price proposal design
DESCRIPTION
price proposal formateTRANSCRIPT
Shamsa Children Village
Design of central heating system, new building and site network
20/Jan/2014
To: Shamsa Children VillageProcurement DepartmentKabul Afghanistan
From:
COMPLEX ENGINEERING SERVICES Darulaman Road opposite to Habibya high SchoolKabul Afghanistan Phone: +93 (0)787 33 53 16
To Whom It May Concern:
We hereby offer to provide our services for the design of Shamsa Children VillageProject in Kabul Afghanistan. Upon conducting site visit, we hereby offer our Services for the design of central heating system and design of new building including all design discipline this project for a sum total of $25,300.00 inclusive of all labors, materials, equipment’s, technical expertise. Our offer is valid for 90 days from the date of this letter.We thank you for this opportunity to support Shamsa Children Village on this project.Should you have any further questions, comments, or require additional information, please contact the undersigned at your convenience.
Sincerely, Complex Engineering Services
Authorized Signature Name and Title: Faisal Amin
General Manager/ Complex Engineering ServicesTele: +93 (0)787 33 53 16Email: [email protected]
Shamsa Children Village
Design of central heating system, new building and site network
S/N Item Description Unite Price Total Price Remarks
1 Topographical Survey 1800 1800 optional
2 Geotechnical Report 4500 4500 optional
3 Central Heating System Design $4800 $4800
5 New Building Architecture Design $4400 $4400
6 New Building Structural Design $4200 $4200
7 New Building Electrical Design $3800 $3800
8 New Building water supply system $2800 $2800
9 New Building sewerage system $2800 $2800
10 Septic tank structural design $1000 $1000
10 Elevated water tank structural design $1200 $1200
Print & Package $300 $300
Grand Total $25300
Design Cost Breakdown (Design of Central Heating system, new building design and site water and sewerage network system design.
Note:
The cost of topographical survey and geotechnical report is not included in the Grand Total cost. We have considered that as optional item if you are agreed then we can add that value to the grand total.
Shamsa Children Village
Design of central heating system, new building and site network