Page 1: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Presented by:  Great Lakes Engineering Group

Page 2: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Michigan Department of TransportationMDOT Project ManagerMr. Richard Kathrens, P.E.

Great Lakes Engineering Group, LLCProject Manager/Qualified Team Leader

Amy Trahey, P.E.

QA Engineer/Qualified Team LeaderJason Rickard, P.E.

Primary Team Members/Qualified Team LeadersEvan Currie, P.E.Eric Rickert, P.E.

Page 3: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Project PurposeIncrease the consistency and accuracy of inspectionsHeighten the awareness of the National Bridge Inspection Standards (NBIS) requirementsEstablish a system of checks and balances on bridge inspectionsAssure that all aspects of the law are adhered to, at a minimumEnsure that written documentation of the history of bridge construction, maintenance, and inspection exists in an acceptable structure

1CFR Vol. 69, No. 239, Part 650, Subpart C – National Bridge Inspection Standards

Page 4: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Project PurposeQuality Control (QC) 1 – Procedures that are intended to maintain the quality of a bridge inspection and load rating at or above a specified level.  Quality Assurance (QA) 1 – The use of sampling and other measures to assure the adequacy of quality control procedures in order to verify or measure the quality level of the entire bridge inspection and load rating program.

1CFR Vol. 69, No. 239, Part 650, Subpart C – National Bridge Inspection Standards

Page 5: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Agency‐Specific  Review ProcessField Activities at Agency Office

Initial Meeting with Bridge Owner and their Consultant (if applicable)Determine what Quality Control Measures are in PlaceFile Reviews of a Sample of BridgesField Reviews of a Sample of BridgesClosing  Out  Meeting with Recommendations 

Table 1:  Quality Assurance and Quality Control Review Breakdown

Total of Quality Assurance ReviewBridges in Inventory File Review Field Review

One to Four 1 1Five to Twenty 2 2Twenty One or More 10% of inventory maximum of 5

Quality Control ReviewFile Review Field Review

All inventory sizes 10% of inventory 10% of inventory

Page 6: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Summary of Agency ResultsQA Review Performed ‐ All Required Components of the QC Program IncludedQA Review Performed ‐Major Components of the QC Program IncludedQC ‐Major Program Components Missing

Page 7: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Tabulation and Comparison of Annual Project Results 

Quality Control and Personnel QualificationsQuality Control ProcessBridge File ComponentsInspection Consistency with Established Criteria

Page 8: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Tabulation of Project ResultsQuality Control and Personnel Qualifications

42%

81% 81%

100%

45%

100%

60%

86% 87%

100%

50%

33%

73%

87%

100% 100% 100% 100%

86%

97%100% 100%

57%

75%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

QA Review? Consultantperforminginspections?

Is the inspector aqualified team

leader?

Load ratingsperformed by PE?

Using divinginspector to check

for scour?

Is the divinginspectorcertified?

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

Page 9: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Tabulation of Project ResultsQuality Control Process

62%

69%

58%

23%

60%

54%

37%

73%

67%

7%

40%

60% 60%

27%

57%

63%

37%

67%

77%

73%

22%

72%

80%

89%

81%

86% 86%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Is MBRS beingutilized?

Utililizingperiodictimelinessreviews?

Was the latestinspection

completed ontime?

RFAs sent bydocument?

10% backcheckof field

inspections?

10% backcheckof inspectionreports?

Is qualitycontrol

effective?

2007

2008

2010

2011

2008

2010

2011

2007

2008

2010

2011

2007

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2007

2011

2010

2008

2007

2008

2010

2011

2008

2010

2011

2007

2008

2010

2011

2007

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2007

2011

2010

2008

Page 10: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Tabulation of Project ResultsBridge File Components

89%

96% 96%

65%

0% 0%

50%

63%

100%

93%

60%

0% 0%

37%

60%

100%

93%

73%

3% 3%

43%44%

94%92%

69%

6%3%

47%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Is there a separatefile for each bridge?

BSIR on file? SI&A form on file? Workrecommendations

on file?

Load analysisassumption form?

Load analysissummary form?

Load analysiscalculations on file?

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2010

2011

2008

2007

Page 11: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Tabulation of Project ResultsBridge File Components

65%

21%

73%

19%

92%

43%

23%

77%

17%

87%

70%

50%

87%

17%

83%83%

52%

100%

14%

100%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Plans / Sketches Scour Assessment /Migration Actions

Correspondence Maintenance Records Pictures

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2008

2007

2010

2011

Page 12: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Tabulation of Project ResultsInspection Consistency with Established Criteria

65%

48%

58%

21%

83%

73%

87%

33%

80%77%

80%

100%100%97%

100% 100%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Comments consistent withthe ratings?

Is the level of commentssufficient?

Ratings, comments alignwith help guides?

Inspection frequencymodified appropriately?

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

2007

2008

2010

2011

Page 13: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

Include file and field verification as a part of QC and documentAdjust bridge inspection frequency when needed, in accordance with guidelines, and documentComplete load ratings, and scour assessments (manage your Scour POA) and documentInclude maintenance records, critical findings and inspector credentials in the bridge filesCompleting underwater bridge inspections using a qualified team

Page 14: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of

CommunicationContinuing Education & Technical AwarenessUpdates to Reference GuidesEvaluation of the MDOT Inspection Notification SystemAnnual Calibration MeetingMDOT Bridge Inspection Manual including QA/QC Guidance

Page 15: Presented Great Lakes Group · MDOT Project Manager Mr. Richard Kathrens, P.E. ... Quality Control (QC) ... Table 1: Quality Assurance and Quality Control Review Breakdown Total of