    Create Network Printer

    Check for the incoming SV request

    Raise the CPR

    Forward the request to the EDS

    Printing team.

    Complete the transport.

    Check for the roles with the

    security team.

    Notify the requestor.

  • 7/31/2019 Printer Network Process in IES

    3/30

  • 7/31/2019 Printer Network Process in IES

    4/30

    Request raised by the user and it has

    arrived in inbox (SO01)

  • 7/31/2019 Printer Network Process in IES

    5/30

    Logon to DT1/300 run the transaction SPAD

  • 7/31/2019 Printer Network Process in IES

    6/30

    Create CPR through the notification

  • 7/31/2019 Printer Network Process in IES

    7/30

    Run the transaction ZCPR, edit the CPR

  • 7/31/2019 Printer Network Process in IES

    8/30

    Update the long text

  • 7/31/2019 Printer Network Process in IES

    9/30

    When the CPR is save then the status

    will be O.

    Mail the CCOE team to change the status

    from OOA and OAA. AI is changed by 1.5Monitoring team.

    Once the CPR is in I then mail to EDS

    Printing team to configure the printer.

  • 7/31/2019 Printer Network Process in IES

    10/30

    Service Request Form

  • 7/31/2019 Printer Network Process in IES

    11/30

  • 7/31/2019 Printer Network Process in IES

    12/30

    The printing team will create a ticketin the OVSD.

    Now wait until the ticket is processed

    and you get a mail into EMEA mailbox

    with the info about it.

    Then open the CPR again for editing and

    click the Create Transport button on

    the bottom left, which became nowavailable.

  • 7/31/2019 Printer Network Process in IES

    13/30

  • 7/31/2019 Printer Network Process in IES

    14/30

    Choose the system from which the transport

    will be

  • 7/31/2019 Printer Network Process in IES

    15/30

  • 7/31/2019 Printer Network Process in IES

    16/30

    Now go to the

    development system

    where the printer

    should be created

    (by the Printing

    team) and look for

    it via transactionSPAD.

    In SPAD enter the

    printer name anddisplay it. (hit

    enter, or display

    button)

  • 7/31/2019 Printer Network Process in IES

    17/30

    Before adding the printer to the CPR/CTF you can

    check within the CPR if the transport has already

    some data or not (in this stage as we have not

    added there anything, it should not).

    Go to the CPR, go above the CTF number and double

  • 7/31/2019 Printer Network Process in IES

    18/30

  • 7/31/2019 Printer Network Process in IES

    19/30

    Go back to the DEV system and add a printer to my

    transport

    and hit the truck icon on the screen:

  • 7/31/2019 Printer Network Process in IES

    20/30

  • 7/31/2019 Printer Network Process in IES

    21/30

    Now I just hit the save

    button and press greenarrow to go away from thatprinter maintenance.

    And we are finished in theDevelopment system.

    Now we can check that wereally have the printerassigned to the request.

    So I go back to the CPR andcheck it again as I did before(through the CTF and look

    into it).

    Now you can see that myCTF has already a printerdefinition within it and itsthe only object there.

    If you had more printers tocreate ou can add them all

  • 7/31/2019 Printer Network Process in IES

    22/30

    Go to your CPR. Double click on the CTF you want to

    release and then in the top left corner hit the ReleaseTransport button:

  • 7/31/2019 Printer Network Process in IES

    23/30

  • 7/31/2019 Printer Network Process in IES

    24/30

  • 7/31/2019 Printer Network Process in IES

    25/30

  • 7/31/2019 Printer Network Process in IES

    26/30

  • 7/31/2019 Printer Network Process in IES

    27/30

    Now the CPR is in OU status, Mail CCOE team to changethe CPR to OP and AUT.

    1.5 Monitoring group will transport and change the status toRP.

    Meanwhile, you can check the role for the printer with thesecurity team.

    Check for the printer exists in PC1 or not.

    Now mail the user to check whether the printer works fine atthere end.

    Once the user sends the confirmation then take steps tochange the status to C.

    As all the steps are performed close the notification.

  • 7/31/2019 Printer Network Process in IES

    28/30

    Change Network Printer

    Check for the incoming SV request

    Raise the CPR

    Forward the request to the EDSPrinting team.

    Notify the requestor.

  • 7/31/2019 Printer Network Process in IES

    29/30

    Delete Network Printer

    Check for the incoming SV request

    Raise the CPR

    Forward the request to the EDSPrinting team.

    Complete the transport.

    Remove the roles with the help of

    security team.

    Notify the requestor.