prezentacja programu powerpoint...mostostal kraków s.a. budimex group * budimex group’s...

33
budimex Budimex Group Presentation for investors for 3Q 2009

Upload: others

Post on 11-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

budimex

budimex

Budimex Group

Presentation for investorsfor 3Q 2009

Page 2: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

2

budimexBudimex GroupStructure of the Group

CONSTRUCTIONBUSINESS

Budimex Dromex S.A.

Mostostal Kraków S.A.

Budimex Group

* Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o.

Budimex Nieruchomości Sp. z o.o.

(a joint venture with Grimaldi Investments BV)*

REAL ESTATEBUSINESS

OTHERACTIVITIES

Budimex DanWood Sp. z o.o.

Companies consolidated under equity method

Current shareholders structureAs of 30.09.2009

59,06%

5,21%

35,73%

Ferrovial Group

PTE PZU S.A.

Other shareholders

Page 3: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

3

budimexBudimex GroupDescription of the business

• Construction of roads, highways,

• Renovations of existing roads,• Construction of bridges.

• Residential construction,• Non-residential general

construction (office buildings, shopping malls, plants),

• Airports.

• Construction of sewage treatment plants,

• Canalization systems.

Infrastructure

General construction

Ecological

• Development of residential property (flats).

Residential development

• Operating one hotel in Poland.Other services

• Rental of investment property to external clients.

• Operating one commercial parking lot.

Rental activity

• Production and developmentof timber – frame houses.

Timber – frame houses

• Electro – installation company(Elektromontaż Poznań S.A.),

• Production of switchboards(Elektromontaż Poznań S.A.).

Other activity (equity pick-up)

CONSTRUCTIONBUSINESS

REAL ESTATEBUSINESS

OTHERACTIVITIES

Budimex Group

Page 4: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

4

budimexBudimex GroupDynamics of Budimex Group sales (year 2004-2009) vs dynamics of the construction production in Poland

Dynamics of Budimex Group construction segment sales in Poland 2004-2009

0,6%-5,1%

18,2%

0,9%

24,0% 15,4%

4,9%

15,7%6,9%

0,4%

19,9%30,0%

-20,0%

-10,0%

0,0%

10,0%

20,0%

30,0%

40,0%

2004 2005 2006 2007 2008 3Q 2009

Dynamics of Budimex Group total sales 2004-2009

8,9%12,6%

25,1%

0,6% 1,1% -2,5%

0,4%6,9%

19,9%

30,0%

15,7%

4,9%

-20,0%

-10,0%

0,0%

10,0%

20,0%

30,0%

40,0%

2004 2005 2006 2007 2008 3Q 2009

Dynamics of Budimex Group sales Dynamics of construction production in current prices

Page 5: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

5

budimexBudimex GroupBudimex price performance 3Q 2009 cumulatively

January 2009 - September 2009 Budimex price performance [PLN/share]

50,00

55,00

60,00

65,00

70,00

75,00

80,00

85,00

2009

-01-

0520

09-0

1-08

2009

-01-

1320

09-0

1-16

2009

-01-

2120

09-0

1-26

2009

-01-

2920

09-0

2-03

2009

-02-

0620

09-0

2-11

2009

-02-

1620

09-0

2-19

2009

-02-

2420

09-0

2-27

2009

-03-

0420

09-0

3-09

2009

-03-

1220

09-0

3-17

2009

-03-

2020

09-0

3-25

2009

-03-

3020

09-0

4-02

2009

-04-

0720

09-0

4-14

2009

-04-

1720

09-0

4-22

2009

-04-

2720

09-0

4-30

2009

-05-

0620

09-0

5-11

2009

-05-

1420

09-0

5-19

2009

-05-

2220

09-0

5-27

2009

-06-

0120

09-0

6-04

2009

-06-

0920

09-0

6-15

2009

-06-

1820

09-0

6-23

2009

-06-

2620

09-0

7-01

2009

-07-

0620

09-0

7-09

2009

-07-

1420

09-0

7-17

2009

-07-

2220

09-0

7-27

2009

-07-

3020

09-0

8-04

2009

-08-

0720

09-0

8-12

2009

-08-

1720

09-0

8-20

2009

-08-

2520

09-0

8-28

2009

-09-

0220

09-0

9-07

2009

-09-

1020

09-0

9-15

2009

-09-

1820

09-0

9-23

2009

-09-

28

`

Page 6: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

6

budimexBudimex GroupStock exchange performance 3Q 2009 cumulatively

Budimex share value performance vs market January 2009 - September 2009 (cumulative % changes, 31 December 2008=100%)

70,00%

80,00%

90,00%

100,00%

110,00%

120,00%

130,00%

140,00%

150,00%

160,00%

2009

-01-

0520

09-0

1-08

2009

-01-

1320

09-0

1-16

2009

-01-

2120

09-0

1-26

2009

-01-

2920

09-0

2-03

2009

-02-

0620

09-0

2-11

2009

-02-

1620

09-0

2-19

2009

-02-

2420

09-0

2-27

2009

-03-

0420

09-0

3-09

2009

-03-

1220

09-0

3-17

2009

-03-

2020

09-0

3-25

2009

-03-

3020

09-0

4-02

2009

-04-

0720

09-0

4-14

2009

-04-

1720

09-0

4-22

2009

-04-

2720

09-0

4-30

2009

-05-

0620

09-0

5-11

2009

-05-

1420

09-0

5-19

2009

-05-

2220

09-0

5-27

2009

-06-

0120

09-0

6-04

2009

-06-

0920

09-0

6-15

2009

-06-

1820

09-0

6-23

2009

-06-

2620

09-0

7-01

2009

-07-

0620

09-0

7-09

2009

-07-

1420

09-0

7-17

2009

-07-

2220

09-0

7-27

2009

-07-

3020

09-0

8-04

2009

-08-

0720

09-0

8-12

2009

-08-

1720

09-0

8-20

2009

-08-

2520

09-0

8-28

2009

-09-

0220

09-0

9-07

2009

-09-

1020

09-0

9-15

2009

-09-

1820

09-0

9-23

2009

-09-

28

WIG - construction WIG Budimex [PLN/share]

Page 7: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

7

budimexBudimex GroupMarket capitalization as of 30 September 2009 (m PLN)

Capitalization as of 30 September 2009 vs competitors in m PLN (with % changes vs. 31 December 2008)

2 820

2 0651 811

1 539

737 656 635

0

500

1 000

1 500

2 000

2 500

3 000

PBG Budimex Polimex MostostalSiedlce

MostostalWarszawa

Polaqua Mostostal Zabrze Erbud

vs. 31 December'08 7,14% 54,32%56,40% 46,67% 110,50%58,32% 27,87%

Page 8: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

budimex

budimex

Budimex Group

Results for 3Q 2009

Page 9: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

9

budimexBudimex GroupFinancial highlights

m PLN 3Q 2009 3Q 2008 ∆

Sales 2 391 2 452 -61% change 3Q 2009 vs. 3Q 2008 -2,5%

Gross margin 306 220 86as % of sales 12,8% 9,0%

Cost of sales and overheads -107 -109 2as % of sales -4,5% -4,5%

Result on sales 199 111 88Other operating activity -69 -24 -45EBIT 130 87 43

as % of sales 5,5% 3,5%Financial activity 22 9 13

Profit before tax 153 98 55

Net profit 119 73 46

Capital Expenditure 9 25 -16

Construction backlog (as of 30 September) 4 622 3 082 1 540

Presales of flats (value)* 49 165 -115

Land Bank (k m2 of flats) (as of 30 September) 251

* without flats returned

Page 10: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

10

budimexBudimex GroupResult by segments – sales cumulatively (m PLN)(3Q 2009 vs 3Q 2008)

sales 3Q 2009 cumulatively

2.218113 98

-38

2.391

Construction business

Real estatebusiness

Otheractivities

Elimination ofinternal

transactions *

TOTAL

sales 3Q 2008** cumulatively

* mainly Budimex Dromex (construction segment) sales to real estate segment** comparative data

dynamics of sales vs. PY

-5,1% -8,8% -100% -5,5% -14,9% -0,7% -2,5%

2.104 114 0

Poland Germanmarket

Othercountries

2.217125 3

Poland Germanmarket

Othercountries

2.345 133 99

-125

2.452

Construction business

Real estatebusiness

Otheractivities

Elimination ofinternal

transactions *

TOTAL

Page 11: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

11

budimexBudimex GroupResult by segments – EBIT cumulatively (m PLN)(3Q 2009 vs 3Q 2008)

72

34

-3-16

87

Construction business

Real estatebusiness

Otheractivities

Elimination ofinternal

transactions *

TOTAL

11320

-1 -2

130

Construction business

Real estatebusiness

Otheractivities

Elimination ofinternal

transactions *

TOTAL

* mainly Budimex Dromex (construction segment) margin on sales to real estate segment

** comparative data

as % of sales

5,1% 17,5% -1,3% 5,5%

as % of sales

3,1% 25,7% -3,0% 3,5%

EBIT 3Q 2009 cumulatively

EBIT 3Q 2008** cumulatively

Page 12: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

budimex

budimex

Budimex Group

Construction segment

Page 13: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

13

budimexBudimex Group Construction segment Financial highlights

m PLN 3Q 2009 3Q 2008 ∆

Sales 2 218 2 345 -128% change 3Q 2009 vs. 3Q 2008 -5,5%

EBIT 113 72 41as % of sales 5,1% 3,1%

Profit before tax 148 86 62

Net profit 115 63 52

Construction backlog (as of 30 September) 4 622 3 082 1 540

Page 14: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

14

budimexBudimex GroupConstruction segment Sales structure

3Q 2008

95%

5%

Polish Market German Market

Sales structure by type of works

Sales structure by markets

3Q 200822%

27%

5%

46%

General construction - residentialGeneral construction - non residentialInfrastructure construction German market

3Q 20098%

18%

69%

5%

General construction - residentialGeneral construction - non residentialInfrastructure construction German market

3Q 2009

95%

5%

Polish Market German Market

Page 15: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

15

budimexBudimex GroupConstruction segment Backlog structure

30 IX 200726%

29%

43%

2%30 IX 2009

5%

25%

1%

69%

30 IX 200820%

24%

2%

54%

Backlog structure by type of works

infrastructure general construction: non residential general construction: residential German market

Budimex Group backlog (m PLN)

3 302 3 082

4 622

1 000

2 000

3 000

4 000

5 000

30 IX 2007 30 IX 2008 30 IX 2009

Residential internal backlog30 IX 2007 30 IX 2008 30 IX 2009

40% 22% 46%

Contracts with value to be realized > 1 m PLN30 IX 2007 30 IX 2008 30 IX 2009

number of contracts 79 58 73average value (m PLN) 38 50 62

Page 16: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

16

budimexBudimex GroupConstruction segment Backlog structure (m PLN)

Backlog structure: expected time of revenues recognition (m PLN)

29%34%31%

71%

66%

69%

0

1 000

2 000

3 000

2009 2010 2011+

Infrastructure construction

General construction

≈700

≈1 300

≈2 600

average period of contract realization (contracts included in backlog as of 30 IX 2009): 28 months

Page 17: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

17

budimexBudimex GroupConstruction segment Contracts signed structure

Contracts signed structure by type of works

3Q 2009 cumul3%

25%

70%

2%3Q 2008 cumul

16%

49%

3%

32%

3Q 2007 cumul

27%

27%

5%

41%

infrastructure general construction: non residential general construction: residential German market

Contracts signed by Budimex Group (m PLN)

2 8762 301

3 232

0500

1 0001 5002 0002 5003 0003 500

3Q cumul 2007 3Q cumul 2008 3Q cumul 2009

Page 18: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

18

budimexPolandGeneral Road Administration (GDDKiA) expenses (m PLN)

2 853 3 7056 026 7 027

9 24411 865

13 618

22 700

31 391

23 221

13 225

0

5 000

10 000

15 000

20 000

25 000

30 000

35 000

2002 2003 2004 2005 2006 2007 2008 2009* 2010 2011 2012

GENERAL ROAD ADMINISTRATION EXPENSES

Current General Road Administration (GDDKiA) budget amounts to 22,7 M PLN. (first version of the budget: 32,4 M PLN, next modification: 29,4 M PLN).At the end of August 2009 GDDKiA expenses amounted to 10,6 M PLN, which is 46,67% of its total budget.

Source: GDDKiA

Page 19: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

19

budimexBudimex GroupConstruction segment GDDKiA budget for 2009: source of financing

≈ 1 250

≈ 5 200

7 85014 3008 400

National Budget

Domestic Roads Fund

Engine fuel tax

Loan from European Investment Bank

Infrastructure bonds emission

22 700

In previous years, financial funds for the construction of roads came mostly from the National Budget.

Currently this method of financing is changing (see the chart above) and most probably the construction of roads will be financed by Domestic Roads Fund in the following years, only renovation and current maintenance of roads will be financed from the National Budget.

Market was afraid of those changes in the structure of roads construction financing (risk of lack of money in GDDKiA budget). Currently feelings on the market are more optimistic, because the high interests related to the first emission of the infrastructure’s bonds (which took place on 14 October 2009) was observed.

source: own calculations based on information from GDDKiA

Page 20: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

20

budimexPolandEuropean Union Funds 2007-2013 (m EUR)

14 014

11 001

1 061

6 133

02 0004 0006 0008 000

10 00012 00014 000

Roads Railways Ports Environment6 699

6 133

26 076

0

5 000

10 000

15 000

20 000

25 000

30 000

35 000

40 000

2007-2013Transport

Environment

Others (no concern of Budimex activities eg. energy-power industry, education, culture and health)

The Operational Programme Infrastructure and Environment 2007-2013 including: EU, national and private contribution*

38 908 m EUR

32 209 m EUR

Budimex activitiesarea:

EU Funds: 27 914 m EURNational contribution: 7 542 m EURPrivate contribution: 3 452 m EURTotal: 38 908 m EUR

* in accordance with National Strategic Reference Framework (NRSF) approved by the European Commission on 7 May 2007

Page 21: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

budimex

budimex

Budimex Group

Real Estate segment

Page 22: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

22

budimexBudimex GroupReal Estate segment Number of flats permitted, started and completed (k PLN)

0

50

100

150

200

250

300

Permits 86 93 98 116 161 248 230 139

Started 77 82 98 106 138 186 174 110

Completed 98 163 108 114 115 134 166 115

2002 2003 2004 2005 2006 2007 2008 IX 2009

Source: Central Statistical Office (CSO)

Page 23: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

23

budimexBudimex GroupReal Estate segment All active projects and land bank - localization

including 100% company Nieruchomości Sp. z o.o.

WarsawPoznan

Cracow

Project Number of flats

Active

Korsaka 156Kocjana 370Inflancka I 262Olbrachta II 269Inflancka II 232Mołdawska 286Idzikowskiego 160Polkowska 49

Land bank 2 835

Project Number of flats

Land bank 3 999

Project Number of flats

Land bank 1 412

Page 24: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

24

budimexBudimex Group Real Estate segment Financial highlights

Budimex Group Real Estate segment result

m PLN 3Q 2009 3Q 2008 ∆

Sales 113 133 -20% change 3Q 2009 vs. 3Q 2008 -14,9%

EBIT 20 34 -14as % of sales 17,5% 25,7%

Profit before tax 8 27 -19

Net profit 6 21 -15

Presales (m PLN)* 49 165 -115

Presales (volume of flats)* 105 276 -172

Land Bank (k m2 of flats) (as of 30 September) 251

Real Estate segment including 100% of Budimex Nieruchomości Sp. z o.o.

m PLN 3Q 2009 3Q 2008 ∆

Sales 199 202 -3% change 3Q 2009 vs. 3Q 2008 -1,5%

Net profit 19 29 -10

Presales (volume of flats)* 171 446 -275

Land Bank (k m2 of flats) (as of 30 September) 502

* without flats returned

Page 25: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

25

budimexBudimex GroupReal Estate segment Notary sales and presales structure by city

Notary sales of flats geographical structure

3Q 2009

87%

7%6%

Warsaw Cracow Poznań

3Q 2008

96%

2%2%

Warsaw Cracow Poznań

3Q 2009

93%

4%3%

Warsaw Cracow Poznań

Presales of flats geographical structure

165 m PLN

122 m PLN3Q 2008

35% 48%

17%

Warsaw Cracow Poznań

103 m PLN

49 m PLN

Page 26: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

26

budimexBudimex GroupReal Estate segment Presales of flats* 3Q 2007 – 3Q 2009

Budimex Group presales - volume of flats

21

40 44

0

10

20

30

40

50

1Q 2009 2Q 2009 3Q 2009

cumulatively

105

276 281

0

50

100

150

200

250

300

3Q 2007 3Q 2008 3Q 2009

* without flats returned

Page 27: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

27

budimex

Budimex GroupReal Estate segment Notary sales (volume of flats)

Budimex Group cumulatively notary sales - volume of flats

cumulatively

217

367

0 50

100 150 200 250 300 350 400

3Q 2008 3Q 2009

122 52 43

0 50

100 150 200 250 300 350 400

1Q 2009 2Q 2009 3Q 2009

Budimex Group notary sales cumulatively – geographical structure

3Q 2008

40%44%

16%

Warsaw Cracow Poznań

3Q 2009

4%7%

89%

Warsaw Cracow Poznań

Page 28: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

28

budimex

Budimex GroupReal Estate segment Projects completed as of 30 September 2009

Projects completed in 2009 - volume of flats

notary act signed already presold not yet presold

(stock)

Bx Inwestycje - - - - 50% of Bx Nieruchomości (J.V.) 529 175 148 207 TOTAL 529 175 148 207

Total number of flats on projects

including

Project completed before 2009 - volume of flats

notary act signed already presold not yet presold

(stock)

Bx Inwestycje 258 250 3 5 50% of Bx Nieruchomości (J.V.) 103 100 2 1 TOTAL 361 350 5 6

Total number of flats on projects

including

Page 29: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

29

budimexBudimex GroupReal Estate segment Projects under construction as of 30 September 2009

Budimex Group projects under construction - volume of flats

Bx Inwestycje 160 109 51 31,9%50% of Bx Nieruchomości (J.V.) 259 123 137 52,7%

TOTAL 419 232 188 44,7%

Total number of flats on projects under

construction

Flats already presold as of 30 September 2009 Flats to be presold

Flats not presold as % of total number of flats

under construction

excluding Inflancka III, presales not started yet

12

18732 232

-

100

200

300

400

2009 2010 2011 Total

The number of flats presold by Budimex Group on projects under construction as of 30 September 2009 amounts to 232.

The notary sales of those flats will be realized in the next years as follows:

Page 30: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

30

budimexBudimex GroupReal Estate segment Land bank as of 30 September 2009

Budimex Group land bank, average flat is 61 m2

projects area land m2 planned m2 of flats (PUM)

planned number of

flats

Warszawa Śródmieście 3 918 9 431 125Dolny Mokotów 118 069 69 558 975Praga Południe 5 410 10 200 159Bielany 7 030 11 013 160

Kraków Czyżyny 71 737 87 768 1 548Podgórze 10 420 11 310 216Prądnik Czerwony 8 931 11 252 202Łagiewniki - Borek Fałęcki 4 540 1 706 35

Poznań Stare Miasto 20 535 24 395 451Grunwald 9 402 14 439 255

TOTAL 259 990 251 070 4 123

Budimex Group land bank geographical structure

42%

40%16%

Warsaw Cracow Poznań

Page 31: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

budimex

budimex

Budimex Group

Other Activity

Page 32: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

32

budimex

Budimex Group Other Activity Financial highlights

m PLN 3Q 2009 3Q 2008 ∆

Sales 98 99 -1% change 3Q 2009 vs. 3Q 2008 -0,7%

EBIT -1 -3 2as % of sales -1,3% -3,0%

Profit before tax -1 2 -2

Net Profit -1 1 -2

Page 33: Prezentacja programu PowerPoint...Mostostal Kraków S.A. Budimex Group * Budimex Group’s consolidated result includes 50% of the result of Budimex Nieruchomości Sp. z o.o. Budimex

33

budimexBudimex GroupOther Activity Sales structure

Sales structure by country

Timber-frame houses backlog (volume) as of 30 September 2009

3Q 2008

72%

2%

13%

13%

Germany Poland U.K. Other countries

3Q 2009

85%

5% 2%8%

Germany Poland U.K. Other countries

Total backlog

297325

050

100150200250300350400

30 IX 2008 30 IX 2009

volu

me

Backlog as of 30 September 2009 by markets

256

8

60

10

50

100150

200250

300

German British Polish Other countries

volu

me