presenter: noraini roslan - eascongress.pemsea.org filezonning plan setting the rules and standards...

20
BUSINESS AND THE BLUE ECONOMY PUBLIC-PRIVATE SECTOR INTERACTION FOR ENABLING SUSTAINABLE DEVELOPMENT OF COASTS AND OCEANS Presenter: NORAINI ROSLAN S.I.S., P.P.T. President Kuala Selangor District Council

Upload: phamdan

Post on 16-Apr-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

BUSINESS AND THE BLUE ECONOMY

• PUBLIC-PRIVATE SECTOR INTERACTION FOR ENABLING SUSTAINABLE DEVELOPMENTOF COASTS AND OCEANS

Presenter:NORAINI ROSLAN

S.I.S., P.P.T.

PresidentKuala Selangor District Council

HOW TO GET TO A WIN-WIN SITUATION?

WHAT THE GOVERNMENT

DESIRES?

WHAT THE GOVERNMENT

DESIRES?

WHAT THE PRIVATE SECTOR WANTS?

WHAT THE PRIVATE SECTOR WANTS?

PUBLIC PRIVATE SECTOR INTERACTION

Follow the rules, procedures and laws;

Benefit the community;

Protect the environment;

Completed and well maintained infrastructure.

Profitable;Customer / clients

satisfactions;Speedy approval;

andMinimal conditions.

COMMUNICATING THE GOVERNMENT’S VISION

MAKE A COMMITMENT

HAVE A PLAN

MAKE THE PLAN TOGETHER

COMMUNICATE, EDUCATE, EMPOWER

PUBLIC PRIVATE SECTOR INTERACTION

PUBLIC PRIVATE SECTOR INTERACTION

KUALA SELANGOR’S

LOCAL PLAN

INTEGRATED COASTAL

USE ZONNING PLAN

SELANGOR STATE

STRUCTURE PLAN

NATIONAL COAST ZONNING PHYSICAL

PLAN

NATIONAL PHYSICAL PLAN

COASTAL DECLARATION

PUBLIC PARTICIPATION IN PLAN MAKING

INITIAL PUBLICITY

KUALA SELANGOR LOCAL PLAN

PUBLICITY AND PUBLIC HEARING

INVESTIGATION OF LOCAL AND PUBLIC HEARING COMMITTEE (JSTPA)

APPROVAL OF LOCAL PLAN DRAFT (JPN)

APPROVAL AT PBN STAGE

GAZETTE OR CANCELLATION(If Any)

Terms of References

Based Maps

Approach Report

Analysis and Development Strategic

Report

Stage 1:Mobilisation

Stage 2:Preparation Draft Local Plan

Stage 4:Gazette or Cancellation of Local Plan Draft

Stage 3:Publicity and Public Hearing

Sub section 12A, Act 172 Sub section 12,

Act 172

Sub section 13, Act 172

Sub section 14, Act 172

Sub section 15 (1), Act 172

Sub section 15 (1c), Act 172

Sub section 15 (4), Act 172

Local Plan Preparation Processes

Project Outline Report (LRP)

Appointment of Consultants

Legend : Requirement of Act 172

Notes: Every stages will be presented to the state committee for the comments, suggestion and results of the report.

ACTION PLANS AND PUBLIC ENGAGEMENTS

KUALA SELANGOR’S LOCAL PLAN

PUBLICITY - LOCAL PLAN DRAFT (SUB-SECTION 13, ACT 172)

A. NOTICE : 3 Issues of Newspaper 2 Types of Newspaper 4 Weeks Before Display Date and Locations

B. DISPLAY AND PUBLIC INPUTMinimum 30 days

CONSIDERING OBJECTION

State Planning Committee - appoint 3 person to investigate objections

INVESTIGATION OF LOCAL AND PUBLIC HEARING COMMITTEE (JSTPA)(SUB-SECTION 14, ACT 172)

CONSIDERING OBJECTION

State Planning Committee - appoint 3 person to investigate objections

LOCAL AUTHORITY’S APPROVAL

STATE’S ENDORSEMENT(SUB-SECTION 15 (1C), ACT 172)

LOCAL PLANLONG TERM

ACTION PLANS AND PUBLIC ENGAGEMENTSPLANNING PERMISSIONSHORT TERM

Adherence to Local Plan & Guidelines

Relevant Agencies Input

Public Input

Approval and Conditions

EXAMPLE

40 PLANNING GUIDELINES

INTEGRATED COASTAL USE

ZONNING PLAN

SETTING THE RULES AND STANDARDS

GUIDELINES FOR SITING AND ZONING OF INDUSTRY AND

RESIDENTIAL AREAS

SELANGOR’S PLANNING

GUIDELINES

ENVIRONMENTAL NOISE LIMITS AND

CONTROL

The Wish of Private Sectors

PROCEDURES OF PROJECT APPROVALSPre-Consultation TECHNICAL AGENCIES

1. Department of Mineral and Geosciences

2. Fire and Rescue Department 3. Department of

environmental4. TNB - Electrical5. SKMM – Communication

and Multimedia6. JPS - Water7. Land Administrator8. Indah Water Consortium9. JKR - Road10. JPBD – State Planning Dept11. Planning Department, MDKS12. Engineering Department,

MDKS13. Landscape Department,

MDKS14. SWCorp – solid waste

management and public cleaning

Letter of Planning Permission Approval must be prepared in 30 working days.

ISO for Planning Department

1. Government follows the ISO’s time frame.2. Their Planning Permission’s Application are passed.

SubmissionRegistration and

distribute to technical agencies

Receive the reviews from

technical agencies

Preparation and coordination paper works

by internal technical agencies

One Stop Centre Committee Meeting

Distribute minits to PTG, PTD, MMKN and internal

technical agencies

Results

THE TRANSPARENCY ISSUE

11

22

33

44

55

Standard Fees

Standard Procedures

During The Plan Making

Standard Processing Time

Rules and Regulations

are Available at the Office and Online

PROJECT IMPLEMENTATIONS

1. Private led developments have been the main engine and trend setter in Selangor

2. The public sector has continuously improve on process and procedural aspect to ensure sustainable development without stifling growth and creativities

PRIVATE LED EXAMPLESGOLD COAST SEPANG

PULAU INDAH DEVELOPMENTPRIVATE LED EXAMPLES

“HOW WE TAKE CARE OF THE NATURE TOGETHER”K U A L A S E L A N G O R N A T U R E P A R K

State Land :Reserved as Mangrove ForestState Land :Reserved as Mangrove Forest

Size: 323.749 hectareSize: 323.749 hectare

Care Taker:Malaysia Nature Society Care Taker:Malaysia Nature Society

Collaborator :Federal, State, RICOH, private sectors, government sectors, public sectors, NGO’s and students.

Collaborator :Federal, State, RICOH, private sectors, government sectors, public sectors, NGO’s and students.

Descriptions: Inland secondary forests, Muddy estuaries and mudflats, A brackish lake that is inhibited by wetland animals, Observation tower.

Descriptions: Inland secondary forests, Muddy estuaries and mudflats, A brackish lake that is inhibited by wetland animals, Observation tower.

THE WORLD WETLANDS DAY AT TAMAN ALAM PUBLIC PRIVATE COLLABORATIONS

FEB 2014

“HOW WE TAKE CARE OF THE NATURE TOGETHER”K G K U A N T A N F I R E F L I E S, K U A L A S E L A N G O R

State Land :Reserved as Fireflies AreaState Land :Reserved as Fireflies Area

Size: 1,817.35 hectareSize: 1,817.35 hectare

Care Taker:MDKSCare Taker:MDKS

Collaborator :Local Residents, TNB, AEON, UKM and Tourism Selangor.

Collaborator :Local Residents, TNB, AEON, UKM and Tourism Selangor.

PUBLIC PRIVATE COLLABORATIONSFEB 2015

“INTERNATIONAL BLUE OCEAN STRATEGY” PROGRAMME

“HOW WE TAKE CARE OF THE NATURE TOGETHER”P A N T A I R E M I S

State Land :Reserved as Fireflies Conservation Area

State Land :Reserved as Fireflies Conservation Area

Size: 12.30 hectareSize: 12.30 hectare

Care Taker:MDKSCare Taker:MDKS

Collaborator :Committee of Sungai Sembilang’s Community, CSR, students.

Collaborator :Committee of Sungai Sembilang’s Community, CSR, students.

Descriptions: A public beach with eating stalls, shellfish markets, playground, public facilities such as toilet

Descriptions: A public beach with eating stalls, shellfish markets, playground, public facilities such as toilet

PUBLIC PRIVATE COLLABORATIONS

THANK YOUTHANK YOUMAJLIS DAERAH KUALA SELANGOR