at the level −20m, we encoun-ter a very dense tertiary sand layer with a very con-sistent thickness of about 5m. This layer is the main foundation layer : the piles are installed to about 1.5m into the sand.

    Figure 1: Overview of the site and location of the three tanks at Ostend, Belgium This layer is underlain by a silty clay of the Tielt formation (“Kortemark”). Geological data suggests that this layer reaches down to the level of −45m (20-25m thick).

    This silty clay layer is itself underlain by a very large overconsolidated clay layer (Kortrijk for-mation), reaching depths of 170 m.

    A large number of CPT tests have been performed across the site, confirming the heterogeneity of the fill and the quite regular location and thickness of the tertiary sand. Unfortunately, none of the CPTs reach more than 10m into the Kortemark silty clay layer, making it impossible to determine its thickness.

    There is also no data available on the thick OC clay layer of the Kortrijk formation. Figure 2 represents a typical CPT result on the site (in the case of this ex-ample, close to tank 3).

    Figure 2: Typical CPT profile in the area of the tanks

    2.2 Settlement estimation

    An initial settlement estimation was done for a single loaded tank using the method of the equivalent raft. Soil parameters for this method were obtained by in-terpreting the CPT given in figure 2.

    The method predicted 32 mm of immediate set-tlement and 81 mm of additional consolidation set-tlement. This was done assuming certain compressi-bility parameters of the layers below level −35m for which we did not have any data. Of the above settle-ment values, about 50% is located in these layers. So the prediction is very much depending on the actual compressibility of the unknown layers. For this rea-son, settlement monitoring of the tanks was deemed to be essential.

    3 OBSERVED SETTLEMENT BEHAVIOUR

    3.1 Monitoring

    Each tank is being monitored on 16 points along its perimeter. This was initially done both at the level of the tank and the level of the concrete slab. This has allowed to get information about the deformation of the asphalt stress-distribution layer between the tank and the concrete slab. Currently, during the opera-tional phase, monitoring is limited to the tank.

    The settlement measurements along the perimeter are analysed and result in an average settlement (av-erage of the 16 points), a best fit plane, the size and direction of the rotation of the tank (tilt), out-of-plane settlements (deviation from the best fit plane) and out-of-plane deflections (distortion). During the op-erational phase, movements of the foundation slab is estimated based on the movements of the tank and the estimated deformations of the asphalt interlayer.

    3.2 Tank settlement and rotation during hydro-test

    As part of the quality control, a hydro-test was per-formed on all tanks in the spring of 2013. During this test, all tanks were filled with water to a height of 18m. The filling of each tank took about 3 days.

    Figure 3 shows the filling sequence of each tank and its settlement response at the level of the tank bottom. As mentioned before, the tank settlement is the combination of the settlement of the foundation (raft and pile group) and the compression of the as-phalt layer. The latter was established to be about 3mm, so the settlement of the foundation is 20 to 21mm under a load of 180 kPa.

    As each tank was tested separately (with only a small overlap between the testing of tank 1 and tank 2) and for a very short period, the impact of the load is presumably limited to the immediate response of the stiff sand layer in which the pile group is resting and the upper part of the underlying silt clay layer.

    It can be noticed that the response of each tank is very similar, indicating that the stiff sand layer in-deed exhibits very similar behaviour across the site.

    The tilt of the tanks during this procedure was ob-viously limited (2-3mm) as there was no real interac-tion between the tanks.

    Analysing the response of the separate tanks under hydro-test loading allows to estimate the immediate

    compressibility parameters of the sublayers. Using a simplified 3D elastic model (Boussinesq stress distri-bution, SteinP 3DT program by Geologismiki), we get a value of 200 MPa for the sand layer and 230 MPa for the underlying silty clay. The same value was assumed for the thick OC clay layer, although the impact of the hydrotest of a single tank probably does not reach deep enough to be significantly im-pacted by this layer.

    At the end of the hydro-test, after fully emptying the tanks, the residual average deformation was about 8mm for all tanks. This value is a combination of the average settlement of the foundation (about 3mm) and a plastic deformation of the asphalt layer (about 5mm).

    Figure 3: Average settlement of the tank during hydrotest

    3.3 Tank settlement and rotation during operation

    The tanks have been in operation since July 15th 2013. In a timeframe of 6 months, all tanks have been filled with diesel, increasing the load on the foundation to 145 kPa. The filling of each tank took about 2 months.

    A first measurement of the settlements occurred right after the filling of tank 3 had been complete (January 2014). A second measurement campaign was organised 8 months later.

    Figure 4 shows the loading sequence of the tanks and the average settlement as a function of time. The additional average settlement during the operational phase at this point has reached values of 34 to 40mm.

  • 1219

    2 SOIL CONDITIONS AT THE SITE

    2.1 Soil layering from CPT

    The area where the tanks are located has been exca-vated and hydraulically refilled over several decades before reaching the today’s level. This has resulted in a very heterogeneous fill of about 20m, consisting of a very soft clayey/silty material containing sandy lenses. The location and thickness of these lenses vary considerably across the site. At the base of this fill, at the level −20m, we encoun-ter a very dense tertiary sand layer with a very con-sistent thickness of about 5m. This layer is the main foundation layer : the piles are installed to about 1.5m into the sand.

    Figure 1: Overview of the site and location of the three tanks at Ostend, Belgium This layer is underlain by a silty clay of the Tielt formation (“Kortemark”). Geological data suggests that this layer reaches down to the level of −45m (20-25m thick).

    This silty clay layer is itself underlain by a very large overconsolidated clay layer (Kortrijk for-mation), reaching depths of 170 m.

    A large number of CPT tests have been performed across the site, confirming the heterogeneity of the fill and the quite regular location and thickness of the tertiary sand. Unfortunately, none of the CPTs reach more than 10m into the Kortemark silty clay layer, making it impossible to determine its thickness.

    There is also no data available on the thick OC clay layer of the Kortrijk formation. Figure 2 represents a typical CPT result on the site (in the case of this ex-ample, close to tank 3).

    Figure 2: Typical CPT profile in the area of the tanks

    2.2 Settlement estimation

    An initial settlement estimation was done for a single loaded tank using the method of the equivalent raft. Soil parameters for this method were obtained by in-terpreting the CPT given in figure 2.

    The method predicted 32 mm of immediate set-tlement and 81 mm of additional consolidation set-tlement. This was done assuming certain compressi-bility parameters of the layers below level −35m for which we did not have any data. Of the above settle-ment values, about 50% is located in these layers. So the prediction is very much depending on the actual compressibility of the unknown layers. For this rea-son, settlement monitoring of the tanks was deemed to be essential.

    3 OBSERVED SETTLEMENT BEHAVIOUR

    3.1 Monitoring

    Each tank is being monitored on 16 points along its perimeter. This was initially done both at the level of the tank and the level of the concrete slab. This has allowed to get information about the deformation of the asphalt stress-distribution layer between the tank and the concrete slab. Currently, during the opera-tional phase, monitoring is limited to the tank.

    The settlement measurements along the perimeter are analysed and result in an average settlement (av-erage of the 16 points), a best fit plane, the size and direction of the rotation of the tank (tilt), out-of-plane settlements (deviation from the best fit plane) and out-of-plane deflections (distortion). During the op-erational phase, movements of the foundation slab is estimated based on the movements of the tank and the estimated deformations of the asphalt interlayer.

    3.2 Tank settlement and rotation during hydro-test

    As part of the quality control, a hydro-test was per-formed on all tanks in the spring of 2013. During this test, all tanks were filled with water to a height of 18m. The filling of each tank took about 3 days.

    Figure 3 shows the filling sequence of each tank and its settlement response at the level of the tank bottom. As mentioned before, the tank settlement is the combination of the settlement of the foundation (raft and pile group) and the compression of the as-phalt layer. The latter was established to be about 3mm, so the settlement of the foundation is 20 to 21mm under a load of 180 kPa.

    As each tank was tested separately (with only a small overlap between the testing of tank 1 and tank 2) and for a very short period, the impact of the load is presumably limited to the immediate response of the stiff sand layer in which the pile group is resting and the upper part of the underlying silt clay layer.

    It can be noticed that the response of each tank is very similar, indicating that the stiff sand layer in-deed exhibits very similar behaviour across the site.

    The tilt of the tanks during this procedure was ob-viously limited (2-3mm) as there was no real interac-tion between the tanks.

    Analysing the response of the separate tanks under hydro-test loading allows to estimate the immediate

    compressibility parameters of the sublayers. Using a simplified 3D elastic model (Boussinesq stress distri-bution, SteinP 3DT program by Geologismiki), we get a value of 200 MPa for the sand layer and 230 MPa for the underlying silty clay. The same value was assumed for the thick OC clay layer, although the impact of the hydrotest of a single tank probably does not reach deep enough to be significantly im-pacted by this layer.

    At the end of the hydro-test, after fully emptying the tanks, the residual average deformation was about 8mm for all tanks. This value is a combination of the average settlement of the foundation (about 3mm) and a plastic deformation of the asphalt layer (about 5mm).

    Figure 3: Average settlement of the tank during hydrotest

    3.3 Tank settlement and rotation during operation

    The tanks have been in operation since July 15th 2013. In a timeframe of 6 months, all tanks have been filled with diesel, increasing the load on the foundation to 145 kPa. The filling of each tank took about 2 months.

    A first measurement of the settlements occurred right after the filling of tank 3 had been complete (January 2014). A second measurement campaign was organised 8 months later.

    Figure 4 shows the loading sequence of the tanks and the average settlement as a function of time. The additional average settlement during the operational phase at this point has reached values of 34 to 40mm.

    Van Impe, Van Impe, Manzotti and Seminck

  • Geotechnical Engineering for Infrastructure and Development

    1220

    This average settlement is obviously higher than the one during the hydrotest. There is the increased stress field -- as now all tanks are loaded at the same time -- and we have the onset of consolidation.

    Figure 4: Average settlement of the tank during operation

    Figure 5 shows the vertical deviation from the av-

    erage value for each measurement point. Points with negative values (outside the smaller circle) indicate points which have settled more than the average. The shape of the curves therefore indicate the size and the direction of the tilt of the tanks. These values have been presented separately in figure 6. The tilt is the largest for tank 3 where we get a value of about 20mm.

    Figure 5: Vertical deviation from average settlement (mm)

    during operation

    Figure 6: Direction and size (mm) of tilt of the tanks during opera-tion

    An increased value of the tilt compared to the situ-

    ation of the hydrotest is also to be expected due to the interaction of the different loads.

    Although the average settlement for all tanks is very similar, there is a significant difference in the size and direction of the tilt. Both tank 1 and 2 exhib-it a 12-13mm tilt (0.00026 m/m) towards the central area in-between the tanks, i.e. the centre of the stress field, while tank 3 tilts almost directly north for about 20 mm (0.0004 m/m).

    Additionally, tanks 1 and 2 exhibit nearly perfect-ly planar tilt while tank 3 is clearly slightly distorted. This could be due to local subsoil heterogeneities be-low tank 3.

    The values of average settlement, tilt and distor-tion are still far below critical values.

    4 ANALYSIS OF THE TIME SETTLEMENT BEHAVIOUR

    The settlement of the full pile group is only marginal-ly influenced by the fill material. The important char-acteristics are those from the dense sand layer, the silty clay and, in the long term, the thick OC clay layer.

    As mentioned, the data on the two latter are very limited. In this respect, authors have attempted to an-alyse the current settlement data in order to predict the long term behaviour of the construction.

    Based on the analysis of the CPT data, following data on the constrained modulus were derived (Rob-ertson 2010)

    Table 1: Deformation parameters from CPT

    layer M (constrained modulus) sand 170-209 MPa silty clay 27 + 2*(z-24) MPa

    between -24m and-44m Based on these compressibility parameters –

    combined with the immediate compressibility param-eters derived from the fast hydrotest, a single value of the consolidation coefficient cv for the silty clay was calculated to obtain the best fit between predic-tion and measurement. Fitting was done on the values of the average settlement.

    The prediction was done using a simplified 3D elastic stress model (again using the SteinP 3DT pro-gram). The model takes into account the slight varia-tion in thickness of the sand layer below the different pile groups (slightly lower thickness below tank 3).

    The ultimate average settlement for the tanks ranges from 87 to 90 mm (See figure 7). The centres of the tank sill settle 132 to 136mm The long-term tilt ranges from 19 to 21 mm.

    As the actual size of the consolidating layer is un-known, fitting was done on the basis of the combined cv/d² parameter (where d is the drainage path length).

    Figure 7: Simplified settlement analysis of the tanks under opera-tional load

    This leads to a value of the time factor cv/d² of 0.0022 month-1. The results of the fitting are present-ed in figures 8 and 9, which show the predicted ver-sus measured values for respectively the average set-tlement and tilting of the tanks. The time range which is presented is approximately 20 years.

    Figure 8: Predicted (lines) versus measured (dots) average settle-ment of the tank under operational load

    The prediction at this point clearly underestimates

    the amount of tilt which is occurring, especially for tank 3. This could be due to the existence of some stiffness heterogeneity in the region of this tank, which – as mentioned above – could also be respon-sible for the distortion (non-planar tilt).

  • 1221

    This average settlement is obviously higher than the one during the hydrotest. There is the increased stress field -- as now all tanks are loaded at the same time -- and we have the onset of consolidation.

    Figure 4: Average settlement of the tank during operation

    Figure 5 shows the vertical deviation from the av-

    erage value for each measurement point. Points with negative values (outside the smaller circle) indicate points which have settled more than the average. The shape of the curves therefore indicate the size and the direction of the tilt of the tanks. These values have been presented separately in figure 6. The tilt is the largest for tank 3 where we get a value of about 20mm.

    Figure 5: Vertical deviation from average settlement (mm)

    during operation

    Figure 6: Direction and size (mm) of tilt of the tanks during opera-tion

    An increased value of the tilt compared to the situ-

    ation of the hydrotest is also to be expected due to the interaction of the different loads.

    Although the average settlement for all tanks is very similar, there is a significant difference in the size and direction of the tilt. Both tank 1 and 2 exhib-it a 12-13mm tilt (0.00026 m/m) towards the central area in-between the tanks, i.e. the centre of the stress field, while tank 3 tilts almost directly north for about 20 mm (0.0004 m/m).

    Additionally, tanks 1 and 2 exhibit nearly perfect-ly planar tilt while tank 3 is clearly slightly distorted. This could be due to local subsoil heterogeneities be-low tank 3.

    The values of average settlement, tilt and distor-tion are still far below critical values.

    4 ANALYSIS OF THE TIME SETTLEMENT BEHAVIOUR

    The settlement of the full pile group is only marginal-ly influenced by the fill material. The important char-acteristics are those from the dense sand layer, the silty clay and, in the long term, the thick OC clay layer.

    As mentioned, the data on the two latter are very limited. In this respect, authors have attempted to an-alyse the current settlement data in order to predict the long term behaviour of the construction.

    Based on the analysis of the CPT data, following data on the constrained modulus were derived (Rob-ertson 2010)

    Table 1: Deformation parameters from CPT

    layer M (constrained modulus) sand 170-209 MPa silty clay 27 + 2*(z-24) MPa

    between -24m and-44m Based on these compressibility parameters –

    combined with the immediate compressibility param-eters derived from the fast hydrotest, a single value of the consolidation coefficient cv for the silty clay was calculated to obtain the best fit between predic-tion and measurement. Fitting was done on the values of the average settlement.

    The prediction was done using a simplified 3D elastic stress model (again using the SteinP 3DT pro-gram). The model takes into account the slight varia-tion in thickness of the sand layer below the different pile groups (slightly lower thickness below tank 3).

    The ultimate average settlement for the tanks ranges from 87 to 90 mm (See figure 7). The centres of the tank sill settle 132 to 136mm The long-term tilt ranges from 19 to 21 mm.

    As the actual size of the consolidating layer is un-known, fitting was done on the basis of the combined cv/d² parameter (where d is the drainage path length).

    Figure 7: Simplified settlement analysis of the tanks under opera-tional load

    This leads to a value of the time factor cv/d² of 0.0022 month-1. The results of the fitting are present-ed in figures 8 and 9, which show the predicted ver-sus measured values for respectively the average set-tlement and tilting of the tanks. The time range which is presented is approximately 20 years.

    Figure 8: Predicted (lines) versus measured (dots) average settle-ment of the tank under operational load

    The prediction at this point clearly underestimates

    the amount of tilt which is occurring, especially for tank 3. This could be due to the existence of some stiffness heterogeneity in the region of this tank, which – as mentioned above – could also be respon-sible for the distortion (non-planar tilt).

    Van Impe, Van Impe, Manzotti and Seminck

  • Geotechnical Engineering for Infrastructure and Development

    1222

    Further modelling would require additional soil data to increase the accuracy of the soil model and higher-level software capable of taking into account complex soil layering.

    Figure 9: Predicted (lines) versus measured (dots) tilt of the tanks under operational load

    5 CONCLUSIONS

    The paper presents some monitoring data on the set-tlement of three large pile groups which function as tank foundations. The three groups are close enough to each other to interact.

    This interaction is clear from the data as the com-bined loading of the three groups gives rise to larger settlements than those measured during the separate loading of the tanks during hydro-testing. Moreover, a significant tilting of the tanks occurs.

    Due to the large scale of the combined construc-tions, the influence depth is considerably larger then the extent of the soil investigation. The tanks are un-derlain by very thick sandy clay and OC clay layers, which will govern the long term settlements. Authors have made an attempt to analyse the data obtained during the hydrotest and the current operational stage to make an educated guess on compressibility and consolidation coefficients. The obtained values lie within the normal range for these type of soils, and allow further extrapolation of the current measure-ments.

    Additional measurement campaigns will be planned to allow further optimization of the model.

    REFERENCES

    Fellenius, B.H. 2014. Discussion on : an instrumented screw pile load test and connected pile group load-settlement behaviour by Van Impe et al 2013. Journal of Geo-Engineering Sciences 1(2), 101-108. Robertson, P.K. 2010. Soil behaviour type from the CPT: an up-date. Proceedings International Symposium on Cone Penetration Testing CPT 10. Van Impe, P.O., Van Impe, W.F. & Seminck, L. 2013. Discussion of an instrumented screw pile load test and connected pile group load-settlement behaviour. Journal of Geo-Engineering Sciences 1(1), 13-36. Van Impe, W.F. et al. 1988. Prediction of the single pile bearing capacity in granular soils our of CPT results. Proceedings of the First International Symposium on Penetration Testing (specialty session), ISBN 90-6191-803-0. Van Impe, W.F. et al. 1988. End and shaft bearing capacity of piles evaluated separately out of static pile loading test results. Proceedings of the First International Geotechnical Seminar Deep Foundations on Bored and Auger Piles, 489-498, CRC Press / Balkema.

    Pile load test results as a basis for reliability calculation with an open polygon response surface

    Résultats de test de charge pile en tant que la base pour le calcule de la fiabilité avec la methode d’ open réponse polygone surface

    M.Wyjadlowski*1, J.Bauer1,and W.Puła1 1 Wroclaw University of Technology, Wrocław, Poland

    * Corresponding Author

    ABSTRACT The aim of this report is to assess a method of analysing intermediate foundation load test results with an open polygon, used for the purposes of pile design employing probabilistic calculations. This method of approximating measurement results ensures that the whole range of loading force will be free of areas with unphysical load-displacement relation, while employing elementary continuous functions like a parabola in ranges of low force values usually results in a relation of a decreasing and negative displacement for a growing load value.

    RÉSUMÉ Le but de ce article est d'évaluer une méthode d'analyse des résultats d'essais de fondation de charge intermédiaires avec un po-lygone ouvert, utilisé aux fins de la conception de pile utilisant des calculs probabilistes. Cette méthode d'approximation des résultats de mesure engarantit que l'ensemble de la force de chargement sera exempt de zones de relation déplacement de la charge non physique, tout en employant des fonctions élémentaires continues comme une parabole dans des gammes de valeurs de force faible se traduit générale-ment par une relation d'un déplacement en baisse et négative pour une valeur de charge de plus en plus.

    1 INTRODUCTION

    The methodology of load test result analysis will be presented based on real measurements of lateral displacements of a pile head under a statically applied lateral load. To achieve greater clarity of the dis-course and reduce some calculations to simple arith-metic operations, the presented analysis uses only load test results for two pairs of piles. However, one could easily employ the proposed calculation method for an arbitrarily large group of pile pairs subjected to a load test (ASTM 1997; Polish Standard 1983; Euro-code 7, 1997).

    The report will propose a method of defining the values of allowable lateral loads that can be ap-plied to pile heads. As specified before, calculations will be based on load test results for two piles, ana-lysed with probabilistic methods using open polygon response surfaces. This approach calculates the value

    of allowable lateral load in such a way that the dis-placement of a pile head does not, with a determined probability (safety level), exceed a predefined value.

    The response surface obtained from a set of load test has one random variable in the form of a standard approximation error, which grows with an increase of load force value. This approximation error random variable is assigned to every displacement value. What follows is a transfer of random variabil-ity from the range of high load values towards that of low and medium ones. The value of the standard error random variable, dependent on the range of load force and consequently on the number of segments in the open polygon forming the response surface, results in the fact that the process of building the response sur-face can be non-objective. The report proposes a cri-terion, whose satisfaction will ensure that the process of determining the number of segments in the open