presenter: issued via email - hover freight
TRANSCRIPT
![Page 1: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/1.jpg)
COMPANY CONFIDENTIAL
The Heavy Lift Hoverbarge
logistics problems? rise above it
Presenter: Issued Via Email
Date: Nov 2014
![Page 2: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/2.jpg)
2 © Hovertrans Solutions Pte. Ltd. 2014
A Joint Venture Between
&
The World leaders in Hoverbarges
with over 30 years experience in the design & manufacture of Hoverbarges
The CTO of HTS has been involved in every Hoverbarge in the following
presentation, designing the first modular one back in the early 1970s.
About us
![Page 3: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/3.jpg)
3 © Hovertrans Solutions Pte. Ltd. 2014
ST Engineering – rank among the largest companies listed on the Singapore Exchange, and
one of Asia’s largest defence and engineering groups
ST Engineering - global workforce of more than 20,000 with a turnover in 2010 of S$5.98b
($4.79b USD)
ST Marine can provide full spectrum capabilities from design, construction, repair and
maintenance of specialised commercial and naval ships in ultra modern facilities
ST Engineering / ST Marine
![Page 4: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/4.jpg)
4 © Hovertrans Solutions Pte. Ltd. 2014
A standard steel barge, built to marine rules with an air cushion system
to provide lift.
Hovering 1.8m in the air, the Hoverbarge is amphibious enabling it to
traverse, wetlands & mudflats etc.
What is a Hoverbarge?
Air Cushion
Buoyant Steel Structure
Air Lift Fans
Cargo Deck
![Page 5: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/5.jpg)
5 © Hovertrans Solutions Pte. Ltd. 2014
Hoverbarge floating
off hover with a 90
tonne payload.
What is a Hoverbarge?
![Page 6: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/6.jpg)
6 © Hovertrans Solutions Pte. Ltd. 2014
Hovercraft v Hoverbarge
High speed Hovercraft Hoverbarge
Over hump speed =
skirts clear of water surface
Always under hump speed =
skirt tips in the water
Hovercraft reach a speed where the skirt lifts out of the water (over hump) and then hover just
above the water surface.
The Hoverbarge travelling a slower speed of 5 knots will always remain under hump speed with
the tip of the skirts in the water. This results in less spray than high speed Hovercraft.
![Page 7: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/7.jpg)
7 © Hovertrans Solutions Pte. Ltd. 2014
Air is fed into the skirt plenum chamber and
the skirt creates a flexible seal around the
periphery of the barge
![Page 8: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/8.jpg)
8 © Hovertrans Solutions Pte. Ltd. 2014
Air feeds into the skirt that seals the periphery
The base is flat with no feet or
protrusions
![Page 9: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/9.jpg)
9 © Hovertrans Solutions Pte. Ltd. 2014
300T Payload 2009
200t Siberian 2009 Cold Weather
Ice Breaking Hoverbarge 1980
160t Ferry Crossing 1976
250t Deep Sea 1976
330t swamp drilling 2008
50t Bog Drilling 1978
50t Core Sampling 1979
Hoverbarge projects conducted by:
Mackace Ltd., Hovertrans Inc. and Hovertrans Ltd.
The management team have been
involved in all of these Hoverbarge
projects.
Previous Hoverbarge Projects
![Page 10: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/10.jpg)
10 © Hovertrans Solutions Pte. Ltd. 2014
Minimal Environmental Footprint
The Hoverbarge only exerts 1psi ground pressure when on hover, compared to a human footprint
of 7-8psi, thus the Hoverbarge has minimal impact to the terrain it travels over.
Large Flat top deck
The Hoverbarge has a large cargo deck, clear of any equipment, along with being flat top
(rather than in a well deck) the Hoverbarge provides huge flexibility in the type of operations
it can be deployed on.
Hoverbarge Advantages
![Page 11: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/11.jpg)
11 © Hovertrans Solutions Pte. Ltd. 2014
Redundancy
In soft mud / water conditions, the Hoverbarge has 100% redundancy built into its lift fan
capacity, ensuring minimal disruption to operations in the event of an engine failure.
Engine Enclosures
Engine enclosures are designed to ensure the engine, fuel tank and lift fans are protected
from extreme temperature. The housing also reduces sound levels and shore power can
supply heaters in the enclosures whilst the craft is not in service.
Hoverbarge Advantages
![Page 12: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/12.jpg)
12 © Hovertrans Solutions Pte. Ltd. 2014
Skirt System
The segmented skirt system provides added redundancy, where if a segment is damaged the
one either side balloons out to fill the gap, minimising any air loss. Replacement of damaged
skirts can be done on site and does not require special skills or tools
Missing skirt segment – the
one each side fills the gap
Skirt R&D – Hovertrans Solutions is constantly improving designs for different applications
Skirt following contours of the ground
Hoverbarge Advantages
![Page 13: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/13.jpg)
13 © Hovertrans Solutions Pte. Ltd. 2014
Reduced Shipping Costs
Access to inland areas via trucks
Easy to use on different projects
Use the pontoons as standard
marine pontoons
Steel Construction
Easy to assemble on site
The first Modular Hoverbarge was
invented by the CTO of Hovertrans
Solutions in the 1970’s.
Modular Hoverbarge
![Page 14: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/14.jpg)
14 © Hovertrans Solutions Pte. Ltd. 2014
• Increased payload
• Can be built on-site
• Ideal for long term contracts
• Built to certification
Mono Hull Hoverbarge
![Page 15: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/15.jpg)
15 © Hovertrans Solutions Pte. Ltd. 2014
Once built or re-assembled the Hoverbarge
can be launched direct from a beach or
graded river bank.
Launching the Hoverbarge
![Page 16: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/16.jpg)
16 © Hovertrans Solutions Pte. Ltd. 2014
• Best application for air cushion
technology
• Moving a 250 ton oil storage tank
soon led to a 4000 ton tank being
relocated
• The Sea Pearl could lift the cross
channel Hovercraft on its back
• Larger deck area = higher payload
Large Payloads
![Page 17: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/17.jpg)
17 © Hovertrans Solutions Pte. Ltd. 2014
• As the Hoverbarge size increases, the
cost increases in steps
• For a small increase in size with little
extra power, the payload increases
significantly
Size & Cost
Hoverbarge
200t Payload
Hoverbarge
300t Payload
Increase in Payload
Cost
![Page 18: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/18.jpg)
18 © Hovertrans Solutions Pte. Ltd. 2014
Methods of propulsion
include:
• Amphibious tractors
• Tugs
• Winching
• Ducted Props (for smaller
Hoverbarges)
Amphibious Tracked Vehicle Shallow Draft Tug Boats
Shore Based Winch System
Amphibious Tractor
Pictures on the Right:
Some examples of methods
used to move the non
propelled Hoverbarge
Propulsion
Swamp Excavator
![Page 19: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/19.jpg)
19 © Hovertrans Solutions Pte. Ltd. 2014
Self Propelled Hoverbarge
Ducted Propellers – as currently
used on Hovercraft can propel the
Hoverbarge up to speeds of 5
knots
Picture shows the Tiger 40
Hovercraft
![Page 20: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/20.jpg)
20 © Hovertrans Solutions Pte. Ltd. 2014
Self Propelled Hoverbarge
![Page 21: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/21.jpg)
21 © Hovertrans Solutions Pte. Ltd. 2014
Moving Anchor
To move the large Hoverbarges, a smaller Hoverbarge can be used as a
moving anchor point for the larger Hoverbarge to winch up to
![Page 22: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/22.jpg)
22 © Hovertrans Solutions Pte. Ltd. 2014
Example Hoverbarge Applications
![Page 23: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/23.jpg)
23 © Hovertrans Solutions Pte. Ltd. 2014
100 tonne payload self Propelled
Hoverbarge
![Page 24: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/24.jpg)
24 © Hovertrans Solutions Pte. Ltd. 2014
440 tonne Self Propelled Hoverbarge on
frozen lake
![Page 25: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/25.jpg)
25 © Hovertrans Solutions Pte. Ltd. 2014
Length = 177m
Width = 75m
Payload = 2500t
Moving Modules
• Transport large
prefabricated modules to
remote sites
• Avoid building infrastructure
such as road, rail and bridges
• Avoid dredging
• Use on multiple projects
![Page 26: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/26.jpg)
26 © Hovertrans Solutions Pte. Ltd. 2014
7000 tonne hover drilling complex, designed for working in 0-5m of water.
Beach can be used as a safe haven.
Hoverbarges can be brought together to form a larger drilling pad
Shallow Water Drilling
![Page 27: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/27.jpg)
27 © Hovertrans Solutions Pte. Ltd. 2014
Keyway drill slot
Wetlands / Swamp Drilling
330 tonne payload hover drilling barge in Suriname
![Page 28: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/28.jpg)
28 © Hovertrans Solutions Pte. Ltd. 2014
• Shallow water oil spill response
• Environmentally sensitive areas
• Reed beds / Wetlands
• Access when shore based approach is restricted
Shallow Water Oil Spill Response
![Page 29: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/29.jpg)
29 © Hovertrans Solutions Pte. Ltd. 2014
•Access shallow water
• Operate regardless of
tide – help against limiting
operational factors such as
wildlife seasons
• Transport parts
• Cable laying
• Move equipment such as
excavators
• Offshore support
platform for directional
drilling
No need to stop work
when the tide is out!
Wind Farms
![Page 30: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/30.jpg)
30 © Hovertrans Solutions Pte. Ltd. 2014
• Access tidal zones
• No need for docks / port
• No need to dredge
• Gain access quickly
without having to build
infrastructure
• Operate over mudflats
and shallow water
Ship to Shore
![Page 31: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/31.jpg)
31 © Hovertrans Solutions Pte. Ltd. 2014
The Hoverbarge Fleet
Piling Hoverbarge
Workboat Hoverbarge
![Page 32: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/32.jpg)
32 © Hovertrans Solutions Pte. Ltd. 2014
The Hover Onshore Pipeline Fleet
Construction onshore
![Page 33: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/33.jpg)
33 © Hovertrans Solutions Pte. Ltd. 2014
Hoverbarge Flexibility Covers all Phases
Equipment delivery Oil spill response 24/7
Piling Repair and maintenance
![Page 34: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/34.jpg)
34 © Hovertrans Solutions Pte. Ltd. 2014
• Access sites all year
• Operates at 1 psi ground pressure
• Avoid damage to the tundra
• Transport heavy loads
• Eliminate the need for long term
storage
• Use in emergencies
Ice Road Alternative
![Page 35: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/35.jpg)
35 © Hovertrans Solutions Pte. Ltd. 2014
• Access 24 hours a day
• Operates at 1 psi ground pressure
• Avoid damage to the soft mud
• Transport heavy loads
Tidal / Mudflat Access
![Page 36: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/36.jpg)
36 © Hovertrans Solutions Pte. Ltd. 2014
A new 90 tonne payload modular Hoverbarge has just been built ready for
chartering.
Dimensions
Outside Length 34m (111’)
Outside Width 17m (56’)
Cargo Deck Area 24m (80’) L x 7m (24’) W
Depth (Hull) 1.52m (5’)
Hover Height 1.8m (6’)
Technical Details
Payload 90 tonnes
Deck Loading 10t/m2
Max Speed 5 knots (towed)
Certification ABS: A1
Construction EH 36 Steel
Lift Engines MAN Diesel (Qty 2)
Engine Emissions Tier 2
Approx Fuel
Consumption
308 l/hr (81 US Gallons per hour) excludes
generator
Range 120 miles (approx) at 5 knots
Lift Fans 2 x Hovertrans Solutions Centrifugal lift fans
Skirt Type Hovertrans Solutions Hoverbarge segmented
skirt system
HOVER90TM – Charter Hoverbarge
![Page 37: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/37.jpg)
37 © Hovertrans Solutions Pte. Ltd. 2014
HOVER90TM – Charter Hoverbarge
![Page 38: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/38.jpg)
38 © Hovertrans Solutions Pte. Ltd. 2014
HOVER90TM – Charter Hoverbarge
![Page 39: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/39.jpg)
39 © Hovertrans Solutions Pte. Ltd. 2014
HOVER90TM – Charter Hoverbarge
http://youtu.be/cmB9gU5PWxc
![Page 40: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/40.jpg)
40 © Hovertrans Solutions Pte. Ltd. 2014
• Hovertrans Solutions Pte. Ltd. has the most experienced Hoverbarge design team in the
World with the infrastructure support of ST Marine enabling us to offer:
– Route Surveys / viability reports
– Full Feasibility Studies
– Hoverbarge Design & Manufacture
– New 90 tonne demonstrator/charter Modular Hoverbarge being built in 2011
• Heavy loads can be transported to sites using Hoverbarges
• Smaller self propelled Hoverbarges can be used for supplies
• Eliminates the need for infrastructure
Summary
![Page 41: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/41.jpg)
41 © Hovertrans Solutions Pte. Ltd. 2014
Hoverbarge pictures used within this presentation are of Hoverbarges
built by Mackace Ltd. Hovertrans Inc., Hovertrans Ltd. & ST Marine
Dan Turner, Chief Technology Officer
Tel: + 44 (0) 1794 519239 (UK)
Jim Ireland, Regional Director Business Development
Tel: (1) 832-431-3026 (USA)
www.hovertranssolutions.com
Contact
![Page 42: Presenter: Issued Via Email - Hover Freight](https://reader034.vdocuments.site/reader034/viewer/2022042107/6256da8dc1de6f4f4b05aa3a/html5/thumbnails/42.jpg)
42 © Hovertrans Solutions Pte. Ltd. 2014
Thank You