prezentare capacitati subtirica
TRANSCRIPT
![Page 1: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/1.jpg)
Increased performance in the activity of RDI by attaining state-of-the-art endowment
for investigation laboratory
Project responsible:
Chem. Adriana – Ioana Subţirică
CAPACITIES - Module I Contract No. 53 /14.09.2007
Project acronym: - STARTEX
![Page 2: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/2.jpg)
Motivation
Out-dated available infrastructure and improper working conditions
Need of performant equipments for research and investigation
Need of being competitive and innovative on a continuous developing research environment
Attracting young students to the field of research Diversification of external research partnerships
![Page 3: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/3.jpg)
Opportunity
Program PNCDI 2, Capacities, Module 1
Contract no. 53/2007 - STARTEXSTARTEX
Implementation period: 24 months
(Sept 2007 - Sept 2009)
Budget: 957.000 RON
![Page 4: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/4.jpg)
Objectives:
- Modernization of the working space and research
infrastructure
- Creating an excellence laboratory in terms of physical -
chemical testing of fabrics
- Attracting young graduates to this research area
- Diversification of international partnerships and cooperation
![Page 5: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/5.jpg)
Results:
Working space modernization
Laboratory furniture and equipments
The laboratory has offered support for national and
international projects
The laboratory has offered support for SMEs through test
reports recognized nationally and internationally
![Page 6: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/6.jpg)
Contract 53 results: Modernization of the working space
![Page 7: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/7.jpg)
Contract 53 results: Modernization of the working space
![Page 8: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/8.jpg)
Contract 53 results: Modernization of the working space
![Page 9: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/9.jpg)
Contract 53 results: Modernization of the working space
![Page 10: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/10.jpg)
Contract 53 results: Modernization of the working space
![Page 11: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/11.jpg)
Contract 53 results: Modernization of the working space
![Page 12: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/12.jpg)
Contract 53 results: Modernization of the infrastructure
Analytic Balance
![Page 13: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/13.jpg)
Contract 53 results: Modernization of the infrastructure
Mechanic stirrer
![Page 14: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/14.jpg)
Contract 53 results: Modernization of the infrastructure
Water distiller
![Page 15: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/15.jpg)
Contract 53 results: Modernization of the infrastructure
Water bath
![Page 16: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/16.jpg)
Contract 53 results: Modernization of the infrastructure
pH - conductivi-meter
![Page 17: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/17.jpg)
Contract 53 results: Modernization of the infrastructure
Optical Microscope
![Page 18: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/18.jpg)
Contract 53 results: Modernization of the infrastructure
Melting point apparatus (heating up to 600 Celsius)
![Page 19: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/19.jpg)
Contract 53 results: Modernization of the infrastructure
Inverted microscope for cell biology
![Page 20: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/20.jpg)
- In 2007 – 2008 our chemical lab participated to an exercise
organized by Joint Research Centre of European Commission
for validating the testing method for melamine fiber
- In 2010 another participation took place for validating the testing
method for PAC fiber, also organized by JRC
Our physical – chemical laboratory has obtained highly appreciated results in both cases.
Infrastructure utilization
![Page 21: prezentare capacitati Subtirica](https://reader034.vdocuments.site/reader034/viewer/2022051523/58adaaf21a28ab73138b4ef9/html5/thumbnails/21.jpg)
Thank you for your kind attention!
Adriana SUBTIRICA