presented by: united states of america presented to: icao ......– zjx, zma, + zsu, zdc, ztl as...

10
Federal Aviation Administration Information Briefing, Atlantic Coast Route Project (ACRP) NorthSouth High Altitude Performance Based Navigation (PBN) Routes Presented by: United States of America Presented to: ICAO/IATA/CANSO at the Caribbean PBN Harmonization Meeting March 28, 2016 April 1, 2016

Upload: others

Post on 30-Jan-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

  • Federal AviationAdministration

    Information Briefing,Atlantic Coast Route Project (ACRP)North‐South High Altitude Performance Based Navigation (PBN) Routes

    Presented by: United States of America

    Presented to: ICAO/IATA/CANSO at the Caribbean PBN Harmonization Meeting

    March 28, 2016 – April 1, 2016

  • Federal AviationAdministration

    Atlantic Coast Route Project 2March/April 2016

    Motivation to advance work on eastern seaboard ahead of National Airspace System (NAS)-wide initiative• Metroplex projects (DC, CLT, ATL & FLA) realigned

    standard instrument departures (SIDs) and standard terminal arrivals (STARs), impacts operations

    • Limited route connectivity with existing jet route structure

    • Airspace cannot be optimized due to Warning Areas

    • ACRP enables north-south integration of Metroplex into high altitude structure

    • Small subset of 300 jet routes impacted• Other areas may have more routing flexibility for

    point-to-point and wind routes, etc.

    Why Now?

  • 3Federal AviationAdministrationAtlantic Coast Route Project

    March/April 2016

    ObjectivesEstablish north-south High Altitude PBN Routes along the United States Atlantic Coast and link into the Caribbean

    • Area Navigation (RNAV)-2 Q Routes• Offshore RNAV-2 Routes• ZBW, ZDC, ZNY, ZJX, ZMA and ZSU• Parallel de-conflicted routes where practical,

    increase routing options and throughput• Air Traffic Control System Command Center

    (ATCSCC) coordinated flows• Remove Jet Route structure after full

    implementation

  • 4Atlantic Coast Route ProjectMarch/April 2016

    Federal AviationAdministration

    • ACRP Q Route Development Area

    • Northern Development Team– ZDC, ZNY, ZBW

    ZDC Provides Connectivity

    ACRP Scope(Extended to include FL Metroplex scope)

    • Florida Metroplex Team Developing Southern Routes

    – ZJX, ZMA, + ZSU, ZDC, ZTL as necessary

  • 5Atlantic Coast Route ProjectMarch/April 2016

    Federal AviationAdministration

    Proposed Offshore Q Routes 

    Notional Design, Subject to Change

  • 6Atlantic Coast Route ProjectMarch/April 2016

    Federal AviationAdministration

    Proposed Offshore Q Routes (cont.)

    Notional Design, Subject to Change

  • 7Atlantic Coast Route ProjectMarch/April 2016

    Federal AviationAdministration

    Proposed Offshore Q Routes (cont.)

    Notional Design, Subject to Change

  • 8Atlantic Coast Route ProjectMarch/April 2016

    Federal AviationAdministration

    Proposed Offshore Q Routes (cont.)Notional Design, Subject to Change

  • 9Federal AviationAdministrationAtlantic Coast Route Project

    March/April 2016

    Approach• Use 7100.41 and Non-Metroplex PBN memorandum of

    understanding (MOU) for processing– Rapid processing and publication– Environmental considerations

    • Leverage expertise, designs, and analyses from applicable efforts– Metroplex– Other relevant PBN designs

    • Coordinate with adjacent Atlantic Coast Air Route Traffic Control Centers (ARTCCs) to link routes across facilities

    • Co-facilitation by FAA/National Air Traffic Controllers Association (NATCA) leads– Work closely with Metroplex efforts and facilities

  • 10Federal AviationAdministrationAtlantic Coast Route Project

    March/April 2016

    Jet Route Removal

    AJV-14 Submits Project to ESC

    Draft TimelineATLANTIC COAST ROUTE PROJECT

    2015 2016 2017

    Usage Analysis

    Northern Q Route Design Meetings with

    Facilities and Stakeholders

    Publication and Initial Use

    Environmental considerations, Rulemaking,

    Route Processing

    Initial Meetings and Concepts,

    BAR

    Preliminary ActivitiesDevelopmentOperational PreparationImplementationPost Implementation Monitoring

    Southern High Route Florida Metroplex

    Design Completion