PRESERVE – OverviewPanos Papadimitratos ([email protected])Presentation – TIMS EIT ICT Labs activity – W3C meeting
FP7 Call 6 V2X Research Landscape
24.01.2011 PRESERVE Overview 2
Field Operational Tests
Smart Urban Mobility &New Mobility ConceptsSmart Urban Mobility &New Mobility Concepts
Coordination &Support Actions Coordination &Support Actions
DRIVE C2X (IP)FOT of coop. systems
FOTsis (IP)FOT of road infra. man. for CS
ITSSv6 (ST)OS IPv6 ITS station stack for FOT
PRESERVE(ST)FOT of security & privacy systems
EURO‐OPTIMA (ST)Fare collection system
SUNSET (ST)Traffic info sharing via Web 2.0 tech
FOTNet2 (SA)FOT Networking PlatformCOMeSafety 2 (CA)
Standards, EU‐US Cooperation
ActiveTest (SA)Testing methods for safety func.
ECOSTAND (CA)Assessment of ITS env. impact
4/23/2012
2
FP7‐ICT‐2009‐6.2, STREP, No. 269994
1.1.2011 – 31.12.2014
324.01.2011 PRESERVE Overview
PRESERVE Challenges and Mission
No existing V2X security solution is complete!
No existing V2X security solution scales!
Open research and deployment questions!
424.01.2011 PRESERVE Overview
Mission: Design, implement, and test a secure and scalable V2X Security Subsystem for realistic
deployment scenarios.
4/23/2012
3
Secure IVC
V2X Security Subsystem
Security and Scalability Testing
524.01.2011 PRESERVE Overview
ITS Privacy
In‐Vehicle Sec.
Sec. Appl. Plat.
Security and Privacy Arch. and Implementation
Security ASIC
Deployment Challenges
V2XFOT
PREDRIVE C2XSec. Arch.
Secure IVC ITS PrivacyIn‐Vehicle Security
Secure Autom. App. Platform
SeVeComBaseline
Architecture
Prototype Implementation
Hooking Architecture
Privacy Enforcing Runtime
Architecture
ITS Privacy Guidelines
Prototype Implementation
On‐Board Security
Architecture
FPGA HW Prototype
Demonstration Prototype
Open Platform for Vehicle
Apps
Secure Access to Comm. Channel
Platform Implementation
624.01.2011 PRESERVE Overview
4/23/2012
4
SeVeCom
• FP6 STREP Project
• 1.1.2006 – 31.3.2009
724.01.2011 PRESERVE Overview
PRECIOSA
• FP7 STREP Project
• 1.3.2008 – 31.8.2010
824.01.2011 PRESERVE Overview
4/23/2012
5
EVITA
• FP7 STREP Project
• 1.7.2008 – 30.6.2011
924.01.2011 PRESERVE Overview
OVERSEE
• FP7 STREP Project
• 1.10.2010 – 31.3.2013
1024.01.2011 PRESERVE Overview
4/23/2012
6
PRESERVE Objectives
Integrated V2X security architecture and implementation based on SeVeCom, EVITA, and PRECIOSA results
Meet performance and cost requirements of current FOTs and future products, esp. build security ASIC
Provide “ready‐to‐use” V2X security subsystem
Solve open deployment and technical issueshindering standardization and product development
1124.01.2011 PRESERVE Overview
PRESERVE WPs
WP1: Integration Project Results in VSA (V2X Security Architecture)
WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development
WP3: Field Operation Test
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1224.01.2011 PRESERVE Overview
4/23/2012
7
PRESERVE WPs (cont.)
• Harmonize security architectures of previous projects• Create a refined V2X Security Architecture• Contribute to Harmonization and Standardization
WP1: Integration Project Results in VSA (V2X Security Architecture)
WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development
WP3: Field Operation Test
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1324.01.2011 PRESERVE Overview
PRESERVE WPs (cont.)
WP1: Integration Project Results in VSA (V2X Security Architecture)
WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development
WP3: Field Operation Test
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1424.01.2011 PRESERVE Overview
• Integrate and refine prototype implementations of previous projects
• Design and produce a security ASIC in sufficient quantities to run internal and external tests
4/23/2012
8
PRESERVE WPs (cont.)
WP1: Integration Project Results in VSA (V2X Security Architecture)
WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development
WP3: Field Operation Test
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1524.01.2011 PRESERVE Overview
• Perform three rounds of tests assessing the scalability, feasibility, and security of the VSS
PRESERVE WPs (cont.)
WP1: Integration Project Results in VSA (V2X Security Architecture)
WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development
WP3: Field Operation Test
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1624.01.2011 PRESERVE Overview
• Packaging the different versions of the VSS
• Documentation
• Support of users
4/23/2012
9
PRESERVE WPs (cont.)
WP1: Integration Project Results in VSA (V2X Security Architecture)
WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development
WP3: Field Operation Test
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1724.01.2011 PRESERVE Overview
• Work on solutions for challenges that hinder deployment– Technical challenges– Business challenges
PRESERVE WPs (cont.)
WP1: Integration Project Results in VSA (V2X Security Architecture)
WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development
WP3: Field Operation Test
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1824.01.2011 PRESERVE Overview
• Active cooperation with stakeholders, standardization bodies and other projects
4/23/2012
10
PRESERVE WPs (cont.)
WP1: Integration Project Results in VSA (V2X Security Architecture)
WP2: Close‐to‐Market VSS (V2X Security Subsystem) Development
WP3: Field Operation Test
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1924.01.2011 PRESERVE Overview
PRESERVE Timing
24.01.2011 PRESERVE Overview 20
Y1 Y2 Y3 Y4
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q16
WP1: Integration Project Results in VSA
WP2: Close-to-Market VSS Development
WP3: Field Operation Testing
WP4: VSS Distribution and Support
WP5: Deployment Issues
WP6: Dissemination, Exploitation, Liaison
WP7: Administration
1100: Req. An..+ Res. Ass. 1200: VSA Design
1300: VSA Refinement
2100: VSS Software 2200: FPGA HW
2300: ASIC HW
2400: Dev. Life-Cycle Man. Comp.
3100: FOT Preparation 3200: FOT Execution
3300: FOT Evaluation
4100: VSS Kit Req.+Spec. 4200: VSS Kit 1
4300: VSS Kit 2 4400: VSS Support
5100: Business Issues 5200: Technical Issues
6100: General Dissemination, Exploitation, Liaison 6200: International Liaison WS
6300: Stakeholder WS 6400: Final Demonstration
7100: Year 1 7200: Year 2
7300: Year 3 7400: Year 4
2310: ASIC Prototype 2320: ASIC Prod./Dis.
2500: System Testing
3210: FOT Trial 1 (FPGA) 3220: FOT Trial 2 (ASIC)
3230: Joined Trial (ASIC)
3310: Evaluation Trial 1 3320: Evaluation Trial 2
3330: Evaluation J. Trial
4/23/2012
11
PRESERVE Results
24.01.2011 PRESERVE Overview 21
Structure of the VSS
24.01.2011 PRESERVE Overview 22
4/23/2012
12
3 Phase Testing
24.01.2011 PRESERVE Overview 23
Trial 1: Internal, smale‐scale, lab‐test
Trial 2: Internal, large‐scale, hybrid testbed
Joint trial:with FOT partner, large‐scale, real vehicles
24.01.2011 PRESERVE Overview 24
Expected Outcome
Harmonized V2X Security Architecture
Implementation of V2X Security Subsystem
Cheap and scalable security ASIC for V2X
Testing results VSS under realistic conditions
Additional results for deployment challenges