Slide 1 of 54 Pressure System Seminar Part 2, 15 May, 2009 PRESSURE SYSTEM SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M. AGENDA Welcome W. Oren Qweak Hydrogen Target System PS-TGT-08-001 D. Meekins CHL Oil Removal Relief Repair PS-CRY-08-015 E. Yuksek DOE Site Office Review of JLab Pressure System Program K. Dixon Pressure Systems, Chapter 6151, Updates, Policy Changes and Chapter Edits W. Oren

Upload: martha

Post on 09-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

PRESSURE SYSTEM SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M. Qweak Hydrogen Target System PS-TGT-08-001 Pressure System Lessons Learned. Dave Meekins and Ed Daly. System Overview. The system is a cryogenic liquid hydrogen target for Qweak experiment in Hall C. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 1 of 54Pressure System Seminar Part 2, 15 May, 2009

PRESSURE SYSTEM SEMINAR – PART 2

CEBAF CENTER L102/10415 May 2009

9:30-11:00 A.M.AGENDAWelcome W. Oren Qweak Hydrogen Target SystemPS-TGT-08-001 D. Meekins

CHL Oil Removal Relief RepairPS-CRY-08-015 E. Yuksek

DOE Site Office Review of JLab Pressure System Program K. Dixon

Pressure Systems, Chapter 6151, Updates, Policy Changes and Chapter Edits W. Oren

Page 2: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 2 of 54Pressure System Seminar Part 2, 15 May, 2009

Qweak Hydrogen Target SystemPS-TGT-08-001

Pressure System Lessons Learned

Dave Meekins and Ed Daly

Page 3: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 3 of 54Pressure System Seminar Part 2, 15 May, 2009

System Overview

Hx

Cell

Pump

Heater

JT valves

Motion System1. Heat Exchanger2. Cell3. Pump4. Heater5. Hydrogen loop plumbing6. Hydrogen gas handling system (not shown)7. He refrigeration plumbing8. Instrumentation (not shown)

Loop plumbing

• The system is a cryogenic liquid hydrogen target for Qweak experiment in Hall C.

• System Fluids are H2 (target fluid) and He (CHL/ESR refrigerant).

• Temperatures are low, 4K (He) and 20K liquid H2.

Major Components

Page 4: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 4 of 54Pressure System Seminar Part 2, 15 May, 2009

How to Implement JLab Pressure Policies? • Some of the design and fabrication work started before

January 2008.• What do we do with components under construction?• What policies do we have to comply with for new

designs?• How do we treat the non standard components in the

system?• Scheduling and budgetary constraints were applying

pressure to continue with “business as usual”.

• Asked the Pressure Committee for guidance.

Page 5: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 5 of 54Pressure System Seminar Part 2, 15 May, 2009

Breakdown of the System• Gas handling system Storage

vessels (6000 gal)

• Cell• Pump

• Hydrogen loop plumbing• Heater

• Heat Exchanger

• Refrigeration Plumbing

• T=120 F MAWP=100psigB31.3 and VIII D1

• T=-433F MAWP=100 psigCode does not apply. Use equivalent measures and peer review.

• T=-433F MAWP=100 psigB31.3

• T=-453F MAWP=300 psigVIII D1 STAMP REQUIRED

• T=-453F MAWP=300 psigB31.3

Temperature

Page 6: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 6 of 54Pressure System Seminar Part 2, 15 May, 2009

Heat Exchanger• UA of HX was established to provide more than 2.5 kW at

20 K.• Designed in house and sent out for bids at 2 code shops. We

provided the necessary code calculations (saved money).– Meyer Tool: Found design conflict with code. (UW-2b

low temperature)– Eden Cryogenics: Lowest bidder but missed the error.– This caused procurement headache.

• Statement of work: • Used the language “lowest price technically

acceptable”.• Language using “Best value” would have made it

easier to reject unsuitable vendor.

Page 7: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 7 of 54Pressure System Seminar Part 2, 15 May, 2009

HX Section View

Page 8: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 8 of 54Pressure System Seminar Part 2, 15 May, 2009

HX Head Modification

Welds not full penetration

Interior structure not a pressure boundary Pressure boundary

UW2 requires full penetration welds for our case

Full penetrationwith integral backing

Page 9: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 9 of 54Pressure System Seminar Part 2, 15 May, 2009

HX at Meyer Tool

Page 10: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 10 of 54Pressure System Seminar Part 2, 15 May, 2009

Cell and Pump• The Codes do not apply.• Pump case and cell body are made from unlisted aluminum alloys.

– Weld procedures are needed.– Design strength of welds are unknown.– WPS was developed and tested. Used lowest pull test values for design.– Using design basis in B31.3 for unlisted materials where possible.

• More complex analysis was needed for non standard geometries.– FEA (VIII D2)– Reviewed hand calculations

• Rely on testing for unlisted materials/geometries:– Pressure testing of components

• B13.3 where possible• Use sound engineering judgment/peer review

– Sensitive He leak check in reverse.• Thin cell apertures are being extensively tested.• No impact testing was performed.

Page 11: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 11 of 54Pressure System Seminar Part 2, 15 May, 2009

Qweak Cell

Entrance window

Exit window

e-

Page 12: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 12 of 54Pressure System Seminar Part 2, 15 May, 2009

Entrance Window

0.004 in

Burst pressure exceeded 500 psig

Page 13: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 13 of 54Pressure System Seminar Part 2, 15 May, 2009

Hydrogen and Refrigeration Plumbing• This plumbing has been designed and fabricated to B31.3• The Minimum Design Metal Temperature (MDMT) is -452 F.• There are non standard components in the system (Conflat

flanges, unlisted materials…)• Parts of the system are contained in an large insulating vacuum

vessel.• Parts of the system are already existing.• Expansion joints (flexible metal hose) were used

to alleviate stress from temperature gradients, misalignments, seismic and other loads. A complex flexibility analysis can be simplified (B31.3 319.4).

• How should seismic loads be quantified and treated?

Page 14: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 14 of 54Pressure System Seminar Part 2, 15 May, 2009

Implications of low MDMT• B31.3 requires impact testing for SST304 at this temperature.

• Tests are required for base metal, weld metal, and HAZ.• St Louis Testing Lab is capable of doing this.

• Section VIII has 2 provisions which can be helpful.– UHA-51g allows for exemption from impact testing for

low stress in high alloy steels.• B31.3 has a similar exemption but with a temperature

limitation.– Div 1 and 2 have a provision that impact testing may be

performed at 77K for SST304 when 316L welding rod is used with an F number less than 5.• B31.3 does not have such a provision.

• Only components thick enough are required to be tested.

Page 15: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 15 of 54Pressure System Seminar Part 2, 15 May, 2009

B31.3 Conflat (CF) Flanges• Conflat (CF) flanges have been used extensively in the past.

• They provide a reliable seal at design temperature.• Allow for quick replacement and modification of system

components.• Eliminate RadCon issues from welding/grinding/brazing.

• B31.3 references VIII Appendix 2.• Flange bolt loads and gasket seating forces were measured for a

variety of geometries and gasket materials.• Off the shelf CF flanges and bolts are not compliant with

Appendix 2 (at least in a conservative analysis) when using standard copper gaskets.

• MDC will supply COC but not CMTRs.• Flanges may not be made from bar stock (UG-14).• Bolt stress exceeds code allowable for SST.

Page 16: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 16 of 54Pressure System Seminar Part 2, 15 May, 2009

Lessons Learned• Code may apply to some components and not others. Where

the code does apply it must be used.

• Use caution when writing statements of work to allow for changes and mistakes.

• Low MDMT can lead to challenges

– Charpy tests

– Subtleties in the code

• Unlisted materials can be useful but require some type of analysis/testing to determine design criteria.

• Policy/guidance regarding seismic analysis would be useful.

Page 17: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 17 of 54Pressure System Seminar Part 2, 15 May, 2009

Questions?

Page 18: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 18 of 54Pressure System Seminar Part 2, 15 May, 2009

CHL Oil Removal Relief RepairPS-CRY-08-015

Errol Yuksek15 May 09

Page 19: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 19 of 54Pressure System Seminar Part 2, 15 May, 2009

The Event

• September ‘08

• Relief valve activated to keep pressure under control

• Branch separation

Page 20: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 20 of 54Pressure System Seminar Part 2, 15 May, 2009

Layout

Oil Removal

Compressors

4K C

old Box

GHe Storage TanksRelief

• Controller card failure

Page 21: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 21 of 54Pressure System Seminar Part 2, 15 May, 2009

Relief Valve

• Set-point of 300 psi

• Helium flow capacity 2.8 kg/s

• Protects the CHL main compressor and oil removal systems

• 20 ft elevation

Page 22: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 22 of 54Pressure System Seminar Part 2, 15 May, 2009

Immediate Repair• Isolate the leak

• Immediate repair crucial

• Sound engineering judgment

• Defer code analysis

• Improve upon the repair if needed

Page 23: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 23 of 54Pressure System Seminar Part 2, 15 May, 2009

Failed InstallationLong outlet pipe - moment arm produces larger stress at base

Inadequate reinforcement at base

Page 24: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 24 of 54Pressure System Seminar Part 2, 15 May, 2009

Repair Process• Bench Test – verify relief set pressure

• Reduce the stresses

– Increase moment of inertia at the base

– Shorten relief outlet

– Add external support

• Gather materials on hand

• In-Process Examinations – qualified weld examiner (not welders)

• Leak Check – intermediate checks and final check at operating pressure

Page 25: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 25 of 54Pressure System Seminar Part 2, 15 May, 2009

Branch Reinforcement Calculation

Twice as much reinforcement was installed than required by B31.3

Page 26: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 26 of 54Pressure System Seminar Part 2, 15 May, 2009

Stress at Inlet 59 ksi > Yield Stress of 304L 25 ksi

Stress Analysis of Old Installation

Stress after repair 33 ksi improvement required

Page 27: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 27 of 54Pressure System Seminar Part 2, 15 May, 2009

Improved Installation

Outlet Tee – momentum cancelling

Page 28: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 28 of 54Pressure System Seminar Part 2, 15 May, 2009

Stress at Inlet 3.7 ksi < Allowable Stress of 304L 16.7 ksi

P. Knudsen

Stress Analysis of New Installation

Page 29: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 29 of 54Pressure System Seminar Part 2, 15 May, 2009

Repair or Modification?• ESH&Q Ch. 6151 ¶6.8 Repairing or Modifying a Pressure System

– “Repairs to piping systems shall be made using sound engineering principles.”

– “Modifications to piping systems shall be made using current ASME Codes and/or documented equivalent measures.”

– “Changing the service of a pressure vessel or piping system is also viewed as a modification. Changing the service can mean any change in the application or change in the location of the vessel or piping if the structural support is affected.”

• Neither application or location were changed.

• Interpreted as a repair of the piping system.

Page 30: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 30 of 54Pressure System Seminar Part 2, 15 May, 2009

Material• Stainless steel did not have certifications

– Spectrum analyzer

– Does not distinguish between 304 and 304L

– 304L assumed for conservative analysis (allowable stress of 16.7 ksi as opposed to 20 ksi).

Page 31: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 31 of 54Pressure System Seminar Part 2, 15 May, 2009

Root Cause

• October ’04

• Engineering change

• No record of a walk-down

• Lack of an established, controlled process for verification of engineering changes resulted in unchanged outlet pipe

• Implementation of ESH&Q Chapter 6151 establishes multiple checks to prevent such occurrences

04’ Installation Drawing

Page 32: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 32 of 54Pressure System Seminar Part 2, 15 May, 2009

Questions?

• Many thanks to Dave Kashy, Ed Daly, and Michael Bevins for their assistance in the repair process.

Page 33: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 33 of 54Pressure System Seminar Part 2, 15 May, 2009

DOE QA Program Review

Kelly Dixon15 May 09

Page 34: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 34 of 54Pressure System Seminar Part 2, 15 May, 2009

P2 Findings• Four findings:

– JSA Training Program not compliant

– Corrective actions for DOE external assessment findings not adequately tracked and closed

– Documents and record management not compliant with QA program for some JSA orgs

– FIND-DES-P2-004

Page 35: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 35 of 54Pressure System Seminar Part 2, 15 May, 2009

FIND-DES-P2-004

• PS records management

– not compliant w/ ES&H Chapter 6151

– doesn’t ensure control between design specs, p. testing and final installation

– extent of condition unknown

Page 36: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 36 of 54Pressure System Seminar Part 2, 15 May, 2009

3” Male Bayonet

Page 37: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 37 of 54Pressure System Seminar Part 2, 15 May, 2009

3” Bayonet Test Can — 100 psi Rating

Page 38: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 38 of 54Pressure System Seminar Part 2, 15 May, 2009

3” Bayonet Test Can — 350 psi Rating

Page 39: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 39 of 54Pressure System Seminar Part 2, 15 May, 2009

Reviewed Documents• Training records• Gas tank specification from another ongoing project• PS-CRY-08-008 (Docushare folders)

– Design calculations– Traveler– Pressure test procedure and records– Drawings– DA completion statement

• PS-CRY-08-012 folders– Design calculations– Pressure test records– Drawings

Page 40: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 40 of 54Pressure System Seminar Part 2, 15 May, 2009

Basis for Finding• Specifically:

– Drawing folder included an item that may not have been built

– Modified item test records not in designated project folder (ESR 80K Bed U-Tube Mods)

– Design documents not signed in file containing upgraded design

– Signed DA completion statement states “system has been installed and in operating condition”

Page 41: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 41 of 54Pressure System Seminar Part 2, 15 May, 2009

Basis for Finding (cont.)– Also noted:

• Pressure test records not consistent where some are hand written

• Wide range of content and formats within PS documents

• Ch 6151 T1, titled “Pressure System Project Implementation and Documentation Guidance” imparts an advisory nature contrary to mandatory recordkeeping language

Page 42: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 42 of 54Pressure System Seminar Part 2, 15 May, 2009

Lessons Learned

• Maintain consistency in forms and process

• Verify all completed items, no matter how simple they are

• Ch 6151 T1, renamed to “Pressure System Project Implementation and Documentation Requirements”

Page 43: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 43 of 54Pressure System Seminar Part 2, 15 May, 2009

Lessons Learned (cont.)• QA inspector must verify all documents

– Ref Ch 6151 T1, ¶ 4.13 Final System Walkthrough: The QA representative shall perform the final safety walk-through for the pressure system before it can be released for operation. This effort shall include reviewing the Pressure System Checklist and DocuShare Folder for completeness, and ensuring that pressure system marking is consistent with applicable code requirements.

Page 44: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 44 of 54Pressure System Seminar Part 2, 15 May, 2009

Page 45: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 45 of 54Pressure System Seminar Part 2, 15 May, 2009

Pressure Systems, Chapter 6151 Updates

Policy Changes and Chapter Edits

Will Oren for the Pressure Systems

CommitteeMay 15, 2009

Page 46: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 46 of 54Pressure System Seminar Part 2, 15 May, 2009

Change/Enhancement Summary• Chapter 6151

– Pressure system definition– Identifying if you have a pressure system– Vessel stamping requirements– Vacuum vessels– Repairs & modifications

• Appendix T1– Guidance changed to requirements– Upfront peer review for “equivalent

measures”– System inspection requirements

• Appendix T2 – Scope section is changed• Appendix T3 – Foam windows• Appendix T5 – Vacuum Systems ** NEW**

Page 47: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 47 of 54Pressure System Seminar Part 2, 15 May, 2009

Chapter 6151Changes• Section- “Key Terms” – Pressure System: 0

psig or greater unless all the following hold:1. <15psig2. Non-flammable/toxic per ASME 31.3

paragraph 300.23. Temperature between -20˚ and 366˚ F(Vac. systems w/ pressure source must

relieve at <15psig)• Section- “Program and Procedure

Summary” – Vacuum systems are more explicitly dealt

with; some relieved below 15 psi may have new requirements if there are personnel or economic risks.

– If the vessel can be stamped it must be stamped.

Page 48: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 48 of 54Pressure System Seminar Part 2, 15 May, 2009

Chapter 6151Changes• Section- “Program and Procedure Summary,

6.1 Identifying a Pressure System” – 3 Steps

1. Is it one by definition? – Is it a vacuum system? (T5)

2. If it is, initiate the required project folder (T1)

3. Identify/choose the applicable code. If equivalent measures to be used a peer review is required at this point!

• Section- “Program and Procedure Summary, 6.7, Inspecting a Pressure System after Initial Operation”• Vessels inspected by Facilities contractor• System inspection intervals for all others as

defined by DA. (This implies that all systems have folders, even the “grandfathered” ones)

Page 49: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 49 of 54Pressure System Seminar Part 2, 15 May, 2009

Chapter 6151Changes• Section- “Program and

Procedure Summary, 6.9 Repairing or Modifying a Pressure System”• Repairs & Mods made to the

“code of record”, if not known, use “sound engineering judgment”

• Non-welding maintenance can be completed by competent technical staff.

Page 50: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 50 of 54Pressure System Seminar Part 2, 15 May, 2009

Appendix T1 Changes• Appendix Title: “Pressure System

Project Implementation and Documentation REQUIREMENTS”

• Section- “Scope”– Read this section carefully, how

repairs and modifications on new and existing systems is discussed.

• Section- “Responsibilities” – New position: “Pressure Systems

Committee Designee” is there to help you with system number assignments, documentation input, inspection reminders, etc… (Bridget please stand up!)

Page 51: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 51 of 54Pressure System Seminar Part 2, 15 May, 2009

Appendix T1 Changes• Section- “Process Steps and

Expectations” –Read the entire section carefully;–A couple of highlights:

• Utilized design codes must be identified/documented

• If equivalent measures are being applied this must be peer reviewed at the time of this decision.

Page 52: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 52 of 54Pressure System Seminar Part 2, 15 May, 2009

Appendices T2-4 Changes• Appendix T2: “Design Program:

– Exclusions from main chapter moved to “scope” section

• Appendix T3: “Thin Window Design”– Foam windows added

• Appendix T4: “Pressure Testing”– No significant changes

Page 53: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 53 of 54Pressure System Seminar Part 2, 15 May, 2009

Appendix T5 • Appendix T5: “Requirements for Vacuum

Systems”– Totally new appendix based on ASW

consensus program for vacuum chambers. (BNL tech note)

– 3 Catagories:• Cat 1: Vacuum systems in which the

differential operating pressure can never exceed 15 psi

• Cat 2: Vacuum systems which can be protected from pressurization exceeding 15 psig through engineering controls. (transfer lines, coldboxes..)

• Cat 3: Vacuum systems which are not or cannot be protected against pressurization exceeding 15psig. (use the pressure system policy to build these)

Page 54: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 54 of 54Pressure System Seminar Part 2, 15 May, 2009

Conclusion• Draft copies of the new chapter,

T1 and T5 are at the door.• This draft is headed to DSC for

approval• You need to read the new

material

• Thanks to the speakers; this is distracting to your ongoing work but important. Thanks for taking the time to prepare and present.

• Thanks for coming and I hope this was helpful!

Page 55: PRESSURE  SYSTEM  SEMINAR – PART 2 CEBAF CENTER L102/104 15 May 2009 9:30-11:00 A.M

Slide 55 of 54Pressure System Seminar Part 2, 15 May, 2009