presupuesto de un proyecto de saneamiento basico integral en el area rural

Upload: juan-carlos-aquise-calloapaza

Post on 06-Oct-2015

13 views

Category:

Documents


0 download

DESCRIPTION

presupuesto exportado del s10 en el area rural

TRANSCRIPT

Sheet1ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)001SISTEMA DE AGUA POTABLE889,805.46001.01OBRAS PROVISIONALES6,390.24001.01.01CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40Mund1.001,453.741,453.74001.01.02ALMACEN, OFICINA, VESTUARIO Y GUARDIANIAm245.00109.704,936.50001.02POZO DE CAPTACION Y CASETA DE BOMBEO35,723.54001.02.01OBRAS PRELIMINARES80.07001.02.01.01LIMPIEZA DE TERRENOm29.303.1128.92001.02.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm29.303.1229.02001.02.01.03TRAZOS, NIVELES Y REPLANTEO DURANTE EL PROCESOm29.302.3822.13001.02.02MOVIMIENTO DE TIERRAS4,030.18001.02.02.01EXCAVACION MANUALm32.3354.38126.71001.02.02.02EXCAVACION EN TERRENO SATURADOm321.20158.763,365.71001.02.02.03REFINE, NIVELACION Y COMPACTACIONm22.768.7324.09001.02.02.04RELLENO COMPACTADO CON MATERIAL DE PRESTAMOm30.5536.3419.99001.02.02.05RELLENO CON MATERIAL GRAVAm30.5764.0136.49001.02.02.06ELIMINACION DE MATERIAL EXCEDENTEm329.4215.54457.19001.02.03OBRAS DE CONCRETO SIMPLE769.15001.02.03.01CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm32.33144.72337.20001.02.03.02SOBRECIMIENTOS431.95001.02.03.02.01ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSm26.1643.64268.82001.02.03.02.02CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOSm30.77211.86163.13001.02.04OBRAS DE CONCRETO ARMADO10,574.74001.02.04.01ANILLOS DE CONCRETO7,211.43001.02.04.01.01ACERO FY = 4200 KG/CM2kg338.294.081,380.22001.02.04.01.02ENCOFRADO Y DESENCOFRADO METALICO FUSTEm298.1729.182,864.60001.02.04.01.03CONCRETO FC = 175 KG/CM2 EN ANILLOSm37.90375.522,966.61001.02.04.02COLUMNAS1,050.93001.02.04.02.01ACERO GRADO 60 EN COLUMNAS F'Y=4200 KG/CM2kg73.094.31315.02001.02.04.02.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm28.6464.34555.90001.02.04.02.03CONCRETO EN COLUMNAS DE F'C=210 KG/CM2m30.48375.03180.01001.02.04.03VIGAS1,281.07001.02.04.03.01ACERO GRADO 60 EN VIGAS F'Y=4200 KG/CM2kg96.974.31417.94001.02.04.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm29.1263.81581.95001.02.04.03.03CONCRETO EN VIGAS F'C=210 KG/CM2m30.80351.48281.18001.02.04.04LOSAS MACISAS1,031.31001.02.04.04.01ACERO GRADO 60 P/LOSAS MACISAS F'Y=4200KG/CM2kg48.964.31211.02001.02.04.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA MACISAm212.1236.74445.29001.02.04.04.03CONCRETO EN LOSAS MACISAS F'C=210 KG/CM2m31.14328.95375.00001.02.05MUROS Y TABIQUERIA DE ALBAILERIA1,127.49001.02.05.01MURO DE LADRILLO KING KONG DE CABEZAm210.50107.381,127.49001.02.06REVOQUES ENLUCIDOS Y MOLDURAS3,586.74001.02.06.01TARRAJEO CON IMPERMEABILIZANTES 1:1, E=1.5CM(INTERIOR)m245.2332.091,451.43001.02.06.02TARRAJEO EN EXTERIORES C/MORTERO 1:5 X1.5 CM.m281.5223.011,875.78001.02.06.03TARRAJEO EN INTERIORES C/MORTERO 1:5 X 1.5CM.m212.0621.52259.53001.02.07CIELORRASOS385.43001.02.07.01CIELORRASOS CON MEZCLA DE CEMENTO-ARENAm29.8339.21385.43001.02.08PISOS Y PAVIMENTOS115.62001.02.08.01FALSO PISO DE 4" DE CONCRETO 1:10m22.7641.89115.62001.02.09CARPINTERIA METALICA517.37001.02.09.01PUERTA METALICA INCLUYE ACCESORIOSm22.00134.97269.94001.02.09.02VENTANA METALICA INCLUYE ACCESORIOSm22.5098.97247.43001.02.10PINTURA855.47001.02.10.01PINTURA EN EXTERIORESm281.528.42686.40001.02.10.02PINTURA EN INTERIORESm221.907.72169.07001.02.11ACCESORIOS11,159.19001.02.11.01SUMINISTRO DE ACCESORIOS CASETA DE BOMBEOGLB1.008,519.858,519.85001.02.11.02COLOCACION DE ACCESORIOSund22.00119.972,639.34001.02.12INSTALACIONES ELECTRICAS2,492.89001.02.12.01TUBERIAS PVC SEL (ELECTRICAS) D=1"M36.709.75357.83001.02.12.02CABLE ELECTRICO THW 2 X 6MM2 +1X10MM2m2.0010.5321.06001.02.12.03CABLE ELECTRICO 2X4MM2 THW +1X10MM2 PARA BOMBASm29.706.84203.15001.02.12.04EXCAVACION DE ZANJAS PARA TUBERIASm31.4036.2650.76001.02.12.05RELLENO CON MATERIAL FILTRANTE EN ZANJASm30.7027.1919.03001.02.12.06RELLENO COMPACTADO A MANO EN ZANJASm30.7043.5130.46001.02.12.07EXCAVACION PARA POZO DE TIERRAm31.9254.38104.41001.02.12.08POZO-CONEXION A TIERRA Y NEUTROund1.001,079.671,079.67001.02.12.09SALIDA DE TECHO C/CABLE THW 2.5MM(14)+TUB. PVC SEL 19MM(3/4)pto1.0077.6677.66001.02.12.10SALIDA DE INTERRUPTORES C/CABLE THW 2.5MM(14)+TUB. PVC SEL 19MM(3/4)pto1.0062.2162.21001.02.12.11SALIDA TOMACORRIENTE C/CABLE THW 4.0MM(12)+ TUB. PVC SAP 19MM(3/4)pto2.0082.98165.96001.02.12.12TABLERO DE DISTRIBUCION (T.D) DE CAJA METALICApza1.0078.0078.00001.02.12.13INTERRUPTOR THERMOMAGNETICO DE 2 X 50Apza1.0048.3848.38001.02.12.14INTERRUPTOR THERMOMAGNETICO DE 2 X 20Apza3.0064.77194.31001.02.13LIMPIEZA Y VARIOS29.20001.02.13.01LIMPIEZA Y OTROSm29.303.1429.20001.03LINEA DE IMPULSION12,192.37001.03.01OBRAS PRELIMINARES554.74001.03.01.01LIMPIEZA DE TERRENO MANUAL EN OBRAS LONGITUDINALESm287.430.74212.70001.03.01.02TRAZO, NIVELACION Y REPLANTEO DE ZANJASm287.431.19342.04001.03.02MOVIMIENTO DE TIERRAS7,959.96001.03.02.01EXCAVACION MANUAL EN TERRENO SEMIROCOSO 0.50X1.00mm287.4315.544,466.66001.03.02.02REFINE NIVELACION DE FONDOS PARA TUBERIA DE AGUAm287.432.42695.58001.03.02.03CAMA DE APOYO(ARENA GRUESA)m287.434.391,261.82001.03.02.04RELLENO Y COMPACTADO DE ZANJASm287.432.43698.45001.03.02.05ELIMINACION DE MATERIAL EXCEDENTE A 30mm353.8915.54837.45001.03.03SUMINISTRO E INSTALACION DE TUBERIAS3,512.39001.03.03.01TUBERIA PVC SAP C - 7.5, D= 2"m287.4311.053,176.10001.03.03.02PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUAm287.431.17336.29001.03.04ACCESORIOS165.28001.03.04.01SUMINISTRO DE ACCESORIOS EN LINEA DE IMPULSIONGLB1.0045.0045.00001.03.04.02COLOCACION DE ACCESORIOS EN LINEA DE IMPULSIONund4.0030.07120.28001.04RESERVORIO (01UND = 25 M3)29,708.44001.04.01OBRAS PRELIMINARES486.72001.04.01.01LIMPIEZA DE TERRENOm256.533.11175.81001.04.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm256.533.12176.37001.04.01.03TRAZOS, NIVELES Y REPLANTEO DURANTE EL PROCESOm256.532.38134.54001.04.02MOVIMIENTO DE TIERRAS1,579.37001.04.02.01EXCAVACION MANUAL EN TERRENO SEMIROCOSOm313.4772.51976.71001.04.02.02REFINE, NIVELACION Y COMPACTACIONm222.418.73195.64001.04.02.03ELIMINACION DE MATERIAL A MENOS DE 30 MTS.m316.8424.17407.02001.04.03OBRAS DE CONCRETO SIMPLE894.59001.04.03.01SOLADO BASE RESERVORIO E=4"m222.4130.62686.19001.04.03.02CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm31.44144.72208.40001.04.04OBRAS DE CONCRETO ARMADO12,286.67001.04.04.01CONCRETO FC = 210 KG/CM2 LOSA FONDOm36.29390.562,456.62001.04.04.02CONCRETO FC = 210 KG/CM2 MUROSm37.76375.522,914.04001.04.04.03ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS)m279.5634.832,771.07001.04.04.04CONCRETO FC = 210 KG/CM2 LOSA MACISA - TAPAm31.78404.06719.23001.04.04.05ENCOFRADO Y DESENCOFRADO DE LOSA TAPAm217.3337.83655.59001.04.04.06ACERO FY = 4200 KG/CM2kg678.954.082,770.12001.04.05TARRAJEOS3,600.97001.04.05.01TARRAJEO CON IMPERMEABILIZANTES 1:1 PARED INTERIOR - PISOm266.4632.092,132.70001.04.05.02TARRAJEO EN EXTERIORES C/MORTERO 1:5 X1.5 CM.m263.8123.011,468.27001.04.06CARPINTERIA METALICA2,780.32001.04.06.01SUMINISTRO Y COLOCACION DE POSTES DE F.G. DE 2" H= 2.5und15.0085.711,285.65001.04.06.02SUMINISTRO Y COLOCACION DE ALAMBRES DE PUASm296.814.301,276.28001.04.06.03SUMINISTRO Y COLOCACION DE PUERTA DE ACCESOund1.00218.39218.39001.04.07PINTURA537.28001.04.07.01PINTURA EN EXTERIORESm263.818.42537.28001.04.08ACCESORIOS4,193.51001.04.08.01SUMINISTRO DE ACCESORIOS RESERVORIOGLB1.001,998.121,998.12001.04.08.02COLOCACION DE ACCESORIOS RESERVORIOund61.0035.992,195.39001.04.09VARIOS3,349.01001.04.09.01JUNTA CON WATER STOPm16.4023.60387.04001.04.09.02LIMPIEZA Y DESINFECCION DE RESERVORIOSm256.531.4581.97001.04.09.03SISTEMA DE CLORACION POR GOTEOGLB1.002,880.002,880.00001.05LINEA DE ADUCCION8,673.45001.05.01OBRAS PRELIMINARES365.47001.05.01.01LIMPIEZA DE TERRENO MANUAL EN OBRAS LONGITUDINALESm189.360.74140.13001.05.01.02TRAZO, NIVELACION Y REPLANTEO DE ZANJASm189.361.19225.34001.05.02MOVIMIENTO DE TIERRAS5,550.61001.05.02.01EXCAVACION MANUAL EN TERRENO SEMIROCOSO 0.50X1.00mm189.3615.542,942.65001.05.02.02REFINE NIVELACION DE FONDOS PARA TUBERIA DE AGUAm189.362.42458.25001.05.02.03CAMA DE APOYO(ARENA GRUESA)m189.364.39831.29001.05.02.04RELLENO Y COMPACTADO DE ZANJASm189.362.43460.14001.05.02.05ELIMINACION DE MATERIAL A MENOS DE 30 MTS.m335.5124.17858.28001.05.03SUMINISTRO E INSTALACION DE TUBERIAS2,577.19001.05.03.01TUBERIA PVC SAP C - 7.5, D= 3"m189.3612.442,355.64001.05.03.02PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUAm189.361.17221.55001.05.04ACCESORIOS180.18001.05.04.01SUMINISTRO DE ACCESORIOS EN LINEA DE ADUCCIONGLB1.0035.9035.90001.05.04.02COLOCACION DE ACCESORIOS EN LINEA DE ADUCCIONund4.0036.07144.28001.06VALVULA DE CONTROL(12 UND)11,350.40001.06.01OBRAS PRELIMINARES83.69001.06.01.01LIMPIEZA DE TERRENOm29.723.1130.23001.06.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm29.723.1230.33001.06.01.03TRAZOS, NIVELES Y REPLANTEO DURANTE EL PROCESOm29.722.3823.13001.06.02MOVIMIENTO DE TIERRAS989.33001.06.02.01EXCAVACION MANUALm310.6954.38581.32001.06.02.02REFINE, NIVELACION Y COMPACTACIONm29.728.7384.86001.06.02.03ACARREO DE MATERIAL A MENOS DE 30 MTS.m313.3724.17323.15001.06.03OBRAS DE CONCRETO SIMPLE4,437.71001.06.03.01CONCRETO FC = 210 KG/CM2 LOSA FONDOm30.97390.56378.84001.06.03.02CONCRETO FC = 210 KG/CM2 MUROSm32.88375.521,081.50001.06.03.03ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS)m257.6034.832,006.21001.06.03.04ACERO FY = 4200 KG/CM2kg238.034.08971.16001.06.04TARRAJEOS924.79001.06.04.01TARRAJEO CON IMPERMEABILIZANTES 1:1 PARED INTERIOR - PISOm224.0032.09770.16001.06.04.02TARRAJEO EN EXTERIORES C/MORTERO 1:5 X1.5 CM.m26.7223.01154.63001.06.05ACCESORIOS4,914.88001.06.05.01SUMINISTRO DE ACCESORIOS VALVULA DE CONTROLGLB1.001,900.001,900.00001.06.05.02COLOCACION DE ACCESORIOSund12.00251.243,014.88001.07LINEA DE DISTRIBUCION700,214.38001.07.01OBRAS PRELIMINARES33,833.77001.07.01.01LIMPIEZA DE TERRENO MANUAL EN OBRAS LONGITUDINALESm17,530.450.7412,972.53001.07.01.02TRAZO, NIVELACION Y REPLANTEO DE ZANJASm17,530.451.1920,861.24001.07.02MOVIMIENTO DE TIERRAS513,850.37001.07.02.01EXCAVACION MANUAL EN TERRENO SEMIROCOSO 0.50X1.00mm17,530.4515.54272,423.19001.07.02.02REFINE NIVELACION DE FONDOS PARA TUBERIA DE AGUAm17,530.452.4242,423.69001.07.02.03CAMA DE APOYO(ARENA GRUESA)m17,530.454.3976,958.68001.07.02.04RELLENO Y COMPACTADO DE ZANJASm17,530.452.4342,598.99001.07.02.05ELIMINACION DE MATERIAL A MENOS DE 30 MTS.m33,286.9624.1779,445.82001.07.03SUMINISTRO E INSTALACION DE TUBERIAS147,943.72001.07.03.01TUBERIA PVC SAP C - 7.5, D= 3"m355.5912.444,423.54001.07.03.02TUBERIA PVC SAP C - 7.5, D= 2"m2,326.0611.0525,702.96001.07.03.03TUBERIA PVC SAP C - 7.5, D= 1 1/2"m1,966.068.7117,124.38001.07.03.04TUBERIA PVC SAP C - 10, D= 1"m7,518.237.4656,086.00001.07.03.05TUBERIA PVC SAP C - 10, D= 3/4"m5,105.134.7224,096.21001.07.03.06PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUAm17,530.451.1720,510.63001.07.04ACCESORIOS4,586.52001.07.04.01SUMINISTRO DE ACCESORIOS EN LINEA DE DISTRIBUCIONGLB1.001,655.401,655.40001.07.04.02COLOCACION DE ACCESORIOS EN LINEA DE DISTRIBUCIONund276.0010.622,931.12001.08PASE AEREO(6UND)4,332.29001.08.01OBRAS PRELIMINARES201.23001.08.01.01LIMPIEZA DE TERRENOm232.303.11100.45001.08.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm232.303.12100.78001.08.02MOVIMIENTO DE TIERRAS183.33001.08.02.01EXCAVACION MANUALm31.9454.38105.50001.08.02.02REFINE, NIVELACION Y COMPACTACIONm22.168.7318.86001.08.02.03CAMA DE APOYO(ARENA GRUESA)m2.804.3912.29001.08.02.04RELLENO Y COMPACTADO DE ZANJASm2.802.436.80001.08.02.05ACARREO DE MATERIAL A MENOS DE 30 MTS.m31.6524.1739.88001.08.03OBRAS DE CONCRETO SIMPLE616.05001.08.03.01DADOS DE CONCRETO FC = 140 KG/CM2m31.63258.28421.00001.08.03.02ENCOFRADO Y DESENCOFRADO DE DADOSm25.6034.83195.05001.08.04SUMINISTRO DE TUBERIAS Y ACCESORIOS3,331.68001.08.04.01SUMINISTRO DE ACCESORIOS PASE AEREOGLB1.00885.60885.60001.08.04.02COLOCACION DE ACCESORIOS PASE AEREOund7.00349.442,446.08001.09VALVULA DE PURGA(11UND)10,125.97001.09.01OBRAS PRELIMINARES76.72001.09.01.01LIMPIEZA DE TERRENOm28.913.1127.71001.09.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm28.913.1227.80001.09.01.03TRAZOS, NIVELES Y REPLANTEO DURANTE EL PROCESOm28.912.3821.21001.09.02MOVIMIENTO DE TIERRAS793.55001.09.02.01EXCAVACION MANUALm38.4654.38460.05001.09.02.02REFINE, NIVELACION Y COMPACTACIONm28.918.7377.78001.09.02.03ACARREO DE MATERIAL A MENOS DE 30 MTS.m310.5824.17255.72001.09.03OBRAS DE CONCRETO SIMPLE3,572.57001.09.03.01CONCRETO FC = 210 KG/CM2 LOSA FONDOm30.89390.56347.60001.09.03.02CONCRETO FC = 210 KG/CM2 MUROSm31.32375.52495.69001.09.03.03ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS)m252.8034.831,839.02001.09.03.04ACERO FY = 4200 KG/CM2kg218.204.08890.26001.09.04TARRAJEOS935.97001.09.04.01TARRAJEO CON IMPERMEABILIZANTES 1:1 PARED INTERIOR - PISOm224.7532.09794.23001.09.04.02TARRAJEO EN EXTERIORES C/MORTERO 1:5 X1.5 CM.m26.1623.01141.74001.09.05ACCESORIOS4,747.16001.09.05.01SUMINISTRO DE ACCESORIOS VALVULA DE PURGAGLB1.001,984.401,984.40001.09.05.02COLOCACION DE ACCESORIOS VALVULA DE PURGAund11.00251.162,762.76001.10VALVULA DE AIRE(2UND)1,576.89001.10.01OBRAS PRELIMINARES13.95001.10.01.01LIMPIEZA DE TERRENOm21.623.115.04001.10.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm21.623.125.05001.10.01.03TRAZOS, NIVELES Y REPLANTEO DURANTE EL PROCESOm21.622.383.86001.10.02MOVIMIENTO DE TIERRAS164.84001.10.02.01EXCAVACION MANUALm31.7854.3896.80001.10.02.02REFINE, NIVELACION Y COMPACTACIONm21.628.7314.14001.10.02.03ACARREO DE MATERIAL A MENOS DE 30 MTS.m32.2324.1753.90001.10.03OBRAS DE CONCRETO SIMPLE738.96001.10.03.01CONCRETO FC = 210 KG/CM2 LOSA FONDOm30.16390.5662.49001.10.03.02CONCRETO FC = 210 KG/CM2 MUROSm30.48375.52180.25001.10.03.03ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS)m29.6034.83334.37001.10.03.04ACERO FY = 4200 KG/CM2kg39.674.08161.85001.10.04TARRAJEOS170.18001.10.04.01TARRAJEO CON IMPERMEABILIZANTES 1:1 PARED INTERIOR - PISOm24.5032.09144.41001.10.04.02TARRAJEO EN EXTERIORES C/MORTERO 1:5 X1.5 CM.m21.1223.0125.77001.10.05ACCESORIOS488.96001.10.05.01SUMINISTRO DE ACCESORIOS VALVULA DE AIREGLB1.00237.80237.80001.10.05.02COLOCACION DE ACCESORIOS VALVULA DE AIREund2.00125.58251.16001.11PILETAS DOMICILIARIAS(100UND)58,447.49001.11.01OBRAS PRELIMINARES685.30001.11.01.01LIMPIEZA DE TERRENOm2110.003.11342.10001.11.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm2110.003.12343.20001.11.02MOVIMIENTO DE TIERRAS1,150.46001.11.02.01EXCAVACION MANUALm313.6054.38739.57001.11.02.02ACARREO DE MATERIAL A MENOS DE 30 MTS.m317.0024.17410.89001.11.03OBRAS DE CONCRETO SIMPLE5,738.75001.11.03.01CONCRETO FC = 140 KG/CM2m320.64278.045,738.75001.11.04OBRAS DE CONCRETO ARMADO30,360.00001.11.04.01ACERO FY = 4200 KG/CM2kg722.504.082,947.80001.11.04.02ENCOFRADO Y DESENCOFRADOm2511.8534.8317,827.74001.11.04.03CONCRETO FC = 175 KG/CM2m326.22365.549,584.46001.11.05PINTURA3,972.98001.11.05.01PINTURA EN EXTERIORESm2471.858.423,972.98001.11.06VARIOS16,540.00001.11.06.01SUMINISTRO DE ACCESORIOS CONECCIONES DOMICILIARIASund100.00115.1711,517.00001.11.06.02COLOCACION DE ACCESORIOS CONEXIONES DOMICILIARIASund100.0050.235,023.00001.12MITIGACION DE IMPACTO AMBIENTAL3,690.00001.12.01MITIGACION DE IMPACTO AMBIENTALGLB1.003,690.003,690.00001.13FLETE TERRESTRE7,380.00001.13.01FLETE TERRESTREGLB1.007,380.007,380.00002UNIDADES BASICAS DE SANEAMIENTO(100UND)806,519.51002.01OBRAS PRELIMINARES4,697.07002.01.01LIMPIEZA DE TERRENO MANUALm2481.754.182,013.72002.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm2481.753.121,503.06002.01.03TRAZOS, NIVELES Y REPLANTEO DURANTE EL PROCESOm2481.752.451,180.29002.02MOVIMIENTO DE TIERRAS10,986.36002.02.01NIVELACION INTERIOR Y APISONADOm2481.753.841,849.92002.02.02EXCAVACION PARA CIMIENTOS CORRIDOSm3144.0036.265,221.44002.02.03ELIMINACION DE MATERIAL EXCEDENTEm3180.0021.753,915.00002.03OBRAS DE CONCRETO SIMPLE52,844.74002.03.01CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm3144.00144.7220,839.68002.03.02SOBRECIMIENTOS28,950.19002.03.02.01ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSm2487.5043.6421,274.50002.03.02.02CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOSm336.23211.867,675.69002.03.03SARDINEL3,054.87002.03.03.01ENCOFRADO Y DESENCOFRADO PARA SARDINELESm251.0043.642,225.64002.03.03.02CONCRETO EN SARDINELES DE F'C= 175 KG/CM2m32.55325.19829.23002.04OBRAS DE CONCRETO ARMADO77,804.38002.04.01COLUMNAS51,387.41002.04.01.01ACERO GRADO 60 EN COLUMNAS F'Y=4200 KG/CM2kg4,109.604.3117,712.38002.04.01.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2381.7564.3424,561.80002.04.01.03CONCRETO EN COLUMNAS DE F'C=210 KG/CM2m324.30375.039,113.23002.04.02VIGAS26,416.97002.04.02.01ACERO GRADO 60 EN VIGAS F'Y=4200 KG/CM2kg1,257.404.315,419.39002.04.02.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm2246.0063.8115,697.26002.04.02.03CONCRETO EN VIGAS F'C=210 KG/CM2m315.08351.485,300.32002.05MUROS DE BLOQUETA106,516.78002.05.01FABRICACION DE BLOQUETASund15,663.384.4770,015.31002.05.02MURO DE BLOQUE HUECO DE CONCRETOm21,160.2531.4636,501.47002.06REVOQUES ENLUCIDOS Y MOLDURAS87,243.21002.06.01TARRAJEO EN EXTERIORES C/MORTERO 1:5 X1.5 CM.m21,473.0023.0133,893.73002.06.02TARRAJEO EN INTERIORES C/MORTERO 1:5 X 1.5CM.m21,403.7521.5230,208.70002.06.03TARRAJEO DE SUPERF. VIGAS C/MORTERO 1:5 X 1.5 CM.m2246.0033.128,147.52002.06.04TARRAJEO DE SUPERF. DE COLUMNAS C/MORTERO 1:5 X 1.5 CM.m2380.2539.4314,993.26002.07PISOS Y PAVIMENTOS19,137.60002.07.01FALSO PISO DE 4" DE CONCRETO 1:10m2270.0041.8911,310.30002.07.02PISO CEMENTO PULIDOm2270.0028.997,827.30002.08CARPINTERIA DE MADERA21,476.00002.08.01PUERTA DE TABLERO REBAJADO SEGUN DISEOund100.00214.7621,476.00002.09COBERTURAS29,688.69002.09.01CORREAS DE MADERA TORNILLO DE 2X2p2891.2511.5410,285.03002.09.02COBERTURA CON PLANCHA ONDULADAm2571.2033.9719,403.66002.10CARPINTERIA METALICA17,800.00002.10.01VENTANA METALICA Iund100.0080.008,000.00002.10.02VENTANA METALICA IIund100.0098.009,800.00002.11VIDRIOS, CRISTALES Y SIMILARES7,326.19002.11.01VIDRIO SEMIDOBLEp21,210.946.057,326.19002.12PINTURA28,442.29002.12.01PINTURA EN EXTERIORESm21,998.758.4216,829.48002.12.02PINTURA EN INTERIORESm21,504.257.7211,612.81002.13LIMPIEZA Y VARIOS1,186.92002.13.01LIMPIEZA Y OTROSm2378.003.141,186.92002.14INSTALACIONES ELECTRICAS25,395.00002.14.01SALIDA DE TECHO C/CABLE THW 2.5MM(14)+TUB. PVC SEL 19MM(3/4)pto100.0077.667,766.00002.14.02SALIDA DE INTERRUPTORES C/CABLE THW 2.5MM(14)+TUB. PVC SEL 19MM(3/4)pto100.0062.216,221.00002.14.03TABLERO DE DISTRIBUCION (T.D) DE CAJA METALICApza100.0078.007,800.00002.14.04INTERRUPTOR THERMOMAGNETICO DE 2 X 60Apza100.0036.083,608.00002.15INSTALACIONES SANITARIAS24,432.00002.15.01INODOROpza100.0078.387,838.00002.15.02DUCHAS CROMADA 1 LLAVE INCL. ACCESORIOSund100.0050.405,040.00002.15.03SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"PTO200.0057.7711,554.00002.16INSTALACIONES DE DESAGUE291,542.28002.16.01OBRAS PRELIMINARES10,344.75002.16.01.01LIMPIEZA DE TERRENO MANUALm21,061.004.184,434.98002.16.01.02TRAZOS, NIVELES Y REPLANTEO PRELIMINARm21,061.003.123,310.32002.16.01.03TRAZOS, NIVELES Y REPLANTEO DURANTE EL PROCESOm21,061.002.452,599.45002.16.02MOVIMIENTO DE TIERRAS63,592.29002.16.02.01EXCAVACION MANUAL EN TERRENO NORMALm3782.2036.2628,362.57002.16.02.02REFINE NIVELACION DE FONDOS PARA TUBERIA DE DESAGUEm1,500.002.423,630.00002.16.02.03CAMA DE APOYO(ARENA GRUESA)m1,500.004.396,585.00002.16.02.04RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIOm3511.0028.9314,783.23002.16.02.05RELLENO CON MATERIAL SELECCIONADO GRAVAm3150.0042.216,331.50002.16.02.06ELIMINACION DE MATERIAL EXCEDENTEm3179.3121.753,899.99002.16.03SISTEMA DE DESAGUE51,057.40002.16.03.01SALIDA DE PVC SAL PARA DESAGUE DE 2"pto100.0033.803,380.00002.16.03.02SALIDA DE PVC SAL PARA DESAGUE DE 4"pto100.0047.814,781.00002.16.03.03TUBERIA DE PVC SAL 2"M2,155.009.1619,739.80002.16.03.04TUBERIA DE PVC SAL 4"M410.0020.668,470.60002.16.03.05REGISTROS DE CROMADO DE 2"pza100.0062.246,224.00002.16.03.06SUMIDEROS CROMADO DE 2"pza200.0042.318,462.00002.16.04CAJA DE REGISTRO25,472.84002.16.04.01OBRAS DE CONCRETO SIMPLE19,225.14002.16.04.01.01ENCOFRADO Y DESENCOFRADO DE CAJA DE REGISTROm2238.0034.838,289.54002.16.04.01.02CONCRETO EN CAJA DE REGISTRO FC = 175 KG/CM2m331.20350.5010,935.60002.16.04.02OBRAS DE CONCRETO ARMADO6,247.70002.16.04.02.01ACERO FY = 4200 KG/CM2kg265.004.081,081.20002.16.04.02.02ENCOFRADO Y DESENCOFRADO DE CAJA DE REGISTROm295.0034.833,308.85002.16.04.02.03CONCRETO EN CAJA DE REGISTRO FC = 175 KG/CM2m35.30350.501,857.65002.16.05BIODIGESTORES141,075.00002.16.05.01BIODIGESTORund100.001,000.56100,056.00002.16.05.02INSTALACION DE BIODIGESTORund100.00410.1941,019.00003EXPEDIENTE SOCIAL19,353.50003.01ACCIONES PRELIMINARES3,121.41003.01.01ACTIVIDADES DE PROMOCION2,649.99003.01.01.01ELABORACION DE LINEA DE BASEGLB1.001,177.381,177.38003.01.01.02TALLER DE PRESENTACION DEL PROYECTOGLB1.0078.4678.46003.01.01.03TALLER DE IDENTIFICACION Y ANALISIS DE LA PROBLEMATICA DEL SABAGLB1.0048.3048.30003.01.01.04CONSTITUCION DE LA JASS Y LIBRO PADRON DE USUARIOSGLB1.001,345.851,345.85003.01.02ACTIVIDADES DE CAPACITACION39.52003.01.02.01TALLER DE APROBACION DE ESTATUTOS Y REGLAMENTOSGLB1.0039.5239.52003.01.03EDUCACION PARA LA HIGIENE Y LA SALUD431.90003.01.03.01PLAN DE TRABAJO ARTICULADO ( COMUNIDAD, SALUD Y EDUCACION)GLB1.00431.90431.90003.02ACCIONES DEL DURANTE6,745.89003.02.01ACCIONES DE PROMOCION4,230.19003.02.01.01CONVOCATORIA PARA TALLER DE LA JASSGLB1.0019.8019.80003.02.01.02PASANTIA(FAMILIAS, CONSEJO DIRECTIVO DE LA JASS Y ACTORES SOCIALES)GLB1.003,652.143,652.14003.02.01.03TALLER DE GENEROGLB1.0079.7579.75003.02.01.04TALLER DE AUTOESTIMAGLB1.0079.7579.75003.02.01.05TALLER DE IMPORTANCIA DEL AGUA PARA LA VIDA Y SALUDGLB1.0079.7579.75003.02.01.06TALLER DE IMPORTANCIA DE LA ADECUADA ELIMINACION DE EXCRETASGLB1.0079.7579.75003.02.01.07TALLER DE PREVENCION DE ENFERMEDADES LIGADAS AL SANEAMIENTOGLB1.0079.7579.75003.02.01.08TALLER DE HABITOS DE HIGIENE PERSONAL EN EL HOGAR Y EN LA COMUNIDADGLB1.0079.7579.75003.02.01.09TALLER DE DISPOSICION DE RESIDUOS SOLIDOS Y RECICLAJE DE PLASTICOSGLB1.0079.7579.75003.02.02ACTIVIDADES DE CAPACITACION2,406.24003.02.02.01TALLER DE ADMINISTRACION Y CONTABILIDADGLB1.00413.33413.33003.02.02.02TALLER DE PARTES DEL SISTEMA Y MANEJO DE ALMACENGLB1.00561.68561.68003.02.02.03TALLER DE GASFITERIA Y REPARACIONESGLB1.00370.43370.43003.02.02.04TALLER DE OPERACION Y MANTENIMIENTO DEL SISTEMA DE AGUA Y BAOSGLB1.00147.88147.88003.02.02.05TALLER DE CLORACION Y DESINFECCIONGLB1.00912.92912.92003.02.03EDUCACION PARA LA HIGIENE Y LA SALUD109.46003.02.03.01CONSTITUCION Y FUNCIONAMIENTO DEL COMITE DE HIGIENEGLB1.0051.0151.01003.02.03.02VERIFICACION DE LOS HABITOS DE HIGIENE DE LOS NIOS/NIASGLB1.0058.4558.45003.03ACCIONES DEL DESPUES9,486.20003.03.01ACTIVIDADES DE PROMOCION3,567.72003.03.01.01ACOMPAAMIENTO Y APOYO A LA GESTION DE LA JASSGLB1.00450.72450.72003.03.01.02SEGUIMIENTO Y APLICACION DEL SID Y REFORZAMIENTO DE ACCIONES DE PROMOCIONGLB1.003,117.003,117.00003.03.02ACTIVIDADES DE CAPACITACION586.11003.03.02.01TALLER DE HABITOS DE HIGIENE Y SIDGLB1.0065.5265.52003.03.02.02TALLER DE PARTICIPACION CIUDADANAGLB1.0062.1862.18003.03.02.03TALLER DE CONSERVACION DEL AGUA EN LA MICROCUENCAGLB1.0018.5718.57003.03.02.04TALLER DE GESTION DE RIESGOS Y ATENCION DE EMERGENCIASGLB1.0018.5718.57003.03.02.05REFORZAMIENTO DE LOS TALLERES DE CAPACITACIONGLB1.00421.27421.27003.03.03EDUCACION PARA LA HIGIENE Y LA SALUD5,332.37003.03.03.01VISITA EN II.EE. PARA LA VERIFICACION DE USO DE SERVICIOS Y HABITOS DE HIGIENEGLB1.0086.2586.25003.03.03.02CONCURSO DE HIGIENE EN LA COMUNIDAD PARA LOGRAR C.C.SALUDABLEGLB1.002,128.202,128.20003.03.03.03CONCURSO DE ESCUELA SALUDABLEGLB1.00394.00394.00003.03.03.04ORGANIZACION Y DESARROLLO DE CAMPAA DE SALUD E HIGIENE EN LA COMUNIDADGLB1.001,019.921,019.92003.03.03.05ORGANIZACION Y DESARROLLO DE CAMPAA DE SALUD E HIGIENE EN LA II.EE.GLB1.00269.40269.40003.03.03.06DIFUSION MENSAJES EDUCATIVOS SOBRE SANEAMIENTOGLB1.00164.00164.00003.03.03.07LINEA DE CORTEGLB1.001,270.601,270.60