At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.

Upload: qadir1

Post on 23-Jun-2015

108 views

Category:

Technology


0 download

DESCRIPTION

Engineering

TRANSCRIPT

Page 1: Prevodnica en

At the beginning there were two canals:Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.

Page 2: Prevodnica en
Page 3: Prevodnica en

In 1963, after 150 yrs of existence of this water way with 11 locks the construction of a huge water carousel started. This extraordinary idea was finished in 2002 and became a symbol of Scotland. This invention saves not only time but also energy.

Page 4: Prevodnica en
Page 5: Prevodnica en
Page 6: Prevodnica en

This is the only rotational boat transporter in the world. It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .

Page 7: Prevodnica en

lower canallower canal

Page 8: Prevodnica en

Entrance to lower canalEntrance to lower canal

Page 9: Prevodnica en

A Boat is approaching the “tub”A Boat is approaching the “tub”

Page 10: Prevodnica en
Page 11: Prevodnica en

There are boats in both “tubs” There are boats in both “tubs” upper and lowerupper and lower

35 m35 m

Page 12: Prevodnica en

Rotation is startingRotation is starting

Page 13: Prevodnica en

Boats in both rotating armsBoats in both rotating arms

Page 14: Prevodnica en

rotationrotation

Page 15: Prevodnica en

Otáčení...Otáčení...

Page 16: Prevodnica en

Just before “landing”Just before “landing”

Page 17: Prevodnica en
Page 18: Prevodnica en
Page 19: Prevodnica en

Closing the gate , regulation of level of water and “tubs” rotationTakes 15 min. only.

Page 20: Prevodnica en
Page 21: Prevodnica en

One “tub” 78ft. Long with water and boat weights about 300 tons. One “tub” 78ft. Long with water and boat weights about 300 tons.

Page 22: Prevodnica en

The “tubs” are filled according the Archimedes’ Law.So the weight of “tubs” are balanced.

To open the upper and lower lock and turn the whole system by 180◦ they need an engine of 22.5 kW which only use 1.5 kWh