pricelist_fresco_homes(1)

Upload: avdhesh-kumar-sharma

Post on 08-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/7/2019 Pricelist_Fresco_Homes(1)

    1/6

    PRICE LIST-FRESCO SECTOR-137 NOIDA

    Category Type of apartment Area sq.ft

    1 2Bedroom+2Toilets+Kitchen 10802 2Bedroom+Study+2Toilets+Kitchen 1220

    3 3Bedroom+2Toilets+Kitchen 1495

    4 3Bedroom+3Toilets+Kitchen 1650

    5 3Bedroom+Study/Servant+4Toilets+Kitchen 1795

    6 4Bedroom+4Toilets+Kitchen 2250

    S.No. Floor Plan-A (Cash Down) Plan-B (Flexi)

    1 1,2,3,4 2905 3025

    2 5,6,7,8 2855 29753 9,10,11,12 2810 2925

    4 12A,14,15,16,17 2760 2875

    OTHER CHARGES Basic Price Include

    PLC (Park,Pool ,Green & Road facing) Rs. 50/-per sq.ft. Lease Rent (one time)

    PLC (Corner) Rs. 25/-per sq.ft. EEC

    PLC (Premium Location) As Applicable Fire fighting charges

    Upgradation Cost for Covered Car Parking Rs.1,00,000/- Power backup installation (1KVA mandatory)

    Covered Parking Rs.1,25,000/- Open parking

    Single Bay Double Parking Rs.4,50,000/- Club membershipIFMS Rs. 25/-per sq.ft.

    1080

  • 8/7/2019 Pricelist_Fresco_Homes(1)

    2/6

    w.e.f.-11.02.2011

    Plan-C (CLP)

    3205

    31503100

    3045

    Rs.100/- per sq.ft.

    Rs.40/- per sq.ft.

    Rs.40/- per sq.ft.

    Rs.20,000/- per KVA

    Rs.1,25,000/-

    Rs.75,000/-

  • 8/7/2019 Pricelist_Fresco_Homes(1)

    3/6

    Payment Plan

    Cash Down Payment Plan - AAt the time of Booking 10% BSP

    Within 30 Days 85% BSP+PLC+Car Parkin

    At the of offer letter for Possession 5% BSP + IFMS + Any Oth

    Flexi Payment Plan - BAt the time of Booking 10% BSP

    Within 30 Days 10% BSP+ 50% PLC

    Within 60 Days 20% BSP

    On Excavation 10% BSP + 50% PLCOn casting of 2nd floor Roof of Slab of Block 10% BSP

    On casting of 5th floor roof slab of block 10% BSP

    On casting of 8th floor Roof Slab of Block 10% BSP

    On casting of 10th floor roof slab of block 10% BSP

    On completion of Masonry & Plaster work within apartment of block 5% BSP

    At the time of offer for Possession 5% BSP + IFMS + Car Park

    Construction Linked Payment Plan

    At the time of Booking 10% BSP

    Within 30 Days 10% BSP+50% PLC

    On EXcavation 10% BSP

    On casting of 3rd floor slab of block 10% BSP

    On casting of 6th floor slab of block 10% BSP+50% PLC

    On casting of 9th floor slab of block 10% BSP

    On casting of 12th floor slab of block 10% BSP

    On casting of 15th floor slab of block 10% BSP

    On completion of Masonry & Plaster work within apartment of block 10% BSP

  • 8/7/2019 Pricelist_Fresco_Homes(1)

    4/6

    (1 sq. mtr. = 10.76391 sq. ft.)

  • 8/7/2019 Pricelist_Fresco_Homes(1)

    5/6

  • 8/7/2019 Pricelist_Fresco_Homes(1)

    6/6