preserve –overview · 2012-04-30 · 4/23/2012 2 fp7‐ict‐2009‐6.2, strep, no. 269994...

12
4/23/2012 1 PRESERVE – Overview Panos Papadimitratos ([email protected]) Presentation – TIMS EIT ICT Labs activity – W3C meeting FP7 Call 6 V2X Research Landscape 24.01.2011 PRESERVE Overview 2 Field Operational Tests Smart Urban Mobility & New Mobility Concepts Smart Urban Mobility & New Mobility Concepts Coordination & Support Actions Coordination & Support Actions DRIVE C2X (IP) FOT of coop. systems FOTsis (IP) FOT of road infra. man. for CS ITSSv6 (ST) OS IPv6 ITS station stack for FOT PRESERVE(ST) FOT of security & privacy systems EUROOPTIMA (ST) Fare collection system SUNSET (ST) Traffic info sharing via Web 2.0 tech FOTNet2 (SA) FOT Networking Platform COMeSafety 2 (CA) Standards, EUUS Cooperation ActiveTest (SA) Testing methods for safety func. ECOSTAND (CA) Assessment of ITS env. impact

Upload: others

Post on 05-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

1

PRESERVE – OverviewPanos Papadimitratos ([email protected])Presentation – TIMS EIT ICT Labs activity – W3C meeting

FP7 Call 6 V2X Research Landscape

24.01.2011 PRESERVE Overview 2

Field Operational Tests

Smart Urban Mobility &New Mobility ConceptsSmart Urban Mobility &New Mobility Concepts

Coordination &Support Actions Coordination &Support Actions 

DRIVE C2X (IP)FOT of coop. systems

FOTsis (IP)FOT of road infra. man. for  CS

ITSSv6 (ST)OS IPv6 ITS station stack for FOT

PRESERVE(ST)FOT of security & privacy systems

EURO‐OPTIMA (ST)Fare collection system

SUNSET (ST)Traffic info sharing via Web 2.0 tech

FOTNet2 (SA)FOT Networking PlatformCOMeSafety 2 (CA)

Standards, EU‐US Cooperation

ActiveTest (SA)Testing methods for safety func.

ECOSTAND (CA)Assessment of ITS env. impact

Page 2: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

2

FP7‐ICT‐2009‐6.2, STREP, No. 269994

1.1.2011 – 31.12.2014

324.01.2011 PRESERVE Overview

PRESERVE Challenges and Mission

No existing V2X security solution is complete!

No existing V2X security solution scales!

Open research and deployment questions!

424.01.2011 PRESERVE Overview

Mission: Design, implement, and test a secure and scalable V2X Security Subsystem for realistic 

deployment scenarios.

Page 3: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

3

Secure IVC

V2X Security Subsystem

Security and Scalability Testing

524.01.2011 PRESERVE Overview

ITS Privacy

In‐Vehicle Sec.

Sec. Appl. Plat.

Security and Privacy Arch. and Implementation

Security ASIC

Deployment Challenges

V2XFOT

PREDRIVE C2XSec. Arch.

Secure IVC ITS PrivacyIn‐Vehicle Security

Secure Autom. App. Platform

SeVeComBaseline 

Architecture

Prototype Implementation

Hooking Architecture

Privacy Enforcing Runtime 

Architecture

ITS Privacy Guidelines

Prototype Implementation

On‐Board Security 

Architecture

FPGA HW Prototype

Demonstration Prototype

Open Platform for Vehicle 

Apps

Secure Access to Comm. Channel

Platform Implementation

624.01.2011 PRESERVE Overview

Page 4: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

4

SeVeCom

• FP6 STREP Project

• 1.1.2006 – 31.3.2009

724.01.2011 PRESERVE Overview

PRECIOSA

• FP7 STREP Project

• 1.3.2008 – 31.8.2010

824.01.2011 PRESERVE Overview

Page 5: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

5

EVITA

• FP7 STREP Project

• 1.7.2008 – 30.6.2011

924.01.2011 PRESERVE Overview

OVERSEE

• FP7 STREP Project

• 1.10.2010 – 31.3.2013

1024.01.2011 PRESERVE Overview

Page 6: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

6

PRESERVE Objectives

Integrated V2X security architecture and implementation based on SeVeCom, EVITA, and PRECIOSA results

Meet performance and cost requirements of current FOTs and future products, esp. build security ASIC

Provide “ready‐to‐use” V2X security subsystem

Solve open deployment and technical issueshindering standardization and product development

1124.01.2011 PRESERVE Overview

PRESERVE WPs

WP1: Integration Project Results in VSA (V2X Security Architecture)

WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development

WP3: Field Operation Test

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1224.01.2011 PRESERVE Overview

Page 7: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

7

PRESERVE WPs (cont.)

• Harmonize security architectures of previous projects• Create a refined V2X Security Architecture• Contribute to Harmonization and Standardization

WP1: Integration Project Results in VSA (V2X Security Architecture)

WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development

WP3: Field Operation Test

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1324.01.2011 PRESERVE Overview

PRESERVE WPs (cont.)

WP1: Integration Project Results in VSA (V2X Security Architecture)

WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development

WP3: Field Operation Test

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1424.01.2011 PRESERVE Overview

• Integrate and refine prototype implementations of previous projects

• Design and produce a security ASIC in sufficient quantities to run internal and external tests

Page 8: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

8

PRESERVE WPs (cont.)

WP1: Integration Project Results in VSA (V2X Security Architecture)

WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development

WP3: Field Operation Test

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1524.01.2011 PRESERVE Overview

• Perform three rounds of tests assessing the scalability, feasibility, and security of the VSS

PRESERVE WPs (cont.)

WP1: Integration Project Results in VSA (V2X Security Architecture)

WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development

WP3: Field Operation Test

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1624.01.2011 PRESERVE Overview

• Packaging the different versions of the VSS

• Documentation

• Support of users

Page 9: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

9

PRESERVE WPs (cont.)

WP1: Integration Project Results in VSA (V2X Security Architecture)

WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development

WP3: Field Operation Test

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1724.01.2011 PRESERVE Overview

• Work on solutions for challenges that hinder deployment– Technical challenges– Business challenges

PRESERVE WPs (cont.)

WP1: Integration Project Results in VSA (V2X Security Architecture)

WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development

WP3: Field Operation Test

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1824.01.2011 PRESERVE Overview

• Active cooperation with stakeholders, standardization bodies and other projects

Page 10: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

10

PRESERVE WPs (cont.)

WP1: Integration Project Results in VSA (V2X Security Architecture)

WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development

WP3: Field Operation Test

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1924.01.2011 PRESERVE Overview

PRESERVE Timing

24.01.2011 PRESERVE Overview 20

Y1 Y2 Y3 Y4

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q16

WP1: Integration Project Results in VSA

WP2: Close-to-Market VSS Development

WP3: Field Operation Testing

WP4: VSS Distribution and Support

WP5: Deployment Issues

WP6: Dissemination, Exploitation, Liaison

WP7: Administration

1100: Req. An..+ Res. Ass. 1200: VSA Design

1300: VSA Refinement

2100: VSS Software 2200: FPGA HW

2300: ASIC HW

2400: Dev. Life-Cycle Man. Comp.

3100: FOT Preparation 3200: FOT Execution

3300: FOT Evaluation

4100: VSS Kit Req.+Spec. 4200: VSS Kit 1

4300: VSS Kit 2 4400: VSS Support

5100: Business Issues 5200: Technical Issues

6100: General Dissemination, Exploitation, Liaison 6200: International Liaison WS

6300: Stakeholder WS 6400: Final Demonstration

7100: Year 1 7200: Year 2

7300: Year 3 7400: Year 4

2310: ASIC Prototype 2320: ASIC Prod./Dis.

2500: System Testing

3210: FOT Trial 1 (FPGA) 3220: FOT Trial 2 (ASIC)

3230: Joined Trial (ASIC)

3310: Evaluation Trial 1 3320: Evaluation Trial 2

3330: Evaluation J. Trial

Page 11: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

11

PRESERVE Results

24.01.2011 PRESERVE Overview 21

Structure of the VSS

24.01.2011 PRESERVE Overview 22

Page 12: PRESERVE –Overview · 2012-04-30 · 4/23/2012 2 FP7‐ICT‐2009‐6.2, STREP, No. 269994 1.1.2011 – 31.12.2014 24.01.2011 PRESERVE Overview 3 PRESERVE Challenges and Mission

4/23/2012

12

3 Phase Testing

24.01.2011 PRESERVE Overview 23

Trial 1: Internal, smale‐scale, lab‐test

Trial 2: Internal, large‐scale, hybrid testbed

Joint trial:with FOT partner, large‐scale, real vehicles

24.01.2011 PRESERVE Overview 24

Expected Outcome

Harmonized V2X Security Architecture

Implementation of V2X Security Subsystem

Cheap and scalable security ASIC for V2X

Testing results VSS under realistic conditions

Additional results for deployment challenges