PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS
Lang Tong School of Electrical and Computer Engineering Cornell University, Ithaca, NY
Support in part by DoE (CERTS) and NSF
Joint work with Yuting Ji, Weisi Deng, and Bob Thomas
June 10, 2016
![Page 2: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/2.jpg)
Overview Objectives
Develop scalable probabilistic forecasting and system simulation tools for real-time market operations.
Applications Provide market participants locational price distributions for integrating
flexible demand and distributed energy resources Provide operator short-term forecast of LMP distribution, power flow
distribution, and probability distributions of discrete events such as congestions and contingencies.
Multi-area interchange scheduling under uncertainty
![Page 3: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/3.jpg)
Outline A scalable forecasting and system simulation tool
Real-time operation models
Geometry of parametric DC OPF
Online learning via dynamic critical region generation
Complexity and performance: numerical results
Multi-area interchange scheduling under uncertainty Multi-area and multi-interface models
Stochastic interchange scheduling
Numerical results
Conclusions and future work
![Page 4: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/4.jpg)
Load vs. LMP forecasting
Load are physical processes a variety of techniques on both point and
probabilistic forecasting accuracy typically at 1-3% mean absolute
percentage error (MAPE)
LMPs are solutions of OPF Many black-box techniques on
(point) LMP forecasting. Limited accuracy (10-20% in
MAPE)
![Page 5: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/5.jpg)
A real time LMP model
![Page 6: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/6.jpg)
Real time LMP model with reserve co-optimization
![Page 7: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/7.jpg)
Seams in multi-area operations
![Page 8: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/8.jpg)
Simulation of large stochastic power networks
Characteristics: Random generation and load Probabilistic contingencies Multiperiod security constrained economic
dispatch (SCED) with ramp constraints Features: Joint and marginal distributions of nodal prices Joint and marginal distributions of power flows Joint and marginal distribution of generation
dispatch and reserve ……….
![Page 9: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/9.jpg)
Probabilistic forecasting and simulation
Generic Monte Carlo Generate sample paths of random
generation, demand, contingency scenarios
Simulate real-time dispatch (OPF) Complexity: #OPF=MT
Online Learning via Dynamic Critical
Region Generation Exploit structures of OPF solution Online learning of solution dictionary Complexity: #OPF=10^{-x}MT
![Page 10: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/10.jpg)
Geometry of Multiparametric Programming
![Page 11: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/11.jpg)
DCRG: Dynamic Critical Region Generation
![Page 12: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/12.jpg)
The Polish Network
3120 buses, 3693 branches 505 thermal units with ramp constraints 30 wind farms (Gaussian) 10 constrained transmission lines 10,000 Monte Carlo runs 24 hour simulation horizon
505 decision variables 2041 constraints ~3M OPFs
![Page 13: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/13.jpg)
Computation cost comparison
![Page 14: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/14.jpg)
Critical region distribution
3000 critical region observed in 3M samples There are ~2^(HT) typical sequences
![Page 15: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/15.jpg)
The IEEE 118 system
118 buses in three areas 10 capacity constraints
91 stochastic loads (Gaussian)
54 thermal generators
1000 Monte Carlo runs
![Page 16: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/16.jpg)
Bus 94
Bus 95
![Page 17: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/17.jpg)
Line 96
Line 114
Line 147
![Page 18: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/18.jpg)
![Page 19: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/19.jpg)
Line 148
Line 115
Line 153
![Page 20: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/20.jpg)
Bus 94
Bus 95
![Page 21: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/21.jpg)
Bus 94
Bus 95
![Page 22: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/22.jpg)
Line 66
Line 152
Line 128
![Page 23: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/23.jpg)
Outline A scalable forecasting and system simulation tool
Real-time operation models
Geometry of parametric DC OPF
Online learning via dynamic critical region generation
Complexity and performance: numerical results
Multi-area interchange scheduling under uncertainty Multi-area and multi-interface models
Stochastic interchange scheduling
Numerical results
Conclusions and future work
![Page 24: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/24.jpg)
NYISO-ISONE CTS Interface
NYISO-PJM CTS Interface
PJM-MISO CTS Interface
![Page 25: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/25.jpg)
Two-area single-interface proxy model
![Page 26: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/26.jpg)
Two-area single-interfance interchange
Each ISO has a simplified model of the neighboring area with a proxy bus
Market participants submit offers/bids for external transactions at proxy buses
Export/import quantity is scheduled ahead of time.
Each ISO schedules its own operations with fixed interchange.
FERC approves coordinated transaction scheduling (CTS) for PJM & NYISO, March 2014.
Estimated cost saving: 9M~26M per year.
Versions of CTS are being implemented for MISO-PJM, NYISO-ISONE
![Page 27: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/27.jpg)
Tie optimization (TO)
![Page 28: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/28.jpg)
Coordinated Transmission Scheduling (CTS)
![Page 29: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/29.jpg)
Stochastic Coordinated Transmission Scheduling (SCTS)
![Page 30: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/30.jpg)
The mutli-interface interchange problem
![Page 31: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/31.jpg)
![Page 32: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/32.jpg)
Scenario 1: 20% renewables
![Page 33: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/33.jpg)
Scenario 2: 30% renewables
![Page 34: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/34.jpg)
![Page 35: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/35.jpg)
Summary of results Real-time LMP models
Energy and energy-reserve markets Deterministic and probabilistic contingencies
Forecasting methodologies Multiparametric programming approach to Deterministic and probabilistic contingencies Forecast methods and applications
An online learning approach of to forecasting of LMP and power flow distributions.
A Markov chain approach for ex ante and ex post LMPs Multi-area interchange scheduling under uncertainties
![Page 36: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/36.jpg)
Related publications Y. Ji, R. J. Thomas, L. Tong, “Probabilistic forecasting of real-time LMP and network congestion,” submitted to IEEE
Trans. Power Systems, under 4th revision
Y. Ji, T. Zhang, L. Tong, “Stochastic interchange scheduling in the real-time electricity market,” submitted to IEEE Trans. Power Systems, under second revision.
G. Ye, L. Tong, et. al., “Coordinated multi-area economic dispatch via multiparametric programming,” submitted to IEEE Trans. Power System, under review, 2016.
Y. Ji and L. Tong, “Multi-proxy interchange scheduling under uncertainty,” IEEE Power & Energy Scoeicty General Meeting, 2016
G. Ye, L. Tong, et. al., “Multi-area economic dispatch via state space decomposition,” IEEE American Control Conf., 2016
Y Ji, R.J. Thomas, and L. Tong, ”Probabilistic Forecast of Real-Time LMP via Multiparametric Programming,” 2015 48th Hawaii International Conference on System Sciences (HICSS), 2015.
Yuting Ji, Jinsub Kim, Robert J. Thomas, and Lang Tong,“Forecasting Real-Time Locational Marginal Price: A State Space Approach,” The 47th Asilomar Conference on Signals, Systems, and Computers , Nov., 2013.
Y. Ji and L. Tong, ”Stochastic coordinated transaction scheduling via probabilistic forecast,” IEEE Power & Energy Society General Meeting, 2015.
![Page 37: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/37.jpg)
![Page 38: PROBABILISTIC FORECASTING FOR POWER …. Tong Probablistic...PROBABILISTIC FORECASTING FOR POWER SYSTEM OPERATIONS . ... Provide operator short-term forecast of LMP distribution,](https://reader031.vdocuments.site/reader031/viewer/2022020214/5b0260fe7f8b9a65618f1a66/html5/thumbnails/38.jpg)